Upload
anna-atkinson
View
220
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Â
Citation preview
WELCOME The Od Group is London’s leading fit-out and refurbishment company in commercial, residential and leisure.
We provide the very best specialist construction skills from project initiation to completion, and we can cope with any scale project including new builds.
We’re experts in organising people and materials within tight timescales.
Jon Kearney has put together a dedicated team with over 50 years’ collective experience as London and the South East’s leading high-quality contractor
Within this document you will find a selection of our recently completed projects
182 8 10 12 14 164 60
(Turnover £m April-April)
2011/2012
20 2422 26
2012/2013
Secured2013/2014 (Projected)
(Turnover £m April-April)
OD Solutions
Secured
Secured OD Interiors
OD Projects
2013/2014 (Projected)
2 8 10 12 144 60
OD GROUP TURNOVER
Secured
Secured2014/2015 (Projected)
TURNOVER
• ODProjectsclientlistincludesArsenalFC,ScottBrownrigg,AYH,andPrice&Myers.
• RecruitmentofCommercialDirector(ManagingSurveyoroftopfit out company)
• RecruitmentofConstructionDirector(BCO&FXQualityAwardWinner)
• AIBframeworkcontractor.
• ODProjectscurrentlyemploy25staff.
• AchieveBritishCouncilforofficescorporatememberstatus.
• Sign5yearleaseandfitoutMoorgateHQ.
• JonKearneyfinalistforG4_NewGenerationAwards–EntrepreneurshipAward.
• RollsRoyceFrameworkcontractor
• GreenAppleAwardforDigitasSaatchi&Saatchi
• InstututeofCharteredAccountants
Frameworkcontractor
• AwardedVogue/CondenastHQfitout
• Educationsectorexpansionwithsuccessful fitout projects for PartnershipsForSchoolsandNorthHertsCollege
• Savillsapprovedcontractor
• Highendresidentialteamacknowledged as leading contractor within sector
• AwardedrefurbishmentforRoyalAlbertHall
2004 2005 2006 2007 2008 2009 2010 2011 2012
InJanuaryJon Kearney foundsOD.
• ClientbaseexpandedtoincludeRoyal&SunAlliance,O2,AIB,MorleyFund,andGISInterpublic.
• ConsultantsincludeGensler,Cushman&Wakefield,BarrGazetas,andLeslieClark.
• Royal&SunAllianceapproved contractor status.
• ODcomplete£4million,107Leadenhall,fitout.
• ODachieveISO9001status.
• Forecastrecordturnoverofcirca£20minwithBusinessPlan.
• Officiallaunchofaftercareteam‘ZEROdEFECTS’.
• SuccessfulcompletionoffirstIrishprojectforMarcusEvansHQinDublin.
• NotableprojectwinsforclientssuchasFinchatton,BMBProperty,UnitedContinentalAirlines,SafestayandRoyalLondonAssetManagement.
• Commitmenttosustainability–BREEAM‘Excellent’ achieved on refurbishment of RLAMpropertyinCrawley,LEEDsilvercertificationachievedforHarrisWilliamsfitoutinMayfair,SKAsilvercertificateachievedforParadigmHousinginHighWycombe.
• RebrandofOdwhichdefinesourfocusanddisciplined approach to achieving quality.
• OdappointedonSavillsEstateAgencyofficefitoutframework
• Repeatbusinesslevelsat70%ofturnover and growing
• NotableprojectwinsforDowJones,RoyalLondonAssetManagement,Fendi,NationalAustraliaGroupandBerkeleyGroupMarketingSuites
• Odcompletesitsfirsthotelrefurbishment for launch of exciting new venture for Safestay in London
• Odworkingonover50000sqftofLondons super prime residential projectsinKnightsbridge,Kensington&Hampstead
• OdGroupformed,divisionsfocusedonCommercialFitout,SuperprimeResidentialandCommercialDesign&Build
• ODExpandofficespacetotakeanotherflooratSunStHQ
HISTORY
OD GROUP
OD INTERIORSOD PROJECTS OD SOLUTIONS
Specialising in interior fit out and construction to the professional construction industry.
WorkingcloselywithArchitects,ProjectManagers,QuantitySurveyorsanddirectforend user clients.
CoveringallsectorsincludingCommercial,RetailandLeisure
Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors
SetuptocaterfordirectEndUserclientsrequiring a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od are procurement specialist to take a client from concept to completion under one roof.
OD INTERIORS
Jon KearneyManagingDirector
Steve CherryConstructionDirector
Greg PinchinCommercial Director
Andy TorlotDirector
Jon KearneyDirector
Andrew WrightDirector
Od are preferred contractor on a framework agreement to refurbish and fit out both new and existingLondonandProvincialEstateAgencyPremises.
