Municipality/Organization: Town of Me ndon EPA NPDES Permit Number: BRPWM08A MassDEP Transmitta l Number: W-036130 Annual Report Number & Reporting Period: Apr il I, 2014 - March 3 I , 201 5 NPDES Pll Small MS4 General Permit Annual Report (Due: May l, 2015) Part I . General Information Contact Person: Alan D. Tetreault Title: Highway Surveyor Telephone # : 508-473-0737 Email: highwaydpt@mendonma. gov Mailing Address: P.O. Box 51 Mendon, MA 01756 Certification: l certify under penalty of law that this document and all attachments were prepared under my di rection or supervision in accordance with a system designed to assure that qualjfied personnel properly gather and evaluate the information submitted. Based on my inquiry of th e person or persons who manage the system, or those persons directly responsible for gathering the inform ation, the infonnation submitted is, to the best of my knowledge and be li ef, true, accurate, and complete. I am aware that there are significant penalties for submitting false information. including the possibility of fine and imprisonment for knowing violations. Signature: Printed Name : Mike Goddard Title: Chaim1an, Board of Sel.ectmen Date: May 1, 2015

NPDES Pll Small MS4 General Permit Annual Report · BM P BMP Descrip tion Responsible Measu rab le Goa ... Progress on Goa l(s) Dept./Person Permit Year 12 Perm it Yea r 13 Name (Reliance

Embed Size (px)

Citation preview

Page 1: NPDES Pll Small MS4 General Permit Annual Report · BM P BMP Descrip tion Responsible Measu rab le Goa ... Progress on Goa l(s) Dept./Person Permit Year 12 Perm it Yea r 13 Name (Reliance

Municipality/Organization: Town of Mendon

EPA NPDES Permit Number: BRPWM08A

MassDEP Transmittal Number: W-036130

Annual Report Number & Reporting Period: April I, 2014 - March 3 I , 201 5

NPDES Pll Small MS4 General Permit Annual Report (Due: May l, 2015)

Part I . General Information

Contact Person: Alan D. Tetreault Title: Highway Surveyor

Telephone # : 508-473-0737 Email: highwaydpt@mendonma. gov

Mailing Address: P.O. Box 51 Mendon, MA 01756

Certification:

l certify under penalty of law that this document and all attachments were prepared under my di rection or supervision in accordance with a system designed to assure that qualjfied personnel properly gather and evaluate the information submitted. Based on my inquiry of th e person or persons who manage the system, or those persons directly responsible for gathering the inform ation, the infonnation submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information. including the possibility of fine and imprisonment for knowing violations.

Signature: /s/ MG~ Printed Name : Mike Goddard

Title: Chaim1an, Board of Sel.ectmen

Date: May 1, 2015

Page 2: NPDES Pll Small MS4 General Permit Annual Report · BM P BMP Descrip tion Responsible Measu rab le Goa ... Progress on Goa l(s) Dept./Person Permit Year 12 Perm it Yea r 13 Name (Reliance

Part II. Self-Assessment

T he Town ofMendon was issued a NPDES Stormwater General Permit in March, 2003. The Town has completed a self-assessment and has determined that we are in compliance with all permit conditions, including:

Sheet flow inspection and reporting on a quarterly basis Inspection ofmaterial storage Annual employee training for spill and pollution prevention Completion and compliance with Illicit Discharge P lan Completion and compliance with Non-Stormwater Discharge Bylaw Compliance with Tier II reporting requirements Completion and compliance with Spill Prevention Control and Countermeasures Plan Compliance with Endangered Species routines Site compliance with established SWPPP Ongoing implementation and improvement of SWMP Maintenance of reporting and record keeping ofestablished plans

2

Page 3: NPDES Pll Small MS4 General Permit Annual Report · BM P BMP Descrip tion Responsible Measu rab le Goa ... Progress on Goa l(s) Dept./Person Permit Year 12 Perm it Yea r 13 Name (Reliance

Par t Ill. Su mm ary of M i n im um Control Measures

l. Public E d uca tion and O u treach

BMP BMP Descripti on Responsible Mea su rable Goa l(s) Progress on Goal(s)- Pla nned Activities ­ID # Dept./Perso n

Na me Permi t Yea r 12 (Reliance on non-municipal partners indicated, ifany.)

Permit Year 13

lA -R~~isc:d .

Community Website

-· --------­ ---­ ------------­

Town Administrator -----­ ----- ---­ --- ·

Post educational materia l ---­ ------­ ----­ ---------­

The Town has a website managed by the BOS; the Highway Department has a page dedicated to Stom1water Management and Ll D practi ces.

Same

IB -R~~ised.

Newspaper Press Release

--------­ ---­ ------··------­

Highway _t;>_e.e!f_I~Q?........

One press release/yr

----­ ------­ --­ ----------­

Article in paper spring of20 15. Annual article.

