It is a structural system without complete vertical local carrying
space frame. (NSCP 208.20)
Braced frame
Bearing wall system
Rigid component
Concentric braced frame
8/10/2019 NSCP Reviewer 1.pdf
2/78
Is a component including its attachments having fundamental
period less than or equal to 0.06 sec. (NSCP 208.20)
Braced frame
Bearing wall system
Rigid component
Flexible component
8/10/2019 NSCP Reviewer 1.pdf
3/78
Is a component including its attachments having fundamental
period greater than 0.60 sec. (NSCP 208.20)
Braced frame
Bearing wall system
Rigid component
Flexible component
8/10/2019 NSCP Reviewer 1.pdf
4/78
8/10/2019 NSCP Reviewer 1.pdf
5/78
A complete record of test of materials and of concrete shall beavailable for inspection during the progress of work and _______
years after completion of the project and shall be preserved by theinspecting engineer or architect for that purpose, (NSCP 403.20)
2 years
5 years
10 years
15 years
8/10/2019 NSCP Reviewer 1.pdf
6/78
8/10/2019 NSCP Reviewer 1.pdf
7/78
8/10/2019 NSCP Reviewer 1.pdf
8/78
The minimum clear spacing between parallel bars in a layer must
be db but not less than? (NSCP 407.7.3)
50mm
25mm
75mm
100mm
8/10/2019 NSCP Reviewer 1.pdf
9/78
In spirally reinforced or tied reinforced compression members, clear
distance between longitudinal bars shall not be less than?(NSCP 407.7.3)
2.0 db
2.15 db
1.50 db
1.75 db
8/10/2019 NSCP Reviewer 1.pdf
10/78
8/10/2019 NSCP Reviewer 1.pdf
11/78
8/10/2019 NSCP Reviewer 1.pdf
12/78
Bars larger than ___mm shall not be bundled in beams:
(NSCP 407.7.6.3)
25mm
16mm
28mm
36mm
8/10/2019 NSCP Reviewer 1.pdf
13/78
Individual bars within a bundle terminated within the span of
flexural members shall terminate at different points with at least____ stagger: (NSCP 407.7.6.4)
12 db
10 db
50 db
40 db
8/10/2019 NSCP Reviewer 1.pdf
14/78
Minimum concrete cover cast against and permanently exposed to
earth: (NSCP 407.8.1)
100 mm
75 mm
50 mm
150 mm
8/10/2019 NSCP Reviewer 1.pdf
15/78
The minimum clear concrete covering for cast in place slab:
(NSCP 407.8.1)
20mm
25mm
40mm
50mm
8/10/2019 NSCP Reviewer 1.pdf
16/78
8/10/2019 NSCP Reviewer 1.pdf
17/78
8/10/2019 NSCP Reviewer 1.pdf
18/78
The minimum one way slab thickness which is simply supported at
the ends only is: (NSCP 409.6.2)
L/20
L/24
L/28
L/10
8/10/2019 NSCP Reviewer 1.pdf
19/78
The minimum one way slab thickness for a ONE end continuous
slab is: (NSCP 409.6.2)
L/20
L/24
L/10
L/28
8/10/2019 NSCP Reviewer 1.pdf
20/78
The minimum one way slab thickness for a BOTH ends continuous
slab is: (NSCP 409.6.2)
L/20
L/24
L/10
L/28
8/10/2019 NSCP Reviewer 1.pdf
21/78
The minimum cantilevered slab thickness is : (NSCP 409.6.2)
L/20
L/24
L/10
L/28
8/10/2019 NSCP Reviewer 1.pdf
22/78
Deep continuous flexural members has overall depth to clear span
ratio greater than: (NSCP 410.8.10)
0.40
0.60
0.75
0.70
8/10/2019 NSCP Reviewer 1.pdf
23/78
Deep simple span flexural members has overall depth to clear span
ratio greater than: (NSCP 307.4.2)
0.40
0.60
0.75
0.70
8/10/2019 NSCP Reviewer 1.pdf
24/78
