November 4th 2009 MICE CM25 - RAL 1

Commissioning Needs – MICO83m. apollonio g. cecchet

November 4th 2009 MICE CM25 - RAL 2

• design completed (Geoff) and device installed on Friday 30th (Roger)

• guillotine with 3 polyethilene blades (14, 29, 55) mm covering

a range of values [14,29,…,98]mm • manually operated from the

turret: no access to DSA, max flexibility!

proton absorber Shut Downwire control

proton absorber

GVA1

November 4th 2009 MICE CM25 - RAL 3

• Identifying “best position”• 1-2-3 are ~20 routing out of

the synch.• Paul’s best choice

– 10 m from TGT– Not worried being close to wall– Happy being close to D1

• I reckon (3) is closer to it• (1) is too close (rate)• (2) is past the ring (does ISIS

like it?)

Luminosity monitor Shut Down

4.3 m

6.3 m

>8 m

12

3

~20m

~20m

November 4th 2009 MICE CM25 - RAL 4

Structure columnPartially shadows beam to LumiMon

3a b

Luminosity monitor

November 4th 2009 MICE CM25 - RAL 5

TOF2 installation

• Arrival : expected November 24th

• Needs: decide cable route + effort for installation

• Mechanical Support: for TOF2 + KL + EM- position?

November 4th 2009 MICE CM25 - RAL 6

Hi Marco,I've been trying to sort out a RAL email with a name like mice-dm thatwould be similar to the mice-om email address that you use as MOM. This email address is needed because the data mover account will needto have GRID certificates and join mailing lists to do with the RAL Tier 1, and as such we want it to be a single point of contact (like the MOM) eventhough like the MOM it may move from person to person over time.…Could you raise it at the next MICO meeting?

Thanks,  Malcolm

… DONE: who’s responsible for that?

GRID certificate for Data Mover