IC -R~~isc"d .

Hazardo us Waste

-~~-~!~~!~~~-~~¥... ··­..... Board of Hea lth

----­ -­ -----------­

One per year

-­ -­ --­ ---­ -----­ ------­ -­

Hazardous Waste Collection Day on June 14, 2014 .

Hazardous Waste Collection Day on June 13 , 2015.

ID ··-­ ---­ -Revised

Educational Displays

~------- - ------------- - --- --

Highway Dept.

-----­ ----­ ------­ -

One display per

_'!,_l!l] !~~e~! -~l!! ~-~~J!g_-.- .. The Highway Department uses rain barre ls, which are on display and information availabl e to the public.

Same

I E · R~~isc·J·

Classroom Education

---------­ ----­ -------------

Science Dept _t:l_ig)!~~Y..I?.~e~ ___

I Stormwater Topic

.P.~~ Y.~~~... . -.. .. .... -·­ · Ordering more sto nn water stickers and bookmarks . Not yet coordinated with school.

Further development of plan with school. To be placed on storm drains summer of20 15.

IF ·Rc~isc·d· -

Educational Pamphlets

-­ --­ -----­ --­ ---------- ---­

Highway Dept. Board of Hea lth ---­ ---­ --­ ------­ -

Post seasonal information -------------­ -­ --­ ---­ -­ -

Pamphlets on stonnwater are avai lable at the BOH office and Highway Dept. Town wide mailing is too costly.

Same as year 12; Additional funds may become available after July I which may enable mailings.

3

Page 4: NPDES Pll Small MS4 General Permit Annual Report · BM P BMP Descrip tion Responsible Measu rab le Goa ... Progress on Goa l(s) Dept./Person Permit Year 12 Perm it Yea r 13 Name (Reliance

2. Public Involvement and Participation

BMP BMP Description Res ponsib le Meas urable Goa l(s) Progr ess on Goa l(s)­ Planned Activities ­10 # Dept/Person

Na me Perm it Year 12 (Reliance on non-municipal partners indicated , if any.)

Permit Year 13

2A Adopt-A-Road Highway Dept Initiate program Officially adopted Adopt-A -Site Program on Jun e 28, 20 I 0. Four sites

Continue program.

----­ --­ ----­ --­ -----------­ --------­ ----------­ -­ -----­ ----­ --------­ -----­ ------Revised approved; 3 were failure s; one is successful.

2B

·Re~i5c"ci ·

Storm Drain Stenciling

------- ---------­ ------­ ---­

Highway Dept

------------------­

Mark 25% oftown's _s_ts>_r_'!l_9!".!\.i~.!'- ~!l.f!~~! [>! __ •

In progress each year; restricted by funding; no additional drains marked.

There was no Town wide clean up in year 12. When held, it is an initiated

Continue program.

Town wide clean up day- date is yet to be determ ined -To be held in

2C Roadway Clean up Day Con. Comm. Annual clean up

-·-----­ -Revised --­ -----------­ -------­ ---­ -­ -------­ --------­ -­ -­ -­ --------­ --------­ -· program for volunteers to get tras h bags from Highway Dept, pick up trash, and then call Highway Dept so that we could dispose of bags.

conjunction with Community Outreach progra m administered by Worcester County Sheriffs Office. Continue voluntary road side clean up.

2D

- l{e~i5cci ­

Adopt-A-Stream

-·· ···-------­-­ --­ -----­ --­

Highway Dept. BOS ---­ --- ----­ ------­

Initiate program

----­ -- -----­ -------­ -­ --­

·'Stream Team" for Mill River organized through BRWA.

Poster contest sponsored by Con Com in conjunction with Town Clean Up.

Needs to be deve loped.

There was no Town Clean Up in year 12. Will try aga in next year.

-­ ... -.. -.. -­R~viscd

Poster Contest

-----­ --------------­ -­ ----­

Con. Comm.

----­ ---­ --------­ -

Annual contest

-------------------------­

................. Revised -----­ ---­ ------­ ---­ --­ ---­ -----------------­ - -------------­ -----------­

4

Page 5: NPDES Pll Small MS4 General Permit Annual Report · BM P BMP Descrip tion Responsible Measu rab le Goa ... Progress on Goa l(s) Dept./Person Permit Year 12 Perm it Yea r 13 Name (Reliance

--- --- --- -- ------- -

------- ---- ----------------

--------------- -- -- ---- -------- ------ ----- ---

-- ------- -- -----------------

------- ---- ---- -- --

----- -- ----- ------- ------------- ----- --------

--- -- -------- ------

-- ----- ----------- --- ----------- --- -- ------ ----- -------- -- ----- ---- -- ----- --------

38

BM P BMP Descrip tion Responsible Measu rab le Goa l(s) Pla nned Activities ID #

Progress on Goa l(s)­Dept./Person Permit Year 12 Perm it Yea r 13 Name (Reliance on non-mun ic ipal par tners

indicated, if any.) 3A Mapping Stormwater Highway Dept. Field Inspect/map All outfalls mapped & marked with Identify and inspect 100% outfalls in

Outfalls GPS Locating Markers - Identify and Urbanized Area . .~99~~ ~-~~~a_IJ~~)!~~F.._... · k-c~is~d-· · ·-------- ----- ------- --- --­

inspect 100% outfalls in Urbanized Area.

