ODOT DISTRICT 1 2019 CONSTRUCTION PROGRAM
MIKE DEWINE, GOVERNOR | JACK MARCHBANKS, PH.D., ODOT DIRECTOR | CHRIS HUGHES, P.E., ACTING DISTRICT DEPUTY DIRECTOR
SERVING ALLEN, DEFIANCE, HANCOCK, HARDIN, PAULDING, PUTNAM, VAN WERT AND WYANDOT COUNTIES
ODOT District 1 Construction Contacts Chris Hughes Acting District Deputy Director 419-999-6804 [email protected]
Chris Hughes Acting Capital Programs Administrator 419-999-6804 [email protected]
Rhonda Pees Public Information Officer 419-999-6803 [email protected]
Scott Mullins District Construction Engineer 419-999-6903 [email protected]
Luke Johansen Area Construction Engineer 419-999-6956 [email protected]
Bashar Kanouh Area Construction Engineer 419-999-7027 [email protected]
COUNTYNO. OF
PROJECTSESTIMATED COST
NO. OF
PROJECTSESTIMATED COST
NO. OF
PROJECTSESTIMATED COST
DISTRICT WIDE 5 $3,606,523 0 $0 5 $3,606,523
ALLEN 7 $14,388,647 3 $1,453,495 10 $15,842,142
DEFIANCE 1 $8,313,662 0 $0 1 $8,313,662
HANCOCK 4 $3,328,520 2 $2,073,766 6 $5,402,286
HARDIN 3 $3,462,908 0 $0 3 $3,462,908
PAULDING 0 $0 0 $0 0 $0
PUTNAM 1 $2,199,476 1 $1,650,328 2 $3,849,804
VAN WERT 3 $3,784,607 1 $698,244 4 $4,482,851
WYANDOT 4 $7,486,263 0 $0 4 $7,486,263
TOTALS 28 $46,570,606 7 $5,875,833 35 $52,446,439
MILES
RESURFACED /
REPAIRED
---
---
---
115.25
6.85
9.45
DISTRICT ONE STATS (ODOT PROJECTS)
COSTNO. OF PROJECTSPROJECT TYPE
BRIDGE MAINTENANCE &
REPLACEMENT
ODOT PROJECTS LOCAL GOV’T. PROJECTS GRAND TOTALS
DISTRICT ONE SUMMARYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2019
ODOT AND LOCAL GOVERNMENT PROJECTS
OTHER
RECONSTRUCTION
RESURFACE
PAVEMENT MARKINGS
CULVERTS
$10,607,471
6 $5,355,186
Sold in 2017
$26,819,875
$1,848,169
5
3
9
1
2 $1,939,905
2
County-Route-
SectionDescription Location
Length
(Miles)
96616 D01-BM-FY18
Perform miscellaneous bridge
maintenance activities on various
structures. Traffic will be maintained at
most locations. Some short term
detours may be necessary.
Various locationss throughout
District OneSpot 3/22/2018
Spring 2018 to
Spring 2019Sold in 2018
96625 D01-PM-FY19
Upgrade existing painted pavement
markings on rural state highway routes.
Traffic will be maintained.
Various routes and sections
throughout District OneVarious SOLD
Spring/Summer/
Fall 2019$1,684,618
103425 D01-HS-FY19
On-Road and guardrail herbicidal
spraying for 4-lane and 2-lane sections
in the district. Traffic will be
maintained.
Various routes and sections
throughout District OneVarious SOLD
Spring/Summer/
Fall 2019$191,693
105653 D01-GR-FY19District wide guardrail repair / upgrade
project. Traffic will be maintained.
Various locations in Defiance,
Van Wert, and Wyandot
counties.
Various SOLD Summer 2019 $1,474,925
98534 D01-RPM-FY20
Replace raised pavement marker casting
and/or lenses as needed on various
routes. Traffic will be maintained.
Various routes and sections
throughout District OneVarious 6/20/2019 Fall 2019 $255,287
$3,606,523DISTRICT WIDE TOTAL
DISTRICT WIDE PROJECTS (No Map)
CONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2019
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
3
County-Route-
SectionDescription Location
Length
(Miles)
93756 ALL-103-1.52Replace bridge over Riley Creek in the Village of
Bluffton. Traffic will be detoured.
Approximately 0.2 miles east of Main
Street in the Village of BlufftonSpot SOLD Spring/Summer 2019 $825,401
94206 ALL-75-9.85
Resurface with asphalt concrete. Repair
pavement joints and replace guardrail. Bridge
repair included. Traffic will be maintained.
Temporary lane closures will be required.
