APR O 7 2016 Municipality/Organization: Massachusetts Department of Correction North Central Correctional Center (NCCI) EPA NPDES Permit Number: MAR 042007 MADEP Transmittal Number: W- 041202 Annual Report Number & Reporting Period: April 1, 2015 March 31, 2016 NPDES PII Small MS4 General Permit Annual Report Part I. General Information Contact Person: Jeffrey J. Quick, A.I.A. Title: Director, Division of Resource Management Telephone #: (508) 422- 3661 Email Jcffrey.Ouick@state.ma.us Mailing Address: 50 Maple Street, Milford, MA 01757 Certification: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that t~ere are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. --- Signature: Printed Name: T itle: Director, Division of Resource Management Date:

NPDES PII Small MS4 General Permit Annual Report reviewed issues at Concord . No : ... Ofnote the NCCI Facility constructed a sand and salt shed in ... Mapping method(s) • Paper/Mylar

Embed Size (px)

Citation preview

APR O7 2016

Municipality/Organization: Massachusetts Department of Correction North Central Correctional Center (NCCI)

EPA NPDES Permit Number: MAR 042007

MADEP Transmittal Number: W- 041202

Annual Report Number & Reporting Period: April 1, 2015 March 31, 2016

NPDES PII Small MS4 General Permit Annual Report

Part I. General Information

Contact Person: Jeffrey J. Quick, A.I.A. Title: Director, Division of Resource Management

Telephone #: (508) 422- 3661 Email [email protected]

Mailing Address: 50 Maple Street, Milford, MA 01757

Certification:

I certify under penalty oflaw that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that t~ere are significant penalties for submitting false information, including the possibility offine and imprisonment for knowing violations.

--­Signature:

Printed Name:

T itle: Director, Division of Resource Management

Date:

Part II. Self-Assessment

The Department of Correction (DOC) received correspondence from the Environmental Protection Agency (EPA) on May 28, 2004 determining the Notice of Intent (NOi) submission was administratively complete. From the time the NOl's were prepared and before they were submitted the DOC began a prioritization list of areas for investigation including but not limited to:

• Entry Points into the storm drainage system(s) maintained by the DOC. • Documentation of discharges points on and off the DOC property. • Coordination with Town(s) that are also MS4s • Illicit connections identification (None were found). • Investigation of infrastructure and identification of problem drainage areas.

Through the State of Massachusetts Clean State Program, NCCI had an oil-water separator (OWS) installed to handle parking lot drainage three years before the Phase II program required a NOi to be submitted. Each DOC operation was critically evaluated to determine what repairs were necessary. In summary, the storm drainage systems operated by the DOC at Gardner are not combined systems where sewer and storm water is discharged. The OWS is inspected approximately every six months and is cleaned as necessary.

The DOC has held numerous training sessions with the DOC executive board, the Directors of Engineering and Environmental Health and Safety Staff. Training will continue through the summer and in the later part of the current fiscal year and next fiscal year as funding becomes available. Training included an introduction of the program, the importance of the program and goals that were set for the first 5 years of the permit program. Ongoing and informal training has continued more so on a case by case basis.

Over the past 7 years storm drains had been systematically cleaned. Minor repairs are such as patching asphalt, and fixing catch basin rims were required. The roadway between the two wind turbines required material to be brought in to stabilize the shoulder and repair some washouts.

Lastly, a full utility of map of the facility was completed.

2

Part III. Summary of Minimum Control Measures

1. Public Education and Outreach

BMPID #

BMP Description Responsible Dept/Person Name

Measurable Goal(s) Progress on Goal(s) ­Permit Year 12 (Reliance on non-municipal partners indicated, if any)

Planned Activities -Permit Year 13

I -­ ----­ ----­Revised

No

Publicize/Present _SW_Program to staff____

Div. of Res. _ Management ___ _

Publicize and Present _Program to ________ ___ __

Conduct facility specific training with maintenance staff and other stakeholders in this program.

Continue with training on a case by case and as funding is identified.

2

--­ ---­ ----­Revised

No

Distribute Printed Materials

-------­ ----­ ------------­ -

Div. of Res. _Management ___ _

Create and Post Material

---­ --­ -----­ ---------­ --­

Provide written updates and progress reports to management staff.

