41
TM Davis-Besse Nuclear Power Station Nuclear Regulatory Commission Public Meeting January 5, 2012

NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

Embed Size (px)

Citation preview

Page 1: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 1/41

TM

Davis-Besse Nuclear Power Station

Nuclear Regulatory CommissionPublic MeetingJanuary 5, 2012

Page 2: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 2/41

Davis-Besse Shield Building - NRC Informational Presentation 2TM

Agenda

Introduction

 – Barry Allen , Site Vice President – Davis-Besse

17th Mid-Cycle Outage Summary

 – Brian Boles , Director – Site Operations

Shield Building Condition Evaluation

 – Ken Byrd , Director – Site Engineering

Closing Comments

 – Barry Allen , Site Vice President – Davis-Besse

Page 3: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 3/41

Davis-Besse Shield Building - NRC Informational Presentation 3TM

Desired Outcomes

Demonstrate FENOC’s overriding priority and commitmentto ensure the safe and reliable operation of Davis-Besse

Recap 17 Mid-Cycle Outage Activities

Describe the discovery and investigation of the ShieldBuilding concrete cracking

Describe the evaluations performed to verify ShieldBuilding capability for operating conditions

Provide summary of actions going forward

Page 4: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 4/41

Davis-Besse Shield Building - NRC Informational Presentation 4TM

17th

Mid-Cycle OutageSummary

Brian Boles – Director, Site Operations

Page 5: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 5/41

Davis-Besse Shield Building - NRC Informational Presentation 5TM

Davis-Besse Plant Status

Currently Operating at 100% Reactor Power

 – 950 Megawatts

31 Days On-Line

122 Days Until 17th Refueling Outage

Reactor, Primary and Secondary systems operating as

designed

Page 6: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 6/41

Davis-Besse Shield Building - NRC Informational Presentation 6TM

Davis-Besse Mid-Cycle Outage Summary

Safety Upgrades

 – Replaced Reactor Head

 – Replaced Integrated Control System

Page 7: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 7/41

Davis-Besse Shield Building - NRC Informational Presentation 7TM

Davis-Besse Outage Summary

ReliabilityImprovements

 – Replaced StationBattery Chargers

 – Installed new stylePower OperatedRelief Valve

 – Replaced powercables

 – Replaced CoreCooling Motors

 – Performed MotorOperated and AirOperated Valvemaintenance

Page 8: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 8/41

Davis-Besse Shield Building - NRC Informational Presentation 8TM

Davis-Besse Outage Summary

Operating MarginImprovements

 – Replaced selectedService Water Piping

 – Drained and cleanedTurbine Plant Cooling

Water System – Performed Cooling

Tower maintenance

Page 9: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 9/41

Davis-Besse Shield Building - NRC Informational Presentation 9TM

Davis-Besse Outage Summary

Inspection Requirements

 – Completed 10 year

Inservice inspection – Inspected all fuel

assemblies

 – Performed Integrated

Leak Rate Testof Containment

Page 10: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 10/41

Davis-Besse Shield Building - NRC Informational Presentation 10TM

Outage Conclusions

Mid-Cycle Outage conducted in a safe manner

FENOC continues to invest in safety and reliability

improvements

As a result of work performed during the Mid-CycleOutage, Davis-Besse is operating safely and efficientlywith improved margins to safety.

Page 11: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 11/41

Davis-Besse Shield Building - NRC Informational Presentation 11TM

Shield Building ConditionEvaluation

Ken Byrd – Director Site Engineering

Page 12: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 12/41

Davis-Besse Shield Building - NRC Informational Presentation 12TM

Background

Mid-cycle outage to replace Reactor Pressure Vessel Head

Access opening required in concrete Shield Building

Opening dimensions 26.5’ w X 35.5’ h

Hydro-demolition method employed

Previous opening in 2002 used similar method

Size and orientation was different

Page 13: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 13/41

Davis-Besse Shield Building - NRC Informational Presentation 13TM

Shield Building

Purpose of ShieldBuilding

 – Biological Shielding – Environmental protection

for containment vessel

 – Controlled release of

annulus atmosphereunder accident conditions

Page 14: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 14/41

Davis-Besse Shield Building - NRC Informational Presentation 14TM

Shield Building

Page 15: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 15/41

Davis-Besse Shield Building - NRC Informational Presentation 15TM

Shield Building

Page 16: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 16/41

Davis-Besse Shield Building - NRC Informational Presentation 16TM

Shield Building Flutes

Page 17: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 17/41

Davis-Besse Shield Building - NRC Informational Presentation 17TM

Shield Building Flutes

Architectural Feature

 – The flute shoulders arepart of the ShieldBuilding. Concrete forshoulders and buildingshell was placedconcurrently.