From the Strewart Road overpass to the
interchange ramps at Napoleon Road.5.95 SOLD Spring/Summer 2019 $5,688,484
105524ALL-65/117/309-
5.09/19.13/15.98
Resurface with asphalt concrete. Also, on SR 117,
replace curb and gutter and drainage structures.
Traffic will be maintained.
SR 65: From Fourth St. to Elm St.
SR 117: From just east of Greely Chapel to
Bowman Rd.
SR 309: From Devonshire Dr. to the Hardin
county line.
11.53 SOLD Spring/Summer 2019 $4,120,321
102197 ALL-66-Culverts Replace 8 culverts. Traffic will be detoured.Between the Auglaize county line and the
Village of SpencervilleSpot SOLD Spring/Summer 2019 $694,018
98471ALL/HAN-30/235-
1.50/7.20
Resurface SR 103 in Allen County and SR 235 in
Hancock County with asphalt concrete. Traffic
will be maintained.
SR 103: From Main St. to Huber St. in the
Village of Bluffton.0.29 4/4/2019 Summer 2019
See Hancock
County
107684ALL/AUG-30/117-
Various
Resurface US 30 and SR 117 in Allen County. Add
centerline rumble strips on SR 117 in Allen and
Auglaize counties. Traffic will be maintained.
US 30: Pave approx. 1,400 feet of the
outside shoulder, beginning at the
westbound enterence ramp from SR 696.
SR 117 (Allen): From Bowman Rd. to the
Auglaize county line, excluding the Village
of Westminster
SR 117 (Auglaize): From the Allen county
line to the Hardin county line
8.10 6/20/2019 Summer 2019 $2,001,223
105714ALL/HAN-75/30/696-
Various
Erosion repair project on roadway embankments
in Allen and Hancock counties. Traffice will be
maintained.
At various locations along IR 75, US 30 and
SR 696 in Allen County and along IR 75 in
Hancock County.
Spot 6/20/2019 Summer 2019 $1,059,200
$14,388,647ALLEN COUNTY-ODOT LET TOTAL
ALLEN COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2019
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
4
County-Route-
SectionDescription Location
Length
(Miles)
80441All- Lima RR Grade
Separation
Construct a railroad grade separation of the
Indiana & Ohio railway at Elm Street.
Reconstruct 0.70 miles of pavement along Elm St.
and construct a roundabout at it's intersection of
with Bellefontaine Avenue. Construct a storm
sewer system outletting to the Ottawa River.
On Elm Street from North St. to
Belfontaine AvenueSpot SOLD
Spring 2018 to
Fall 2019Sold in 2018
103412
ALL-Delphos-
1st/3rd/7th St.
Bridges
Replace 2 bridges over Flat Fork Creek in the City
of Delphos. Traffic will be detoured.
On 1st, 3rd and 7th Streets over
Flat Fork Creek in the City of
Delphos.
Spot SOLDSpring / Summer
2019$1,159,893
104252ALL-CR 77-5.50
Grubb Rd
Replace bridge over a tributary of Honey Run.
Traffic will be detoured.
Approximately 1 mile north of SR
81Spot SOLD
Spring / Summer
2019$293,602
$1,453,495
$15,842,142TOTAL ESTIMATED COST FOR ALLEN COUNTY:
(Continued)
ALLEN COUNTY
ALLEN COUNTY-LOCAL GOVERNMENTS TOTAL
CITY OF LIMA
ALLEN COUNTY ENGINEER
Local Governments
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
CITY OF DELPHOS
5
ELIDA
SPENCERVILLE
BEAVERDAMCAIRO
HARROD
LAFAYETTE
LIMA
DELPHOS
BLUFFTON
75
7530
3030
696
117
501
196
198
81
117
65
65
66
117
309 115
12
81
103
66
309
104252
105714
105524
105714
94206
94206
105524 107684
105524
103412
102197 105714
107684
107684
9375698471
80441
M
ap Pr
oduc
ed by
Cod
y Lap
e
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects
64/3/2019
Allen County 2019 Construction Projects
PID Name PID Name80441 ALL Lima RR Grade Separation 103412 ALL Delphos 1st/3rd/7th St Brdgs93756 ALL SR 103 1.52 104252 ALL CR 77 5.50 Grubb Road94206 ALL IR 75 9.85 105524 ALL SR 65/117/309 5.09/19.1398471 ALL/HAN SR 103/235 1.50/7.20 105714 ALL/HAN IR75/US30/SR696 3.99102197 ALL SR 66 Culverts 107684 ALL/AUG US 30/SR 117 Var
County-Route-
SectionDescription Location
Length
(Miles)
96605 DEF-15-14.77Replace Clinton Street (SR15/18/66) bridge over the
Maumee River. Traffic will be detoured.
