7/21/2019 NWL Self Lay Addendum June 2015-1
http://slidepdf.com/reader/full/nwl-self-lay-addendum-june-2015-1 1/9
NORTHUMBR
Self lay policy
and
Company speto the Code of Practic
– England and Wales
Revision – June 2015
IAN WATER LIMIT
ific addendumfor Self-Laying of Water Mai
2nd Edition) (Published by WR
D
s and Services
c plc)
7/21/2019 NWL Self Lay Addendum June 2015-1
http://slidepdf.com/reader/full/nwl-self-lay-addendum-june-2015-1 2/9
Northumbrian Water Limited: Adden
Table of Contents
1. Introduction
2. Contacting Northumbria
3. Related OFWAT Docum
4. Addendum Specifics
Part 1 - General
• Ownership of mains
• Ownership of servic
• Responsibility for pr
• Competence of Self
• Contestable and No
• Interfaces with local
Part 2 – Self Lay Procedur
• Initial enquiry
• Design by Develope• Design by NWL
• Construction stage
• Water main installati
Part 3 – Design & Constru
• Design drawings
• Flow and pressure
• Multiple service con
• Meter boxes
•
Service connection t• Data capture/As laid
5. Charges
6. Appendices
All terms in this addendum
England and Wales for th
and National addendum
specified.
dum for the Self Laying of Water Mains and Services
Water Ltd
ents
s
tection of street furniture
Lay Organisations
-Contestable Work
fire authority
s
r/SLO
on
tion Guidance
ections
o the water distribution systemdrawings
will have the same meaning as in the C
Self- Laying of Water Mains and Ser
or Safe Control of Routine Mains Co
Page 2
de of Practice for
ices 2nd Edition
nnections unless
7/21/2019 NWL Self Lay Addendum June 2015-1
http://slidepdf.com/reader/full/nwl-self-lay-addendum-june-2015-1 3/9
Northumbrian Water Limited: Adden
1. INTRODUCTION
Northumbrian Water Ltd (
self lay to Developers and
(SLO’s), while ensuring th
not compromised. As suc
Wales for the Self-Laying
WRc plc.
This addendum, which sho
& the National addendum
additional information and
particular requirements, pr
This addendum came into
lay policy. NWL reserves tnotice.
2. CONTACTING NWL
The NWL area of supply i
area and the southern or E
to the appropriate Develop
Developer Services (Nort
Northumbrian Water LimiteLeat House
Pattinson Road
Washington
Tyne & Wear
NE38 8LB
Tel: 08457 171100
Fax: 0191 4196764
Email: [email protected]
When applying to self-lay nand submit the Self-Lay a
the application is submitte
should accompany the app
dum for the Self Laying of Water Mains and Services
WL) is committed to providing a cost ef
their agents, often referred to as Self-
t the standards of installation work and
NWL has adopted the Code of Practi
f Water Mains and Services 2nd Editio
uld be read in conjunction with the Code
for Safe Control of Routine Mains Conn
sets out any variations to the CoP in
cedures and charges that may apply.
effect on 1st June 2015 and supersede
e right to amend the addendum at any
s made up of two regions, the northern
ssex & Suffolk area. Self-lay enquiries s
r Services department as follows:
h) Developer Services (S
d Essex & Suffolk WaterPO Box 969
Chelmsford
Essex
CM2 0XL
Telephone: 0345 60946
Fax: 01268 664802
ew mains and services the Developer/Splication form available on the NWL an
by an SLO a letter of authorisation fr
lication.
Page 3
ective service for
ay Organisations
water quality are
e for England &
as published by
of Practice (CoP)
ections, provides
luding details of
any earlier self-
time without prior
or Northumbrian
hould be directed
uth)
38
O shall completeESW website. If
m the developer
7/21/2019 NWL Self Lay Addendum June 2015-1
http://slidepdf.com/reader/full/nwl-self-lay-addendum-june-2015-1 4/9
Northumbrian Water Limited: Adden
3. RELATED OFWAT DO
Ofwat have published guid
Ofwat website: www.ofwat.
guidance in http://www.ofw
4. ADDENDUM SPECIFIC
CoP Part 1 - General
Ownership of mains (Co
The Developer/SLO re
workmanship for an agree
NWL is 12 months. Within
with the SLO. This is to e
Liability Period to repair an
Ownership of services (C
The Developer/SLO re
workmanship for an agree
connection.
