Notes for Guidance on the Specification for Works NG 000 -

Introduction

CC-GSW-00010

June 2016

Page 2: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page i

About TII

Transport Infrastructure Ireland (TII) is responsible for managing and improving the country’s national road and light rail networks.

About TII Publications

TII maintains an online suite of technical publications, which is managed through the TII Publications website. The contents of TII Publications is clearly split into ‘Standards’ and ‘Technical’ documentation. All documentation for implementation on TII schemes is collectively referred to as TII Publications (Standards), and all other documentation within the system is collectively referred to as TII Publications (Technical).

Document Attributes

Each document within TII Publications has a range of attributes associated with it, which allows for efficient access and retrieval of the document from the website. These attributes are also contained on the inside cover of each current document, for reference.

TII Publication Title Notes for Guidance on the Specification for Works NG 000 -

Introduction

TII Publication Number CC-GSW-00010

Activity Communications &

Commissioning (CC) Document Set Standards

Stream

Guidance on

Specification for Works

(GSW)

Publication Date June 2016

Document

Number 00010

Historical

Reference Series NG 000

TII Publications Website

This document is part of the TII publications system all of which is available free of charge at http://www.tiipublications.ie. For more information on the TII Publications system or to access further TII Publications documentation, please refer to the TII Publications website.

TII Authorisation and Contact Details

This document has been authorised by the Director of Professional Services, Transport Infrastructure Ireland. For any further guidance on the TII Publications system, please contact the following:

Contact: Standards and Research Section, Transport Infrastructure Ireland

Postal Address: Parkgate Business Centre, Parkgate Street, Dublin 8, D08 DK10

Telephone: +353 1 646 3600

Email: [email protected]

Page 3: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page ii

TII Publications

Activity: Communications & Commissioning (CC)

Stream: Guidance on Specification for Works (GSW)

TII Publication Title: Notes for Guidance on the Specification for Works NG 000 - Introduction

TII Publication Number: CC-GSW-00010

Publication Date: June 2016

Set: Standards

Contents

1. Introduction ................................................................................................................. 1

2. Terms and Abbreviations ........................................................................................... 3

3. Appendices .................................................................................................................. 4

4. Standards and Other Reference Documents ............................................................ 6

5. Thickness of Material and Tolerances ....................................................................... 7

6. Construction Products ............................................................................................... 8

7. Contract Implementation .......................................................................................... 13

8. Sample Appendices 0/1 to 0/4 .................................................................................. 15

Page 4: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page iii

Contents Table

1. Introduction ................................................................................................................. 1 1.1 General ............................................................................................................... 1

1.2 Incorporation of the Specification into the Contract ............................................ 1

1.3 Proprietary Work, Goods or Materials ................................................................. 1

1.4 Use of the Specification for Works (SPW) .......................................................... 2

2. Terms and Abbreviations ........................................................................................... 3

3. Appendices .................................................................................................................. 4

3.1 Numbered Appendices – General....................................................................... 4

3.2 Numbered Appendices – 0/1 to 0/4 .................................................................... 4

4. Standards and Other Reference Documents ............................................................ 6

5. Thickness of Material and Tolerances ....................................................................... 7

6. Construction Products ............................................................................................... 8 6.1 General ............................................................................................................... 8

6.2 Harmonised Technical Specifications ................................................................. 8

6.3 Assessment and Verification of Constancy of Performance (AVCP) .................. 8

6.4 Determination of product type ............................................................................. 8

6.5 Factory Production Control (FPC)....................................................................... 8

6.6 Declaration of Performance (DoP) ...................................................................... 9

6.7 CE Marking ....................................................................................................... 11

6.8 Market Surveillance .......................................................................................... 11

6.9 Competent National Authority ........................................................................... 12

7. Contract Implementation .......................................................................................... 13

8. Sample Appendices 0/1 to 0/4 .................................................................................. 15 8.1 Sample Appendix 0/1: Contract-Specific Additional, Substitute and Cancelled

Clauses, Tables and Figures included in the Contract...................................... 15

8.2 Sample Appendix 0/2: Contract – Specific Minor Alterations to Existing Clauses, Tables and Figures included in the Contract .................................................... 16

8.3 Sample Appendix 0/3: List of Numbered Appendices referred to in the Specification and included in the Contract ........................................................ 16

8.4 Sample Appendix 0/4: List of Drawings Included in the Contract ..................... 25

Page 5: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 1

1. Introduction

1.1 General

Guidance on the Specification for Works (GSW) in TII Publications (Standards) is published as a collective group of documents under the Construction and Commissioning activity within the TII Publications system and are divided into parts corresponding to those in the Specification. The headings in the guidance documents directly relate to headings in the Specification; however there are not corresponding headings to every Specification heading. The SPW and GSW are maintained as part of the TII Publications website, available online at http://www.tiipublications.ie/.

The GSW has been drafted for use in conjunction with the Public Works Contracts (published by the Department of Finance). Users of the GSW must take care to interpret terminology in a manner that is consistent with the form of contract being considered and to use appropriate terminology when compiling project specific Appendices to the SPW.