Approximately 0.2 miles north of
Second Street in the City of DefianceSpot SOLD
Spring/Summer/Fall
2019$8,313,662
$8,313,662
County-Route-
SectionDescription Location
Length
(Miles)
$0DEFIANCE COUNTY-LOCAL GOVERNMENTS TOTAL
TOTAL ESTIMATED COST FOR DEFIANCE COUNTY: $8,313,662
Local Governments
PID No.
Project
Sale Date Approximate Duration Estimated Cost
DEFIANCE COUNTY-ODOT LET TOTAL
DEFIANCE COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2019
ODOT Projects
PID No.
Project
Sale Date Approximate Duration Estimated Cost
7
SHERWOOD
NEY
HICKSVILLEDEFIANCE
127
127
24
24
18
66
49
249
281
2
2
249
2
18
15
111
15
15
49
18
1896605
M
ap Pr
oduc
ed by
Cod
y Lap
e
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects
84/3/2019
Defiance County 2019 Construction Projects
PID Name96605 DEF SR 15 14.77
County-Route-
SectionDescription Location
Length
(Miles)
87005 HAN-75-14.39
Major reconstruction and widening of IR 75 through the
City of Findlay. Reconstruct the IR 75/US 68 system
interchange and replace all mainline structures. Traffic will
be maintained during construction.
On IR 75 from approximately 0.8 miles
south of the US68 interchange to just
south of the CR 99 interchange
6.85 SOLDSpring 2017 -
Summer 2020Sold in 2017
107177 HAN-103-8.03Replace and widen paved shoulders. Through traffic will be
detoured and local traffic will be maintained.
From SR 698 to the west corp limit of the
Village of Arlington3.36 SOLD
Spring / Summer
2019$1,120,005
98471ALL/HAN-30/235-
1.50/7.20
Resurface SR 103 in Allen County and SR 235 in Hancock
County with asphalt concrete. Traffic will be maintained.
SR 235: From CR 313 to the Wood county
line, excluding the overlaps with SR 12
and SR 186.
15.37 4/4/2019 Summer 2019 $2,208,515
105714ALL/HAN-
75/30/696-Various
Erosion repair project on roadway embankments in Allen
and Hancock counties. Traffice will be maintained.
At various locations along IR 75, US 30
and SR 696 in Allen County and along IR
75 in Hancock County.
Spot 6/20/2019 Summer 2019 See Allen County
$3,328,520
County-Route-
SectionDescription Location
Length
(Miles)
99210HAN-CR 304/330-
12.00/4.72
Resurface CR 304 and CR 330 with asphalt concrete. Traffic
will be maintained.
CR 304: From US 68 to the Wyandot
county line
CR 330: From US 224 to SR 12
10.94 SOLD Spring/ Summer 2019 $1,552,945
100185HAN-Resurfacing-
FY2019
Resurface parts of Industrial Dr. and Production Dr. with
asphalt concrete and replace some curbs. Traffic will be
maintained.
Industrial Drive: From Bright Rd. to the
dead end
Production Drive: From Bright Rd. to
Industrial Drive
1.31 SOLD Spring/ Summer 2019 $520,821
$2,073,766
Hancock County Engineer
City of Findlay
HANCOCK COUNTY-LOCAL GOVERNMENTS TOTAL
TOTAL ESTIMATED COST FOR HANCOCK COUNTY: $5,402,286
Local Governments
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
HANCOCK COUNTY-ODOT LET TOTAL
HANCOCK COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2019
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
9
ARLINGTON
ARCADIA
RAWSON VANLUE
JENERA
MOUNTCORY
BENTON RIDGE
MOUNT BLANCHARD
VAN BUREN
FINDLAY
FOSTORIA
BLUFFTON
MCCOMB
75
75
30
68
224224
30
68
568
37
698
15
186
330
613
103
18
37
103
235
12
235
103
12
235
235
37
613
18
12
613
9847187005
99210
107177
8700599210
98471
98471
87005
105714
100185
Map
Prod
uced
by C
ody L
ape
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects
104/1/2019
Hancock County 2019 Construction Projects
PID Name87005 HAN-75-14.3998471 ALL/HAN SR 103/235 1.50/7.2099210 HAN CR 304/330 12.00/4.72
100185 HAN Findlay FY2019 Resurfacing105714 ALL/HAN IR75/US30/SR696 3.99107177 HAN SR 103 8.03 Widening
County-Route-
SectionDescription Location
Length
(Miles)
96800 HAR-67-10.87
Replace culvert and raise roadway profile,
including the intersection with TR 119, to
improve sight distance. Traffic will be detoured.
