Upload
micheline-blanc
View
18
Download
0
Embed Size (px)
DESCRIPTION
Objective COM10. ESSIP Plan 2014. Adriatik KOKONA DSS/EIPR 19.09.2014. Objective COM10. Comprehensive Explanation Link to European ATM Master Plan Most important SLoA (s) Finalisation Criteria and Closed Questions Supporting Material ESSIP Report 2013 - PowerPoint PPT Presentation
Citation preview
Objective COM10
ESSIP Plan 2015
Adriatik KOKONADPS/PEPR
01.11.2015
ESSIP Plan 2015 / Objective COM10 2
Objective COM10
Comprehensive Explanation Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material ESSIP Report 2014 Objective Coordinator’s Analysis, recommendations, tips & tricks Conclusions Links and contacts
ESSIP Plan 2015 / Objective COM10 3
Comprehensive Explanation
AFTN / CIDIN technology is now becoming obsolescent, and is not sufficiently flexible to support future messaging requirements. It is intended that existing AFTN and CIDIN users and systems will transition to more modern technology, using the ATSMHS application, defined by ICAO to replace the AFTN telegraphic style of working with a store-and-forward Message Handling System based on international Standards and providing enhanced functionality.
The ATS Message Handling System (AMHS) is a proven messaging application based on the X.400 worldwide standards for messaging and on the Internet Protocol (IP) for transmission and routing. In the EUR ICAO Region it was decided to implement the AMHS on top of a TCP/IP network infrastructure. The deployment of AMHS is an ongoing work, which was started with the implementation of the "Basic Service" since 2006. An important development will be the introduction of the "Extended Service" which is described in the ICAO documentation.
ESSIP Plan 2015 / Objective COM10 4
Link to European ATM Master Plan
Enabler - [CTE-C06.c]
ESSIP Plan 2015 / Objective COM10 5
Most important SLoA(s)
COM10-ASP01 Implement AMHS capability (Basic ATSMHS) and gateway facilities to AFTN;
COM10-ASP03 Enhance AMHS capability (Extended ATSMHS)
ESSIP Plan 2015 / Objective COM10 6
Finalisation Criteria and Closed Questions
AMHS capability for Basic ATSMHS has been implemented, documented and in operational service (12/2011)
Extended ATSMHS capability has been implemented, documented and in operational service (12/2014)
ESSIP Plan 2015 / Objective COM10 7
Supporting Material
EUROCONTROL Specification on the Air Traffic Services Message Handling System (AMHS)" 0136, Edition number 2.0 "EUROCONTROL specification on the Air Traffic Services Message Handling System (AMHS)" published as Community Specification in the Official Journal of the European Union (ref. OJ C 323, 31.12.2009, p. 24)
ICAO ATS Messaging Management Manual (ICAO EUR Doc 021) ICAO EUR AMHS Manual (ICAO EUR Doc 020) ICAO detailed technical specifications (ICAO Doc 9880 Part IIB)
ESSIP Plan 2015 / Objective COM10 8
ESSIP Report 2014
ESSIP Plan 2015 / Objective COM10 9
Objective Coordinator’s Analysis, recommendations, tips & tricks
Priority should be given to implement the required communication infrastructure Internet Protocol (IPv6);
Start implementing Basic ATSMHS
ESSIP Plan 2015 / Objective COM10 10
Conclusions
Importance of the IP based communication infrastructure Implement COM10-ASP01 and ASP03
ESSIP Plan 2015 / Objective COM10 11
Links and contacts
PEPR Objective Coordinator: Adriatik Kokona, +32 2 729 3556
DNM Objective Expert(s): Yuksel EYUBOGLU, +32 2 729 3379