Where appropriate within the GSW, the terms “Employer’s Representative”, “specialists responsible for the design” and “compiler” are used. These titles should be interpreted as follows:-

i) The term Engineer when used in relation to scheme preparation relates to the “designer/compiler” and not the Engineer under the Contract.

ii) Where the context implies reference to the supervisory function of the Engineer under the Contract this should be read as applying equally to the Employer’s Representative and vice-versa as suits the form of contract being used.

iii) For Works designed by the Employer the term “specialist responsible for the design” means the Employer’s designer, be that a member of the Employer’s own staff or a consultant engaged by the Employer to undertake the design. For Works designed by the Contractor the term “specialist responsible for the design” means the Contractor’s designer, be that a member of his own staff or a consultant engaged by the Contractor to undertake the design, and in particular any “Specialist” named in the Contract.

iv) The compiler is a generic term referring to the party responsible for preparing an element of the SPW, which may be any of the above.

1.2 Incorporation of the Specification into the Contract

The SPW has been drafted for use in conjunction with the Public Works Contracts.

The Contract is to contain a Preamble to the Specification and standard Preamble to the Specification is included in the GSW. This includes an explanation of how alternative text is incorporated depending on whether the Contract is for Work designed by the Employer or Works designed by the Contractor.

Where amendments, omissions or extensions are envisaged to the SPW or SCD within the Contract, such changes should be presented as part of the compiled documentation for approval through the Departure from Standards process.

1.3 Proprietary Work, Goods or Materials

Proprietary work, goods or materials must not be specified unless their function cannot be described in any other way using specifications which are sufficiently precise and easily understood. Where the

Page 6: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 2

specification of proprietary work, goods or materials cannot be avoided, European law requires that the brand name or type be followed by the words “or equivalent”.

1.4 Use of the Specification for Works (SPW)

The SPW has been widely drawn to cover all road contracts from the provision of new to the improvement or reconstruction of existing roads and bridges. It also covers such schemes as the installation of road lighting, traffic signals or other traffic signing schemes on existing roads.

There is no need to reproduce the SPW in the Contract documents as it is incorporated by reference in the Preamble to the Specification.

Contract-specific requirements should be incorporated in the Numbered Appendices to the Specification (without the need to alter requirements, etc.) in one of two ways:

i) Specific requirements referred to in the national requirements:

These are generally indicated by the words “as described/stated in Appendix -/-.”

ii) Alternatives to national requirements:

These are generally indicated by the words “unless otherwise described in Appendix -/-”.

The information contained in the Numbered Appendices 0/1 to 0/4 and 1/1 onwards should be bound either in one volume or more as appropriate. Each volume should be clearly titled as to the content.

The compiler's attention is drawn to the requirements of the Safety, Health and Welfare at Work (Construction) Regulations and in particular the need for a health and safety plan to be prepared and provided at the same time as the tender documents. In particular the compiler should ensure consistency between information referred to in the above plan and the detailed information included in Appendices to the Specification. Appendices likely to be referred to, include but are not confined to:

Appendix 1/7 Site extents and limits of use

Appendix 1/9 Control of noise and vibration

Appendix 1/13 Programme of works

Appendix 1/16 Privately and publicly owned services and supplies

Appendix 1/17 Traffic safety and management

Appendix 1/18 Temporary diversions of traffic

Appendix 1/19 Routeing of vehicles

Appendix 1/23 Risks to health and safety from materials or substances

Page 7: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 3

2. Terms and Abbreviations

Terms and abbreviations used in Additional, and Substitute Clauses and in minor alterations made by ‘delete and insert’ methods must be consistent with those described in Section 2 of CC-SPW-00010 - Specification for Works Series 000 - Introduction.

Page 8: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 4

3. Appendices

3.1 Numbered Appendices – General

The Numbered Appendices to the Specification are to be drawn up for the specific project by the compiler and included in the Contract documents. Where it is considered appropriate to include project-specific Works Requirements on drawings, cross-reference should be made in the Numbered Appendix to the relevant drawing numbers.

The Numbered Appendices are to be compiled using advice given in the relevant part of the GSW and in the Sample Appendices given at the end of each part of the GSW. Depending on whether the Contract is for Works designed by the Employer or Works designed by the Contractor various of the Numbered Appendices are to be completed by the Tenderer, the Contractor or the Specialist responsible for the design.

Appendices 1/24, 1/25 and 1/26 should comprise lists of accepted quality management schemes, product certification schemes and information relating to NSAI Agrément Certificates.

New Numbered Appendices can be used to extend Contract-specific alterations, but see Sample Appendix 0/3 regarding numbering of additional Numbered Appendices.

3.2 Numbered Appendices – 0/1 to 0/4

The “Zero” Series Numbered Appendices (0/1 to 0/4) should be compiled in accordance with the Samples following and as explained below.

The Contract-specific alterations to the SPW (accepted only under an Approved Departure from Standards) should be described in Appendices 0/1 and 0/2 taking account of the following:

i) Requirements relating to Clauses equally apply to Tables and Figures.

ii) Care should be taken to ensure compatibility between Clauses and any associated Tables and Figures which are altered.

iii) Text which conflicts with or duplicates the provisions of the Contract Conditions is to be avoided.