Non-Stormwater BOi-UHighway En force bylaw. Ordinance

Draft and enforce Enforced bylaw. .I?.~P.!-[~9~...... . -~)!!~~---·-············ ·· -,~C:~isc<i-

3C Develop Illicit Highway Dept. Implement Plan Requirements of IDDP met: train ing Develop and utilize logs and complete, visual inspection ofoutfalls complaint/no tice procedures for_Qj~~~-3:r~~ -~!~1_1------ -----·Rc~isc<i- done; established track ing system and Illicit Discharges; further develop log system. Public Respo nse system and methods

to determine sources. 3D Illegal Dumping BOH!Highway Post signage; clean up Continued weekly c lean up ofall Same as year 12; continued

.'Y~~~~ -~~ ~~~_S_S_ll:'Y. _______ .. dumped materials . Dedicated clean up identification ofsensitive areas..J?.e..P.~·-- .. ------.-.· k-c~;;;J- day by Highway Department in April, 20 I 5 due to critica l need.

3E Non-storm water Highway Dept. Develop and Outfall s inspected ; All reporting for Improve dry weather sampling . -~i_s_c:}!~~g~- ___ . ________ . ___ waste oil, nsd, and pollution sources program._i!~lp_l~.'!l~-~~- ~~-J!l.P-Ii~.s.- .. .-Rc~ise_J_

cata logued and documented. Official sampling not practiced due to fundi ng constraints. Complaint procedure deve loped more tho ro ughly.

3F DPW Employee Highway Dept. Annual training Annual Refresher, July, 20 14. Refresher, Spring/Summer 20 15. Education

-Rc~is.:-ci- ·- --- ---- ---- ---------- ----

3G Failing Septic Systems BOH Coordinate with BOH. _i_!l_~(!~p~_r_a_t~- !!!!<? -~~1?9.1"! __ Maintain records, BOH keeps records.

-Rc~is~ci - ----------- --- ---------- ---

3H Video Inspection Planning Board Inspect Storm Drains No opportunity for use. Continue to implement the plan. in new subd ivisions

3. Illicit Discharge De tection a nd E limination

­

­

­

5

Page 6: NPDES Pll Small MS4 General Permit Annual Report · BM P BMP Descrip tion Responsible Measu rab le Goa ... Progress on Goa l(s) Dept./Person Permit Year 12 Perm it Yea r 13 Name (Reliance

4. Construction Site S tormwater Runoff Control

BMP BMP Description Responsible Measurable Coal(s) Progress on Coa l(s)- Planned Activities ­ID # Dept./Person Permit Year 12 Permit Year 13

Name (Reliance on non-municipal partners indicated. ifany.)

4A

··---­--· Revised

Construction s ite runofT Ordinance -·-­ ----------------------­

Con. Comm./ .~!~~_!1_i_!1_g_~~-'!~~ -·

Draft for adop tion

------­ ---····--·---·----·

Stonnwater Protection bylaw passed November, 20 I 0. Stonnwater Management Bylaw approved by AG March. 20 I I.

Follow bylaw.

48 Plan Review Planning Board Enforce existing Site Plan Review bylaw includes more Review regulations and improve if

--- ··--­-Revised -----------------------·-·­

BOH/ConComm ----­ ---­ -­ -----­ -­

_~~g~_l~_tf~!l_S__ _________ .. _ extensive Sire runoff regulations. necessary.

4C Inspection/Reporting Building Enforce existing Enforced as is. Same as Year 12. I nspector/BO H/ regulations

·-­-­ --·­Revised · ----- -----------·----------Enoineer --­ >< --------­····· -- ----------­ -­ ---­ --­ ---­

.. -.. ----- .. Revised ··--·--·-------------------­ -----------­ ---·--­ -----------­ -----·-------­

-R~~isc"d-- -­ -----------­ ------------­ -------------­ ---­ - -­ ------------------­ -­ --­

-----­ --· Revised -­ ---­ --------------------­ -­ --------·····-· -­ -------­ ······-----------­

4a. Additions

I I

6

Page 7: NPDES Pll Small MS4 General Permit Annual Report · BM P BMP Descrip tion Responsible Measu rab le Goa ... Progress on Goa l(s) Dept./Person Permit Year 12 Perm it Yea r 13 Name (Reliance

BMP ID #

BM P Description Respons ible Dept./Person Name

Measurab le Goa l(s) Pro gress on Goa l(s) Permit Year 12 (Reliance on non-municipal partners indicated. ifany.)

