westonandsampson.com Offices in: MA, CT, NH, VT, NY, PA, MD, NC, SC & FL 55 Walkers Brook Drive, Suite 100, Reading, MA 01867 Tel: 978.532.1900 October 22, 2020 Conservation Commission Town of Holden 1196 Main Street Holden, MA 01520 Attn: Glenda Williamson Re: Notification of Minor Changes (No. 2) NOI Filing New DPW Facility 18 Industrial Drive Dear Commissioners: Regarding the 11/19/2019 Notice of Intent and Order of Conditions issued 1/8/2020 (DEP File #: 183-0665) for the new DPW facility project at 18 Industrial Drive, we are hereby submitting information regarding additional minor changes in the design. The additional minor changes relate to the locations of the buildings and the overall elevation of the site, as well as minor adjustments to the drainage system necessitated by building relocation and the elevation change. The changes do not have any appreciable impact on the design as previously reviewed by the Commission, and they represent a slight improvement with respect to proximity to wetland resource areas. The additional minor changes are summarized as follows: slight shift in location of main facility building and salt storage structure adjusted finish grade of the site minor adjustments to drainage system minor adjustments to Limit of Work associated with above changes These minor design changes are described in more detail below, and they are depicted in the attached plans. Shift in Location of Buildings In order to optimize circulation on the site and minimize excavation, the location of the salt shed was shifted approximately 50 feet to the southeast (away from wetlands). In order to maintain adequate maneuvering space between the salt shed and main DPW facility building, the main DPW facility building was shifted approximately 17 feet to the east. This contributed to increased separation from the wetlands. These location shifts are shown on the attached plan entitled “C-301 Comp – Layout Comparison Plan” which shows the revised building, salt shed and drainage system locations (in black linework) compared with the former locations (in blue linework). Also, based on the current status of the project, the Town anticipates proceeding with constructing the portion of the building identified as “Bid Alt” as shown in the documents as originally submitted. Raised Elevation of the Site In order to decrease export of soil from the project, the finish grade was raised by approximately one foot. This included the main DPW facility building, the salt shed, the fuel island and paved areas (except where they transition to the existing grades at the entrance/exit at Industrial Drive). The landscaped areas near the main building were also raised. However, the elevation of the landscaped areas along Industrial Drive did not change, nor did the elevation of the infiltration swales.

October 22, 2020 - Holden MA

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: October 22, 2020 - Holden MA

westonandsampson.com Offices in: MA, CT, NH, VT, NY, PA, MD, NC, SC & FL

55 Walkers Brook Drive, Suite 100, Reading, MA 01867

Tel: 978.532.1900

October 22, 2020

Conservation Commission

Town of Holden

1196 Main Street

Holden, MA 01520

Attn: Glenda Williamson

Re: Notification of Minor Changes (No. 2)

NOI Filing

New DPW Facility

18 Industrial Drive

Dear Commissioners:

Regarding the 11/19/2019 Notice of Intent and Order of Conditions issued 1/8/2020 (DEP File #: 183-0665) for

the new DPW facility project at 18 Industrial Drive, we are hereby submitting information regarding additional

minor changes in the design.

The additional minor changes relate to the locations of the buildings and the overall elevation of the site, as well

as minor adjustments to the drainage system necessitated by building relocation and the elevation change. The

changes do not have any appreciable impact on the design as previously reviewed by the Commission, and they

represent a slight improvement with respect to proximity to wetland resource areas.

The additional minor changes are summarized as follows:

• slight shift in location of main facility building and salt storage structure

• adjusted finish grade of the site

• minor adjustments to drainage system

• minor adjustments to Limit of Work associated with above changes

These minor design changes are described in more detail below, and they are depicted in the attached plans.

Shift in Location of Buildings

In order to optimize circulation on the site and minimize excavation, the location of the salt shed was

shifted approximately 50 feet to the southeast (away from wetlands). In order to maintain adequate

maneuvering space between the salt shed and main DPW facility building, the main DPW facility building

was shifted approximately 17 feet to the east. This contributed to increased separation from the wetlands.

These location shifts are shown on the attached plan entitled “C-301 Comp – Layout Comparison Plan”

which shows the revised building, salt shed and drainage system locations (in black linework) compared

with the former locations (in blue linework). Also, based on the current status of the project, the Town

anticipates proceeding with constructing the portion of the building identified as “Bid Alt” as shown in the

documents as originally submitted.

Raised Elevation of the Site

In order to decrease export of soil from the project, the finish grade was raised by approximately one foot.

This included the main DPW facility building, the salt shed, the fuel island and paved areas (except where

they transition to the existing grades at the entrance/exit at Industrial Drive). The landscaped areas near

the main building were also raised. However, the elevation of the landscaped areas along Industrial Drive

did not change, nor did the elevation of the infiltration swales.

Page 2: October 22, 2020 - Holden MA

Page 2

westonandsampson.com Offices in: MA, CT, NH, VT, NY, PA, MD, NC, SC & FL

Adjustments to Drainage System

As a result of the building relocation and the site elevation change, minor adjustments were made to the

drainage system, including but not limited to a shift in the location of the subsurface infiltration system

between the salt shed and the main building and slight adjustments in the location of manholes, catch

basins and drainage piping. See attached C-501 Comp – Drainage Comparison Plan which shows the

revised building, salt shed and drainage system locations (in black linework) compared with the former

locations (in blue linework).

Shift in Limit of Work

The Limit of Work along the west side of the site was shifted slightly to the east in recognition of the shift

of the Salt Shed described above. There were also minor modifications to the Limit of Work in Industrial

Drive to reflect utility connection work.

Attached Plans

In order to assist the Commission with understanding the minor design changes discussed herein, we

have prepared and attached two plans entitled “C-301 Comp – Layout Comparison Plan” and “C-501

Comp – Drainage Comparison Plan” that show the revised building, salt shed and drainage system

locations (in black linework) compared with the former locations (in blue linework).

In addition, we have included the following plans from the original NOI revised with the changes described

above:

Sheet C301 – Layout and Materials Plan

Sheet C501 – Grading and Drainage Plan

As indicated above, these proposed changes will not significantly change the performance of the stormwater

system as presented in the design and calculations submitted with our original Notice of Intent. As was the case

with the original design, all post-development conditions will be improvements compared to pre-development

conditions.

We respectfully request review of the minor changes outlined above and confirmation as to whether they will require

further action.

If you have any questions or would like to discuss this further, please do not hesitate to contact me at (978) 532-

1900, ext. 2209.

Sincerely,

WESTON & SAMPSON ENGINEERS, INC.

Anthony J. Wespiser, P.E.

