Objective FCM04

ESSIP Plan 2013

Octavian CIOARADSS/EIPR

13.09.2013

Page 2: Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013

ESSIP Plan 2013 / Objective FCM04 2

Objective FCM04

• Comprehensive Explanation• What is new or has changed since LSSIP 2012• Link to European ATM Master Plan• Finalisation Criteria and Closed Questions• ESSIP Report 2012• Objective Coordinator’s Analysis, recommendations, tips & tricks• Links and contacts

Page 3: Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013

Comprehensive Explanation

ESSIP Plan 2013 / Overview LSSIP 2012 3

Area of applicability: France, Germany, Italy, Poland, Spain, Switzerland Applicable to: Paris, Bordeaux, Marseille, Brest, Karlsruhe, Roma, Warsaw,

Madrid, Barcelona, Geneva and Zurich FMP

Initial Operational Capability (IOC): 09/2013Full Operational Capability (FOC): 12/2015

The objective will ensure the deployment of Short Term ATFCM Measures – Phase 1 (as defined by the Interim Deployment Programme – IDP)

As deployed in London, Raims and Maastricht FMP

A more automated version of STAM (labeled STAM phase 2) will be released in the next years by SESAR – Not within the scope of FCM04!

Page 4: Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013

What is new or has changed since LSSIP 2012

ESSIP Plan 2013 / Overview LSSIP 2012 4

Not the case. New objective.

Page 5: Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013

Link to European ATM Master Plan

ESSIP Plan 2013 / Overview LSSIP 2012 5

Objective FCM04 covers the following SESAR OI steps:

OI step - [DCB-0205] – Short Term ATFCM Measures

Page 6: Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013

Most important SLoA(s)

FCM04-ASP01 – Availability of demand-capacity balancing tools via CHMI (finalisation date 12/2015)

FCM04-ASP02 – Provision of ANSPs sector and traffic occupancy parameters data to NM (finalisation date 12/2015)

FCM04-ASP03 – Implement FCM procedures to enable application of flow management techniques on traffic streams closer to real-time and including more accurate assessment of forecast sector loads and cooperative management of groups of sectors and ATCO resources (finalisation date 12/2015)

ESSIP Plan 2013 / Overview LSSIP 2012 6

Page 7: Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013

Finalisation Criteria and Closed Questions

ESSIP Plan 2013 / Overview LSSIP 2012 7

Finalisation criteria:Contact your subject matter expert to determine the deployment Status for each SloA

Closed questions:Closed Questions have been introduced for this ObjectiveStatements on Deployment Status should provide answersto Closed Questions

Page 8: Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013

ESSIP Report 2012

ESSIP Plan 2013 / Overview LSSIP 2012 8

Not the case. New objective.

Page 9: Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013

Objective Coordinator’s Analysis, recommendations, tips & tricks

ESSIP Plan 2013 / Overview LSSIP 2012 9

Ensure that your subject matter expert is involvement once you make your statement.

Information provided per SLoA can be easily verified by checking the provisions laid down in the supporting material.

Attention to the applicability to the Military stakeholders as airspace users.

Page 10: Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013

Links and contacts

ESSIP Plan 2013 / Overview LSSIP 2012 10

Objective Coordinator: Octavian CIOARA +32 2 729 3282

[email protected]

NMD Objective Expert: Marcel RICHARD +32 2 729 9857

[email protected]