Objective ATC 15

ESSIP Plan 2013

Luca DELL’ORTODSS/EIPR

13.09.2013

Page 2: Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

2

Comprehensive Explanation

Scope: Multi-N (changed in ESSIP Plan ed. 2013 to match the reports provided by individual ANSPs in the LSSIP 2012 exercise)

Applicability area: AT / BA / BE / BG / CH / CZ / DE / DK / EE / ES / FI / FR / HR / HU / IE / IT / LU / LV / MAS / ME / NL / NO / PL / PT / RO / RS / SE / TR / UA / UK

Requirements: Implement in En-Route operations in selected ACCs, information exchange mechanisms, tools and procedures in support of Basic AMAN operations in adjacent and/or subjacent TMAs.

ESSIP Plan 2013 / Objective ATC15

Page 3: Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

3

What is new or has changed for ESSIP Plan ed. 2013

Scope changed from ECAC to Multi-N

ESSIP Plan 2013 / Objective ATC15

Page 4: Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

4

Link to European ATM Master Plan and/or Interim Deployment Programme (IDP)

Eur. ATM Master Plan:[TS-0305] - Arrival Management Extended to En Route Airspace – ESSENTIAL

IDP:WP 5.2

ESSIP Plan 2013 / Objective ATC15

Page 5: Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

5

Most important SLoA(s)

ASP01 – ‘Develop safety assessment for the changes’ Followed by: REG01 – ‘Conduct safety oversight of the changes’ REG02 – ‘Approve the procedures for operation of AMAN tools

in en route sectors supporting AMAN in adjacent/subjacent areas.’

…then: ASP02 – ‘Adapt the ATC systems that will implement arrival

management functionality (…)’ ASP03 – ‘Implement ATC procedures in En-Route

airspace/sectors (…)’…then ASP05 – (AIS Providers) ‘Revise and publish Aeronautical

Information documents’

ESSIP Plan 2013 / Objective ATC15

Page 6: Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

6

Finalisation Criteria and Closed Questions

Follows from what is said on slide before: REG01 / REG02 – The NSA provides an oversight of the changes

and the introduction of the change into service was accepted and a notification of acceptance has been provided to the ANSP.

ASP01 – ASP03 – assessed, adapted and implemented, documented and in operational use.

ASP05 – AIS information is updated. NSA conducts oversight of changes? Safety assessment done by ASP and accepted by NSA? Notification of acceptance received from NSA? Information available in the AIP?

ESSIP Plan 2013 / Objective ATC15

Page 7: Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

7

ESSIP Report 2012

It was a new objective in 2011. 5 ANSPs have implemented it; another 4 have partially completed

the actions and 11 reported as planned within the objective FOC date (12/2017).

From the reported ANSP plans, the current estimate for achievement is 12/2016 for 80% of the applicable area.

ESSIP Plan 2013 / Objective ATC15

Page 8: Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013

8

Links and contacts

Objective Coordinator: Dell’Orto Luca, +32 2 729 3325

[email protected]

EUROCONTROL Objective Expert(s):

Paul Conroy +32 2 729 3580 [email protected]

Predrag Terzioski, +32 2 729 3347

[email protected]

ESSIP Plan 2013 / Objective ATC15