Senior Project Manager

Attachments: Drawing Sheet C-301 Comp – Layout Comparison Plan

Drawing Sheet C-501 Comp – Drainage Comparison Plan

Drawing Sheet C301 – Layout and Materials Plan (revised 10/01/2020)

Drawing Sheet C501 – Grading and Drainage Plan (revised 10/01/2020)

cc: Gary Kaczmarek, Town of Holden

Page 3: October 22, 2020 - Holden MA

D

MAP

186,

LOT

43N/

F LA

NDS

OFQU

AMCO

INC

BK. 8

424,

PG. 9

7

MAP

186,

LOT

35N/

F LA

NDS

OFCL

EALA

ND B

. BLA

IRBK

. 111

87, P

G. 18

7

(P

UB

LIC

- 50' W

ID

E)

IN

DU

ST

RIA

L D

RIV

E

STOP

ST

OP

ST

OP

IN

DU

ST

RIA

L D

RIV

E

SALT SHED

BID ALT. 3

EN

ENENEN

EN

EN

EN

EN

ADMINISTRATION

ENGINEERING

STAFF

PROPOSED PUBLIC

WORKS FACILITY

SHOPS

VEHICLE

MAINTENANCE

VEHICLE STORAGE

CANOPY

WASH BAY

FU

TU

RE

E

XP

AN

SIO

N

STOP

ST

OP

ST

OP

EN

EN EN

EN

EN

EN

EN

EN

EN

EN

MEDIUM

AQUIFER

BOUNDARY

ORIGINAL

LIMIT OF

WORK

REVISED

LIMIT OF

WORK

ORIGINAL

BUILDING

LOCATION

REVISED

BUILDING

LOCATION

ORIGINAL

SALT SHED

LOCATION

REVISED

SALT SHED

LOCATION

100 FT

WETLAND

BUFFER

25 FT "NO

DISTURB"

WETLAND

BUFFER

Project:

JANUARY 13, 2020Date:

Drawn By:

Reviewed By:

Approved By:

Drawing Title:

Sheet Number:

EC

Seal:

Revisions:

Rev Date Description

Consultants:

W&S Project No:

WESTON & SAMPSON COPYRIGHT 2019

SCALE: AS NOTED

PERMITTING

Issued For:

Weston & Sampson Engineers, Inc.

100 Foxborough Boulevard Suite 250

Foxborough, MA 02035

(508) 698-3034 (800) SAMPSON

www.westonandsampson.com

2150412

TOWN OF HOLDEN, MA

DEPARTMENT OF PUBLIC WORKS

18 INDUSTRIAL DRIVE

HOLDEN, MA

EC

LFK

FOR PERMIT ONLY

NOT FOR CONSTRUCTION

NOTES:

1. THIS PLAN SHOWS THE REVISIONS TO THE PREVIOULSY SUBMITTED

AND APPROVED PLANS FOR PROPOSED DPW FACILITY. THE ORIGINAL

BUILDING LOCATIONS, CURBING, AND LIMIT OF WORK ARE SHOWN IN

BLUE. REVISED LOCATIONS ARE SHOWN IN BLACK

N

N

A

D

8

3

C-301

COMP

LAYOUT

COMPARISON

PLAN

0

SCALE: 1" = 40'

