Objective ATC 15
ESSIP Plan 2013
Luca DELL’ORTODSS/EIPR
13.09.2013
2
Comprehensive Explanation
Scope: Multi-N (changed in ESSIP Plan ed. 2013 to match the reports provided by individual ANSPs in the LSSIP 2012 exercise)
Applicability area: AT / BA / BE / BG / CH / CZ / DE / DK / EE / ES / FI / FR / HR / HU / IE / IT / LU / LV / MAS / ME / NL / NO / PL / PT / RO / RS / SE / TR / UA / UK
Requirements: Implement in En-Route operations in selected ACCs, information exchange mechanisms, tools and procedures in support of Basic AMAN operations in adjacent and/or subjacent TMAs.
ESSIP Plan 2013 / Objective ATC15
3
What is new or has changed for ESSIP Plan ed. 2013
Scope changed from ECAC to Multi-N
ESSIP Plan 2013 / Objective ATC15
4
Link to European ATM Master Plan and/or Interim Deployment Programme (IDP)
Eur. ATM Master Plan:[TS-0305] - Arrival Management Extended to En Route Airspace – ESSENTIAL
IDP:WP 5.2
ESSIP Plan 2013 / Objective ATC15
5
Most important SLoA(s)
ASP01 – ‘Develop safety assessment for the changes’ Followed by: REG01 – ‘Conduct safety oversight of the changes’ REG02 – ‘Approve the procedures for operation of AMAN tools
in en route sectors supporting AMAN in adjacent/subjacent areas.’
…then: ASP02 – ‘Adapt the ATC systems that will implement arrival
management functionality (…)’ ASP03 – ‘Implement ATC procedures in En-Route
airspace/sectors (…)’…then ASP05 – (AIS Providers) ‘Revise and publish Aeronautical
Information documents’
ESSIP Plan 2013 / Objective ATC15
6
Finalisation Criteria and Closed Questions
Follows from what is said on slide before: REG01 / REG02 – The NSA provides an oversight of the changes
and the introduction of the change into service was accepted and a notification of acceptance has been provided to the ANSP.
ASP01 – ASP03 – assessed, adapted and implemented, documented and in operational use.
ASP05 – AIS information is updated. NSA conducts oversight of changes? Safety assessment done by ASP and accepted by NSA? Notification of acceptance received from NSA? Information available in the AIP?
ESSIP Plan 2013 / Objective ATC15
7
ESSIP Report 2012
It was a new objective in 2011. 5 ANSPs have implemented it; another 4 have partially completed
the actions and 11 reported as planned within the objective FOC date (12/2017).
From the reported ANSP plans, the current estimate for achievement is 12/2016 for 80% of the applicable area.
ESSIP Plan 2013 / Objective ATC15
8
Links and contacts
Objective Coordinator: Dell’Orto Luca, +32 2 729 3325
EUROCONTROL Objective Expert(s):
Paul Conroy +32 2 729 3580 [email protected]
Predrag Terzioski, +32 2 729 3347