8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
1/31
HUAWEI TECHNOLOGIES CO.,LTD.UMTS Project
OFB Hardware
Installation
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
2/31
O F B H A R D W A R E I N S T A L L A T I O N
1111
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
3/31
O F B H A R D W A R E I N S T A L L A T I O N
External Structure of the OFB
1
23 4
5
(1) Heat exchanger (2) OFB housing (3) Foot(4) External groundingbar
(5) Mounting ear
PGND cable shouldnot be longer than
15m. Cross sectionalarea should be
25mm2
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
4/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 3 333
Internal Structure of the OFB
1 2 3 4 5 6
7
(1) DC input wiring terminal (for heat
exchanger)
(2) Door control sensor
(3) Fiber coiler (4) Cable holes(5) Internal grounding bar (6) Mounting bar(7) Guide rail
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
5/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 4 444
Install OFB on the Wall
Install OFB on the Metal Pole
Position the
Anchor point
Install the
ExpansionboltMounting the ear Install the OFB on the wall
66
Mounting the pole Mounting the house on the metal
Important: When the OFB is installed with a sun shield , the space above the top of
the OFB must be at least 80cm (Floor to OFB bottom)
The Conduit pipe has to be at least 20 cm below the OFB bottom ( CPRIand RRU DC Cable)
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
6/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 5 555
1. UNPACKING THE OFB
The following photos show the accessories that come with the OFB s Box:
Fig. 1.1. OFB box from warehouse Fig. 1.2. OFB inside of box fromWarehouse
Fig. 1.3 . OFB box from warehouse Fig. 1.4 . Material inside of OFB
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
7/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 6 666
Fig. 1.5. Material for OFB installation Fig. 1.6 . Material inside of OFB
Fig. 1.7. Material for OFB installation Fig. 1.8. Material for OFB installation
Fig. 1. 9 Nuts for equipment installation Fig. 1.10 Captive screw for equipment
Stainless Press Explode.Depend on the
characteristics of the
wall, we should replacethis for another one that
comes with the RRU
Mounting EarSeal
MountingEar
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
8/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 7 777
Fig. 1.11. OFB rear view Fig. 1.12. OFB rear view earsmounted
Fig. 1.13. DPD32-1-6
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
9/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 8 888
2.-INTERNAL INSPECTION
For this initial inspection we will check that the OFB does not have any damage , also
if the whole cabinet comes with the internal cabling.
3. SPACE DISTRIBUTION OF THE OFBThe figure 3.1 shows the space assignation
PGND Bar
DC PowerCable for
HeatExchanger
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
10/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 9 999
3.1. Installation of the Units inside the OFB according the spacedistribution of the OFBThe installation of the units in the OFB, proceed as follows:
First : Determine the position for installing the unit , for example the BBU3806 ,as shown in the figure 3.2
Position for installing the BBU3806
1
Figure 3.2(1) A space of 1U
6.-Free forwork s ace
6.-Space forothers customerequipments.
5.- DPD
3.- BBU
Figure 3.1. OFB front view - Space assignation for internal equipment.
1.- SPBC
2.- Free
9. Optionalposition forBreaker Rail
Blank panel
Blank panel
Blank panel
Blank panel
RIEL GUIDE
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
11/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 10 101010
Second: Remove the four screws M6 x 12 from the guide rails and placed them inthe determined position, the riel guide will support the BBU 3806
Third : Push the BBU3806 gently into its position and fasten it with the screws M6x 12.Figure 3.3
The rest of the units will follow the same steps for its installation .
Figure 3.3 OFB front view space assignation for internal equipment.
1.- FREE or SPBC One 01 UR free or SPBC space.
2.- BBU SPACE This space will be assigned for the first BBU.
3.- SECOND BBU SPACE RESERVED This space will be assigned for the secondBBU and during the installation this spaceshould be free.
4.- DPD SPACE This space will be assigned for the DPD.
5.- CUSTOMER EQUIPMENT For other customer equipment.
6.- FREE SPACE FOR O&M This space will be free.
9. FREE SPACE FOR BREAKER RIEL This space will be placed by the breaker rielwhen Its is necessary .
RU for SPBC
RU for DPD
RU for BBU
RU for Exp BBU
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
12/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 11 111111
4. CONNECTION POINTS FOR -48VDC RRU AND BBUCABLESThis point shows where we will connect the RRU s power cables to the DPD32-1-6.
Fig. 4.1. Points connection for RRUs and BBU
LOAD1 This will be used for BBU0
LOAD2 This will be used for BBU1 ( Expansion)LOAD3 This will be used for Heat Exchanger
LOAD4 This will be used for RRU0
LOAD5 This will be used for RRU1
LOAD6 This will be used for RRU2
The fig. 4.1. and 4.2. shows the points connection for the LOADS and we will use themas follow::
Power BBU1SW1
Power RRU1SW5
Power RRU0SW4
Power BBU ExpSW2
Power HeatExchanger
SW3
Power RRU2SW6
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
13/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 12 121212
Fig 4.2 Cabling of RRUs and BBUs.