Appendix 0/1 is for incorporation of Contract-specific alterations to the SPW as follows:

i) Additional Clause – written in Appendix 0/1 with suffix “AR” added to the Clause number.

ii) Substitute Clause – rewritten in Appendix 0/1 in full with existing Clause number and with suffix “SR”.

iii) Cancelled Clause – Clause number with suffix “CR” followed by its title written in Appendix 0/1, with the word “Cancelled” alongside it.

iv) If there are no Additional, Substitute or Cancelled Clauses to be included in the Contract write NONE in Appendix 0/1.

Appendix 0/2 is for incorporation of Contract-specific minor alterations to existing Clauses, Tables and Figures. These can be described by the “delete and insert” or “add new sub-clause” procedure, provided they are neither extensive nor confusing. The Clause is not then a Substitute Clause and there is no need to add a suffix. The instructions for these minor alterations are to be written in Appendix 0/2. If there are none write “NONE”.

Page 9: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 5

Appendix 0/3 is to comprise a complete list of Numbered Appendices included in the Contract. List A contains those referred to in the national Specification and List B contains any additional Numbered Appendices devised by the compiler. Where a Numbered Appendix in List A is not used, this should be marked “Not Used” alongside its number. Those to be completed by the Tenderer/Contractor/Specialist responsible for the design must be identified and blanks of “pro-formas”, copied from the GSW, are to be included as appropriate.

Appendix 0/4 is to list the drawings in the Works Requirements, including those from the Standard Construction Details (SCD) in TII Publications (Standards), with any omission or amendment of any applicable SCDs subject to Section 3 of CC-SPW-00010 - Specification for Works Series 000 - Introduction.

Page 10: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 6

4. Standards and Other Reference Documents

In general the date 10 working days prior to the tender returns date or, if applicable, the extended tender returns date establishes, for each standard or other referenced document incorporated in the Contract, the respective edition which is to be used. However, where the date of publication of a Standard or other referenced document is specified the specified edition applies. The date is specified throughout SPW where at least one reference to the Standard includes a specific clause, section, table or appendix. Similarly, if a Standard is amended in one reference, the year is specified throughout SPW.

The compiler should ascertain whether any amendments or new editions of the reference documents have been issued since the last published national alteration of the relevant parts of the SPW and where appropriate include Contract-specific alterations in Appendix 0/1 or 0/2. Where a Harmonised European Standard or a European Standard has been issued in the period between the date of the invitation to tender and the date of the last published edition of the SPW parts, Contract-specific alterations should be made to ensure the European Standard is properly incorporated in the Contract. Use of European Standards issued prior to the date of the invitation to tender is mandatory and Section 4 of CC-SPW-00010 provides for their incorporation in the Contract by default.

The compiler should ensure that there are no inconsistencies between the reference documents specified in the Contract and those used in the design. Where necessary, Contract – specific alterations should be included in Appendix 0/1 or 0/2 to achieve consistency. Amendments to Harmonised European Standards are not permitted. Amendments to European Standards may be considered only in exceptional circumstances where there is clear and proper justification. In such circumstances, and in cases where the basis of design may be compromised unless amendments are made, the Employer/TII should be consulted.

The Employer should consider whether reference document amendments published after the Contract has been awarded should be incorporated in the Contract. Amendments making editorial changes will often have negligible cost implications and should usually be adopted. When the Employer considers an amendment should be incorporated in the Contract but there are significant cost or delay implications, TII should be consulted.

Page 11: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 7

5. Thickness of Material and Tolerances

It is not considered necessary or desirable to specify tolerances for all dimensions. Where dictated by functional or aesthetic need, tolerances are included in the SPW. Other tolerances are incorporated by reference to Standards and other publications. If the compiler requires further tolerances to apply these should be given on the drawings. Unnecessarily fine tolerances have the effect of increasing prices and should be avoided.

Page 12: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 8

6. Construction Products

6.1 General

The requirement to CE mark products means that documentation validating the properties of those mixtures and containing information on their composition will be available. This should be made available before the start of the Works, any change to the source or design mix changes are made.

6.2 Harmonised Technical Specifications

Harmonised technical specifications are prepared on the basis of the basic requirements for Construction Works and contain essential characteristics that a construction product must comply with. The construction product is then placed on the market for incorporation in construction works.

6.3 Assessment and Verification of Constancy of Performance (AVCP)

The system by which the performance of the construction product is assessed and the production is controlled is termed the AVCP. The responsibilities and tasks relevant to the systems required by the TII may be specified in the respective parts of the SPW.

6.4 Determination of product type

The determination of product type on the basis of type testing is performed at the beginning of the production of a new or modified product or method of production where this may affect the stated performance. It is repeated every 5 years or whenever a change occurs in the design, the raw material or the supplier, that would affect significantly one or more of the characteristics.

The number of samples, assessment method and compliance criteria for each characteristic is dependent on the product and as specified by the relevant hEN, SPW and/or other relevant parts of TII Publications (Standards). The results of the type testing, including the testing carried out on the constituents, shall be documented in Type Test reports and form part of the Declaration of Performance. The manufacturer shall retain all test reports for at least 10 years after the last date of production to which they relate. The information shall be made available when requested.