40 160100

OCTOBER 1,2020

AutoCAD SHX Text
ASPHALT CURB
AutoCAD SHX Text
ASPHALT CURB
AutoCAD SHX Text
ASPHALT CURB
AutoCAD SHX Text
ASPHALT CURB
AutoCAD SHX Text
DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
6' CLF
AutoCAD SHX Text
6' CLF
AutoCAD SHX Text
6' CLF
AutoCAD SHX Text
6' CLF
AutoCAD SHX Text
6' CLF
AutoCAD SHX Text
EDGE OF WOODS
AutoCAD SHX Text
EDGE OF WOODS
AutoCAD SHX Text
EDGE OF WOODS
AutoCAD SHX Text
STOP BAR
AutoCAD SHX Text
DYL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
STOP BAR
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
DYL
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
TELE BOX
AutoCAD SHX Text
ELEC BOX
AutoCAD SHX Text
SMH RIM=715.41
AutoCAD SHX Text
WV
AutoCAD SHX Text
DMH RIM=716.74
AutoCAD SHX Text
SMH RIM=716.95
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
SMH RIM=720.53
AutoCAD SHX Text
GV
AutoCAD SHX Text
TELE BOX
AutoCAD SHX Text
ELEC BOX
AutoCAD SHX Text
DMH RIM=721.93
AutoCAD SHX Text
UP
AutoCAD SHX Text
CB GRT=721.30
AutoCAD SHX Text
CB GRT=721.20
AutoCAD SHX Text
CB GRT=716.35
AutoCAD SHX Text
CB GRT=716.61
AutoCAD SHX Text
24" CMP INV=718.7
AutoCAD SHX Text
24" CMP INV=716.0
AutoCAD SHX Text
MW
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
4" PVC
AutoCAD SHX Text
CULVERT
AutoCAD SHX Text
INV=725.8±
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
APPROX LOC OF UG TELE LINE (PER UTILITY MARKOUT) (SEE NOTE #3)
AutoCAD SHX Text
WLF #D48
AutoCAD SHX Text
WLF #D47
AutoCAD SHX Text
WLF #D31
AutoCAD SHX Text
WLF #D30
AutoCAD SHX Text
WLF #D29
AutoCAD SHX Text
WLF #D28
AutoCAD SHX Text
WLF #D27
AutoCAD SHX Text
WLF #D26
AutoCAD SHX Text
WLF #D25
AutoCAD SHX Text
WLF #D24
AutoCAD SHX Text
WLF #D23
AutoCAD SHX Text
WLF #D22
AutoCAD SHX Text
WLF #D21
AutoCAD SHX Text
WLF #D20
AutoCAD SHX Text
WLF #D19
AutoCAD SHX Text
WLF #C21
AutoCAD SHX Text
WLF #D18
AutoCAD SHX Text
WLF #D17
AutoCAD SHX Text
WLF #D16
AutoCAD SHX Text
WLF #C20
AutoCAD SHX Text
WLF #D15
AutoCAD SHX Text
WLF #C19
AutoCAD SHX Text
WLF #D14
AutoCAD SHX Text
WLF #C16
AutoCAD SHX Text
WLF #D13
AutoCAD SHX Text
WLF #C15
AutoCAD SHX Text
WLF #D12
AutoCAD SHX Text
WLF #C14
AutoCAD SHX Text
WLF #D11
AutoCAD SHX Text
WLF #D10
AutoCAD SHX Text
WLF #D9
AutoCAD SHX Text
WLF #C13
AutoCAD SHX Text
WLF #D8
AutoCAD SHX Text
WLF #C12
AutoCAD SHX Text
WLF #C11
AutoCAD SHX Text
WLF #D7
AutoCAD SHX Text
WLF #C10
AutoCAD SHX Text
WLF #C9
AutoCAD SHX Text
WLF #D6
AutoCAD SHX Text
WLF #D5
AutoCAD SHX Text
WLF #C8
AutoCAD SHX Text
WLF #C6
AutoCAD SHX Text
WLF #C5
AutoCAD SHX Text
WLF #C7
AutoCAD SHX Text
WLF #C3
AutoCAD SHX Text
WLF #C4
AutoCAD SHX Text
WLF #D4
AutoCAD SHX Text
WLF #C2
AutoCAD SHX Text
WLF #D2
AutoCAD SHX Text
WLF #D3
AutoCAD SHX Text
WLF #D1
AutoCAD SHX Text
WLF #C1
AutoCAD SHX Text
WLF #B7
AutoCAD SHX Text
WLF #B8
AutoCAD SHX Text
WLF #B9
AutoCAD SHX Text
WLF #B6
AutoCAD SHX Text
WLF #B5
AutoCAD SHX Text
WLF #B4
AutoCAD SHX Text
WLF #B3
AutoCAD SHX Text
WLF #B2
AutoCAD SHX Text
WLF #B1
AutoCAD SHX Text
WLF #A20
AutoCAD SHX Text
WLF #A19
AutoCAD SHX Text
WLF #A18
AutoCAD SHX Text
WLF #A17
AutoCAD SHX Text
WLF #A16
AutoCAD SHX Text
WLF #A15
AutoCAD SHX Text
WLF #A14
AutoCAD SHX Text
WLF #A13
AutoCAD SHX Text
WLF #A12
AutoCAD SHX Text
WLF #A11
AutoCAD SHX Text
WLF #A10
AutoCAD SHX Text
WLF #A1
AutoCAD SHX Text
WLF #A2
AutoCAD SHX Text
WLF #A3
AutoCAD SHX Text
WLF #A4
AutoCAD SHX Text
WLF #A5
AutoCAD SHX Text
WLF #A6
AutoCAD SHX Text
WLF #A7
AutoCAD SHX Text
WLF #A8
AutoCAD SHX Text
WLF #A9
AutoCAD SHX Text
WLF #C18
AutoCAD SHX Text
WLF #C17
AutoCAD SHX Text
EDGE OF WET LANDS
AutoCAD SHX Text
EDGE OF WET LANDS
AutoCAD SHX Text
EDGE OF WET LANDS
AutoCAD SHX Text
GRASS AREA
AutoCAD SHX Text
APPROX LOC OF UG GAS LINE PER (UTILITY MARKOUT) (SEE NOTE #3)
AutoCAD SHX Text
OVERGROWN AREA
AutoCAD SHX Text
OVERGROWN AREA
AutoCAD SHX Text
WOODED AREA
AutoCAD SHX Text
WOODED AREA
AutoCAD SHX Text
WOODED AREA
AutoCAD SHX Text
WOODED AREA
AutoCAD SHX Text
WOODED AREA
AutoCAD SHX Text
WOODED AREA
AutoCAD SHX Text
T14
AutoCAD SHX Text
T14
AutoCAD SHX Text
T14
AutoCAD SHX Text
STONE BOUND W/DRILL HOLE FOUND
AutoCAD SHX Text
STONE BOUND W/DRILL HOLE FOUND
AutoCAD SHX Text
TBM-A
AutoCAD SHX Text
TBM-B
AutoCAD SHX Text
UTO-SEALED
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
12" CHANNEL
AutoCAD SHX Text
12" CHANNEL
AutoCAD SHX Text
INV=710.75
AutoCAD SHX Text
INV(A)=715.4 (INV(B)=713.1
AutoCAD SHX Text
12" CHANNEL
AutoCAD SHX Text
12" CHANNEL
AutoCAD SHX Text
8" CIP
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
D
AutoCAD SHX Text
12" HDPE
AutoCAD SHX Text
12" HDPE
AutoCAD SHX Text
12" HDPE
AutoCAD SHX Text
INV=711.6
AutoCAD SHX Text
INV(A)=711.6 INV(B)=711.5 INV(C)=711.2
AutoCAD SHX Text
INV=714.0
AutoCAD SHX Text
C
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
INV(A)=RECESSED INV(B)=713.0 INV(C)=712.9
AutoCAD SHX Text
D
AutoCAD SHX Text
12" CIP
AutoCAD SHX Text
12" CIP
AutoCAD SHX Text
12" CMP
AutoCAD SHX Text
12" CIP
AutoCAD SHX Text
INV=716.2
AutoCAD SHX Text
INV=717.1
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
TAKING LINE
AutoCAD SHX Text
TAKING LINE
AutoCAD SHX Text
SEE NOTE #11
AutoCAD SHX Text
SEE NOTE #11
AutoCAD SHX Text
SEE NOTE #11
AutoCAD SHX Text
NT
AutoCAD SHX Text
PER REF. #6
AutoCAD SHX Text
APPROX. LOC. OF UG ELECTRIC LINE
AutoCAD SHX Text
PER REF. #6
AutoCAD SHX Text
APPROX. LOC. OF UG WATER LINE
AutoCAD SHX Text
PER REF. #6
AutoCAD SHX Text
PER REF. #6
AutoCAD SHX Text
WLF #D32
AutoCAD SHX Text
WLF #D33
AutoCAD SHX Text
WLF #D34
AutoCAD SHX Text
WLF #D35
AutoCAD SHX Text
WLF #D36
AutoCAD SHX Text
WLF #D37
AutoCAD SHX Text
WLF #D38
AutoCAD SHX Text
WLF #D39
AutoCAD SHX Text
WLF #D40
AutoCAD SHX Text
WLF #D41
AutoCAD SHX Text
WLF #D42
AutoCAD SHX Text
WLF #D43
AutoCAD SHX Text
WLF #D44
AutoCAD SHX Text
WLF #D45
AutoCAD SHX Text
WLF #D46
AutoCAD SHX Text
MW
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOG
AutoCAD SHX Text
EOP
AutoCAD SHX Text
EOP
AutoCAD SHX Text
EOP
AutoCAD SHX Text
EOP
AutoCAD SHX Text
EOP
AutoCAD SHX Text
EOP
AutoCAD SHX Text
ASPHALT PAVEMENT
AutoCAD SHX Text
EOG
AutoCAD SHX Text
GRAVEL DRIVE
AutoCAD SHX Text
GRAVEL AREA
AutoCAD SHX Text
EOP
AutoCAD SHX Text
GRAVEL AREA
AutoCAD SHX Text
EOG
AutoCAD SHX Text
GRAVEL AREA
AutoCAD SHX Text
GRAVEL AREA
AutoCAD SHX Text
GRAVEL AREA
AutoCAD SHX Text
INDUSTRIAL DRIVE
AutoCAD SHX Text
TWO WAY TRAFFIC
AutoCAD SHX Text
EDGE OF WOODS
AutoCAD SHX Text
EDGE OF WOODS
AutoCAD SHX Text
PATCH
AutoCAD SHX Text
TRAILOR
AutoCAD SHX Text
E
AutoCAD SHX Text
EMH RIM=726.85
AutoCAD SHX Text
APPROX LOC OF UG ELEC LINE
AutoCAD SHX Text
(PER UTILITY MARKOUT) (SEE NOTE #3)
AutoCAD SHX Text
UP #82-97
AutoCAD SHX Text
UP W/ELEC METER
AutoCAD SHX Text
GW
AutoCAD SHX Text
APPROX LOC OF UG ELEC LINE
AutoCAD SHX Text
(PER UTILITY MARKOUT) (SEE NOTE #3)
AutoCAD SHX Text
S
AutoCAD SHX Text
SMH
AutoCAD SHX Text
GV
AutoCAD SHX Text
APPROX LOC OF UG GAS LINE
AutoCAD SHX Text
(PER UTILITY MARKOUT) (SEE NOTE #3)
AutoCAD SHX Text
APPROX LOC OF UG GAS LINE
AutoCAD SHX Text
(PER UTILITY MARKOUT) (SEE NOTE #3)
AutoCAD SHX Text
GV
AutoCAD SHX Text
APPROX LOC OF UG GAS LINE
AutoCAD SHX Text
(PER UTILITY MARKOUT) (SEE NOTE #3)
AutoCAD SHX Text
APPROX LOC OF UG GAS LINE
AutoCAD SHX Text
(PER UTILITY MARKOUT) (SEE NOTE #3)
AutoCAD SHX Text
APPROX LOC OF UG GAS LINE
AutoCAD SHX Text
(PER UTILITY MARKOUT) (SEE NOTE #3)
AutoCAD SHX Text
E
AutoCAD SHX Text
ELEC BOX
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
EMH RIM=716.11
AutoCAD SHX Text
TELE BOX
AutoCAD SHX Text
734.70
AutoCAD SHX Text
734.01
AutoCAD SHX Text
734.50
AutoCAD SHX Text
734.49
AutoCAD SHX Text
735.16
AutoCAD SHX Text
735.19
AutoCAD SHX Text
734.47
AutoCAD SHX Text
734.32
AutoCAD SHX Text
734.36
AutoCAD SHX Text
734.56
AutoCAD SHX Text
734.06
AutoCAD SHX Text
733.81
AutoCAD SHX Text
733.70
AutoCAD SHX Text
734.30
AutoCAD SHX Text
735.12
AutoCAD SHX Text
733.95
AutoCAD SHX Text
740.01
AutoCAD SHX Text
742.38
AutoCAD SHX Text
733.54
AutoCAD SHX Text
733.86
AutoCAD SHX Text
733.84
AutoCAD SHX Text
734.15
AutoCAD SHX Text
733.98
AutoCAD SHX Text
733.94
AutoCAD SHX Text
733.91
AutoCAD SHX Text
734.29
AutoCAD SHX Text
734.26
AutoCAD SHX Text
734.31
AutoCAD SHX Text
734.38
AutoCAD SHX Text
734.09
AutoCAD SHX Text
734.61
AutoCAD SHX Text
734.43
AutoCAD SHX Text
733.55
AutoCAD SHX Text
734.50
AutoCAD SHX Text
737.04
AutoCAD SHX Text
737.03
AutoCAD SHX Text
736.53
AutoCAD SHX Text
737.22
AutoCAD SHX Text
735.04
AutoCAD SHX Text
734.58
AutoCAD SHX Text
734.25
AutoCAD SHX Text
733.91
AutoCAD SHX Text
733.96
AutoCAD SHX Text
734.01
AutoCAD SHX Text
734.14
AutoCAD SHX Text
733.72
AutoCAD SHX Text
733.79
AutoCAD SHX Text
734.20
AutoCAD SHX Text
753.45
AutoCAD SHX Text
756.13
AutoCAD SHX Text
756.79
AutoCAD SHX Text
758.40
AutoCAD SHX Text
751.14
AutoCAD SHX Text
743.29
AutoCAD SHX Text
737.74
AutoCAD SHX Text
735.02
AutoCAD SHX Text
736.66
AutoCAD SHX Text
737.70
AutoCAD SHX Text
737.92
AutoCAD SHX Text
738.86
AutoCAD SHX Text
739.29
AutoCAD SHX Text
736.18
AutoCAD SHX Text
733.59
AutoCAD SHX Text
APPROX LOC OF 12" AC WATER MAIN
AutoCAD SHX Text
25'
AutoCAD SHX Text
25'
AutoCAD SHX Text
25'
AutoCAD SHX Text
100'
AutoCAD SHX Text
100'
AutoCAD SHX Text
100'
AutoCAD SHX Text
100'
AutoCAD SHX Text
100'
AutoCAD SHX Text
100'
AutoCAD SHX Text
25'
AutoCAD SHX Text
25'
AutoCAD SHX Text
25'
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
B
Page 4: October 22, 2020 - Holden MA

