India’s largest power company, NTPC was set up in 1975 to accelerate power development in India.

NTPC has been operating its plants at high efficiency levels. Although the company has 17.75% of the total national capacity, it contributes 27.40% of total power generation due to its focus on high efficiency.

The total installed capacity of the company is 39,174 MW with 16 coal based and 7 gas based stations.

Page 3: ntpc  faridabad ppt ece

Salient Features

1. Project Faridabad Gas Power Project

2. Location /Address Village Mujedi, P.O.Neemka,Faridabad Haryana.

3. Plant Capacity 430 MW

4. Plant Configuration Gas Turbine 1 - 138 MW

Gas Turbine 2 - 138 MW

Steam Turbine - 156 MW

5. Fuel Natural Gas

6. Alternate Fuel Naptha

7. Average Gas Requirement 2 million cubic meters per day

8. Fuel Source HBJ pipe line ( through GAIL)

9. Cooling Water Source Rampur Distributory of Gurgaon Canal

10. Naphtha Storage 2 tanks of 8000 Kl each

11. Power Evacuation 2x220V Double Circuit Lines to 220 KV BBMB sub-station at Samaipur (Ballabgarh)

2x220 KV Double Circuit Lines to 220 KV HVPN sub-station at Palla (Faridabad)

12. Govt. Approved Date 25.07.1997

13. Project Cost Rs.1163.60 Cr

14. International Assistance OECF,Japan

BRIEF DESCRIPTION OF PLANT AND PLANT PROCESS

Page 4: ntpc  faridabad ppt ece

Main Plant(two GT , one

ST)DM plant Cooling Tower

(29000 m3)

Storage reservoir(two reservoirs of

45000 m3)

C.W. Chlorination

Plant

Naphtha Storage System

(Two Tanks of 8000 m3)

Switchyard

PLANT CONFIGURATION

Page 5: ntpc  faridabad ppt ece

Output 432 MW To HVPN

138 MW 138 MW 156 MW

GTG 1 GTG2HRSG 1

HRSG 2

STG

-Primary Fuel(Natural Gas)

-Secondary Fuel(Naphtha

WaterFrom

Gurgaon Canal

INPUT

GTG: Gas Turbine GeneratorSTG:Steam Turbine GeneratorHRSG:Heat Recovery Steam GenetraorTR:TransformerHVPN:Haryana Vidyut Prasaran Nigam

220 KVTR

220 KVTR

220 KVTR

Page 6: ntpc  faridabad ppt ece

Control and instrumentationMaintaining the pressures, temperatures, level and the flow in the various tanks,

pipes and also in the various heat exchangers present in the plant.

Alarm generation in case of failure of any equipment.

There are numerous equipments in the plant and all their readings are maintained by C & I department. For this purpose softwares like PI(Plant Info) system,SAP etc. are used.

Various electronic instruments such as electronic sensors, actuators and controllers are used to take the readings of the equipments.

Measurement and display of various parameters is done by converting the signals from equipments to digital form.

All purchasing,installing and maintenance of equipments comes under C & I Dept.

The main work of C & I department is to observe ,control and manipulate electrical as well as non-electrical quantities like temperature, pressure, vibrations etc.

Page 7: ntpc  faridabad ppt ece

Chemistry DepartmentDe-Mineralisation System

WAC exchanger

SAC exchanger

Degasser System

WBA exchanger

SBA exchanger

Mixed Bed

Pre-Treatment

Settling and coagulation

Filtration

Page 8: ntpc  faridabad ppt ece

Switchyard(Collection,Transmission, Distribution)

Bus bar(conduct within the the distribution board)

Isolator(disconnection switch used to transfer load from one bus to

another)

Circuit Breaker(automatically operated switch used to avoid overload or short

circuit)

Current Transformer(step up the low level of voltage)

Page 9: ntpc  faridabad ppt ece

Maintenance And Planning

• Analyse equipments• Raises notification for any disturbance.• Issue orders to the concerned department.

I.T.

• Computer networking through LANs.• Networking with coorporates through BSNL lease lines and VSAT(Very Small Aperture Terminal) links.• Telephone exchange of SEIMENS.• E-apps like SMS alerts.• Labour Gate Pass System• Material Gate Pass System• Document Tracking System