11
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR 01.11.2015

Objective COM10

Embed Size (px)

DESCRIPTION

Objective COM10. ESSIP Plan 2014. Adriatik KOKONA DSS/EIPR 19.09.2014. Objective COM10. Comprehensive Explanation Link to European ATM Master Plan Most important SLoA (s) Finalisation Criteria and Closed Questions Supporting Material ESSIP Report 2013 - PowerPoint PPT Presentation

Citation preview

Page 1: Objective COM10

Objective COM10

ESSIP Plan 2015

Adriatik KOKONADPS/PEPR

01.11.2015

Page 2: Objective COM10

ESSIP Plan 2015 / Objective COM10 2

Objective COM10

Comprehensive Explanation Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material ESSIP Report 2014 Objective Coordinator’s Analysis, recommendations, tips & tricks Conclusions Links and contacts

Page 3: Objective COM10

ESSIP Plan 2015 / Objective COM10 3

Comprehensive Explanation

AFTN / CIDIN technology is now becoming obsolescent, and is not sufficiently flexible to support future messaging requirements. It is intended that existing AFTN and CIDIN users and systems will transition to more modern technology, using the ATSMHS application, defined by ICAO to replace the AFTN telegraphic style of working with a store-and-forward Message Handling System based on international Standards and providing enhanced functionality.

The ATS Message Handling System (AMHS) is a proven messaging application based on the X.400 worldwide standards for messaging and on the Internet Protocol (IP) for transmission and routing. In the EUR ICAO Region it was decided to implement the AMHS on top of a TCP/IP network infrastructure. The deployment of AMHS is an ongoing work, which was started with the implementation of the "Basic Service" since 2006. An important development will be the introduction of the "Extended Service" which is described in the ICAO documentation.

Page 4: Objective COM10

ESSIP Plan 2015 / Objective COM10 4

Link to European ATM Master Plan

Enabler - [CTE-C06.c]

Page 5: Objective COM10

ESSIP Plan 2015 / Objective COM10 5

Most important SLoA(s)

COM10-ASP01 Implement AMHS capability (Basic ATSMHS) and gateway facilities to AFTN;

COM10-ASP03 Enhance AMHS capability (Extended ATSMHS)

Page 6: Objective COM10

ESSIP Plan 2015 / Objective COM10 6

Finalisation Criteria and Closed Questions

AMHS capability for Basic ATSMHS has been implemented, documented and in operational service (12/2011)

Extended ATSMHS capability has been implemented, documented and in operational service (12/2014)

Page 7: Objective COM10

ESSIP Plan 2015 / Objective COM10 7

Supporting Material

EUROCONTROL Specification on the Air Traffic Services Message Handling System (AMHS)" 0136, Edition number 2.0 "EUROCONTROL specification on the Air Traffic Services Message Handling System (AMHS)" published as Community Specification in the Official Journal of the European Union (ref. OJ C 323, 31.12.2009, p. 24)

ICAO ATS Messaging Management Manual (ICAO EUR Doc 021) ICAO EUR AMHS Manual (ICAO EUR Doc 020) ICAO detailed technical specifications (ICAO Doc 9880 Part IIB)

Page 8: Objective COM10

ESSIP Plan 2015 / Objective COM10 8

ESSIP Report 2014

Page 9: Objective COM10

ESSIP Plan 2015 / Objective COM10 9

Objective Coordinator’s Analysis, recommendations, tips & tricks

Priority should be given to implement the required communication infrastructure Internet Protocol (IPv6);

Start implementing Basic ATSMHS

Page 10: Objective COM10

ESSIP Plan 2015 / Objective COM10 10

Conclusions

Importance of the IP based communication infrastructure Implement COM10-ASP01 and ASP03

Page 11: Objective COM10

ESSIP Plan 2015 / Objective COM10 11

Links and contacts

PEPR Objective Coordinator: Adriatik Kokona, +32 2 729 3556

[email protected]

DNM Objective Expert(s): Yuksel EYUBOGLU, +32 2 729 3379

[email protected]