Document Reference: MS04-000995 Issue: 01 - Approved NV Environmental Requirements of Contractors Document N o MS04-000995 Prepared: Georgina Rofique Signed Electronically: 17-Mar-2011 Checked: Susan Schnadhorst Signed Electronically: 22-Mar-2011 Approved: Julian Hubbard Signed Electronically: 22-Mar-2011

NV Environmental Requirements of Contractors · 2014. 1. 27. · Document Reference: MS04-000995 Issue: 01 - Approved p.2 5.0 RESPONSIBILITIES Contractors shall identify all potential

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

  • Document Reference: MS04-000995 Issue: 01 - Approved

    NV Environmental Requirements of Contractors

    Document No MS04-000995

    Prepared: Georgina Rofique Signed Electronically: 17-Mar-2011

    Checked: Susan Schnadhorst Signed Electronically: 22-Mar-2011

    Approved: Julian Hubbard Signed Electronically: 22-Mar-2011

  • Document Reference: MS04-000995 Issue: 01 - Approved

    Revision History

    Issue Date Nature and Location of Change01 18-03-2011 Created from the UK Environmental Requirements of

    Contractors 01226R00016 version 08 (draft).

  • Document Reference: MS04-000995 Issue: 01 - Approved

    CONTENTS

    1.0 OBJECTIVES ....................................................................................................................... 1

    2.0 DEFINITIONS ....................................................................................................................... 1

    3.0 SCOPE................................................................................................................................. 1

    4.0 REFERENCE DOCUMENTS................................................................................................. 1

    5.0 RESPONSIBILITIES ............................................................................................................. 2

    6.0 PROCEDURE ....................................................................................................................... 2

    6.1 EXISTING FEATURES 2

    6.2 SITE DRAINAGE 3

    6.3 DELIVERIES 4

    6.4 STORAGE OF FUELS, OILS AND CHEMICALS 4

    6.5 CHEMICALS (INCLUDING FUELS AND OILS) 7

    6.6 WASTE MANAGEMENT 8

    6.7 EARTHWORKS 9

    6.8 PLANT 10

    6.9 ROAD CLEANLINESS 11

    6.10 DRIP TRAYS 11

    6.11 CONCRETE 12

    6.12 EMERGENCIES 12

    6.13 WILDLIFE 13

    6.14 FENCING AND WOOD 13

    6.15 TRAINING AND AWARENESS 13

    7.0 DELIVERABLES................................................................................................................. 14

    8.0 APPENDICES..................................................................................................................... 14

    Appendix 1 - Fuel and Oil Storage (mobile refuelling point) 15

    Appendix 2 - Dealing with Silty Water 17

    Appendix 3 - Spill Kits 19

    Appendix 4 - Environmental Requirements of Contractors - Receipt for Issue 21

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.1

    1.0 OBJECTIVES

    This procedure aims to identify environmentally safe working procedures and standards for particular operations that must be implemented by all Contractors when working on a site managed by NV.

    When using this Procedure the user must ensure that Swedish environmental legislation is being used is being complied with.

    2.0 DEFINITIONS

    Abbreviation or term Explanation of abbreviation or term

    i) C Contractor:

    The person or persons, firm or company, including its employees and agents or Contractors, to whom the Company has awarded a contract, which requires work to be carried out on the Companies premises or sites.

    ii) COSHH Control of Substances Hazardous to Health

    iii) CSM Construction Site Manager

    3.0 SCOPE

    This procedure is applicable to NV employees and all NV Contractors working on wind farm construction sites managed by NV.

    The following procedures provide minimum requirements to address environmental hazards thatwill normally be encountered during the development, construction and generation phases of a wind farm. Contractors shall remain responsible for the assessment of project specific environmental risks and the identification and application of all preventative measures, which shall form part of a Contractor’s work instruction (method statement).

    4.0 REFERENCE DOCUMENTS

    This procedure shall be read and implemented in conjunction with:

    i) Environmental Emergency Preparedness & Response Plan - 01226R00010

    ii) Emergency Procedure in the Event of a Contaminant Spill – 01276R00001

    iii) Template for Wind Farm Construction and Decommissioning Method Statement -01157R00010

    iv) Environmental Checklist – 01157R00017

    v) Reporting and Recording – 01276R00002

    vii) SEPA Pollution Prevention Guidelines (PPGs)

    CIRIA reference and guidance material was used to support and inform best practise within this procedure.

    http://ecm1/livelink/livelink.exe/open/883795http://ecm1/livelink/livelink.exe/open/883835http://ecm1/livelink/livelink.exe/open/883284http://ecm1/livelink/livelink.exe/open/669729http://ecm1/livelink/livelink.exe/open/883401

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.2

    5.0 RESPONSIBILITIES

    Contractors shall identify all potential environmental risks within the construction site, report these to the CSM, and ensure that all employees working on the NV managed wind farm follow and adhere to these procedures as absolute minimum requirements. These responsibilities are supplementary to project specific requirements detailed in Contract specifications.