22

MAP

173,

LOT

56N/

F LA

NDS

OFED

WAR

D T

COLE

BK. 2

3959

, PG.

78MA

P 17

3, BL

OCK

34 LO

T 2

N/F

LAND

S OF

ROBE

RT P

. HIM

MER

BK. 1

3205

, PG.

209

MAP

186,

LOT

35N/

F LA

NDS

OFCL

EALA

ND B

. BLA

IRBK

. 111

87, P

G. 18

7

D

D

D

D

MAP

186,

LOT

43N/

F LA

NDS

OFQU

AMCO

INC

BK. 8

424,

PG. 9

7

D

MAP

186,

LOT

43N/

F LA

NDS

OFQU

AMCO

INC

BK. 8

424,

PG. 9

7

MAP

186,

LOT

35N/

F LA

NDS

OFCL

EALA

ND B

. BLA

IRBK

. 111

87, P

G. 18

7

A

IN

DU

ST

RIA

L D

RIV

E

STOP

ST

OP

ST

OP

D

DD

D

D

D

DD

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

W W W W W W

W W W W W W W W W W W

EE

EE

E

S

S

S

S

S

G

WW

WW

WW

WW

WW

EE

E

E E E E E E E

W W

W W

E

E E E

E E E E E EE

E

E

E

T T T T T TT

T

T

T

T

E

HH

HH

T

TT

TT

TT

T T TT

HH

EE

EE

EE

E

E

HH

HH

E

HH E

E

w

ww

s

s

s

w

ww

E

E

EE

EE

EE

E

E E E E

INFILTRATION

SWALE 2

INFILTRATION

SWALE 1

MEET EXISTING

GRADE AT

SAWCUT LINE

100-YEAR

FLOOD

AREA

25' NO DISTURB BUFFER

100' WETLANDS BUFFER

SLEEVE EXIST 24" CMP WITH

18" SDR 35 PVC PIPE

REPAIR EXIST HEADWALL; MORTAR

SPACE BETWEEN EXIST AND NEW

PIPE AT HEADWALL;

ADD RIPRAP AT THE HEADWALL

FOR EROSION PROTECTION

IN

DU

ST

RIA

L D

RIV

E

STOP

ST

OP

ST

OP

73

2

7

3

1

7

2

7

733

733

732

7

3

1

7

3

0

7

3

2

73

2

7

2

9

7

2

8

7

2

7

7

2

6

7

2

5

7

2

4

7

2

3

7

3

0

7

2

9

7

2

8

7

2

7

7

2

6

7

2

5

7

2

4

7

2

4

7

2

1

71

3

715

714

71

5

71

8

71

8

71

7

71

9

72

0

720

71

9

71

7

733

730

7

2

7

723

7

2

8

7

3

0

71

9

7

3

4

7

3

3

7

2

9

7

2

2

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

73

3

D

D

EMERGENCY SPILLWAY

EL =717.2

EMERGENCY SPILLWAY

EL =719.25

CONNECT TO EXIST DMH

INV = 712.20

7

2

2

727

725

721

719

7

3

2

7

3

0

72

7

7

2

9

7

2

9

7

3

1

7

3

1

7

1

8

7

2

6

716

734734

7

3

2

7

3

3

7

3

4

7

3

3

7

3

2

7

3

3

734

733

7

3

3

7

3

3

7

3

4

7

3

3

7

3

2

733 733 733

73

3

TW: 731.6

BW: 728.8

TW: 730.4

BW: 727.5

TW: 731.5

BW: 728.1

717

7

3

4

7

3

3

7

3

4

FFE = 734

PROPOSED DPW

SALT SHED

FFE = 733

Project:

JANUARY 13, 2020Date:

Drawn By:

Reviewed By:

Approved By:

Drawing Title:

Sheet Number:

EC

Seal:

Revisions:

Rev Date Description

Consultants:

W&S Project No:

WESTON & SAMPSON COPYRIGHT 2019

SCALE: AS NOTED

PERMITTING

Issued For:

Weston & Sampson Engineers, Inc.

100 Foxborough Boulevard Suite 250

Foxborough, MA 02035

(508) 698-3034 (800) SAMPSON

www.westonandsampson.com

2150412

TOWN OF HOLDEN, MA

DEPARTMENT OF PUBLIC WORKS

18 INDUSTRIAL DRIVE

HOLDEN, MA

EC

LFK

FOR PERMIT ONLY

NOT FOR CONSTRUCTION

N

N

A

D

8

3

0

SCALE: 1" = 40'

40 160100

NOTES:

1. THIS PLAN SHOWS THE REVISIONS TO THE PREVIOULSY SUBMITTED

AND APPROVED PLANS FOR PROPOSED DPW FACILITY. THE ORIGINAL

BUILDING LOCATIONS AND DRAINAGE NETWORK ARE SHOWN IN BLUE.