5. CABLING AND INTERNAL LAYOUT
5.1. E1 cables and Optical fiber
Fig. 5.1.1 Route for E1 cable and Optical Fiber.
The figure 5.1 shows the route of the E1 cables and the Optical Fiber and the rule for this lay outis as follow:
E1 cable: We will use the hole marked as Spare 1 to pass through the two E1 cables to the BBU0.
The layout ofboth Cables ison the left side
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
14/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 13 131313
Optical Fiber: We will use the hole marked as F.O. 3 to 5 to pass the 3 Optical fiber.
The Optical fiber and the E1 cable will be installed on the left side of the BBU and I will beseparated each other as the fig 5.1.1 shows.
5.2 . Transmission cables
For the E1s we will use the SPBC box as Lightning protection .The next figure shows the SPBCpanel.
SPBC E1/T1 LIGHTNING PROTECTION BOXSPBC E1/T1 LIGHTNING PROTECTION BOX FRONT VIEW.
SPBC E1/T1 CROSS CONNECTIONS POINTS
SPBC E1/T1 INSIDE OF APM100
Fig 5.2 .1SPBC E1/T1 Lightning Protection Box.
The use of the SPBC is recommended when the distance between the BBU and theTransmission equipment is more than 5m. as the fig 5.2.2 shows.
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
15/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 14 141414
Fig 5.2.2 SPBC E1/T1 Lightning Protection Box.
The fig 5.2.3 shows the connection and lay out of the E1s cable inside of OFB.
Fig 5.2.3 SPBC E1/T1 Lightning Protection Box.
Distance : A-B. 1.5 m
Labeling of the Transmission Cable
See : Annex 1_E1 labeling
OFB outdoor cabinet
04046800:SFYZ75-1-1
E1 cable 10mTRANNS. EQUIP.
Outdoor cable length more than5 m
SMB coaxial SMB coaxial connector
E1 cable
FIU-FXC-ALCATEL-SIEMENS
BBU3806
E1 Lightning Protection Box RX toRX
RX toRX
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
16/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 15 151515
5.3. BBU Alarm Cable and BBU power cable.
Fig 5.3 shows the cabling route for BBU -48VDC and the Alarm cable.
Fig. 5.3. 1Route for BBU -48VDC and Alarm cable.
The two cables will be route by the right side as the fig. 5.2.1 and 5.3 .1 show, but separatedeach one.
Figure 5.3.2
BBU Alarm
Cable
BBU Power Cable
Both CablesSeparately bound
NOTE: We should use nyloncables tie in order to tie thecables to the riel
Alarm
Cable
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
17/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 16 161616
Fig. 5.3. 3 Route for BBU -48VDC and Alarm cable.
5.4. -48VDC RRU CABLES AND GROUND CABLES
The Fig. 5.4.1 Show s the route for RRU -48VDC and Grounding cables
.
Fig. 5.4.1 Route for RRU -48VDC and Ground cables.
BBU Alarm cable
Grounding cable
Power Cable
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
18/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 17 171717
For the RRU -48 VDC cables we will use the hole marked as DC LOAD 0 and we will use a 1adaptor for 1 pipe.The cables will be routed from the back to the front using the right side as the fig. 5.4 shows.
For the Grounding Bar the holes distribution will be as the following :
Fig. 5.9 Physical distribution of grounding bar holes.
5.5 . -48VDC INPUT CABLES
PGND OF DPD
PGND OF BBU0
PGND OF RRU0
PGND OF RRU1
PGND OF RRU2
PGND OF HEAT EX.
PGND OF SPBC
PGND ofthe RRUs
PGND ofthe BBU
PGND ofthe DPD
PGNDfor theHeat
Exchanger
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
19/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 18 181818
Fig. 5.5.1 Route for -48VDC INPUT Cables.
The -48VDC INPUT cables will be routed by the left side and we will use the hole marked as DCIN 0. To do that we will use a 1 terminator for 1 flexible pipe. As the fig 5.5.1 shows.
Note: We can use the cable BLACK and BLUE cable from china if the distance betweenthe OFB and the POWER SOURCE equipment is less than 18 m.
5.6. . ALARM CABLESThe alarm cable or the BBU is an R J45 connector which has three cablepairs, and each pair is connected as the pictures show.
.
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
20/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 19 191919
Fig. 5.6.1. Alarm cable for DPD. Fig. 5.6.2 Alarm cable for door
Fig 5.6.3.Alarm cable for Heath exchanger
Fig 5.6.4 Structure of OFB alarm connector
After the commissioning all the alarms should be tested one by one .
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
21/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 20 202020
6. USED HOLES OF THE OFB
Fig. 6.1 Used holes of OFB.
SPARE 0 : We will use a 1 terminator and 1 flexible pipe to pass the -48VDC Cables.SPARE 1 : We will use a 1 terminator and 1 flexible pipe to pass the E1 Cable.
Fig 6.2. Connection to 1 pipeA: Connector -tube pipe-connector -adapter to 1
B: Adapter to 1
DC LOAD 1 to 3: We will use a 1terminator and 1 flexible pipe to pass 3 -48VDC RRU cables.NOTE: IN SOME CASES IT COULD BE CHANGED ACCORDING TO RRUS LOCATION.