    The CSM shall complete the environmental check-sheet template 01157R00017 at regular intervals (interval at the discretion of the CSM depending on level of works on site but at least once per month), and any actions arising from this shall be discussed with Contractors at the site safety meetings. Completed check-sheets shall be stored in the Construction Environmental Plan and any actions shall be completed within the agreed time frame.

    Contractors shall be responsible for informing NV of any environmental incident or potential incident as soon as practicable. The CSM shall be responsible for informing the HSQE Manager of any environmental incident or emergency which may occur on the construction site and completing the relevant form under the reporting and recording work instruction 01276R00002.

    6.0 PROCEDURE

    6.1 EXISTING FEATURES Responsibility

    Contaminated Land

    i) Areas of contaminated land shall be identified in the Project Health and Safety Plan. Where the construction works require the disturbance of these areas the procedure to be used shall also be detailed in the Project Health and Safety Plan. Any remediation or disposal of contaminated land shall only be carried out following consultation with the local environmental authority.

    If it is not necessary to disturb these areas then it is important that any contaminated area is fenced off and all personnel are aware of this hazard through induction and the site rules.

    CSM

    C

    ii) Where any unexpected and potentially hazardous obstacles are encountered, construction in the area shall cease until specialist advice is sought.

    C

    Underground Services

    i) Existing underground services shall be identified in the Project Health and Safety Plan, which shall include procedures for the control of risks including the use of a permitting system where necessary. Assessment of the hazards for underground services shall include an assessment of the environmental impact of damage during construction.

    Should the general condition of a buried service appear to be poor, even after being safely exposed, then this shall be reported to the relevant authority.

    CSM

    http://ecm1/livelink/livelink.exe/open/669729http://ecm1/livelink/livelink.exe/open/883401

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.3

    Existing Storage Tanks

    i) Any old containers found on site shall be checked and emptied by a Licensed Waste Carrier before they are removed.

    A copy of the licence certificate and where waste has been removed the waste transfer note shall be obtained and handed to the NV site manager for inclusion in the Construction Environmental Plan.

    Further information regarding disposal of waste is given in WasteManagement 6.5 below.

    C

    C

    CSM

    Protection from Vandalism

    i) Vandalism, theft and tipping are common causes of pollution and where required the project area shall be adequately protected by fencing and locked access to discourage unauthorised access.

    Any occurrence of rubbish dumping on the site shall be reported to the site management who shall then inform the local environmental authority and the police if necessary.

    C

    CSM

    6.2 SITE DRAINAGE Responsibility

    i) Surface water drains shall carry uncontaminated rainwater only and shall be protected from ingress of silt, or any other contaminants. Wet cement and raw concrete shall never be allowed to enter any watercourse.

    Refer to the contract drawings for details of the site drainage plan to be implemented and monitored. It is essential that drainage is installed as roads are installed /progressed, thus ensuring that silt is controlled at source.

    C

    ii) If working adjacent to a watercourse, ensure that a suitable method for containing any surface water is provided (e.g. cut off ditches and interceptors).

    C

    iii) Avoid storing or moving plant within 10m of a watercourse where no works are required on the watercourse bank.

    C

    iv) All methods being implemented to prevent water contamination shall be regularly checked and works carried out to ensure full functionality at all times.

    Any sign of failing water treatment measures or sight of silted or contaminated water entering a water course shall be reported to the site management immediately.

    C/CSM

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.4

    6.3 DELIVERIES Responsibility

    i) Fuel and oil deliveries shall take place within designated refuelling areas only, as detailed in the contract drawings.

    A responsible person shall supervise site deliveries to ensure that the correct amount of material is delivered to the correct tank and that the level is checked prior to refilling to avoid spillage.

    C

    6.4 STORAGE OF FUELS, OILS AND CHEMICALS Responsibility

    i) Oil is the most common pollutant, therefore, it is essential that Contractors provide suitable resources to ensure that the risk of pollution occurring is minimised.