REVISED LOCATIONS ARE SHOWN IN BLACK

C-501

COMP

DRAINAGE

COMPARISON

PLAN

OCTOBER 1,2020

DELETE WITHBUILDING EXTENSION

Page 5: October 22, 2020 - Holden MA

D

D

D

D

D

MAP

186,

LOT

43N/

F LA

NDS

OFQU

AMCO

INC

BK. 8

424,

PG. 9

7

MAP

186,

LOT

35N/

F LA

NDS

OFCL

EALA

ND B

. BLA

IRBK

. 111

87, P

G. 18

7

A

B

(P

UB

LIC

- 50' W

ID

E)

(AKA ROUTE 122A)

(PUBLIC-VARIABLE WIDTH)

IN

DU

ST

RIA

L D

RIV

E

SALT SHED

BID ALT. 3

EN

ENENEN

EN

EN

EN

EN

ADMINISTRATION

ENGINEERING

STAFF

PROPOSED PUBLIC

WORKS FACILITY

SHOPS

VEHICLE

MAINTENANCE

VEHICLE STORAGE

CANOPY

WASH BAY

FU

TU

RE

E

XP

AN

SIO

N

STOP

ST

OP

ST

OP

EN

EN EN

EN

EN

EN

EN

EN

EN

EN

HH

HH

HH

HH

HH

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

20

'2

5'

20

'2

0'

25

'2

0'

10'

(TYP)

8'24' 20'

8

0

'

4

3

'

10'

HMA BERM

CONC PAD FOR

GENERATOR

CONC PAD

FOR TRANSF.

DUMPSTER

ON CONC. PAD

6' CONC.

WALK

PROP.

FLAGPOLE

PROP. LIGHT

POLE (TYP)

HYDRANT

(TYP)

4" PAVEMENT

STRIPING

(TYP)

GRAN. CURB

GRAN. CURB

GRAN. CURB

GRAN. CURB

GRAN. CURB

GR

AN

. C

UR

B

GR

AN

. C

UR

B

H

M

A

B

E

R

M

35' OPENING

AUTOMATIC

SLIDING GATE

32' OPENING

AUTOMATIC

SLIDING

GATE

R1-1

SIGN

R1-1

HEAVY DUTY

HMA

PAVEMENT

HEAVY DUTY

HMA

PAVEMENT

CONC. BLOCK

LOADING RAMP

BOLLARD

(TYP)

MEET EXIST.

PAVEMENT AT

SAWCUT LINE

FUEL ISLAND

BID ALT. 2

(SEE EQ-DWGS)

6' CHAIN LINK

FENCE

MEET EXIST. CLF

6' CHAIN LINK

FENCE

R7-8 IN

BOLLARD

LIMIT OF

WORK (TYP)

INFILTRATION

SWALE 1

INFILTRATION

SWALE 2

100 YEAR FLOOD

BOUNDARY

WESTERN

AREA

DISPOSAL

BOUNDARY

SOUTHERN

AREA

DISPOSAL

BOUNDARY

GATE

OPERATOR ON

CONC. PAD

RIP RAP

APRON (TYP)

GATE

OPERATOR

KEY PAD

WESTERN

AREA

DISPOSAL

BOUNDARY

25' NO DISTURB BUFFER

100' WETLANDS BUFFER

100 YEAR FLOOD AREA

WCR

STEEL BACKED

TIMBER GUARD

RAIL

30

'

43

'

43

'

37

.1

2'

120'

LOAM AND

SEED

83.73'

27'

24'

8'

33

'

146.52'

LIGHT DUTY

PAVEMENT

5' CONC.

WALK

R1-1

AUTHORIZED

VEHICLES

ONLY SIGN

HEAVY DUTY

HMA PAVEMENT

UNDER CANOPY

FUEL ISLAND CANOPY

BID ALT. 4

(SEE EQ-DWGS)

16

.9

'

CRUSHED

STONE

CURB TYPE CHANGE.

USE VERTICAL TO

CURB GRANITE

TRANSITION CURB

INSTALL 5' HMA STRIP

ALONG GATE PATH

INSTALL 5' HMA STRIP

ALONG GATE PATH

6" HMA PAVEMENT

INSIDE SALT SHED

LOAM AND

SEED (TYP)

CATCH BASIN

(TYP)

DRAIN

MAINHOLE

(TYP)

SEWER

MANHOLE

(TYP)

DASHED LINE

REPRESENTS GATE IN

OPEN POSITION (TYP)

GAS METER

PAD

PAVEMENT

STRIPING

(TYP)

20

'

5'

DPW

IDENTIFICATION

SIGN

CONC. PAD FOR

FUEL ISLAND

CABINET

50'

28'

6' CHAIN LINK

FENCE

6' CHAIN LINK

FENCE

KNOCKDOWN

AREA (SLOPE

TO CB)

LIMITS OF

GROUND

IMPROVEMENT

(SEE NOTE 8)

RETAINING

WALL

LIMIT OF GROUND

IMPROVEMENT

(SEE NOTE 8)

10'

ACCU 2 & 3

CONC. PAD

ACCU 1

CONC. PAD

CURB TYPE CHANGE.

USE VERTICAL TO

BERM GRANITE

TRANSITION CURB

R7-8 &

R7-8A

IN BOLLARD

10'

12

'

5'

7'

6.5'

WCR

WCR

Project:

JULY 8, 2020Date:

Drawn By:

Reviewed By:

Approved By:

Drawing Title:

Sheet Number:

Seal:

Revisions:

Rev Date Description

Consultants:

W&S Project No:

WESTON & SAMPSON COPYRIGHT 2019

SCALE: AS NOTED

BID

Issued For:

Weston & Sampson Engineers, Inc.

100 Foxborough Boulevard Suite 250

Foxborough, MA 02035

(508) 698-3034 (800) SAMPSON

www.westonandsampson.com

TOWN OF HOLDEN, MA

DEPARTMENT OF PUBLIC

WORKS

18 INDUSTRIAL DRIVE

HOLDEN, MA

2150412

0

SCALE: 1" = 40'

40 160100

NOTES:

1. GRANITE CURB SHALL BE TYPE VA-4 UNLESS OTHERWISE IDENTIFIED.

2. EXISTING SITE CONDITIONS SHOWN ARE FROM GROUND SURVEYS

PERFORMED BY CONTROL POINT ASSOCIATES, INC. DATED 4-4-19,

UPDATED ON 7-11-19.

3. PROVIDE 6" HMA PAVING WITHIN SALT SHED.

4. PROVIDE NEW HOT MIX ASPHALT PAVEMENT BETWEEN ALL

PROPOSED CURB LINES, EDGE OF PAVEMENT & BUILDINGS

(INCLUDING UP TO SAWCUT LIMITS).

5. ALL SAWCUTS SHALL HAVE RS-1 ASPHALT EMULSION TACK COAT

ADDED PRIOR TO ABUTTING PAVEMENT, MATCHING EXISTING

CONDITIONS.