Responsibility for protec
The Developer/SLO rem
including covers, lids, fram
adopted by the party respo
Competence of Self Lay
Only SLOs competent in
permitted to carry out wor
registered and accredited
Scheme (WIRS): www.lloy
Competence of Self Lay
The Developer/SLO shall e
water mains and/or servictraining and practical e
undertaken. Relevant pers
Register’ on www.eusr.co.
Safety and Environment P
carried at all times and sh
demand.
Contestable and Non-co
NWL will carry out work th
including:
dum for the Self Laying of Water Mains and Services
UMENTS
nce relating to self-lay activities that ca
gov.uk . This addendum aims to align its
at.gov.uk/developers/connection/selflay/
section 1.2)
ains responsible for any defective
d Defect Liability Period. The Defect L
this period, the Developer must maintain
nsure that the SLO returns to the site
identified defect.
oP section 1.3)
ains responsible for any defective
d Defect Liability Period of 12 months
ion of Street Furniture (CoP section 1
ins responsible for the protection o
es and chambers until such time as th
nsible for its ongoing maintenance
rganisations (CoP section 1.5)
the laying of water mains and servic
on behalf of the Developer. NWL req
with the Lloyds Register Water Ind
sregister.co.uk/schemes/WIRS/
rganisations (CoP section 1.5 (5))
nsure that all staff employed by them for
es shall have an appropriate combinatperience relating to the constructio
onnel shall be registered on the ‘Ener
uk and be in possession of a valid ‘Wat
ssport’ including a National Hygiene Ca
ll be available for inspection by NWL r
testable Work (CoP 1.8)
t may affect water quality to existing cus
Page 4
be found on the
elf with the Ofwat
materials and
iability Period for
their relationship
within the Defect
materials and
from the date of
.4)
street furniture
street has been
e pipes shall be
ires SLOs to be
stry Registration
the installation of
ion of education,activity to be
y & Utility Skills
er Sector Health,
d. Cards shall be
presentatives on
omers,
7/21/2019 NWL Self Lay Addendum June 2015-1
http://slidepdf.com/reader/full/nwl-self-lay-addendum-june-2015-1 5/9
Northumbrian Water Limited: Adden
• Establishing a point
• Designing and instal
• Work on a trunk or s
• Work on a main that
• Work on a main con
• Installation of an off
development
• Service connections
• Service connections
In addition, the following w
• Provision and Install
• Water quality sampli
NWL will install the wate
connections. The SLO sh
connection.
Interfaces with local Fire
Where the Developer/SLOthe designer, they shall
requested to do so by the
behalf of the Developer/SL
CoP Part 2 – Self Lay Pro
Initial enquiry (CoP secti
NWL will provide the p
parameters/constraints to
service layout.
Design by Developer / SL
If the Developer/SLO und
listed in Table 4 of the Cod
Design by NWL (CoP sec
If the Developer/SLO requ
all of the information liste
required design fee.
dum for the Self Laying of Water Mains and Services
of connection to the existing network
ling reinforcement work
trategic main
has been subject to recorded supply int
structed of a material requiring specialist
site main intended to be shared with an
to existing off-site mains
greater than 32mm in diameter
rk is non-contestable:
ation of meters
ng and testing
r meters to all wall box, boundary b
ll fit a trickle flow plug on new service pi
Authority (CoP section 1.13)
is responsible for the design of a newbe responsible for all Fire Authority
eveloper/SLO, NWL may consult with
. There will be a charge for this servic
cedures
n 2.2)
int of connection together with any
enable the Developer/SLO to prepar
O (CoP section 2.3.1)
rtakes the design they must submit all
e of Practice.
ion 2.3.2)
sts NWL to undertake the design then
d in Table 5 of the Code of Practice
Page 5
rruptions
attention
nrelated new
ox and manifold
pes at the time of
ains scheme, asliaison. Where
ire Authorities on
.
specific design
the mains and
f the information
they must submit
to NWL with the
7/21/2019 NWL Self Lay Addendum June 2015-1
http://slidepdf.com/reader/full/nwl-self-lay-addendum-june-2015-1 6/9
Northumbrian Water Limited: Adden
Construction stage (CoP
A pre-start meeting shall
the commencement of w
agreement has been comp
Water main installation (
If the site layout changes,
not allow the main to
immediately. No further co
evaluated and approved
construction then see secti
CoP Part 3 – Design & C
3.3 Design drawings
Format of designs (CoP
Wherever possible, site layin .dwg file format compatiagreement.
