6
Octobre 17 2006 MPI Munich -energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006) -realistic simulation (2007) -background studies, occupancy (2007) -Clustering (blind reconstruction) (2007) -tracking plane in front (2007/08) -digital calorimeter (2007) -crossing angle, magnetic field (2008) Milestones LumiCal simulation

Octobre 17 2006MPI Munich -energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006) -realistic simulation (2007) -background

Embed Size (px)

Citation preview

Page 1: Octobre 17 2006MPI Munich -energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006) -realistic simulation (2007) -background

Octobre 17 2006 MPI Munich

-energy calibration and resolution (end 2006)-Implementaion in LDC/Mokka (end 2006)-realistic simulation (2007)-background studies, occupancy (2007)-Clustering (blind reconstruction) (2007)-tracking plane in front (2007/08)-digital calorimeter (2007)-crossing angle, magnetic field (2008)

Milestones LumiCal simulation

Page 2: Octobre 17 2006MPI Munich -energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006) -realistic simulation (2007) -background

Octobre 17 2006 MPI Munich

Milestones BeamCal simulation

-full simulation of BD algorithms, minimal set of layers (end 2006)-background backscattered in the central detector (2007)-concept fast readout scheme (2007)-test of algoriths for fast feedback (2007)

Page 3: Octobre 17 2006MPI Munich -energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006) -realistic simulation (2007) -background

Octobre 17 2006 MPI Munich

RO Electronics and sensors

-test of amplifier from NCPHEP (2006)-Design and manufacturing for test beam use (2007/08)-test board for phy3, performance studies (2006)-technical design for RO (2007)-Radiation hardness studies (2006/07 ….)-readout-structure on sensor plane signal shape, cross talk, (2007)-Si, GaAs prototype sensors (2006/07)-TAU laboratory (2006/07)-israeli industry for si-sensor design, production (2006/07)

Page 4: Octobre 17 2006MPI Munich -energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006) -realistic simulation (2007) -background

Octobre 17 2006 MPI Munich

Personnel situation

BNL: 0.7 FTE + Postdoc (req)Colorado:Cracow INP:Cracow Univ.:DESY: 2 FTE, 2 Postdocs, 2 Ph.D., 1 Dip.st. part time: electronics engineerJINR:2 part time FTE, 1 Ph.D.NCPHEP: 1 FTE, 1 Ph.D.Prague: 1 Ph.D.TAU: 1 Diploma, 1.5 FTEVINCA: 0.5 Ph.D. 0.5 FTE, Postdoc (req) Yale:

Page 5: Octobre 17 2006MPI Munich -energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006) -realistic simulation (2007) -background

Octobre 17 2006 MPI Munich

Budget(no personnel)

BNL:Colorado:Cracow INP:Cracow Univ.:DESY: 50 – 80 k /yearJINR:NCPHEP: Prague: TAU:VINCA:Yale:

Page 6: Octobre 17 2006MPI Munich -energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006) -realistic simulation (2007) -background

Octobre 17 2006 MPI Munich

Working groups

-Beam Diagnostics (Ch. Grah, Bill)-Simulation BeamCal/LumiCal (Bogdan) -Sensors beam, tests (Wolfgang La.)- Readout electronics (Cracow)- Laser alignment, mechanics (Wojtek)