Spacing of shear reinforcement placed perpendicular to axis of
non-prestressed member shall not exceed: (NSCP 411.6.4.1)
d/2
d/4
d
d/5
8/10/2019 NSCP Reviewer 1.pdf
25/78
8/10/2019 NSCP Reviewer 1.pdf
26/78
Is an essentially vertical truss system of the concentric or eccentric
type that is provided to resist lateral forces: (NCSP 208.1)
Building frame system
Braced frame
Diaphragm
Collector
8/10/2019 NSCP Reviewer 1.pdf
27/78
8/10/2019 NSCP Reviewer 1.pdf
28/78
Is a frame in which members and joints are capable of resisting
forces primarily by flexure:
Moment resisting frame
Ordinary braced frame
Truss
Eccentric braced frame
8/10/2019 NSCP Reviewer 1.pdf
29/78
8/10/2019 NSCP Reviewer 1.pdf
30/78
8/10/2019 NSCP Reviewer 1.pdf
31/78
8/10/2019 NSCP Reviewer 1.pdf
32/78
8/10/2019 NSCP Reviewer 1.pdf
33/78
The minimum distance that the toe of fill slope made to the site
boundary line: (NSCP 302.4.3)
0.80 M0.60 M
1.50 M
2.00 M
8/10/2019 NSCP Reviewer 1.pdf
34/78
8/10/2019 NSCP Reviewer 1.pdf
35/78
8/10/2019 NSCP Reviewer 1.pdf
36/78
8/10/2019 NSCP Reviewer 1.pdf
37/78
When grillage footings of structural steel shapes are used on soils,
they shall be completely embedded in concrete. Concrete covershall be at least _____mm on the bottom. (NSCP 305.8)
100 mm200 mm
150 mm
8/10/2019 NSCP Reviewer 1.pdf
38/78
Temporary open air portable bleachers may be supported upon
wood sills or steel plates placed directly upon the ground surface,provided soil pressure does not exceed ____Kpa. (NSCP 305.9)
100 Kpa50 Kpa
150 Kpa
200 Kpa
8/10/2019 NSCP Reviewer 1.pdf
39/78
The minimum nominal diameter of steel bolts when wood plates or
sill shall be bolted to foundation wall in zone 2 seismic area in thePhilippines. (NSCP 305.60)
10mm12mm
16mm
20mm
8/10/2019 NSCP Reviewer 1.pdf
40/78
The minimum nominal diameter of steel bolts when wood plates or
sill shall be bolted to foundation wall in zone 4 seismic area in thePhilippines. (NSCP 305.60)
10mm12mm
16mm
20mm
8/10/2019 NSCP Reviewer 1.pdf
41/78
Individual pile caps and caissons of every structure subjected toseismic forces shall be interconnected by ties. Such ties shall be
capable of resisting in tension or compression a minimum
horizontal force equal to _____% of the largest column verticalload. (NSCP 306.20)
15%20%
10%
25%
8/10/2019 NSCP Reviewer 1.pdf
42/78
Such piles into firm ground may be considered fixed and laterallysupported at _____M below the ground surface. (NSCP 306.20)
1.50 M2.00 M
2.50 M
3.00 M
8/10/2019 NSCP Reviewer 1.pdf
43/78
8/10/2019 NSCP Reviewer 1.pdf
44/78
The maximum length of cast in place piles/bored piles shall be_____times the average diameter of the pile. (NSCP 307.2.1)
10 times20 times
30 times
15 times
8/10/2019 NSCP Reviewer 1.pdf
45/78
Cast in place/bored piles shall have a specific compressivestrength Fc of not less than ______Mpa. (NSCP 307.2.1)
17.50 Mpa20 Mpa
15 Mpa
25 Mpa
8/10/2019 NSCP Reviewer 1.pdf
46/78
8/10/2019 NSCP Reviewer 1.pdf
47/78
8/10/2019 NSCP Reviewer 1.pdf
48/78
Pre-cast pre-stressed concrete piles shall have a specifiedcompressive strength Fc of not less than ____Mpa.