    C

    ii) General Storage and Usage Requirements

    All fuel tanks and bowsers on site must be labelled with the fuel type and capacity of the tank.

    The contents of any tanks, bottles or containers on site must be clearly marked. Warning notices including “No smoking” and “Close valves when not in use” shall also be displayed.

    All re-fuelling and refilling of fuel tanks and bowsers shall take place over a drip tray (See 6.10 for more details) and refuelling shall always take place away from watercourses or surface drains.

    No tanks or containers may be perforated or dismantled on site. A competent operator shall empty all contents and residues for safe disposal elsewhere.

    C

    iii) Bunded Areas / Containers

    Tanks and Generators shall be bunded (the bund shall be capable of containing 110% of the fuel tank’s capacity) or shall have a double skinned fuel tank with an internal bund.

    The bund shall be kept empty of water, either by emptying/ draining via an oil interceptor or keeping the bunded area covered. The oil interceptor shall be a full retention separator, with the addition of an automatic closure device.

    It is highlighted that these are two separate and equally feasible options; i.e. covered refuelling area or uncovered refuelling area with full retention separator connected directly downstream.

    The full retention separator shall have the same design capacity as that of the bund.

    C/CSM

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.5

    iv) Single Skinned Fuel Tanks

    Definition; A tank which consists of single 1 layer thick walls, in which fuel is stored.

    No single skinned fuel tanks are allowed on NV sites.

    C/CSM

    v) Double Skinned Fuel Tanks

    Definition; This is primary tank with another "skin" placed around it with a very small gap between the two, none of the pipe work or ancillary equipment is contained between the skins.

    There must be checks on the structure of the fuel container, identifying any dents, holes etc when the tank arrives on site and checks that no additional damage has occurred on site.

    They must be able to check the space between the skins is empty, this can be for example be a visual check or a dipstick. These checks must be carried out and recorded weekly.

    All tanks must be labelled with their contents, capacity and any warning signs including no smoking, close valves when not in use.

    Tanks must be stored so as to minimise the risk of collision and vandalism. They shall not be stored adjacent to watercourses or in areas (such as wet lands) as identified by site management.

    There must also be appropriate spill kits kept and maintained by the Contractor, at suitable locations on site to deal with the event of a spillage, this must be made available at ALL times to all construction personnel

    C/CSM

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.6

    vi) Mobile Fuel Bowsers

    In addition to the requirements for the Double skinned fuel tanks all mobile fuel bowsers must be stored so as to minimise the risk of collision, run-away and vandalism. They shall not be stored adjacent to watercourses. When not in use, bowsers shall be securely stored in the designated refuelling area.

    In addition to the general requirements for primary and secondary containment, the following are requirements for mobile bowsers;

    Any flexible pipe, tap or valve must be fitted with a lock where it leaves the container and be locked when not in use. (Typically a pad lock.)

    Flexible delivery pipes must be fitted with manually operated pumps or a valve at the delivery end that closes automatically when not in use.

    The pump or valve must have a lock and be locked when not in use.

    C

    vii) Generators

    Generators permanently stationed in the site compound (used for powering site cabins) shall be kept in the designated refuelling area. Generators used elsewhere on the site shall be bunded (the bund shall be capable of containing 110% of the fuel tank’s capacity) or shall have a double skinned fuel tank.

    C/CSM

    viii) Bunded Areas / Containers

    Tanks and Generators shall be bunded (the bund shall be capable of containing 110% of the fuel tank’s capacity) or shall have a double skinned fuel tank with an internal bund.

    The bund shall be kept empty of water, either by emptying/ draining via an oil interceptor or keeping the bunded area covered. The oil interceptor shall be a full retention separator, with the addition of an automatic closure device.

    It is highlighted that these are two separate and equally feasible options; i.e. covered refuelling area or uncovered refuelling area with full retention separator connected directly downstream.

    The full retention separator shall have the same design capacity as that of the bund.

    C/CSM

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.7

    ix) Spill Kits

    The contractor is responsible for ensuring a chemical risk assessment is carried out and suitable spill kits are stored near to fuel containers.

    Appendix 3 details the minimum contents specification required for Spill Kits to be kept on site – the Contractor is responsible for determining the required volumes/ number and maintaining kit replenishment. ‘Kelp’ bio-remediation solution is to be provided by the Contractor for early treatment of any oil spills after initial clean-up.