Theserangeinvaluefrom£150,00to£600,000andare in a variation of premises including traditional high streetlocations,throughtonewbusinessparkofficepremises. The projects are completed under a full designandbuildJCTContractdirectwithSavills.
Projectstodateinclude:
• SavillsBeaconsfield
• SavillsHarpenden
• SavillsIslington
• SavillsNorthcoteRoad
• SavillsBrookGreen
SAVILLS ESTATE AGENTFRAMEWORK–VARIOUSLOCATIONS
DOW JONESGRAYSINNROAD,LONDON
Refurbishmentofofficefloorwhilstthebuildingremainedinfulloccupation,worksincluded: › Procurement: Design&Build › Architect: Edge › QuantitySurveyor: Arcadis › ServicesConsultant: Arcadis › Duration: 12weeks › Value: £1m › Size: 30,000sqft
• Stripout• Installationofnewelectrical&mechanicalservices• Glasspartitions• FitOutofnewtoilets• TeaPoints
• Highspecificationrestaurant• Floorcoverings
PROJECT PHANTOMKINGSTREET,LONDON
› Architect: MCM › ProjectManager: Savills › QuantitySurveyor: Confidential › Value Confidential › Size: 8,000sqft
FullDesign&BuildCATBfitoutoflevels5&6,23KingStreet,London.
Theworkscomprised:
CLIENTFACINGFRONTOFHOUSE:• HighspecificationMeetingrooms• Lime-washedoakfloor•Whitemarblecladding• PresentationSuiteswithfullAudioVisualcapacity
BACKOFHOUSE:• MainBoardDirectorsExecutiveSuite• Centralfocalhubcladinablacklacqueredfinish
with inset joinery • Administrationsupportarea• Generalworkingofficeandancillaryareas
› Client: RoyalLondonMutualInsurance › Location: GracechurchStreet,London › Size: 9,000sqft › Value: Confidential › Completion: December2013
ROYAL LONDON MUTUAL INSURANCEGRACECHURCHSTREET
Clientfacingfrontofhouse:• Meetingrooms• Lounges• CateringFacilities• PresentationSuiteswithfullAudioVisualCapacity
BackofHouse:• MainBoardDirectorsexecutiveSuite• Administrationsupportarea• Generalworkingofficeandancillaryareas
FullDesign&BuildoftheirUKHeadQuarters.
WorksInclude:
› Architect: MCM › ProjectManager: Savills › Duration: 13weeks › Size: 10,000sqft › Value: £1,200,000
Thedesignandfitoutofahighqualityofficeenvironmentcommensuratewith a Legal institution of this calibre
SCHULTE ROTH & ZABEL LLPONEEAGLEPLACE,LONDON
Worksinclude:• Lime-washedoakfloors• Double-glazedfrontedoffices• High-specmodernfinishes• Polishedplasterwalls
• Verticaltimbershutters• Noise-cancellingpanels
HARRIS WILLIAMSLEVEL2,63BROOKSTREET,MAYFAIR,W1
› ProjectManager: Gensler › Architect: Gensler › Duration: 14weeks › Size: 10,000sqft › Value: £535,000
CATBfitoutofthefirstfloornewlyrefurbishedoccupiedbuildingtoprovideahighqualityoffice.
Theworkscomprised:
•Highqualitybespokejoinery,
•Mechanical&electricalmodifications,
•DoubleglazedBENEpartitions&doors,
•Handmadecarpetflooring,
•Audiovisualinstallations.
SAPINDALEVEL5,25PARKLANE,W1
› Procurement: Design & Build › Architect Gensler › Project Manager Gensler › Quantity Surveyor Montie › Duration 11 Weeks › Value £600,000 › Size 3000 sq ft
Strip out and new fit out of existing occupied offices in two separate phases. The works undertaken comprised:
• New Cellularized Offices,
• New Meeting and Board rooms,
• High spec stone reception,
• Stone flooring,
• Specialist joinery,
• New Lighting inclusive of feature lighting installed throughout
INSTITUTE OF CHARTERED ACCOUNTANTSMOORGATE,LONDON,EC2
ConsiderablerefurbishmentofGradeIIlistedbuildingincludingCatBfitoutwhilstthebuildingremainedinfulloccupation
Worksincluded:
› Architect: PringleBrandon › QuantitySurveyor: Sense › ProjectManager: JonesLangLaSalle › Duration: 18weeks › FinishDate: September2010 › Value: £1m › Size: 8,000sqft
• Stripout/demolition;• Installationofnewfloorslablinkinglibrary&memberslounge;
• Removalofstructuralwalls&installationofsteelsupportwork;
• Installationofnewelectrical&mechanicalservices&DDAlift;
• Relocationandnewcentralplantserving3buildings• Newpartitions;• Fitoutofnewtoilets;• Constructionofanewmezzaninefloor.