(NSCP 307.5.1)
20 Mpa15 Mpa
25 Mpa
35 Mpa
8/10/2019 NSCP Reviewer 1.pdf
49/78
8/10/2019 NSCP Reviewer 1.pdf
50/78
8/10/2019 NSCP Reviewer 1.pdf
51/78
8/10/2019 NSCP Reviewer 1.pdf
52/78
Buildings used for college or adult education with a capacity of 500or more students fall to what type of occupancy?
Miscellaneous occupancyEssential facilities
Special occupancy
Hazardous facility
8/10/2019 NSCP Reviewer 1.pdf
53/78
8/10/2019 NSCP Reviewer 1.pdf
54/78
8/10/2019 NSCP Reviewer 1.pdf
55/78
Buildings or structures therein housing and supporting toxic orexplosive chemicals or substances fall to what type of category?
Miscellaneous occupancyEssential facilities
Special occupancy
Hazardous facility
8/10/2019 NSCP Reviewer 1.pdf
56/78
8/10/2019 NSCP Reviewer 1.pdf
57/78
8/10/2019 NSCP Reviewer 1.pdf
58/78
8/10/2019 NSCP Reviewer 1.pdf
59/78
Retaining walls shall be designed to resist sliding by at least_______times the lateral force. (NSCP 206.6)
32
1.50
1.0
8/10/2019 NSCP Reviewer 1.pdf
60/78
8/10/2019 NSCP Reviewer 1.pdf
61/78
As per NSCP 2001 sect. 206.9.3 vertical impact force for craneload, if powered monorail cranes are considered, the max. wheel
load of the crane shall be increased by what percent to determinethe induced vertical impact? (NSCP 206.9.3)
50%25%
15%
20%
8/10/2019 NSCP Reviewer 1.pdf
62/78
The lateral force on a crane runway beam with electrically poweredtrolleys shall be calculated as ______% of the sum of the rated
capacity of the crane and the weight of the hoist and trolley.
(NSCP 206.9.4)
20%15%
30%
50%
8/10/2019 NSCP Reviewer 1.pdf
63/78
8/10/2019 NSCP Reviewer 1.pdf
64/78
An open building is a structure having all walls at least _____%open. (NSCP 207)
50%60%
80%
75%
8/10/2019 NSCP Reviewer 1.pdf
65/78
Low rise buildings is an enclosed or partially enclosed with meanroof height less than or equal to? (NSCP 207.20)
70 M50 M
15 M
18 M
8/10/2019 NSCP Reviewer 1.pdf
66/78
8/10/2019 NSCP Reviewer 1.pdf
67/78
8/10/2019 NSCP Reviewer 1.pdf
68/78
8/10/2019 NSCP Reviewer 1.pdf
69/78
8/10/2019 NSCP Reviewer 1.pdf
70/78
Large city centers with at least 50% of the buildings having a heightgreater than 21M. falls on what exposure category for wind
loading? (NSCP 207.5.3)
Exposure AExposure B
Exposure C
Exposure D
8/10/2019 NSCP Reviewer 1.pdf
71/78
8/10/2019 NSCP Reviewer 1.pdf
72/78
Flat unobstructed areas exposed to wind flowing over open waterfor a distance of at least 2 km falls on what exposure category for
wind loading?
Exposure AExposure B
Exposure C
Exposure D
8/10/2019 NSCP Reviewer 1.pdf
73/78
8/10/2019 NSCP Reviewer 1.pdf
74/78
8/10/2019 NSCP Reviewer 1.pdf
75/78
8/10/2019 NSCP Reviewer 1.pdf
76/78
8/10/2019 NSCP Reviewer 1.pdf
77/78
8/10/2019 NSCP Reviewer 1.pdf
78/78
In testing concrete laboratory cured specimens, no individualstrength test (average of 2 cylinders) falls below fc by more than
_______. (NSCP 405.7.3.3)
5 Mpa4.25 Mpa
3.50 Mpa
4.0 Mpa