Approximately 4.2 miles west of the
City of KentonSpot SOLD
Spring / Summer
2019$528,140
103589HAR-701-
0.10/1.35Replace culverts. Traffic will be detoured.
Approximately 0.1 east of SR 309 and
approx. 0.7 miles east of CR 65.Spot SOLD
Spring/Summer
2019$565,932
105525HAR-81/235/701-
2.25/Various
Resurface with ashalt concrete. Traffic will be
maintained.
SR 81: From the west corp limit to the
east corp limit of Ada.
SR 235: From SR 309 to the north corp
limit of Ada.
SR 701: From SR 309 to US 68.
13.93 SOLDSpring / Summer
2019$2,368,836
$3,462,908
County-Route-
SectionDescription Location
Length
(Miles)
$0
HARDIN COUNTY-ODOT LET TOTAL
HARDIN COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2019
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
TOTAL ESTIMATED COST FOR HARDIN COUNTY: $3,462,908HARDIN COUNTY-LOCAL GOVERNMENTS TOTAL
Local Governments
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
11
FOREST
DUNKIRK
RIDGEWAY
MOUNT VICTORY
ALGER
MCGUFFEY
PATTERSON
KENTON
ADA
68
68
68
67
309
292
235
701
31
385
309
309
195
8181
117
273
117
67
53
235
37
88848
105525
103589
96800
103589105525
Map
Prod
uced
by C
ody L
ape
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects
124/1/2019
Hardin County 2019 Construction Projects
PID Name96800 HAR SR 67 10.87
103589 HAR SR 701 0.10/1.35105525 HAR SR 81/235/701 2.25/15.99/0.0
County-Route-
SectionDescription Location
Length
(Miles)
$0
County-Route-
SectionDescription Location
Length
(Miles)
$0
PAULDING COUNTY-ODOT LET TOTAL
PAULDING COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2019
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
TOTAL ESTIMATED COST FOR PAULDING COUNTY: $0PAULDING COUNTY-LOCAL GOVERNMENTS TOTAL
Local Governments
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
13
County-Route-
SectionDescription Location
Length
(Miles)
98467PUT-224/114-
0.00/2.86
Resurface with asphalt concrete. Traffic
will be maintained.
US 224: From the Van Wert
county line to the bridge just east
of TR25-Q;
US 224: From the east corp limit
of Ottoville to Ralph Street in the
Village of Kalida;
SR 114: From the north corp limit
of Kalida to US 224
12.24 SOLDSpring / Summer
2019$2,199,476
$2,199,476
PID No. Project Sale DateApproximate
DurationEstimated Cost
County-Route-
SectionDescription Location
Length
(Miles)
96835 PUT-CR 19-8.50Replace bridge over the Blanchard River.
Traffic will be detoured.
Approximately 0.9 miles north of
SR 694Spot SOLD
Spring / Summer
2019$1,650,328
$1,650,328
TOTAL ESTIMATED COST FOR PUTNAM COUNTY: $3,849,804
PUTNAM COUNTY-ODOT LET TOTAL
Local Governments
Putnam County Engineer
PUTNAM COUNTY-LOCAL GOVERNMENTS TOTAL
PUTNAM COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2019
ODOT Projects
PID No.
Project
Sale DateApproximate
Duration
Estimated
Cost
14
LEIPSIC
KALIDA
GLANDORF
PANDORA
DUPONT
OTTOVILLE
CONTINENTAL
COLUMBUS GROVE
BELMORE
CLOVERDALE
FORTJENNINGS
MILLER CITY
WEST LEIPSIC
GILBOAOTTAWA224
224
224
224
613
115
694
109
65
12
108
190
634
634
114
634
63465
189
11515
190
66
613
189
613
114
12
15
15 65
696
30
98467
98467
98467
96835
Map
Prod
uced
by C
ody L
ape
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects
154/1/2019
Putnam County 2019 Construction Projects
PID Name96835 PUT CR 19-8.5098467 PUT US 224/SR 114 0.00/2.86
County-Route-
SectionDescription Location
Length
(Miles)
95500 VAN-81-13.65
Replace twin culverts with a new culvert.
Regrade ditch on the north side of the roadway
for 0.60 miles. Install new drainage along 0.77
miles on the south side of the roadway with
new culverts. Traffic will be maintained.