6. CONTRACTOR SHALL PATCH EXISTING PAVED AREAS WITH HMA

FOLLOWING UTILITY INSTALLATION

7. ALL BACKFILL MATERIAL BELOW PROPOSED BUILDINGS SHALL

CONSIST OF STRUCTURAL FILL PER EARTHWORK SPECIFICATION 31 00

00.

8. GROUND IMPROVEMENT NOTE: ACHIEVE THE RAPID IMPACT

COMPACTION (RIC) DESIGN REQUIREMENTS DESCRIBED IN

SPECIFICATIONS SECTION 31 66 13 - GROUND IMPROVEMENT BY RAPID

IMPACT COMPACTION. TO BE COMPLETED WITHIN, PROPOSED

STRUCTURES INCLUDING THE MAIN BUILDING (INCLUDING FUTURE

EXPANSION AREA), SALT SHED, CANOPY STRUCTURES, AND FUEL

ISLAND). GROUND IMPROVEMENTS FOR SALT SHED AND FUEL ISLAND

SHALL BE COMPLETED UNDER THE BASE BID WORK.

N

N

A

D

8

3

C301

LAYOUT AND

MATERIALS PLAN

HEAVY DUTY PAVEMENT

CONCRETE

LEGEND:

100 YEAR FLOOD AREA PER

W&S FLOOD STUDY

LIGHT DUTY PAVEMENT

CRUSHED STONE

PLANTED AREA, REFER TO

PL101

EC

EC

LFK

1 10/1/2020 PERMITTING UPDATE

NOTE:

1. THIS PLAN INCLUDES ALL REVISIONS MADE TO THE DESIGN

PLANS AFTER ORIGINAL PERMITTING SUBMITTAL. IT IS BEING

RESUBMITTED FOR RECORD.

DELETE WITHBUILDING EXTENSION

Page 6: October 22, 2020 - Holden MA

MAP

173,

LOT

56N/

F LA

NDS

OFED

WAR

D T

COLE

BK. 2

3959

, PG.

78MA

P 17

3, BL

OCK

34 LO

T 2

N/F

LAND

S OF

ROBE

RT P

. HIM

MER

BK. 1

3205

, PG.

209

MAP

186,

LOT

35N/

F LA

NDS

OFCL

EALA

ND B

. BLA

IRBK

. 111

87, P

G. 18

7

MAP

186,

LOT

43N/

F LA

NDS

OFQU

AMCO

INC

BK. 8

424,

PG. 9

7

D

MAP

186,

LOT

43N/

F LA

NDS

OFQU

AMCO

INC

BK. 8

424,

PG. 9

7

MAP

186,

LOT

35N/

F LA

NDS

OFCL

EALA

ND B

. BLA

IRBK

. 111

87, P

G. 18

7

A

FFE = 734

IN

DU

ST

RIA

L D

RIV

E

STOP

ST

OP

ST

OP

73

2

7

3

1

7

2

7

733

733

732

7

3

1

7

3

0

7

3

2

73

2

7

2

9

7

2

8

7

2

7

7

2

6

7

2

5

7

2

4

7

2

3

7

3

0

7

2

9

7

2

8

7

2

7

7

2

6

7

2

5

7

2

4

7

2

4

7

2

1

71

3

715

714

71

5

71

8

71

8

71

7

71

9

72

0

720

71

9

71

7

733

-3.0:1

-6.6:1

730

7

2

7

723

7

2

8

7

3

0

71

9

7

3

4

7

3

3

7

2

9

7

2

2

CB-1

R=732.81

I(out)=729.76 (DMH-17)

D

DMH-17

R=732.91

I(in)=729.18 (CB-1)

I(in)=729.69 (CB-2)

I(out)=729.18 (DMH-18)

P-1

D

DMH-18

R=732.92

I(in)=728.62 (DMH-17)

I(in)=729.68 (CB-3)

I(out)=728.62 (SWTU-1)

P-2

D

SWTU-1

R=732.21

I(in)=727.50 (DMH-18)

I(in)=728.63 (DBCB-2)

I(out)=727.50 (INF-1)

P-3

P-4

D

OCS-1 (W/ GRATE)

R=732.80

I(in)=727.00 (INF-1)

I(out)=728.00 (DMH-14)

VEE WEIR EL = 728.75

P-5

P-6

CB-2

R=732.80

I(out)=729.75 (DMH-17)

P-7

CB-3

R=732.80

I(out)=729.75 (DMH-18)

P-8

SWTU-2

R=732.86

I(out)=728.90 (INF-1)

P-9

CB-4

R=733.22

I(out)=730.17 (DMH-3)

D

DMH-3

R=734.20

I(in)=728.83 (CB-4)

I(in)=728.92 (CB-6)

I(out)=728.92 (DMH-4)

P-10

D

DMH-4

R=733.63

I(in)=728.13 (DMH-3)

I(in)=729.28 (DBCB-3)

I(in)=730.54 (CO-8)

I(out)=728.13 (SWTU-3)

P-11

D

SWTU-3

R=733.57

I(in)=727.70 (DMH-4)

I(in)=727.94 (DMH-5)

I(out)=727.70 (INF-1)

P-12

P-13

CB-5

R=732.12

I(out)=729.07 (DMH-5)

D

DMH-5

R=732.41

I(in)=728.39 (CB-5)

I(in)=728.38 (DBCB-1)

I(out)=728.30 (SWTU-3)

P

-

1

4

P-15

CB-6

R=732.25

I(out)=729.20 (DMH-3)

P-16

DBCB-1 (6' DIA)

R=731.67

I(out)=728.62 (DMH-5)

P-17

DBCB-2 (6' DIA)

R=731.76

I(out)=728.71 (SWTU-1)

P-18

DBCB-3 (6' DIA)

R=732.57

I(out)=729.52 (DMH-4)

P

-

2

1

CB-7

R=731.62

I(out)=728.57 (DMH-6)

D

DMH-6

R=731.11

I(in)=728.06 (CB-7)

I(in)=726.19 (CB-11)

I(out)=726.19 (DMH-7)

P-22

D

DMH-7

R=730.78

I(in)=725.48 (DMH-6)

I(in)=727.36 (CB-12)

I(out)=725.48 (DMH-10)

P-23

D

DMH-8

R=725.10

I(in)=721.80 (CB-10)

I(in)=722.00 (DBCB-4)

I(out)=721.80 (DMH-9)

P-24

P

-25

D

DMH-9

R=718.87

I(in)=714.13 (CB-8)

I(in)=714.13 (CB-9)

I(in)=714.65 (DMH-8)

I(out)=714.00 (SWTU-6)

D

SWTU-6

R=718.00

I(in)=713.91 (DMH-9)

I(out)=713.90 (FES1)

P-27

FES1

I(in)=713.66 (SWTU-6)

P-28

CB-8 (LOW PROFILE FRAME)

R=717.12

I(out)=714.18 (DMH-9)

P-29

CB-9 (LOW PROFILE FRAME)

R=717.07

I(out)=714.27 (DMH-9)P

-

3

0

CB-10

R=724.89

I(out)=721.84 (DMH-8)

P-31

DBCB-4 (6' DIA)

R=728.46

I(out)=725.41 (DMH-8)

P-32

CB-11

R=729.53

I(out)=726.48 (DMH-6)

P-33

CB-12

R=730.45

I(out)=727.40 (DMH-7)

D

DMH-10

R=730.17

I(in)=724.28 (CB-13)

I(in)=724.36 (DMH-7)

I(out)=724.28 (SWTU-5)

P-34

D

SWTU-5

R=727.08

I(in)=722.55 (DMH-10)