The Type Testing procedure shall demonstrate that all constituent materials conform to the appropriate requirements. The tests for geometrical properties of the constituents shall be carried out on the constituents actually used in Type Testing. For other constituent properties, tests carried out as part of the AVCP procedures used to demonstrate conformity with the appropriate European Standard shall be acceptable.

All testing shall be carried out strictly in accordance with the appropriate European test method on samples taken strictly in accordance with the appropriate EN sampling method to be representative of the normal constituents and mixed materials.

6.5 Factory Production Control (FPC)

The manufacturer must establish written policies and procedures to ensure that products placed on the market comply with the declared performance. The FPC system consists of procedures, inspections and tests to control constituents, equipment and the production process to attain a level of confidence in the constancy of performance of the product.

Page 13: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 9

6.6 Declaration of Performance (DoP)

The model of the DoP is provided in Annex III of the Construction Product Regulation (EU) No 305/2011; the relevant hEN provides further details of information that the DoP is required to contain. The Type Test reports shall form part of the DoP.

An example DoP for Asphalt Concrete is contained in Figure NG 0/1.

DECLARATION OF PERFORMANCE

No. 001 CPR 2015-01-01

1. Unique identification code of the product-type:

Asphalt Concrete

AC 20 dense bin 70/100

2. Type, batch or serial number or any other element allowing identification of the construction product as required under Article 11(4):

Asphalt Concrete

AC 20 dense bin 70/100 — 0001

3. Intended use or uses of the construction product, in accordance with the applicable harmonised technical specification, as foreseen by the manufacturer:

For binder courses

4. Name, registered trade name or registered trade mark and contact address of the manufacturer as required under Article 11(5):

Any Co Ltd,

X Street,

Dublin, Ireland

Tel. +353 1 234 5678

Fax: +353 1 234 5679

E-mail: [email protected]

5. Where applicable, name and contact address of the authorised representative whose mandate covers the tasks specified in Article 12(2):

N / A

6. System of assessment and verification of constancy of performance of the construction product as set out in CPR, Annex V:

System 2+

Page 14: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 10

7. In case of the declaration of performance concerning a construction product covered by a harmonised standard:

National Standards Authority of Ireland

Notified body No. 0050 Performed: the initial inspection of the manufacturing plant and evaluation of factory production control and the continuous surveillance, assessment and evaluation of factory production control under system:

2+ and issued:

the certificate of conformity of the factory production control

8. Declared performance.

Essential characteristics Performance Harmonised technical

specification

1. Adhesion of binder to aggregate

2. Stiffness

3. Resistance to permanent deformation

4. Resistance to fatigue

5. Skid resistance

6. Resistance to abrasion

7. Reaction to fire

8. Dangerous substances

9. Durability

1EN 13108-1

2, 3, 4, 5, 6, 9 Target grading passing sieve

Sieve

mm

Passing

%

31,5 100

20 99

10 62

6,3 47

2 30

0,250 13

0,063 5,5

EN 12697-2

1, 2, 3, 4, 5, 6, 9 Target binder content 4,9% EN 12697-1

1, 2, 4, 5, 9 Minimum and maximum void content

Vmin 4,0; Vmax 7,0

EN 12697-8; EN 12697-6 procedure B SSD; EN 12697-5 procedure A in water

1, 9 Water sensitivity ITSR70 EN 12697-12 Method A

1, 2, 3, 4, 9 Maximum Temperature 180 °C Minimum temperature 140 °C

2, 9 Minimum Stiffness Smin 1800 EN 12697-26 Annex B

Page 15: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 11

9. The performance of the product identified in points 1 and 2 is in conformity with the declared performance in point 8. This declaration of performance is issued under the sole responsibility of the manufacturer identified in point 4.

Signed for and on behalf of the manufacturer by:

(Name and function) _______________________________________ ________________________________________ (Place and date of issue) (Signature)

Figure NG 0/1 Example DoP

6.7 CE Marking

By affixing a CE Marking the manufacturer indicates that he is responsible for conformity of the construction product with the declared performance and compliance with all applicable requirements laid down in the CPR.

The CE Mark contains similar information to the DoP, an example CE Mark for Asphalt Concrete is contained in Figure NG 0/2.

The CE marking symbol must be affixed to the product, packaging or accompanying documents such as a delivery docket / ticket.

6.8 Market Surveillance

Member States are required to undertake market surveillance of construction products to ensure:

i) They do not compromise the health and safety of users;

ii) Non-conforming products are withdrawn, prohibited or restricted;

iii) The public, the Commission and other Member States are informed of any non-conformity issues;

iv) That infrastructure and programmes are in place to guarantee that effective measures can be taken.

The market surveillance authority will establish procedures to include the steps to be taken should an issue of non-compliance with the CPR be identified; including;

i) The grounds for serving of prohibition, warning or suspension notices;

ii) Scenarios where immediate protective action against products are regarded as being serious risk;

iii) The legal penalties associated with breaches of the Regulation.

As the nominated Market Surveillance Authority, Local Authority building control departments are entitled to initiate any investigation and testing deemed necessary before, during and/or after the supply of the construction product.

Page 16: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 12

6.9 Competent National Authority

As Competent National Authority, the National Roads Authority (NRA), trading as TII, is entitled to see all documentation relating to the conformity of the construction product. This information shall be provided when requested by the NRA.