    C

    x) Switchgear

    Any switchgear installation containing SF6 (Sulphur Hexafloride) shall be clearly labelled, both on the equipment itself, and on the door to the substation and/or wind turbine. The contact numbers for the responsible Contractor shall be included on the notice.

    SF6 will not normally be handled onsite as it’s delivered in sealed units, however if any leak or damage to switchgear containing SF6 occurred, it shall be treated following the guidance in the Emergency Procedure in the Event of a Contaminant Spill –01276R00001.

    C/CSM

    6.5 CHEMICALS (INCLUDING FUELS AND OILS) Responsibility

    i) Chemicals on site must be stored in accordance with their materials safety data sheet and chemical risk assessment, which must be readily available and up to date. An appropriate spill kit must be kept and maintained by the Contractor, at a suitable location on site to deal with the event of a spillage, this must be made available at ALL times to all construction personnel.

    All chemicals must be stored in a correctly marked container clearly identifying the contents. Where labels are worn off, then they must have a new label placed on them or the contents transferred to a correctly marked container.

    Where chemicals are required on site, they must be placed in an appropriate bund to prevent ground contamination.

    Appendix 3 details the minimum contents specification required for Spill Kits to be kept on site – the Contractor is responsible for determining the required volumes/ number and maintaining kit replenishment. ‘Kelp’ bio-remediation solution is to be provided by the Contractor for early treatment of any oil spills after initial clean-up.

    The CSM is responsible for filing the information sheets in the Construction Environment Plan.

    C

    CSM

    http://ecm1/livelink/livelink.exe/open/883835

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.8

    ii) The Contractor is responsible for carrying out a risk assessment of each substance and ensuring that all appropriate storage, protective equipment and if necessary emergency procedures are put in place on site.

    C

    iii) All chemical materials must be stored in appropriate containers, must be indelibly and legibly labelled to identify the contents, hazards and precautions required.

    C

    iv) Chemicals on site must be stored in a bunded area and in accordance with their materials safety data sheet and chemical assessment, which must be readily available and up to date. An appropriate spill kit must be kept and maintained by the Contractor, at a suitable location on site to deal with the event of a spillage, this must be made available at ALL times to all construction personnel.

    Where chemicals are required on site, they must be placed in an appropriate bund to prevent ground contamination.

    C

    6.6 WASTE MANAGEMENT Responsibility

    i) Waste management shall follow the route of; Reduce, Re-Use, Re-Cycle;

    Methods to reduce the amount of waste generated in the first place, together with the re-use and recycling of wastes must be considered.

    There is scope for significant savings, as the costs of raw materials and waste disposal continue to rise.

    C

    ii) All waste must be stored in designated areas that are isolated from surface drains, prior to removal from site.

    Skips must be covered to prevent refuse blowing away and rainwater accumulating. They shall be replaced when full and the contents disposed of in accordance with statutory requirements.

    C

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.9

    iii) Contractors work areas shall be kept tidy. Burning of waste on site is prohibited.

    Chemical containers, used oil and filters, solvents, paints, electrical items, contaminated materials and hazardous refuse are all classified as “hazardous waste” and, as such, must be stored in a bunded area away from watercourses and disposed of by licensed contractors in a controlled manner.

    Producers of waste shall ensure it is taken to a licensed disposal facility by a registered waste carrier.

    The carrier shall have a licence, and shall take the waste to a similarly licensed disposal facility. Current copies of the carrier’s licence certificate, waste disposal facility licence and correctly completed consignment notes / waste transfer notes, shall be handed over to the NV site manager for inclusion in the Construction Environmental Plan.

    C/CSM

    C

    C/CSM

    6.7 EARTHWORKS Responsibility

    i) All site personnel shall refer and work to the site drainage plan being implemented from the project design, any alterations to this must be agreed with NV site management first.

    C/CSM

    ii) Silt pollution is a major cause of environmental incidents; it can damage and kill aquatic life by smothering and suffocating and can also cause flooding by blocking culverts and channels.

    If you can prevent water becoming contaminated in the first place, then it reduces the risk of pollution and the overall cost of your control measures.

    To avoid silt pollution you shall, whenever possible, use methods of work that reduce or eliminate working in the channel and that do not contaminate surface water.

    C

    iii) Silty water can arise from excavations; exposed ground, stockpiles, wheel-washing and site roads and water containing silt shall not be discharged directly into rivers, streams or surface water drains.