 – Evaluation of structuralcapacity of ShieldBuilding does not creditflute shoulders.

 – Evaluated as a dead loadin structural analysis.

AuxiliaryBuildingRoof

Page 18: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 18/41

Davis-Besse Shield Building - NRC Informational Presentation 18TM

Shield Building

Page 19: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 19/41

Davis-Besse Shield Building - NRC Informational Presentation 19TM

Discovery

Cracking found on October 10 during hydro-demolition

Indications reported

 – Full length of left side of opening

 – Top and bottom of opening on left side

 – Indications appeared to be near the first (outer) rebar mat

Page 20: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 20/41

Davis-Besse Shield Building - NRC Informational Presentation 20TM

Initial Response

NRC Resident Inspector notified

Condition Report written

Restraint on restart established

Mobilized team of experts to investigate issue

Page 21: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 21/41

Davis-Besse Shield Building - NRC Informational Presentation 21TM

Initial Investigation

Decision made to “chip back” concrete to observeindication

No indications remained on bottom or left side of openingafter chipping

Chipping at top of opening revealed the crack extendedbeyond the construction opening

Page 22: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 22/41

Davis-Besse Shield Building - NRC Informational Presentation 22TM

Upper Opening Indication Investigation

Construction Technology Laboratory (CTL) ImpulseResponse (IR) testing methodology used to investigateextent of crack

IR was employed as a tool to provide a non-destructivemeans to identify regions of interest for furtherinvestigation

Core bores were taken to confirm the boundary of crackingbased on IR results

Page 23: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 23/41

Davis-Besse Shield Building - NRC Informational Presentation 23TM

Initial Investigation Around Construction Opening

Page 24: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 24/41

Davis-Besse Shield Building - NRC Informational Presentation 24TM

Investigation of Extent of Condition

Extent of Cracking Condition was investigated using IRtesting and Core Bores.

The results of the investigation were documented in theCorrective Action Process as follows:

 – October 10, Initiated CR and notified NRC – Unexpected concretecrack within Shield Building temporary opening

 – October 24, Initiated CR and notified NRC – Additional crackidentified in Shield Building architectural flute shoulder area

 – October 26, Initiated CR and notified NRC – Cracking identified inShield Building at Main Steam Line Penetration region

 – October 31, Initiated CR and notified NRC – Shield Building IRindications above Elevation 780

Page 25: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 25/41

Davis-Besse Shield Building - NRC Informational Presentation 25TM

Impulse Response Inspection

IR Testing Performed:

 – 15 of 16 flute shoulders

 – 6 of 8 flutes – 8 of 8 shell regions between flute shoulders

 – Main Steam Line Rooms and Fan Equipment room

 – Vertically to the top of Shield Building wall

Page 26: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 26/41

Davis-Besse Shield Building - NRC Informational Presentation 26TM

Shield Building Core Bores

70 core bores performed

Core bore pairs were usedto validate the IR results

Measured cracks were

adjacent to the ShieldBuilding outer rebar mat

Page 27: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 27/41

Davis-Besse Shield Building - NRC Informational Presentation 27TM

Shield Building Core Bores

All measured cracks were

very tight Eight deep core bores were

taken that reached theinterior reinforcing steel

mat. Confirmed crackingonly in outer rebar mat.

 – 2 in flute shoulders

 – 4 in flutes – 2 in Main Shell Region

Page 28: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 28/41

Davis-Besse Shield Building - NRC Informational Presentation 28TM

Shield Building Visual Examinations

Surface examinations of all areas investigated for spalledconcrete, corrosion/staining, surface bulging and looseconcrete

 – Surface examination results revealed no indications of concretesurface distress impacting the structural integrity of the ShieldBuilding

 – Condition Report initiated to document a case of exposedreinforcement and spalling in the corner of a shoulder.

Rebar inspected at the construction opening in goodcondition

Page 29: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 29/41

Davis-Besse Shield Building - NRC Informational Presentation 29TM

Laboratory Evaluation of Shield Building

Concrete

Initial Laboratory

evaluation of two corebores performed by CTLGroup

Results of tests indicate

 – Concrete is in good conditionwith no apparent deficienciesthat would affect itscontinued service

 – Carbonation is at a depthconsistent with the age of theconcrete

Page 30: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 30/41

Davis-Besse Shield Building - NRC Informational Presentation 30TM

Summary of Shield Building Condition

Cracking is generic to flute shoulder regions and can be assumedto be present at any elevation in the flute shoulders. Crackingobserved to be more prevalent on the south side of the building.