Plan ned Activities Permit Year 13

SA Post Construction Runoff Ordinance

Planning Bd/ Con Comm

Draft ordinance Stormwater Protection bylaw passedNovember, 2010. Stom1\vater

Follow bylaw.

- Rc~isc"ci- --- ------· -- ---------------­ ----- ------------ -- -------------------------- Management Bylaw approved by AG March, 20 I I.

5B

-R~~isc:J·

Construct ion site plan review

----- ----- ---------------- --

Planning Board Con Comm ----- --------- --- --

Enforce. existing _r_~g~·!~!i_~Q~ _____ _____ __ __

Site Plan Review bylaw includes more extensive Site runoff regulations.

Review regulations and improve if necessary.

sc

-Re\,isc·ci

Stonnwater System Maintenance Plan

-_<:;?!~!1_ ~(l~~~-~-'~~!!i}~g_---

BOS

--- ----------------

Enforce existing regulations/bylaws

-- ---- -- -------------- ----

Enforced as is. Same as Year 12.

-Re~isc_J_ ---- ---- -------------------- ---------------- --- -------····-·----- ------ -

-Rc~isc-ci - -------- -- ----- ------ -- ---- - ------ ------------- -------- --······------- --

-Rc~iscci- ·-- --- ---------------------­ ------------------- --------------------------

5. Post-Construction Stormwater Management in New Development and Redevelopment

­­

­

­

­

Sa. Addit ions

I I

7

Page 8: NPDES Pll Small MS4 General Permit Annual Report · BM P BMP Descrip tion Responsible Measu rab le Goa ... Progress on Goa l(s) Dept./Person Permit Year 12 Perm it Yea r 13 Name (Reliance

BMP BM P Descri ptio n Res ponsib le Measu r able Coal(s) Progress on Coa l(s)­ Planned Activities-10 # Dep t./Perso n Per mit Year 12 Perm it Year 13

Name (Reliance on non-municipal partners indicated, if any.)

6A Catch Basin Program Highway Dept. Annual cleaning Catch basins cleaned August, 20 l 4. Same, with continued observance of etlectiveness of new catch basins.

-Re~is-cd"- ···-------- ------ ----------­ ------------------- ------------------------- -

6B Street Sweeping and Highway Dept. Annual sweeping Street sweeping all roads; May- June ­ Same as Year 12. July, 2014. -~~~~!~£ h<.>~ _c;:!~~!l_i!l.g- --­ -- --------- ---------R~~isi<i- -- -------- ---------------·

SWPPP/ MSGP Highway Dept. Compliance with Ongoing compliance. Same as Y car 12. 6C -~~i~~i-~g_R~~I)_......_-- -­---- ---- -Revised --------- --- ---- ------------ -------------------

6D Curbs ide Recycling Board of Health Annual evaluation of Continued weekly pickup. Continue weekly pickup.

-?!-::v!:~~ ~~.e~~~~'P. --------Re~ise-ci- -------------- ------------- ------ ------- ------

Metal Dumpster Board of Health Evaluate program; Continued weekly drop off program ; Continue weekly program. 6E -~~~X~~i_n_~-~~?$!_3!~ ______ transferred management ofcenter to -~~J~~~ -~~-~~~~~~~!}'_--- -­-Re~·Is;J- --- ---------- ------ Highway Surveyor in July, 20 I 0.

Revolving fund establis hed to help maintain area free of pollution.

6F Mercury Therrn. And Board of Health Collection program Continued button ce ll battery, Continue burton cell battery, fluorescent bulb and mercury tluorescent bulb and mercury -~~~- ~':?~!~!1.:1~. -----------R~~isid-- ------------- ------ --- --------------------··· thennometer collection . thermometer collection.

Composting Program Highway Dept Collection of yard Weekly collection of yard waste at Same as Year 12. 60 waste Highway Department

------------- --- ------------Rc~Iiiti- ----------- -------- -- ---- - ------ -~--------···

6H Trash Collection Board of Health Weekly curbside Continued weekly pick up program. Continue weekly pickup. pickup

Revised

----- --------- -- --------- ----- ---- --- ------------- ------ -- ------- -----------------

6. Pollu tion P r evention a n d Goo d Ho u se keep in g in M unicip al O per ations

8

Page 9: NPDES Pll Small MS4 General Permit Annual Report · BM P BMP Descrip tion Responsible Measu rab le Goa ... Progress on Goa l(s) Dept./Person Permit Year 12 Perm it Yea r 13 Name (Reliance

Part IV. Summary of Information C ollected and Analyzed

Permit conditions are being completed and followed to every extent possible.