› QuantitySurveyor: Gleeds › Architect: DEGW › ServicesConsultant: ARUP › ProjectValue £2,000,000 › Duration 21weeks › Size: 60,000sqft
ROLLS ROYCEPRIDEPARK,DERBY
Underthedesignandbuildcontractthefitoutandrefurbishmentoftwofloorsof G-Wing evolved to a negotiated second phase involving a further three floors of similar works comprising, new suspended ceilings, new partition layouts with glazedwalls,airconditioningmodifications,newelectricalinstallations,toiletfitout and specialist joinery.
› Architect: Award › QuantitySurveyor: Ridge&Partners › ServicesConsultant: KUT › Duration: 30weeks
SAFESTAYJOHNSMITHHOUSE,SE17
FullrefurbishmentoftheGradeIIListedJohnSmithHousetoprovidehostelfacilities.
Worksincluded:• Demolition• DrainageWorks• StructuralWorks• RoofWorks• ElectricalandMechanicalServicesInstallation•WindowsandDoors• Plastering
• InternalJoinery• Decoration• HardandSoftLandscaping
› Architect: LifschutzDavidsonSandilands › QuantitySurveyor: Measur › ServicesConsultant: Tasc › Duration: 56weeks
EATON SQUAREBELGRAVIA
The project comprises the design, construction and fitting out to basement, lower ground and uppergroundlevelsofapproximately606m²grossinternalarea.
Worksincluded:•Basementswimmingpoolandleisurefacility•Rearmewsextension•Highlevelresidentialfinishes
•Installationofaccesslifttoallfloors•HighspecAVinstallation•Externalrooftopinsideoutsidefacility
› Architect: OriginateArchitectsLtd › QuantitySurveyor: Vincent&Partners › ServicesConsultant: ChapmanBathurst › StructuralEngineer: MichaelAlexander › Duration: 63weeks › Value: £5,000,000
RUTLAND GARDENKNIGHTSBRIDGE
The demolition of an existing two storey property with this prime location in Knightsbridge, forminga16mdeepbasementtotheentiresite.
• Completedemolition&softstrip• Secantpilingtothesiteboundaries•Acomplicatedtemporarysupportsystem&10mdeepbasementformation,carriedoutasCDP
• Highqualitystonework•Wholehouseventilation,air-conditioning,
i-Light systems audio visual package
› ProjectManager: AYH › Architect: Hamilton › QuantitySurveyor: AYH › ServicesEngineer: AWA › InteriorDesign: KeechGreen › Duration: 48weeks
KENWOOD PLACEHAMPSTEAD
Thefitoutofapenthouseapartmentwith3bedroomsandbathroomscomprising:
Worksincluded:
•Newmechanical&electricalservices•Audiovisual&ITnetworks•Specialistjoinery
•Extensivestonework•Highqualityfinishes.
STAGE 1 – PLANNING FOR QUALITY•ZeroDefectsIntroductionMeeting•DetailedDesignReview•IdentifyQualityRisks•IdentifyWorkZones/Sequencing/Phasing•Sub-contractorTargetProgramme
STAGE 2 – INFORMATION RELEASE•Drawing/InformationReleaseSchedule•SampleSchedule•OffSiteInspectionSchedule
STAGE 3 – SETTING QUALITY STANDARDS•Benchmarking•SampleApproval•KeyInspections•ProtectionRegime
STAGE 4 – REVIEW & QUALITY CONTROL SIGN OFF•Review•Monitoring•Handover
STAGE 5 – SNAGGING & DEFECTS•DefectsProcess•IdentifyingDefects•SiteMarkUps•Sub-ContractorDefectManagement•DefectReporting
STAGE 6 – PROJECT CLOSE OUT•FinalisationPlan•CloseOutProgrammes•DefectReporting•RecordDocument•ClientFamiliarisation
Odoperatesa‘zerodefects’plan.Thisismorecommonlyknownasaqualityplan.Theplaniswrittenatthecommencement of the project and sets out to achieve as high a quality delivery as possible. This is not just inthefinishedproduct,itcoverseverystageoftheprojectincludingmanagementtechniquesasfollows;
CERTIFICATION
Fit‐out Sustainability AssessmentThis is to certify that
Paradigm Housing GroupBuilding A1 Glory Park
High Wycombe Bucks HP10
has achieved the Ska rating of
Silver
Accredited Assessor
Pringle Brandon LLP
On behalf of
Paradigm Housing Group
Project Manager
Savills Commercial Ltd
Architect
Mansfield Monk
Contractor
OD Projects
Building Services Engineer
Capita Symonds
Certificate Reference
Glory Park, High Wycombe
Date
29/06/2010
This certificate has been produced using Ska Rating Offices version 1.0
SUSTAINABLE CREDENTIALS
1SUNSTREETLONDONEC2A2EP