Design drawing and sup
The design drawing and s
following:
• Notation to indicate
• Notation to indicate
3.4 Design Guidance - G
Location of other apparat
It is the responsibility of thwith all current informationproviders information durin
3.5.1 Design Guidance -
Clearances between maiIn cases where NWL is nwith the designer and NWwater main and proposedfeatures
Flow and pressure (CoP
dum for the Self Laying of Water Mains and Services
section 2.4)
e organised and attended by the SLO
rk, following NWL’s confirmation that
leted.
oP section 2.4.2)
round contamination is identified or gro
e constructed as designed, NWL m
nstruction shall take place until the des
by NWL. If ground contamination is
n 3.7.2 of the Code of Practice.
nstruction Guidance
ection 3.3.1)
outs and designs should be submitted oble with AutoCAD (2009 or earlier) or
lementary design information (CoP s
upplementary design information should
esponsibility for construction of service
ervice strips and easements.
neral
us (CoP section 3.4.3)
Developer [designer in the CoP] to prorelating to the location of other existinthe design process
ains
s and proposed properties (CoP 3.5.1 t the designer, the Developer should d
L, an acceptable clearance between throperty constructions, any existing stru
ection 3.5.3.3)
Page 6
nd NWL prior to
he self lay legal
nd conditions do
ust be informed
ign has been re-
identified during
n CD or by emailnother format by
ction 3.3.4)
also include the
onnections
vide the designerutility or service
.1)iscuss and agree
line of the newtures and on site
7/21/2019 NWL Self Lay Addendum June 2015-1
http://slidepdf.com/reader/full/nwl-self-lay-addendum-june-2015-1 7/9
Northumbrian Water Limited: Adden
NWL will provide sufficientthe designer to design a sflow and pressure for watconnection locations.
Multiple Service ConnectNWL’s requirement is that
location of which will be ag
Meter boxes (CoP sectio
NWL’s preference is theshould be a multi depth bmeters (1.5qn) and incorpbox to be used is subject tbox types may be used by
Boundary boxes should bother locations as may beare acceptable.
Service Connections to t
Service connections and t
permits the installation of
properties. The minimum
service pipe is installed fr
Trenches should be leftcompliance with the Water
subject to the relevant notif
Data Capture/’As laid’ Dr
Full postal address and
SLO/Developer prior to
alternatively, at the time th
Before any section of sel
provide 3 copies of ‘as laname, scheme number, d
may also be submitted ele
Final as laid drawings sho
mains and Communicatio
NWL in the format detailed
5. CHARGES
Our standard charges sche
www.eswater.co.uk
dum for the Self Laying of Water Mains and Services
flow and pressure at the Point(s) of Constem that meets the minimum statutoryr used for Domestic Purposes at the
ions (CoP Section 3.6.4)separately occupied premises have indi
eed in advance with NWL on a site spe
3.6.5)
combined meter / stop tap boundaryx with plastic surface lid suitable for hrating a stop tap spindle operation. Theapproval by NWL in advance of installa
agreement with NWL in advance.
installed at or adjacent to the roadsidgreed with NWL. Manifold boxes (two,
e Water Distribution System (CoP se
e associated supply pipes are subject to
service connections prior to the compl
equirement for inspection purposes is t
om the main up to and including the
pen for inspection. If the SLO is Wat Supply (Water Fittings) Regulations ca
ication being received by NWL.
wings (CoP section 3.7.5)
meter installation details need to be
WL carrying out a Water Regulatio
Watersafe certificate is provided to NW
laid main is connected to the networ
id’ drawings, clearly marked with SLOte of installation of phase and date of
tronically in the format detailed in sectio
uld be submitted to NWL by the SLO
Pipes by NWL. The drawings should
in section 3.3.1 above.
me is available from our website. www.n
Page 7
ection, to enablerequirements for
proposed service
idual meters, the
ific basis.
ox option – thisusing concentrictype of boundaryion. Other meter
e boundary or infour and six way)
tion 3.7.4)
inspection. NWL
etion of the new
hat the complete
internal stop tap.
ersafe approved,be self certified,
provided by the
s inspection or,
L.
k, the SLO shall
and Developer’ssubmission, this
3.3.1 above.
rior to vesting of
be submitted to
wl.co.uk and
7/21/2019 NWL Self Lay Addendum June 2015-1
http://slidepdf.com/reader/full/nwl-self-lay-addendum-june-2015-1 8/9
Northumbrian Water Limited: Adden
Appendix A – Northern R
Worked example calcula
and asset payment.