0050

Any Co Ltd, X Street, Dublin, Ireland

15

001-CPR-2015/01/01

EN 13108-1:2006

Asphalt Concrete

AC 20 dense bin 70/100 — 0001

binder courses

Void content: max. 7,0 %

min. 4,0 %

Water sensitivity min. 70

Maximum Temperature of the mixture 180 °C

Minimum Temperature of the mixture 140 °C

Grading target composition

Sieve size

mm

Passing

%

31,5 100

20 99

10 62

6,3 47

2 30

0,250 13

0,063 5,5

Target Binder content 4,9 %

Minimum stiffness 1 800 MPa

Table NG 0/2 Example CE Mark

Page 17: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 13

7. Contract Implementation

The standard Preamble to the Specification is contained below.

Preamble to the Specification

The Specification referred to in the Contract shall be the Specification for Works (SPW) in TII Publications (Standards) published by TII as a collective group of documents under the Construction and Commissioning activity within the online TII Publications system (http://www.tiipublications.ie/), current on the date 10 working days prior to the tender returns date or, if applicable, the extended tender returns date and incorporating all amendments current on that date and as extended by the following:-

i) Appendix 0/1: Contract-specific Additional, Substitute and Cancelled Clauses, Tables and Figures;

ii) Appendix 0/2: Contract-specific minor alterations to existing Clauses, Tables and Figures;

iii) The Numbered Appendices listed in Appendix 0/3;

iv) Appendix 0/4 containing a list of the drawings referred to in the Specification.

An Additional Clause as indicated by a suffix 'AR' in Appendix 0/1 is a Contract-specific alteration.

A Substitute Clause as indicated by a suffix 'SR' in Appendix 0/1 is a Contract-specific alteration.

A Cancelled Clause indicated by a suffix 'CR' in Appendix 0/1 is a Contract-specific alteration.

Insofar as any of the Numbered Appendices may conflict or be inconsistent with any provision of the SPW the Numbered Appendices shall always prevail.

Any reference in the Contract to a part of the SPW or Appendix shall be deemed to refer to the corresponding Substitute part of the SPW or Appendix listed in Appendix 0/1 or 0/2.

Where a part of the SPW is altered, any original Table/Figure referred to in the part of the SPW shall apply unless the Table/Figure is also altered. Where a Table/Figure is altered, any reference in a part of the SPW to the original Table/Figure shall apply to the altered Table/Figure.

Where a part of the SPW relates to work goods or materials that are not required for the Works it shall be deemed not to apply.

Any Appendix referred to in the SPW that is not used shall be deemed not to apply.

References in the SPW to “NRA Road Construction Details” shall be taken to refer to Standard Construction Details (SCD) in TII Publications (Standards) published by TII as a collective group of documents under the Construction and Commissioning activity within the online TII Publications system (http://www.tiipublications.ie/), current on the date 10 working days prior to the tender returns date or, if applicable, the extended tender returns date.

Text shown in grey highlight applies only to Contracts where the applicable Conditions of Contract is the Public Works Contract for Civil Engineering Works Designed by the Employer, the Public Works Contract for Minor Building and Civil Engineering Works Designed by the Employer.

Text shown in square brackets immediately following text shown in grey highlight, if any, is deemed to replace the text in grey highlight for Contracts where the applicable Conditions of Contract is the Public Works Contract for Civil Engineering Work Designed by the Contractor.

Page 18: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 14

Throughout the SPW and Appendices to the SPW, the following interpretations shall apply:

“Base Course” shall mean “Binder Course”

“Roadbase” shall mean “Base”

“Wearing Course” shall mean “Surface Course”

“UK Department of Transport” shall mean “UK Highways Agency”

[Note to compiler: When using the Public Works Contracts for Civil Engineering Works Designed by the Employer, the Public Works Contract for Minor Building and Civil Engineering Works Designed by the Employer or the Public Works Contract for Civil Engineering Work Designed by the Contractor, the Preamble to the Specification must be reproduced unaltered and bound in the Works Requirements with the Numbered Appendices. If any other form of contract is utilized then both the above Preamble and the Specification as a whole must be reviewed and amended as necessary to ensure consistency between the Conditions of Contract and the Specification].

Page 19: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 15

8. Sample Appendices 0/1 to 0/4

8.1 Sample Appendix 0/1: Contract-Specific Additional, Substitute and Cancelled Clauses, Tables and Figures included in the Contract

[Note to compiler: See Section 1 of CC-GSW-00010 regarding approval of contents of Appendix 0/1]

List of Additional Clauses, Tables and Figures

Clause No. (etc.)