I(out)=722.55 (FES2)

P-35

FES2

I(in)=718.00 (SWTU-5)

P-36

CB-13

R=729.44

I(out)=725.41 (DMH-10)

P-37

DBCB-5 (6' DIA)

R=729.12

I(out)=721.98 (SWTU-4)

D

SWTU-4

R=724.28

I(in)=719.31 (DBCB-5)

I(in)=718.80 (CB-14)

I(in)=719.00 (CB-15)

I(out)=718.00 (FES3)

P

-

3

8

FES3

I(in)=717.11 (SWTU-4)

P

-3

9

CB-14 (LOW PROFILE FRAME)

R=721.92

I(out)=719.20 (SWTU-4)

P

-

4

0

CB-15 (LOW PROFILE FRAME)

R=721.88

I(out)=719.26 (SWTU-4)

P-41

CO-1

INV=730.79

P-42

P-43

P-44

CO-2

INV=728.43

P-45

D

DMH-11

R=732.27

I(in)=727.60 (CO-2)

I(in)=730.21 (CO-6)

I(out)=727.60 (DMH-12)

P-46

P

-

4

7

D

DMH-12

R=732.41

I(in)=725.19 (DMH-14)

I(in)=725.46 (DMH-11)

I(out)=725.09 (DMH-1)

D

DMH-1

R=732.35

I(in)=723.12 (DMH-12)

I(out)=±719.6 (EX. HW)

(SEE NOTE 11)

P-49

CO-3

INV=730.47

P-50

CO-4

INV=729.60

P-51

P-52

OCS-2

R=718.00

I(out)=715.25 (DMH-2)

D

DMH-2

R=716.26

I(in)=714.71 (OCS-2)

I(out)=714.61 (DMH-13)

P

-

5

3

D

DMH-13

R=716.80

I(in)=712.26 (DMH-2)

I(in)=712.63 (OCS-3)

I(out)=712.62 (CO-5)

P-54

P

-

5

5

OCS-3

R=716.75

I(out)=712.75 (DMH-13)

3 - 5" ORIFICES @ 715.75

P-56

CO-6

INV=730.97

P-57

73

3

D

DMH-14

R=733.28

I(in)=726.70 (OCS-1)

I(in)=728.70 (DMH-15)

I(out)=726.70 (DMH-12)

D

DMH-15

R=733.46

I(in)=729.59 (CO-3)

I(in)=729.24 (CO-7)

I(out)=729.00 (DMH-14)

CO-7

INV=730.46

P-58

P-59

P-60

INF-1

7 ROWS X 23 ADS

DC-780 CHAMBERS

BOT. OF CHAMBERS

EL=727.0

EMERGENCY SPILLWAY

EL =717.2

EMERGENCY SPILLWAY

EL =719.25

X

733.5

HP

734.1

734.1

734.1

734.1

734.5

HP

732.4BW

735.0 TW

733.5

733.1

732.9

X

733.0 BW

737.0 TW

X

733.5

HP

X

728.1

HP

X

731.5

HP

X

734.0

HP

734.0

734.0

CONNECT TO EXIST DMH

INV = 712.20

7

2

2

727

725

721

719

7

3

2

7

3

0

72

7

7

2

9

7

2

9

7

3

1

7

3

1

7

1

8

7

2

6

733.5

HP

733.5

HP

733.5

HP

716

CO-8

INV=730.83

P

-

6

1

734.0 734.0

734.0

734.0

733.8

734.0

734.0

734.0

733.5

733.5

734.0

734.0

733.4732.3

732.2

731.8

733.3

733.0

733.0

732.6

728.9

730.0

734.0

FUEL ISLAND CANOPY

DRAINS - BASE BID

(SEE EQ. DWGS)

PROPOSED

DOWNSPOUTS (TYP), SEE

ARCH DWGS NUMBER

AND LOCATIONS

733.5

734.0

734734

734.0

7

3

2

CO-9

INV=730.91

732.4

733.9

733.0

733.9734.2

CO-10

INV=730.32

CO-11

INV=729.92

CO-12

INV=729.75

734.5

734.5

734.0

732.1

732.1

732.7

728.9

729.2

722.3

722.3725.7

X

735.1

X

732.4 BW

737.0 TW

X

734.7

X

733.4 BW

737.0 TW

X

734.0

7

3

3

7

3

4

7

3

3

7

3

2

7

3

3

734

733

7

3

3

733.0733.0

733.0733.0

7

3

3

7

3

4

7

3

3

7

3

2

733 733 733

73

3

-3.0

:1

-

3

.

2

:

1

-3.5:1

TW: 731.6

BW: 728.8

TW: 730.4

BW: 727.5

727.4

728.9

TW: 731.5

BW: 728.1

717

PVC GATE

VALVE (SEE

NOTE 10)

PVC GATE

VALVE (SEE

NOTE 10)

733.8

732.5

FUEL SYSTEM

BID ALT. 2

FUEL ISLAND CANOPY

BID ALT. 4

7

3

4

7

3

3

7

3

4

INFILTRATION

SWALE 2

INFILTRATION

SWALE 1

MEET EXISTING

GRADE AT

SAWCUT LINE

100-YEAR

FLOOD

AREA

25' NO DISTURB

BUFFER

100' WETLANDS

BUFFER

SLOPE

KNOCKDOWN

ARE TO CATCH

BASIN

PROPOSED DPW

SALT SHED

BID ALT. 3

SLEEVE EXIST 24" CMP WITH

18" SDR 35 PVC PIPE

REPAIR EXIST HEADWALL; MORTAR

SPACE BETWEEN EXIST AND NEW

PIPE AT HEADWALL;

ADD RIPRAP AT THE HEADWALL

FOR EROSION PROTECTION

4" PERF. PVC

DAILIGHT

THROUGH

FACE OF

WALL @

EVERY 40 FT.