Completed separate Intranet page .. In addition, a newsletter that highlighted the Stormwater Phase II program was completed and distributed.

Provide progress reports to management staff

Periodic updates as needed. 3

--------­ --­Revised Yes/New

Intranet Posting

-­ --­ ---­ ---­ ----­ --------­Preparation of Newsletter

Div. of Res. _Management ____

Post Materials

---­ ---­ ---­ ---­ ---------­

4

-­ -­ -------­Revised

No

Stenciling

----­ ---­ --------­ ----­ --­ -

Div. of Res. _Management ____

Complete stenciling

-­ ---­ --------------­ --­ -­

Maintenance is required but concerns have been raised about security.

Need to revisit issue with security operations.

--­ ---­ ----­Revised --------------------------­ --- -­ ---- ----­ ---­ - -­ --­ ---­ ---------------­ -

---­ ----­ -­ -Revised -- ------------------------­ -­ ---­ ----­ --­ ----­ ------­ ------­ --------­ --­

la. Additions

I I 3

2. Public Involvement and Participation

BMP BMP Description Responsible Measurable Goal(s) Progress on Goal(s)­ Planned Activities ­ID# Dept.!Person

Name Permit Year 12 (Reliance on non-municipal partners indicated, if any)

Permit Year 13

5 Fonn Stonnwater Div. of Res. Form Committee Work with the State's Leading By With retirements and personnel

--- -­ ---­Committee

--­ -------­ ---------­ ------­ -~ ~!1!1_g~~~!1!--. -. ---- -­ ----­ -­ -------­ ----­Example and State Sustainability changes, need to establish new

Revised Council fac ilities contacts. No 6 Staff input Div. of Res. Solicit lnput and Input has been received. Investigation Continue with staff education.

---­----­-- -­ ----- ---------- -­ ------­ -~~!1!1_g~~~!1!----. Implement Ideas_. __ __ __ and some locations prioritized. Revised Recently reviewed issues at Concord No with our Fiscal to stress the need to be

proactive with maintenance.

--­ ---- -­Revised -----­ ----­ ----­ --­ -­ -----­ ------------------­ -------------- ------- -­ --­

--­ --­ ... -­Revised ---- -----------------------­ ------------------­ ... ­ - - ­ - - -... --·-- ­ --..-- - - - ­

--------­Revised ------------------------ --­ -----­ -------­ ---­ - --­ ---- -­ --- ---­ ----- ---­ -

--------­Revised --------------­ --------- --­ - ----- -­ -­ ---- -­ ---­ ---- ---­ ---------- ---- ---­

2a. Additions

I I 4

3. Illicit Discharge Detection and Elimination

BMP BMP Description Responsible Measurable Goal(s) Progress on Goal(s)­ Planned Activities ­ID# Dept/Person

Name Permit Year 12 (Reliance on non-municipal partners indicated, if anv)

Permit Year 13

7-­ - .. -.. -.. -Revised

Map Drain System

------- ------------ --- --- --­

Div. of Res. Management__ __ _

Complete Mapping

-­ ------­ -------------­ --­

Mapping completed. Annual inspections and update as needed.

8 Dry/Wet Weather _ Surveys __________ __ ______

Div. of Res. Management___ __

Document and Prioritize

Storm drains require minor repairs. Funding limited ability to make any repairs. Minor

Prioritize those catch basins that require repairs.

--------­Revised -­ ---­ --------- ----------­ paving repairs completed. One section of

drain line replaced

9 Correct Problems Div. of Res. Management __ ___

Make Repairs and Document

Extensive paving and catch basin rebuilds.

Quarterly inspections and cleaning as required.

-­ -­ ----­----------­ - --­ ----------­ -­ -------------------------­Revised

10 Policy for Enforcement Div. of Res. Prepare Policy Stonnwater Committee to be charged Update policy as needed. Review for

- - - - - - - - - --------- ----------- ------·­ _fy'!<?!}_a_g~~~!1!_---­ ----- --- --- -- ------- -­ -­ -­ with preparation of policy. Policy in improvements. Revised place that ties in sustainable practices

with this BMP.