Title Written on Page No.

following

[Note to compiler: List here Contract-specific Additional Clauses, and Tables and Figures suffixed by the letters AR and preferably commencing with the 70th Clause, etc. of the respective parts]

List of Substitute Clauses, Tables and Figures

Clause No. (etc.) Title Rewritten on Page No.

following

[Note to compiler: List here Contract-specific Substitute Clauses, Tables and Figures suffixed by the letters SR]

List of Cancelled Clauses, Tables and Figures

Clause No. (etc.) Title

[Note to compiler: List here Contract-specific Cancelled Clauses, Tables and Figures suffixed by the letters CR]

Additional Clauses, Tables and Figures

Clause No.(etc.) Title and written text

[Note to compiler: Write here the Additional Clause etc. listed above]

Substitute Clauses, Tables and Figures

Clause No.(etc.) Title and written text

[Note to compiler: Rewrite here the Substitute Clause etc. listed above]

Page 20: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 16

8.2 Sample Appendix 0/2: Contract – Specific Minor Alterations to Existing Clauses, Tables and Figures included in the Contract

Clause No. (etc.) Alterations to be made

[Note to compiler: Write here the minor alteration using ‘delete and insert’ or ‘add at end of Clause’ techniques]

8.3 Sample Appendix 0/3: List of Numbered Appendices referred to in the Specification and included in the Contract

[Note to compiler: Include the following explanatory statements relating to List A and List B]

This Appendix 0/3 is comprised of a list of the Numbered Appendices referred to in the Specification and included in this Contract.

Responsibility for the compilation/completion of the appendices is indicated by the following symbols:

E Employer compiles

C Contractor to compile and submit to the Employer’s Representative

E/C Employer partially compiles and Contractor completes and submits to the Employer’s Representative

T/C Tenderer compiles and returns with his Tender. Post award of Contract the Contractor reviews and submits to the Employer’s Representative.

(P) The symbol ‘P’ indicates the appendix is a national pro-forma and the format must not be altered.

Where a Contractor or Tenderer is required to compile or complete an Appendix, they shall do so in accordance with the GSW, and providing information similar to that stated in the sample appendices as a minimum.

Appendix 0/3 is comprised of two lists, A and B, of Numbered Appendices as follows.

List ‘A’ is a complete list of the Numbered Appendices referred to in the SPW with those not adopted marked “Not Used”. Those identified by the letters ‘T’ or ‘C’ shall be compiled by the Tenderer or the Contractor respectively.

List ‘B’ gives a list of Contract – specific Numbered Appendices devised for this Contract.

[Note to compiler: Reproduce here the following sample List A deleting the word ‘Sample’ and adding Volume No. where each is located within the documents and stating those Numbered Appendices not used. Ensure the ‘Instructions for Tendering’ correspond with the requirements for submission of completed Appendices by the Tenderers.]

[Note to compiler: Insert a List B of any project specific Appendices in a similar format to List A. Preferably commence the numbering of these Project-specific Numbered Appendices at the 70th Appendix of the respective parts (e.g. 1/70) to avoid conflict with future national Additional Numbered Appendices.]

Page 21: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 17

Sample List of Numbered Appendices – List A

Volume No.

Contract for Works

Designed by the Contractor

Compiled/

Completed By

Contract for Works

Designed by the Employer

Compiled/

Completed By Appendix

No. Title

Introduction

E E 0/1 Contract-specific Additional, Substitute and Cancelled Clauses and Tables included in the Contract

E E 0/2 Contract-specific Minor Alterations to Existing Clauses and Tables included in the Contract

E E 0/3 List of Numbered Appendices Referred to in the Specification and included in the Contract

E E 0/4 List of drawings included in the Works Requirements

Preliminaries

E E 1/1 Accommodation and Equipment for The Employer’s Representative

E E 1/2 Vehicles for the Employer’s Personnel

E E 1/3 Communications System for the Employer’s Personnel

C E 1/4 Working and Fabrication Drawings

E / C E 1/5 Testing to be Carried out by the Contractor

E E 1/6 Supply and Delivery of Samples to the Employer’s Representative

E E 1/7 Site Extent and Limitations on Use

E E 1/8 Operatives for the Employer’s Representative

E E 1/9 Control of Noise and Vibration

C E 1/10 Principal Structures to be Designed by the Contractor

C E 1/11 Structural Elements and Other Features to be Designed by the Contractor

E E 1/12 Setting Out and Existing Ground Levels

E E 1/13 Programme of Design and Execution and Completion of the Works

E E 1/14 Monthly Statements

E E 1/15 Accommodations Works

T / C E 1/16 Privately & Publicly Owned Services & Supplies

Page 22: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 18

Volume No.

Contract for Works

Designed by the Contractor

Compiled/

Completed By

Contract for Works

Designed by the Employer

Compiled/

Completed By Appendix

No. Title

E E 1/17 Traffic Safety & Management

E / C E 1/18 Temporary Diversions for Traffic

E E 1/19 Routeing of Vehicles

E E 1/20 Recovery Vehicles for Breakdowns

E E 1/21 Information Boards

E E 1/22 Progress Photographs

C E 1/23 Substances Hazardous to Health

E E 1/24 Quality Management System

E E 1/25 Product Certification Schemes

E E 1/26 Irish Agrément Board Roads and Bridges Certificates

Site Clearance

E / C E 2/1 List of Buildings, etc., to be Demolished

C E 2/2 Filling of Trenches and Pipes

C E 2/3 Retention of Material Arising from Site Clearance

E / C E 2/4 Explosives and Blasting

E / C E 2/5 Hazardous Materials

Fencing and Environmental Noise Barriers

E / C E 3/1 Fencing, Gates and Stiles

C E 3/2 Fencing: NRA Road Construction Details

Road Restraint Systems (vehicle and pedestrian)

C E 4/1 Safety Barriers

C E 4/2 Pedestrian Restraint Systems

C E 4/3 Safety Barrier Terminals

E E 4/4 Safety Barrier Maintenance

C E 4/5 Anti-Glare Screens

C E 4/6 Safety Barriers: NRA Road Construction Details

C E 4/7 Vehicle Parapet Systems

Drainage and Service Ducts

Page 23: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 19

Volume No.