Please note this worked ex
that is used to calculate c
only and is simplified.
Variables
Total scheme cost £100,00
Number of properties 100
Years before all properties
Average income per prope
Interest rate for borrowing
Discount rate 3.25%
Long term annual inflationNumber of applicable year
Year to Relevant Annual
31 Mar Revenue Cost
2016 450 10,197
2017 4,929 10,197
2018 8,887 10,197
2019 13,067 10,197
2020 17,495 10,197
2021 21,362 10,1972022 22,300 10,197
2023 22,969 10,197
2024 23,658 10,197
2025 24,368 10,197
2026 25,099 10,197
2027 25,852 10,197
The relevant revenue is t(based on a cumulative oc
received and increased ea
dum for the Self Laying of Water Mains and Services
gion Example
ing the relevant deficit, discounted
ample is intended to be an illustration of
arges and the asset payment. As such
0
are chargeable 5
ty £177
.25%
.0%12
Discounted
Annual Relevant Discount Aggregate In
Deficit Deficit Factor Deficit All
9,747 9,747 0.969 9,440
5,268 5,268 0.938 4,941
1,310 1,310 0.909 1,190
(2,871) - 0.880 - 1
(7,299) - 0.852 - 1
(11,166) - 0.825 - 1(12,103) - 0.799 - 1
(12,772) - 0.774 - 1
(13,461) - 0.750 - 1
(14,171) - 0.726 - 1
(14,902) - 0.703 - 1
(15,655) - 0.681 - 1
Relevantdeficit
DADTOTAL
16,324 15,571
e number of properties connected in tupancy) multiplied by the income per pr
h year in line with inflation.
Page 8
ggregate deficit
the methodology
it is an example
come Asset
wance Payment
450 436
,929 4,624
,887 8,074
0,197 8,972
0,197 8,690
0,197 8,4160,197 8,151
0,197 7,895
0,197 7,646
0,197 7,406
0,197 7,172
0,197 6,947
Assetpayment
84,429
he relevant year,perty that will be
7/21/2019 NWL Self Lay Addendum June 2015-1
http://slidepdf.com/reader/full/nwl-self-lay-addendum-june-2015-1 9/9
Northumbrian Water Limited: Adden
Appendix B – Southern R
Worked example calcula
and asset payment.
Please note this worked ex
that is used to calculate ch
Variables
Total scheme cost £100,00
Number of properties 100
Years before all properties
Average income per prope
Interest rate for borrowing
Discount rate 3.25%
Long term annual inflation
Number of applicable year
Year to Relevant Annual
31 Mar Revenue Cost
2016 181 10,197
2017 11,353 10,197
2018 22,286 10,197
2019 22,968 10,197
2020 23,670 10,197
2021 24,380 10,197
2022 25,112 10,1972023 25,865 10,197
2024 26,641 10,197
2025 27,440 10,197
2026 28,264 10,197
2027 29,112 10,197
The projected future revenyear, (based on a cumulati
will be received and increa
dum for the Self Laying of Water Mains and Services
egion Example
ing the relevant deficit, discounted
ample is intended to be an illustration of
rges. As such it is an example only and
0
are chargeable 5
ty £208
.25%
.0%
12
Discounted
Annual Relevant Discount Aggregate
Deficit Deficit Factor Deficit
10,016 10,016 0.969 9,700
(1,156) - 0.938 -
(12,089) - 0.909 -
(12,771) - 0.880 -
(13,474) - 0.852 -
(14,184) - 0.825 -
(14,915) - 0.799 -(15,668) - 0.774 -
(16,444) - 0.750 -
(17,244) - 0.726 -
(18,067) - 0.703 -
(18,915) - 0.681 -
Relevantdeficit
DADTOTAL
10,016 9,700
ue is the number of properties connectve occupancy) multiplied by the income
ed each year in line with inflation.
Page 9
ggregate deficit
the methodology
is simplified.
Income Asset
Allowance Payment
181 175
10,197 9,565
10,197 9,264
10,197 8,972
10,197 8,690
10,197 8,416
10,197 8,15110,197 7,895
10,197 7,646
10,197 7,406
10,197 7,172
10,197 6,947
Assetpayment
90,300
d in the relevantper property that