--------­Revised ---------- ----- -­ --­ -­ -­ --­ - ----­ -­ -----­ - -­ -­ ---- ---------------------­

----­ -­ -­ -------­ ------- ----- -- -----­Revised ---- --- -----------­ ------------------------­ -

3a. Additions

I I

5

4. Construction Site Stormwater Runoff Control

BMP BMP Description Responsible Measurable Goal(s) Progress on Goal(s) ­ Planned Activities ­lD# Dept./Person

Name Permit Year 12 (Reliance on non-municipal partners indicated, if any)

Permit Year 13

11 -----­ --­Revised

Construction

. Mana_gement·--····­ --· __

Div. of Res. Management_____

As Necessary

-----------­ ----­ -----­ --­

Installation of2 large wind turbines. Proj ect completed area is stabilized, area has been established and re-vegetated

Some rip rap placement and shoulder stabilization is necessary.

-----­ --­Revised

Paving ofFacility

-------­ ---­ ----------­ ----­

Div. ofRes. Management___ __

Monitor for pavement failures_and flooding __ __

During rain storms, monitor new paving and look for washouts, erosion and ponding water.

Continue as Needed

- - - - - - - - -Revised

----­ --­ -----­ ------­ ---­ --­ -----­ --­ ---------­ -------------------------­

--------­Revised -----------------­ ---­ -----­ ------------------­ -­ -­ --­ ----­ -------------­

-------­ ----------­Revised

---------------­ -­ -----­ --­ -­ ----­ -­ - --­ - ---------------------­

- - - - - - - - -----­Revised

--­ ---­ ---­ -­ ------­ --­ -­ ----------­ -----­ ----------­ ---­ ----------­

4a. Additions

I I

6

5. Post-Construction Stormwater Management in New Development and Redevelopment

BMP BMP Description Responsible Measurable Goal(s) Progress on Goal(s) - Planned Activities ­ID# Dept./Person Permit Year 12 Permit Year 13

Name (Reliance on non-municipal partners indicated, if any)

12 Post Construction Div. of Res. As Required None during permit year See above - roadway maintenance Activities _Management ____ _ required

Revised

Post Paving Div. ofRes. Monitor paving over time Repairs as needed Management __ __ _

Revised

Revised

Revised

Revised

Revised

Sa. Additions

I I

7

6. Pollution Prevention and Good Housekeeping in Municipal Operations

BMP BMP Description Responsible Measurable Goal(s) Progress on Goal(s) Planned Activities

ID# Dept./Person Permit Year 12 Permit Year 13Name (Reliance on non-municipal partners

indicated, if any)

Develop O&M Plan Div. of Res. Clean catch basins and repaired some Continue with evaluation of program

13 Mana_gement ___ __ under the paving project. .. -.. - - - - - ------ --------- --- ---------­ ----- -- ----- ----- --··----Revised

14 Execute O&M Plan Div. of Res. With new paving O&M activities Review and Execute O&M Plan

Mana_gement ____ _ incorporated in to routine inspections --- ------ ------ -- -------- ------ -- -- -- ------ ----- --- -- ---- ----- -Revised major maintenance and improvements

made.

15 Long Tenn Planning Div. of Res. Evaluated what is needed to implement Modify as necessary

Management __ __ _ O&M plan.---··-- -- -- ----- --- ---- -- -- ---- ------ --- ·--- --------­--- -- ----Revised

· ----- --­ --- -------- -· ----- ------ ·- -­ ----- -- ---- ---- ---- ··--- ---- -----------· --·-Revised

----- ---- ------ ------------ ------ ---------- ------ --- --------- -- --- --- ---------- ---Revised

---- --- -- ------ ----- ------ --- --- ----- ------ ---- ---- ----- -------- ---------- ---- -- --Revised

­­

­

­

­

6a. Additions

I I 8

7. BMPs for Meeting Total Maximum Daily Load (TMDL) Waste Load Allocations (WLA) <<ifapplicable>>

BMP ID#

BMP Description Responsible Dept./Person Name

Measurable Goal(s) Progress on Goal(s) -Permit Year 12 (Reliance on non-municipal partners indicated, if any)

Planned Activities ­Permit Year 13

Revised

NA

Revised

Revised

Revised

Revised

Revised

7a. Additions

I I 7b. WLA Assessment

9

Part IV. Summary of Information Collected and Analyzed

At the NCCI, the locations of the drain lines and outfalls have been identified. Paving of the perimeter road, catch basin work and access drives solved many problems at the facility. The facility has been charged to conduct routine inspections and take corrective actions as needed. Currently, irunate labor is used to pick-up litter and other roadside debris.