From approximately 0.09 miles west of
to approximately 0.34 miles east of TR
109 (Brown Rd.)
Spot SOLDSpring / Summer
2019$626,011
100378 VAN-697-0.00
Replace and widen paved shoulders. Through
traffic will be detoured and local traffic will be
maintained.
From SR 116 to Jennings-Delphos Rd. 6.09 SOLDSpring / Summer
2019$1,249,363
92692 VAN-116-0.00/2.51Resurface with asphalt concrete. Traffic will be
maintained.
From the Auglaize county line to Middle
Point Rd., excluding the SR 117 overlap17.65 SOLD
Spring / Summer
2019$1,909,233
$3,784,607
County-Route-
SectionDescription Location
Length
(Miles)
CITY OF VAN WERT
101085 VAN-Jefferson StReplace Jefferson Street bridge over Town
Creek. Traffic will be detoured.
In the City of Van Wert, between Main
St. and Crawford St.Spot SOLD
Spring / Summer
2019$698,244
$698,244
TOTAL ESTIMATED COST FOR VAN WERT COUNTY: $4,482,851
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
VAN WERT COUNTY-LOCAL GOVERNMENTS TOTAL
Local Governments
VAN WERT COUNTY-ODOT LET TOTAL
VAN WERT COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2019
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
16
SCOTT
CONVOY
WREN
OHIO CITY
MIDDLE POINT
ELGIN
WILLSHIRE
VENEDOCIA
VAN WERT
DELPHOS
30
33
224
224
127
224
127
81
709
697
116
118
116
116
117
49
49
81
49
118
66
637
30
92692
92692 100378
101085
92692
95500
M
ap Pr
oduc
ed by
Cod
y Lap
e
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects 17
4/3/2019
Van Wert County 2019 Construction Projects
PID Name92692 VAN SR 116 0.00/2.5195500 VAN SR 81 13.65100378 VAN SR 697 0.00101085 VAN Jefferson St
County-Route-
SectionDescription Location
Length
(Miles)
88832 WYA-23-15.89
Resurface with asphalt concrete and
repair paveemnt joints. Includes some
repair on the bridge over the Sandusky
River. Traffic will be maintained.
Temporary lane closures will be
required.
From the US23 / US 30 interchange
to CR 97 near the Village of Carey6.17 SOLD
Spring / Summer
2019$3,236,775
102664 WYA-67-26.80
Replace bridge deck and approach slabs,
repair bridge foundations and paint
steel beams. Traffic will be detoured.
In the Village of Sycamore,
approximately 0.2 miles south of SR
231.
Spot SOLDSpring / Summer
2019$902,476
105526WYA-67/103/231-
25.86/Various
Resurface with asphalt concrete. Traffic
will be maintained.
SR 67: From SR 103 to the north
corp limit of Sycamore
SR 103: From SR 199 in Carey to the
Seneca county line, excluding the SR
53 overlap section.
SR 231: From CR 330 to the Seneca
county line.
24.02 SOLDSpring / Summer
2019$3,087,012
108861 WYA-23-12.80
Eliminate the intersection of US 23 with
CR 50 in Wyandot County. Traffic on US
23 will be maintained.
CR 50 intersection with US 23 SPOT 8/8/2019 Fall 2019 $260,000
$7,486,263
County-Route-
SectionDescription Location
Length
(Miles)
$0WYANDOT COUNTY-LOCAL GOVERNMENTS TOTAL
TOTAL ESTIMATED COST FOR WYANDOT COUNTY: $7,486,263
Local Governments
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
WYANDOT COUNTY-ODOT LET TOTAL
WYANDOT COUNTYCONTRACT PROJECTS TO BE UNDER CONSTRUCTION
DURING CALENDAR YEAR 2019
ODOT Projects
PID No.
Project
Sale DateApproximate
DurationEstimated Cost
18
HARPSTER
NEVADA
WHARTON
SYCAMORE
KIRBY
MARSEILLES
UPPER SANDUSKY
CAREY
FOREST
23
30
23
23
30
231
294
53
103
199
293
231
103
67
53
15
568
231
231
53
67
67
37
67
53
103
294
105526
88832
108861
88832
105526105526
105526
102664
Map
Prod
uced
by C
ody L
ape
Ohio Department of TransportationDistrict One - Lima
Office of Capital Program1885 N. McCullough
Lima, Ohio 45801
LegendSpotBridge ReplacementBridge Rehab
Local Sponsored ProjectsODOT Sponsored Projects
194/1/2019
Wyandot County 2019 Construction Projects
PID Name88832 WYA US 23 15.89