Cracking exists at the top 20 feet of the Shield Building walloutside the flute shoulder region.

Two small regions adjacent to the Main Steam Line penetrationshave similar cracks. The extent of these regions is localized andunique to these particular penetrations.

Cracks are located near the outer reinforcing mat. No crackingobserved in interior reinforcing mat.

Cracks are very tight.

Page 31: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 31/41

Davis-Besse Shield Building - NRC Informational Presentation 31TM

Structural Evaluation

Shield Building Design

 – Building designed and constructed with significant reinforcement

 – Significant Margin under design basis loads – Design Basis

 –  Earthquake 6 – 6.5 on Richter magnitude scale

 –  Tornado winds of 300 miles per hour

 –  Tornado wind-driven debris

 –  Tornado depressurization

Impact of laminar cracks on design

 – Potentially reduce the bond strength between concrete andreinforcing steel

Page 32: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 32/41

Davis-Besse Shield Building - NRC Informational Presentation 32TM

Bond Strength

Force transfer between reinforcement and concrete

 – Adhesion (small contribution)

 – Friction (moderate contribution) – Mechanical bearing of lugs (most contribution)

Page 33: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 33/41

Davis-Besse Shield Building - NRC Informational Presentation 33TM

Bond Strength

Bond stress about 50% of capacity under Design BasisLoad

Concrete much stronger than specified (>6000 psi vsspecified 4000 psi)

Test results indicate a margin of at least 50% after initiationof a splitting crack.

Page 34: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 34/41

Davis-Besse Shield Building - NRC Informational Presentation 34TM

Bounding Building Analysis

Bond strength with adjacent cracks can not be quantifiedand is conservatively treated as non-existent in analysis.

Calculations performed to provide a bounding evaluation ofthe effect of cracking.

 – Vertical and horizontal reinforcement ineffective for strength in fluteshoulders, two steam line penetration areas and in regions at top of

shield building. Any bond between reinforcement and concrete in crack

regions provides additional margin.

Page 35: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 35/41

Davis-Besse Shield Building - NRC Informational Presentation 35TM

Bounding Building Analysis

Calculations are consistent with the original design andmethodology.

Calculations were performed by highly qualified andexperienced Bechtel engineering team.

FENOC Engineering staff performed detailed owner’sacceptance review.

Independent third party engineering review was performedby Sargent & Lundy.

Page 36: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 36/41

Davis-Besse Shield Building - NRC Informational Presentation 36TM

Root Cause

Root Cause determination in progress

 –  Director Fleet Performance Improvement

 –  Davis-Besse Root Cause Evaluator –  MPR Associates, Inc.

 –  Performance Improvement International

Page 37: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 37/41

Davis-Besse Shield Building - NRC Informational Presentation 37TM

Root Cause

Root Cause Team Activities

 – Visual Inspections

 – Review of IR and Core Bore Inspection Results – Review of Construction Records

 – Analysis of Core/Rebar Samples

 – Detailed Modeling of Shield Building

Expected Results of Root Cause

 – How, Why and When Cracking Occurred

 – Long Term Monitoring Program

Page 38: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 38/41

Davis-Besse Shield Building - NRC Informational Presentation 38TM

Summary of Evaluation Results

Shield Building meets strength requirements.

Meets serviceability as demonstrated by the structure’s

past performance. Any bond between the concrete and reinforcement in

cracked regions would be an additional margin of safety.

Shield Building is capable of performing its safetyfunctions.

Page 39: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 39/41

Davis-Besse Shield Building - NRC Informational Presentation 39TM

Closing Comments

Barry Allen – Site Vice President

Page 40: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 40/41

Davis-Besse Shield Building - NRC Informational Presentation 40TM

Summary of Actions Going Forward

FENOC has committed to the following ongoing actions:

Determine Root Cause of cracks in the Shield Building

Perform interim monitoring of the Shield Building duringthis run cycle

Perform additional monitoring of the Shield Building during

the 2012 refueling outage Develop Long-Term Monitoring Requirements

Page 41: NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

8/3/2019 NRC Davis-Besse Nuclear Power Station Public Meeting 1-05-12 FENOC Slides

http://slidepdf.com/reader/full/nrc-davis-besse-nuclear-power-station-public-meeting-1-05-12-fenoc-slides 41/41

Davis-Besse Shield Building - NRC Informational Presentation 41TM

Conclusions

The Shield Building condition has been extensivelyinvestigated to establish a thorough understanding of theextent of cracking.

Conservative calculations demonstrate the Shield Buildingmeets strength requirements.

The Shield Building is structurally sound, and is fully

capable of performing its safety function.

Davis-Besse is being operated safely.