    Where silty water does occur and presents a hazard to the environment, suitable treatment shall be required.

    General details of the use of settlement lagoons or tanks or grassed areas are contained in Appendix 2, though reference shallalways be made to the site drainage design.

    C

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.10

    iv) Where possible, water shall be prevented from entering excavations. Use of cut-off ditches and well point de-watering may be necessary. Water discharged by any pumping arrangement shall be dealt with according to the site drainage plan.

    C

    v) It is of paramount importance to minimise disturbance to flora and fauna whilst carry out the construction works, and to ensure that disturbed habitats will regenerate quickly after completion of the works.

    Topsoil and vegetation (stored separately from subsoil) shall be retained and reinstated over the track shoulders and all other areas of stripped ground, as soon as possible to prevent erosion and leaching.

    On wet and marshy ground it may be necessary to store excavated materials on a geotextile in order to minimise disturbance to the vegetation below. Where reasonably practicable, turfs shall be reinstated with the vegetated side facing upwards, in order to speed up the re-generation process, minimise the need for re-seeding, and help maintain the original species mix.

    C

    vi) The total quantity of exposed ground and stockpiles, and storage duration shall be minimised in order to minimise generation of silt and dust. If long-term storage is required then stockpiles can be seeded or covered and silt fences constructed from a suitable geotextile. In dry weather dust suppression measures may be required.

    C

    vii) The Contractor is responsible for avoiding excessive levels of nuisance dust being created, measures shall be taken to eliminate at source, e.g. watering.

    C

    viii) The Contractor shall be deemed to be familiar with and shall execute works in accordance with the guidance provided in the Environment Agencies PPG5 – Works and maintenance in or near water.

    C

    6.8 PLANT Responsibility

    i) Where possible, mobile plant shall be refuelled in the designated area. Where plant is to be refuelled outside this area a double skinned bowser must be used and re-fuelling shall take place over a drip tray.

    Refuelling shall always take place away from watercourses or surface drains.

    C

    ii) Plant and site vehicles are to be well maintained and any vehicles leaking fluids must be repaired or removed from site immediately. Any servicing operations shall take place over drip trays.

    C/CSM

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.11

    iii) All plant must contain a spill kit and operatives shall be suitably trained on immediate actions in event of a fluid spill.

    C

    6.9 ROAD CLEANLINESS Responsibility

    i) Site Roads shall be brushed or scraped as required to minimise dust and mud deposits, especially at site entrances and any watercourse crossings. If necessary during dry weather, dust suppression may be achieved by spraying water onto the site tracks to dampen down the airborne dust particulate.

    C/CSM

    ii) Measures shall be undertaken throughout the construction phase of the wind farm to ensure that dust and mud does not migrate onto the adjacent public highways, private roads or accesses.

    This may require the establishment of a wheel washing station comprising an apron onto which vehicles shall drive in order to clear the wheels and undersides using a power washer. Any water used during the wheel washing process shall be collected and passed through a silt trap before discharging into a soakaway.

    Where necessary, roads shall be cleaned with a mechanical suction brush.

    C/CSM

    6.10 DRIP TRAYS Responsibility

    i) Where practicable, drip trays shall contain absorbent granules, sheets or fibres, so that these can be disposed of once contaminated.

    After use the drip tray shall be cleaned using an appropriate absorbent material which shall be disposed of in accordance with Chemical regulations. Drip trays shall be regularly checked and cleaned.

    C

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.12

    6.11 CONCRETE Responsibility

    i) Concrete is highly alkaline and corrosive and can have a detrimental impact on watercourses and wildlife. It is illegal to allow cement and wash-out water to enter a watercourse.

    Washing-out of concrete wagons on site shall only be permitted when the Contractor has provided a designated, suitably prepared wash-out area with signage identifying the area as suitable for concrete wagon wash-out to the satisfaction of the NV Site Manager.

    The concrete ‘washout’ in the lagoon shall not be emptied into any watercourse and shall be disposed of once set in accordance with the Site Waste Management Plan

    No tools, equipment or materials may be washed in watercourses. Mortar mixing and material storage areas must be away from watercourses.

    Sulphate resistant concrete shall be used where geological conditions dictate, to prevent long term corrosion of concrete (local release of alkaline compounds) due to sulphate attack.

    C

    C

    CSM

    ii) When undertaking construction involving wet concrete in proximity or within a watercourse, consent shall be sought from the appropriate agency and work shall not commence without agreement from the NV site manager.