EN

ENEN

EN

EN

ADMINISTRATION

ENGINEERING

STAFF

SHOPS

EN

EN

EN

EN

733

733

73

2

D

TW: 731.6

BW: 728.8

734.0 TC733.87BC733.87

FLUSH

TRANSITION

CURB

RAMP

734.0

TC734.32BC733.82

733.9

TC733.82BC733.32

734.0734.0

TC733.85BC733.35TC733.85BC733.35

733.9734.1733.9733.4

733.35

RAMP

RAMP

TC733.85BC733.35

734

TC733.50BC733.00

733.00

733.0733.5

734.0

734.0733.85

TC734.5BC734.0

733.80733.80

RAMP

TC733.55BC733.05

TC733.45BC732.95

TC733.56BC732.16

734.0734.0

PIPE TABLE

PIPE

P-1

P-2

P-3

P-4

P-5

P-6

P-7

P-8

P-9

P-10

P-11

P-12

P-13

P-14

P-15

P-16

SIZE & TYPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

18" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

LENGTH

67 LF

67 LF

130 LF

17 LF

7 LF

159 LF

2 LF

3 LF

41 LF

118 LF

75 LF

23 LF

25 LF

64 LF

36 LF

52 LF

SLOPE

0.008

0.008

0.008

0.027

0.000

0.008

0.010

0.010

0.008

0.011

0.010

0.016

0.026

0.010

0.009

0.005

PIPE TABLE

PIPE

P-17

P-18

P-21

P-22

P-23

P-24

P-25

P-27

P-28

P-29

P-30

P-31

P-32

P-33

P-34

P-35

SIZE & TYPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

LENGTH

20 LF

18 LF

44 LF

64 LF

67 LF

108 LF

136 LF

5 LF

21 LF

6 LF

24 LF

4 LF

99 LF

55 LF

6 LF

159 LF

SLOPE

0.010

0.004

0.005

0.008

0.010

0.010

0.051

0.010

0.010

0.005

0.005

0.005

0.033

0.005

0.005

0.011

PIPE TABLE

PIPE

P-36

P-37

P-38

P-39

P-40

P-41

P-42

P-43

P-44

P-45

P-46

P-47

P-49

P-50

P-51

P-52

SIZE & TYPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

18" HDPE

18" HDPE

12" HDPE

12" HDPE

12" HDPE

LENGTH

46 LF

24 LF

76 LF

36 LF

40 LF

22 LF

94 LF

80 LF

35 LF

132 LF

81 LF

142 LF

24 LF

87 LF

131 LF

70 LF

SLOPE

0.092

0.040

0.034

0.023

0.009

0.010

0.005

0.005

0.005

0.010

0.010

0.015

0.070

0.010

0.010

0.010

PIPE TABLE

PIPE

P-53

P-54

P-55

P-56

P-57

P-58

P-59

P-60

P-61

SIZE & TYPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

18" HDPE

12" HDPE

LENGTH

35 LF

104 LF

42 LF

7 LF

74 LF

120 LF

6 LF

139 LF

56 LF

SLOPE

0.014

0.022

0.010

0.011

0.010

0.010

0.030

0.011

0.005

Project:

JULY 8, 2020Date:

Drawn By:

Reviewed By:

Approved By:

Drawing Title:

Sheet Number:

Seal:

Revisions:

Rev Date Description

Consultants:

W&S Project No:

WESTON & SAMPSON COPYRIGHT 2019

SCALE: AS NOTED

BID

Issued For:

Weston & Sampson Engineers, Inc.

100 Foxborough Boulevard Suite 250

Foxborough, MA 02035

(508) 698-3034 (800) SAMPSON

www.westonandsampson.com

TOWN OF HOLDEN, MA

DEPARTMENT OF PUBLIC

WORKS

18 INDUSTRIAL DRIVE

HOLDEN, MA

2150412

Grading at Admin Entrance Detail

SCALE1"=20'

1

0 20 40

N

N

A

D

8

3

C501

GRADING AND

DRAINAGE PLAN

0

SCALE: 1" = 40'

40 160100

NOTES:

1. ON-SITE EXCAVATION MATERIAL MAY BE USED FOR BACKFILL

OUTSIDE LIMITS OF BUILDING ONLY IF IT MEETS THE

REQUIREMENTS FOR BACKFILL PER THE EARTHWORK

SPECIFICATION (31 00 00). ON-SITE EXCAVATION MATERIAL

SHALL NOT BE USED BELOW ANY BUILDING FOOTPRINTS. IF

MATERIAL DOES NOT MEET SPECIFICATIONS FOR REUSE, THE

CONTRACTOR SHALL REMOVE AND DISPOSE OF MATERIAL IN

ACCORDANCE WITH LOCAL AND STATE REQUIREMENTS. NO

ADDITIONAL COST WILL BE CONSIDERED FOR REMOVAL AND

DISPOSAL OF EXCAVATED MATERIAL AND REPLACEMENT WITH

NEW SUITABLE FILL TO MEET PROPOSED GRADES.

2. UNLESS OTHERWISE NOTED ALL DRAIN PIPES SHALL BE 12"

HDPE (HIGH DENSITY POLYETHYLENE).

3. UNLESS OTHERWISE NOTED, ALL DRAIN MANHOLES SHALL BE 4'

INSIDE DIAMETER.

4. ALL RIM ELEVATIONS SHALL BE FLUSH WITH FINISH GRADE.

5. DUMPSTER PAD SHALL SLOPE AT A MINIMUM 2% INTO THE

PAVED AREA.

6. EROSION CONTROL FABRIC "A" SHALL BE USED FOR ALL SLOPES

3:1 OR STEEPER.

7. FOR THE PROPOSED ROOF DRAIN LINES, THE CONTRACTOR

SHALL INSTALL CLEAN OUTS AT THE END OF THE PIPE LINE, AT

ANY LOCATION WHERE THE PIPE CHANGES DIRECTIONS, AND

AT A 100 FOOT INTERVALS AS NEEDED. CLEANOUTS LOCATED IN

PAVED AREAS SHALL BE INSTALLED TO PROVIDE H-20 WHEEL

LOADING RATING.

8. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE

SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN

INDEPENDENTLY VERIFIED BY THE OWNER OR ITS

REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE

EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE

COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE

FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY

THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND

PRESERVE ANY AND ALL UNDERGROUND UTILITIES. WHERE AN

EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED

WORK, THE LOCATION, ELEVATION AND SIZE OF THE UTILITY

SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE

CONTRACTOR AND THE INFORMATION FURNISHED TO THE

ENGINEER FOR RESOLUTION OF THE CONFLICT.

9. THE CONTRACTOR SHALL INSTALL SILT SACKS ON ALL

PROPOSED INLETS FOR THE DURATION OF CONSTRUCTION AND

INSPECT THE CATCH BASINS AFTER EACH RAIN EVENT. THE

SEDIMENT FROM SEDIMENT TRAPS SHALL BE REMOVED WHEN

DESIGN CAPACITY HAS BEEN REDUCED BY 50 PERCENT. SILT

SACKS SHALL BE REMOVED ONCE THE SITE IS PERMANENTLY

STABILIZED AT THE END OF CONSTRUCTION.

10. CONTRACTOR SHALL PROVIDE 12" PVC GATE VALVE TO ALLOW

FOR SHUTOFF OF DRAINAGE PIPING UPSTREAM OF

INFILTRATION CHAMBER SYSTEM AND DOWNSTREAM OF

KNOCKDOWN AREA CATCH BASIN. GATE VALVES SHALL BE AS

MANUFACTURED BY VALTERRA, OR APPROVED EQUAL.

11. CONTRACTOR SHALL DO A TEST PIT TO CONFIRM INVERT

ELEVATION OF THE EXISTING 24" CMP PIPE AT DMH1 AND

PROVIDE INFORMATION TO THE ENGINEER PRIOR TO

INSTALLATION OF DMH1.

12. CONTRACTOR SHALL STAKE OFF THE AREA OF INFILTRATION

CHAMBER SYSTEM AND INFILTRATION SWALES TO PREVENT

CONSTRUCTION EQUIPMENT AND STOCKPILED MATERIALS

FROM COMPACTING THE SUBGRADE SOIL, AND TO PROTECT

THEM FROM CONSTRUCTION TRAFFIC AFTER INSTALLATION.

13. THE CONTRACTOR IS DIRECTED TO THE GEOTECHNICAL

REPORT FOR DEPTH TO LEDGE. THE CONTRACTOR IS REQUIRED

TO REMOVE ALL LEDGE NECESSARY TO INSTALL THE

PROPOSED WORK AT NO ADDITIONAL COST TO THE TOW.

EC

EC

LFK

1 10/1/2020 PERMITTING UPDATE

NOTE:

1. THIS PLAN INCLUDES ALL REVISIONS MADE TO THE DESIGN

PLANS AFTER ORIGINAL PERMITTING SUBMITTAL. IT IS BEING

RESUBMITTED FOR RECORD.

(DELETE WITH BUILDING EXTENSION)