26
November 14, 2014 Hobby International & IAH Terminal Redevelopment Program Update Jarrett Simmons, Assistant Aviation Director – Planning Houston Airport System

November 14, 2014

Embed Size (px)

DESCRIPTION

Hobby International & IAH Terminal Redevelopment Program Update Jarrett Simmons, Assistant Aviation Director – Planning Houston Airport System. November 14, 2014. Hobby International Terminal Program. Hobby International Terminal Program. New Parking Garage. Entry Roadway Modifications. - PowerPoint PPT Presentation

Citation preview

November 14, 2014

Hobby International & IAH Terminal Redevelopment Program Update

Jarrett Simmons, Assistant Aviation Director – PlanningHouston Airport System

22

Hobby International Terminal Program

Hobby International Terminal Program

New Concourse

New Parking Garage

Terminal Expansion

New Satellite Central Plant

Entry Roadway Modifications

Hobby International Terminal ProgramRoadway Signage

Hobby International Terminal ProgramAirport Boulevard Landscaping

Hobby International Terminal ProgramNew Concourse Construction

Hobby International Terminal ProgramNew Concourse Construction

Hobby International Terminal ProgramNew Garage Construction

Hobby International Terminal ProgramNew Garage Construction

1010

Intercontinental Airport Terminal Redevelopment Program

(ITRP)

1111

International traffic is booming in HoustonReflecting the strength of the local economy, airlines continue to add new routes—most outside of IAH’s historically strong Latin American market.

2007: Dubai (Emirates) 2008: Singapore via Moscow

(Singapore) 2009: Rio de Janeiro (United); Doha

(Qatar) 2010: Monterrey (VivaAerobus) 2011: Lagos (United) 2012: A380 to Frankfurt (Lufthansa)

2013: Third daily London (United); Istanbul (Turkish); Beijing (Air China)

2014: Second daily Tokyo, Munich, and Punta Cana (United); Seoul (Korean); Stavanger (SAS); Guadalajara and Cancun (VivaAerobus); Santiago de Chile (United); Monterrey (Aeromexico and Interjet); A380 to Dubai (Emirates)

2015: Taipei (EVA)

1212

More international gates are needed to meet demandWith only 6 widebody gates, Terminal D cannot accommodate new long-haul services at peak times.

Terminal D12 gates;

foreign flags

Terminal E23 gates UA int’l

Central FIS~4,000 pax

per hour

Terminal CUA domestic

Terminal BUA Express

Terminal AOther

domestic

1313

Emirates Airbus 380 – Arrives at IAH 12/3/14

1414

Second A380 gate under construction at IAH (11/13/14)

1515

Emirates A380 First Class Fare

16

Intercontinental Airport Terminal Redevelopment Program (ITRP)ITRP is in partnership between HAS and United Airlines

United’s Scope HAS’s Scope

Utility Site & Utility Corridor PackageNew electrical receiving station, domestic water tanks & utility tunnel

New Hardstand

Future Hardstand8 – 747/777 Positions

ITRP PMO Building

The Leland International Terminal is the best solution

Terminal Package - 801,530 S.F. 15 international widebody gates (including 4 A380)Apron Package – 1,386,000 S.F. (Pavement, drainage, hydrant fueling, etc.)

Mickey Leland International Terminal (Terminal D)

New North Terminal Roadway Package (Includes New dedicated lanes for Terminals C, D & E)

Federal Inspection Services Package (FIS) PackageFIS Expansion, Security Checkpoint Consolidation & New Custom & Border

Protection (CBP) & Public Parking Garage

Upcoming ITRP Procurement Dates

Package Date

Industry Day Jan. 2015

Enabling Utility Design/Build 1st Qtr 2015

Hardstand Design/Build 1st Qtr 2015

PMO Building Design/Build 1st Qtr 2015

Terminal Design 2nd Qtr 2015

For more information on the IAH Terminal Redevelopment Program

• Please visit: www.fly2houston.com/TerminalD

• Communications Regarding Executive Program Management (EMP) and Program Support Services (PSS) RFQ’s must Be Received In Writing And Directed Only To:

Mr. Andre’ Morrow

Senior Procurement Specialist

Houston Airport System

Supply Chain Management

[email protected]

• For information on MWDBE certification please contact: [email protected]

Other upcoming FY15/FY16 opportunities

Project # Status Project Cost Mil

721 D IAH Cell Phone Lot (JFK Will Clayton) $11.8

736 DB HAS Admin Building Expansion TBD

686 D IAH Storm water Pollution Control System $16.0

565 C IAH Landside Roadway Repairs $13.8

634 C IAH Terminal A Vault Replacement $11.6

651 C IAH Taxiway WA/WB $33.6

675 D IAH NA Taxiway $34.0

689 A / B D IAH Term A & C OTA Baggage Handling System $35.0 / $2.0

699 D IAH Sanitary Sewer Improvements $9.0

711 C IAH EcoPark2 $11.8

712 C IAH Terminal C Light Pole Replacement $5.0

740 D IAH Vehicle Maintenance Facility $4.4

746 C IAH Old Control Tower Demolition $2.0

761 DB IAH Parking Locator Guidance System $15.0

545 B C HOU Consolidated Maintenance Center Complex $6.3

690 C HOU TSA Checked Baggage EDS Recap $11.2

TBD D HOU RTR Cable Relocation $0.4

TOTAL $222.9

2626

Questions