    C/CSM

    6.12 EMERGENCIES Responsibility

    i) Environmental emergencies such as spills shall be dealt with in accordance with 01226R00010 Environmental Emergency Response Plan, and Contractors shall familiarise themselves with this document.

    C/CSM

    ii) Each Contractor working with controlled substances shall supply an appropriate spill kit which shall be kept on site - refer to Appendix 3for requirements.

    The spill kit shall be made accessible at all times to all site personnel.

    C

    iii) The relevant environmental emergency number shall be posted by NV in all Contractors’ accommodation, and the emergency procedure shall be included in the NV site induction.

    CSM

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.13

    6.13 WILDLIFE Responsibility

    i) Wildlife shall be protected from entering and becoming trapped in any part of the works on the site. For excavations this may mean that fences, crossings or escape routes are necessary.

    C

    ii) The CSM shall identify any ecological / bird habitat constraints on site and/or ensure working time restrictions due to ecological / bird habitat constraints being respected on site.

    CSM

    iii) If unexpected wildlife is encountered during construction (e.g. bird nest), work shall be temporarily suspended and the CSM informed.

    If required work in the area shall remain suspended until advice is sought from the environmental authority responsible for that area.

    CSM

    6.14 FENCING AND WOOD Responsibility

    i) Existing animal proof fencing on the site shall be retained in good order, and where necessary all gates shall be kept closed to ensure livestock does not stray or escape during construction.

    NV shall agree a fencing scheme with the landowner(s), identifying any sections of fencing to be removed to make way for the works, locations of replacement temporary and permanent fencing, and new gates and cattle grids to be installed - refer to the contract drawings.

    C

    CSM

    ii) The Contractor shall, whenever possible, only use wood from sustainable sources, both in construction and during temporary works.

    C

    6.15 TRAINING AND AWARENESS Responsibility

    i) The Contractor shall ensure that all site personnel whom they have responsibility for are fully briefed and aware of any on site environmental constraints and sensitivities. The Contractor shallprovide adequate environmental training and awareness for construction site personnel.

    The CSM shall initiate tool box talks where necessary and ensure all site personnel are inducted on environmental issues on site.

    C

    CSM

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.14

    7.0 DELIVERABLES

    The following shall, be retained as Environmental Records in the Construction Environmental Plan.

    i) Issue / Receipt record sheets for this Procedure (Appendix 4) shall be filed in the Wind Farm Construction Environmental Plan

    ii) Completed Environmental Checklists

    iii) Completed Waste Transfer Notes

    8.0 APPENDICES

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.15

    Appendix 1 - Fuel and Oil Storage (mobile refuelling point)

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.16

    Two examples of the required arrangement for a mobile refuelling point are shown below:

    In addition to the design of the storage unit itself, the surrounding area shall be improved to ensure that any spills are contained within an area that can be later removed along with other contaminated waste.

    Any draw off guns used for fuel delivery shall not be lockable to avoid over-delivery.

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.17

    Appendix 2 - Dealing with Silty Water

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.18

    Silty Water

    Wherever possible, silty water shall be avoided. However, where is does occur it is vital that the silt that is held in suspension is allowed to settle out before the water reaches a watercourse. Silt can cause lasting damage to river life such as fish, insects and plants, can pollute local private water supplies and can also build up and cause flooding.

    All watercourses on site shall be shown to be free of the risk of silt pollution. The drainage design which shall be used to control runoff at the proposed site has been designed to cater for both quality and quantity and has been based on the design principals of SUDS. A full SUDS Design Statement has been submitted for the site (See Construction Method Statement Appendix) and forms an integral part of the Construction Method Statement. Reference must always be made to the SUDS Design Statement in the first instance, which provides the minimum specification upon which the contractor would be required to build. The SUDS design philosophy is based around prevention of contamination with silt. Where silt is unavoidably introduced into runoff, the runoff is dealt with at source through the use of regular check dams, numerous breakouts over a vegetated area, silt sumps, silt fences and settlement ponds, which are incorporated into a treatment train.

    Generic Solutions for Dealing with Silty Water:

    1. Flat Grassed Area

    Where the topography allows, existing grassed depressions are ideal for the natural filtration of run-off containing silt. However, it is important to ensure that water issuing onto such areas is not causing erosion en route, and also that the volume of silt being deposited in the settlement area is tolerable.