F.O.3 to 5 : We will use a 1 terminator and 1 flexible pipe to pass the 3 Optical Fiber. NOTE: IN SOME CASES IT COULD BE CHANGED ACCORDING TO THE RRUS LOCATION.
7. INSTALLATION SCENARIOS
B
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
22/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 21 212121
OFB ON THE WALL
When the OFB need to be installed on the wall, we will consider the following
-RRUS in the same position:
E1
OFB DC
CPRI
RRU DCRRU DC
RRURRURRU
On tower
OFB
Ladder
Wall
Fig. 7.1 RRUs installed in the same tower.
.With this scenario the RRUs are in the same tower or in the same pole and we can run 3-48vdccables inside of 2 pipes 1 and the 3 fiber cables inside of a pipe 1:
We will use the distribution if the RRU are located in different positions .
-RRUS Distributed in different position:
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
23/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 22 222222
Fig. 7.2 RRUs installed in different position. The figure 7.2 show the installation way when the RRUs are installed in different position.
We will use the boxes to distribute the optical and the power cables from the OFB to the RRU,and inside the boxes we can run the cables to different directions as the fig 7.3 shows.
Fig. 7.3 Internal cable distribution
OFB ON POLE
The fig. 7.4 shows the OFB mounted on pole .
To two RRUs
To One RRUs
OFB
1 PIPES
RRU ONTOWER
Horizontalladder
F.O -48VDC
OFB
WALL
RRU ON POLE RRU ON THEWALL
-48VDC INPUTE1
1 PIPES
SPACE ASSIGNED FORFUTURE APPLICATION
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
24/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 23 232323
Fig. 7.4 Pipes of OFB.
The Fig. 7.4 show that the pipes are mixed and to fix that we should use and additional metallicladder as the fig 7.5 shows
Fig. 7.5 OFB mounted on pole
OFB
F.O DCESPACIO PARA FUTURATUBERIA DE FIBRA
ESPACIO PARA FUTURATUBERIA DE DC
POLE
Is necessary to use an additionalmetallic ladder to fix the pipesand boxes
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
25/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 24 242424
8. PICTURES OF OFB INSTALLATION
E1 and OFB DC connection
Fig. 8.2 OFB and RRU mounted on the wall
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
26/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 25 252525
Fig. 8.3 OFB Installing the power and E1 cables
Fig. 8.4 Ground for OFB
Fig 8.5 Optical Fiber excess in the OFB
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
27/31
OFB HARDWARE INSTALLATION
(11/7/2007) Huawei Technologies Co., Ltd 26 262626
Annexes
Annex 1 . E1 labeling Annex 2 . RRU power cable in ODF
Annex 3. Cabling position
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
28/31
1 2 3 4 5 6 7
OFB
a e ng
CUSTOMER
4
41
3
1 2
Annex1. E1 Labeling
3
2
BBU 0SPBC - RX0
BBU 0SPBC - TX0
BBU
SPBC
SPBC - TX0 IU1-1 - RX1
SPBC - RX0 IU1-1 - TX1
SPBC - RX0 IU1-1 - TX1
SPBC - RX0 IU1-1 - TX1
SPBC - RX0 IU1-1 - TX1
IU X-Y IU: Transmission Indoor unitX: Transmission Rack unit
1 to 4 GSM cabinet 5 to Z -Another cabinet (E
Y: Port number
BBU 0SPBC - RX1
Huawei Technologies Co.,Ltd. Confidential 10/31/2007
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
29/31
Page 1 10/31/2007
Annex 2. RRU power cable in ODF
Preparing the Power Cable of RRU
Step 1Step 2
Step 3 Step 4
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
30/31
Page 2 10/31/2007
Step 5 Step 6
Step 7 Step 8
8/14/2019 Ofbinstall v1.0.5.Rev Nov 07
31/31
Annex 3. Cabling position ( 7-11-07)
NOT AVAILABLE
TRANSMISION HUAWEI
TRANSMISIONNOT AVAILABLE
NOT AVAILABLEDC - 1 ATERRAMIENTO
NOT AVAILABLE
Position asigned by Claro
LATERAL EDGE ELTEK RECTIFIER
EXTRATALK II RECTIFIER ( Alternative I)
EXTRATALK II RECTIFIER (Alternative II)
EXTRATALK II RECTIFIER (Alternative III)
DC CABLE RRU/DC OFB
NOT AVAILABLE
FIBER CABLE RRU /E1
NOT AVAILABE
NOT AVAILABLEFIBER CABLE
RRU
E1
BACK BTS GSM
DC CABLE RRU/OFB
FIBERCABLE
RRUTRASMISION E1
NOT AVAILABLE
DC OFB
DC Cable /DC OFB
RX TX RX TX RX TX
A
D
MW
GN
SECTOR 3 SECTOR 2 SECTOR 1
ALARMAS
G AC FO E1 DC
G FO B A D E1 DC
ALAR
G FO B A D FO DC
G FO B A D DC DC
G AC FO D DC