Contract for Works

Designed by the Contractor

Compiled/

Completed By

Contract for Works

Designed by the Employer

Compiled/

Completed By Appendix

No. Title

C E 5/1 Drainage Requirements

C E 5/2 Service Duct Requirements

C E 5/3 Surface Water Channels and Drainage Channel Blocks

C E 5/4 Fin Drains and Narrow Filter Drains and Geotextiles for Filter Drains

C E 5/5 Combined Drainage and Kerb Systems

C E 5/6 Linear Drainage Channel Systems

C E 5/7 Drainage and Service Ducts: NRA Road Construction Details

C E 5/8 Thermoplastics Structural Wall Pipes and Fittings

E/C E 5/9 Attenuation

Earthworks

C E 6/1 Requirements for Acceptability & Testing of Earthworks Materials

C E 6/2 Requirements for Dealing with Class U2 Unacceptable Material

C E 6/3 Requirements for Excavation, Deposition, Compaction (other than Dynamic Compaction)

Not Used Not Used 6/4 Not Used

C E 6/5 Geotextiles Used to Separate Earthworks Materials

C E 6/6 Fill to Structures & Fill Above Structural Foundations

C E 6/7 Sub-formation & Capping & Preparation & Surface Treatment of Formation

C E 6/8 Topsoiling, Grass Seeding and Turfing

C E 6/9 Earthwork Environmental Bunds, Landscape Areas, Screening Mounds, Strengthened Embankments

C E 6/10 Ground Anchorages, Crib Walling and Gabions

C E 6/11 Swallow Holes & Other Naturally Occurring Cavities & Disused Mine Workings

C E 6/12 Instrumentation & Monitoring

C E 6/13 Ground Improvement

Page 24: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 20

Volume No.

Contract for Works

Designed by the Contractor

Compiled/

Completed By

Contract for Works

Designed by the Employer

Compiled/

Completed By Appendix

No. Title

Road Pavements – General

T/C E 7/1 Permitted Pavement Options

C E 7/2 Excavation & Reinstatement of Existing Surfaces

C E 7/3 Surface Dressing Product (End Performance)

C E 7/4 Bituminous Sprays

Not Used Not Used 7/5 Road Pavements: NRA Road Construction Details

C E 7/6 Breaking Up or Perforation of Existing Pavement

Not Used Not Used 7/7 Not Used

Not Used Not Used 7/8 Not Used

C E 7/9 Cold Milling (Planing) of Bituminous Bound Flexible Pavement

C E 7/10 Microsurfacing

C E 7/11 High Friction Surfacing

C E 7/12 Low Energy Bound Mixtures

C E 7/21 Recipe Surface Dressing

Kerbs, Footways and Paved Areas

C E 11/1 Kerbs, Footways and Paved Areas

C E 11/2 Access Steps

C E 11/3 Kerbs, Footways and Paved Areas: NRA Road Construction Details

Traffic signs

C E 12/1 Traffic Signs: General

C E 12/2 Traffic Signs: Reflective Markers

C E 12/3 Traffic Signs: Road Markings & Studs

C E 12/4 Traffic Signs: Cones, Cylinders, FTD's & Other Traffic Delineators

C E 12/5 Traffic Signs: Traffic Signals

C E 12/6 Traffic Signs: Special Sign Requirements on Gantries

Page 25: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 21

Volume No.

Contract for Works

Designed by the Contractor

Compiled/

Completed By

Contract for Works

Designed by the Employer

Compiled/

Completed By Appendix

No. Title

C E 12/7 Traffic Signs: Preparation and Finish of Metal and Other Surfaces

Road Lighting Columns & Brackets

C E 13/1 Information to be Provided by the Designer for the Road Lighting Works when Specifying Lighting Columns and Brackets

C (P) C (P) 13/2 Column & Bracket Data Sheets 1 & 2

(P) (P) 13/3 Instructions for Completion of Column and Bracket Data Sheet

C (P) E/C (P) 13/4 Certification for Lighting Columns

C E 13/5 Road Lighting Column and Brackets: NRA Road Construction Details

Electrical Work for Road Lighting and Traffic Signs

E E 14/1 Site Records

C E 14/2 Location of Lighting Units and Feeder Pillars

C E 14/3 Temporary Lighting

C E/C 14/4 Electrical Equipment for Road Lighting

C E 14/5 Electrical Equipment for Traffic Signs

C E 14/6 Preparation and Finish of Metal and Other Surfaces

Motorway Communications

C C 15/1 Motorway Communications

Piling and Embedded Retaining Walls

C E 16/1 General Requirements for Piling and Embedded Retaining Walls

C E 16/2 Precast Reinforced and Prestressed Concrete Piles and Precast Reinforced Concrete Segmental Piles

C E 16/3 Bored Cast-in-Place Piles

C E 16/4 Bored Piles Constructed Using Continuous Flight Augers and Concrete or Grout Injection Through Hollow Auger Stems

C E 16/5 Driven Cast-in-Place Piles

C E 16/6 Steel Bearing Piles

Page 26: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 22

Volume No.