    2. Sumps

    A sump dug prior to any site drainage reaching an existing watercourse shall act as a settlement lagoon. The level of accumulated silt shall be monitored and lowered through controlled removal (such as a sludge tanker) when necessary. A series of sumps may be necessary to deal with larger discharges.

    3. Settlement / Separation Tanks

    These proprietary tanks operate on the same principle as the sump. Their performance is often enhanced by the inclusion of a baffle which prevents water overshooting the settlement tank. This baffle arrangement has the added advantage of acting as an oil separator in the event of such pollution reaching the tank. Sophisticated separators, or interceptors, which monitor the silt/oil level trapped are available. The tank size, layout and number of baffles can all be selected to identify the most appropriate arrangement.

    4. Filter Drains / Stone Check Dams

    These shall be built up with the filter drains along the length of the access tracks at regular intervals to slow the flow within the filter drain and trap sediment. They need to be installed as the tracks progress and regularly maintained to ensure they act as a barrier across the channel and routinely cleared to prevent sediment build up.

    5. Geotextile Check Dams

    These shall be kept on site in case of emergency silt ingress, when they shall be deployed immediately. Please refer to the SUDS Design Statement for more details. Geotextile shall only be used as a downstream polisher (last stage in the treatment train). As geotextile check dams are difficult to install properly and are onerous to maintain, their use shall be avoided and implementation of a full SUDS system shall minimise requirements.

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.19

    Appendix 3 - Spill Kits

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.20

    Minimum Spill Kit Contents

    The Spill Kits on site shall contain and be maintained with the following contents:

    - Absorbent Granules

    - Pads

    - Rolls/ Socks

    - Disposal Bags and ties

    - Personnel Safety Kit

    The Contractor shall ensure that as a minimum there is a spill kit kept within the bunded refuelling are, with the capacity to absorb 250l, the Contractor must replenish the kits if any material is taken from them.

    The Spill Kit MUST be contained in a suitable container; i.e. wheelie bin accessible at all times to the bunded area.

    It is recommended that security seal tape is placed on the spill kits to ensure that when they are checked it is clear if any content has been taken if the seal is broken.

    Mobile spill kits must be provided in each item of plant working on site.

    Suitable quantities of ‘Kelp’ bio-remediation solution such as; LK-301 shall also be kept on-site to enable quick response to any oil spillages by acting as a chemical dispersant.

    In addition to the spill kit detailed above, the Contractor shall provide for straw bales and filter fences to be made available on site as deemed necessary in the site drainage plan.

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.21

    Appendix 4 - Environmental Requirements of Contractors - Receipt for Issue

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.22

    ENVIRONMENTAL REQUIREMENTS FOR CONTRACTORS

    ISSUE DOCUMENT

    Issued to .................................................................................................................

    Contract Number and Description .............................................................................................................................

    .............................................................................................................................

    .............................................................................................................................

    Location ..................................................................................................................

    The person named below is the Company Project Manager responsible for overall management of the contract.

    Project Manager .............................................................Telephone ..............................

    The person named below is the Company Site Manager responsible for local management of the contract, who shall be permanently on site.

    Site Manager ..................................................................Mobile ..................................

    Other Site Telephones .................................................................................................

    The Site Manager shall always be the first point of contact, if for any reason, he is not available you shallcontact the Company Project Manager.

    The Company Environmental Management System and Site Rules are available/displayed at :

    .............................................................................................................................

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.23

    ENVIRONMENTAL REQUIREMENTS FOR CONTRACTORS

    RECEIPT DOCUMENT

    NORDISK VINDKRAFT COPY

    (To be detached and retained by the Site Manager when this document is issued to a Contractor on site)

    I acknowledge receipt of the Environmental Management System Procedure - Environmental Requirements of Contractors.

    I will disseminate the information contained within this procedure to our company workforce by;

    .............................................................................................................................

    .............................................................................................................................

    .............................................................................................................................

    I will disseminate the information contained within this procedure to our contractors by;

    .............................................................................................................................

    .............................................................................................................................

    .............................................................................................................................

    Contract Number and Description...............................................................................................................

  • Document Reference: MS04-000995 Issue: 01 - Approved

    p.24

    .............................................................................................................................

    .............................................................................................................................

    Location ......................................................................................

    Signed .........................................................................................

    Contracting Company .......................................................................................................

    Date ............................................................................................

    Contracting Company Head Office Telephone ....................................................................

    Local/site Telephone Number .......................................................