Of note the NCCI Facility constructed a sand and salt shed in 2001.

Will continue to monitor roadway for the two wind turbines- repairs will be made as necessary and as needed. After storm events, road conditions will be documented.

Work has been funded for the past year for additional drain cleaning.

Part V. Program Outputs & Accomplishments (OPTIONAL)

Programmatic

Stormwater management position created/staffed YES Staffby DRM

Annual program budget/expenditures ($)12,000 yes

Education, Involvement, and Training

Estimated number ofresidents reached by education program(s) 100% DOC Staffonly

Stormwater management committee established Yes Stream teams established or supported No Shoreline clean-up participation or quantity of shoreline miles cleaned NA Household Hazardous Waste Collection Days NA

• days sponsored No • community participation NIA • material collected (tons or gal)

School curricula implemented NA Recycling efforts 2100 tons yes

10

Legal/Regulatory In Place Prior to Phase II

Under .Rev1ew Drafted Adopet d

Regulatory Mechanism Status (indicate with "X")

• Illicit Discharge Detection & Elimination X

• Erosion & Sediment Control X

• Post-Development Stormwater Management X

Accompanying Regulation Status (indicate with "X")

• Illicit Discharge Detection & Elimination X X • Erosion & Sediment Control X X • Post-Development Stormwater Management X X

Mapping and Illicit Discharges

Outfall mapping complete 100% Estimated or actual number of outfalls Six (6) One to stream

and 5 to veg. swales

System-Wide mapping complete (100%) Mapping method(s)

• Paper/Mylar 100% • CADD 10% • GIS 100%

Outfalls inspected/screened 100% Illicit discharges identified Zero (0) Illicit connections removed NA % of population on sewer (100 %) % ofpopulation on septic systems (0%)

11

Construction

Number of construction starts(>1-acre) Paving yes Estimated percentage of construction starts adequately regulated for erosion and sediment control 1 Site inspections completed 2 Tickets/Stop work orders issued NA Fines collected NA Complaints/concerns received from public None

Post-Development Stormwater Management

Estimated percentage ofdevelopment/redevelopment projects adequately regulated for post­ NA-0% construction stormwater control Site inspections completed 4 Estimated volume of storrnwater recharged NA unk

Operations and Maintenance

Average frequency of catch basin cleaning (non-commercial/non-arterial streets) 1 time/ year In permit yr. l 0

Average frequency of catch basin cleaning (commercial/arterial or other critical streets) NA Total number ofstructures cleaned 8 6 Storm drain cleaned 8 8 Qty. of screenings/debris removed from storm sewer infrastructure (lbs. or tons) 3 cy Disposal or use of sweepings (landfill, POTW, compost, recycle for sand, beneficial use, etc.) X Cost of screenings disposal ($) $2000.00

12

Average frequency of street sweeping (non-commercial/non-arterial streets) NA Average frequency of street sweeping ( commercial/arterial or other critical streets) 0/yr contract Qty. ofsand/debris collected by sweeping (lbs. or tons) Disposal of sweepings (landfill, POTW, compost, beneficial use, etc.) (location) ben. reuse Cost of sweepings disposal ($) 0 Vacuum street sweepers purchased/leased Contracted

Services No No Vacuum street sweepers specified in contracts

Reduction in application on public land of: ("NIA" = never used; "100%" = elimination) • Fertilizers NA NA • Herbicides NA NA • Pesticides NA NA

Anti-/De-Icing products and ratios 10% NaCl Unknown 0% CaCb amounts 0%MgCh 0%CMA 0% Kac 0%KC1 90% Sand

Pre-wetting techniques utilized -Manual control spreaders used -Automatic or Zero-velocitv spreaders used -Estimated net reduction in typical year salt application TBD Salt pile( s) covered in storage shed( s) Yes Yes Storage shed(s) in design or under construction NA NA