Contract for Works

Designed by the Contractor

Compiled/

Completed By

Contract for Works

Designed by the Employer

Compiled/

Completed By Appendix

No. Title

C E 16/7 Reduction of Friction on Piles

C E 16/8 Non-Destructive Methods for Testing Piles

C E 16/9 Static Testing of Piles

C E 16/10 Diaphragm Walls

C E 16/11 Hard/Hard Secant Pile Walls

C E 16/12 Hard/Soft Secant Pile Walls

C E 16/13 Contiguous Bored Pile Walls

C E 16/14 King Post Walls

C E 16/15 Steel Sheet Piles

C E 16/16 Integrity Testing of Wall Elements

C E 16/17 Instrumentation for Piles and Embedded Walls

C E 16/18 Support Fluid

Structural Concrete

C E 17/1 Concrete – Classification of Mixes

C E 17/2 Concrete – Impregnation and Coating Schedule

C E 17/3 Concrete – Surface Finishes

C E 17/4 Concrete – General

Structural Steelwork

C E 18/1 Requirements for Structural Steelwork

Protection of Steelwork against Corrosion

E/C (P) E/C (P) 19/1 (Specification for Road Works) Sheet No. Form BE/P1 (New Works) Paint System Sheet

E/C E/C 19/2 (New Works) Requirements for Other Work

C (P) C (P) 19/3 (Specification for Road Works) Form BE/P2 Paint Data Sheet

C (P) C (P) 19/3* (Specification for Road Works) Form BE/P3 Paint Sample Despatch List: Sheet 1

C (P) C (P) 19/3* (Specification for Road Works) Form BE/P3 Paint Sample Despatch List: Sheet 2

E E 19/4 (New Works) General Requirements

Page 27: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 23

Volume No.

Contract for Works

Designed by the Contractor

Compiled/

Completed By

Contract for Works

Designed by the Employer

Compiled/

Completed By Appendix

No. Title

E/C (P) E/C (P) 19/5 (Specification for Road Works) Form BE/PE1 (Maintenance) Paint System Sheet 1

C (P) C (P) 19/6 (Specification for Road Works) Form BE/P1 (Maintenance) Paint System Sheet 2

E/C E/C 19/7 (Maintenance) Requirements for Other Work

E E 19/8 (Maintenance) General Requirements

Waterproofing for Concrete Structures

C (P) C (P) 20/1 Form PWS Proprietary Waterproofing System Data Sheet (1991 & Annex 'A')

E / C E 20/2 Waterproofing for Concrete Structures

Bridge Bearings

C E 21/1 Bridge Bearing Schedule

Bridge Expansion Joints and Sealing of Gaps

C E 23/1 Bridge Deck Expansion Joint Schedule

C E 23/2 Sealing of Gaps Schedule (other than in Bridge Deck Expansion Joints)

Brickwork, Blockwork and Stonework

C E 24/1 Brickwork, Blockwork and Stonework

C E 24/2 Brickwork, Blockwork and Stonework: NRA Road Construction Details

Special Structures

C E 25/1 Requirements for Corrugated Steel Buried Structures

C E 25/2 Requirements for Reinforced Soil and Anchored Earth Structures

C E 25/3 Requirements for Reinforced Clay Brickwork Retaining Walls of Pocket Type and Grouted Cavity Construction Structures

Miscellaneous

C E 26/1 Ancillary Concrete

C E 26/2 Bedding Mortar

C E 26/3 Cored Thermoplastic Node Markers

Page 28: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 24

Volume No.

Contract for Works

Designed by the Contractor

Compiled/

Completed By

Contract for Works

Designed by the Employer

Compiled/

Completed By Appendix

No. Title

Watermains, Utilities and Accommodation Works

E/C E 27/1 Requirements for Watermains

E/C E 27/2 Watermains: NRA Road Construction Details

Trenchless Installation of Road Drainage & Service Ducts

E/C E 28/1 Trenchless and Minimum Dig Techniques

CCTV Survey of Road Drainage Systems

E/C E 29/1 CCTV Survey of Road Drainage Systems

[Note to compiler:

* These Appendices relate to alternatives in the Sample Appendices where the choice is to be made by the Contractor and all appropriate alternatives should be listed in List A.].

Page 29: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 25

8.4 Sample Appendix 0/4: List of Drawings Included in the Contract

8.4.1 Contract-specific Drawings Supplied to Each Tenderer

Drawing No. Title Volume No.

[Note to compiler: List here all drawings especially drafted for the Contract. Also include re-numbered Standard Construction Details (SCD) in TII Publications (Standards) which have Contract-specific

amendments. See Notes to compiler on SCD’s below.]

8.4.2 Standard Drawings

8.4.2.1 Supplied to Each Tenderer

Drawing No. Title Volume No.

[Note to compiler: List here any Standard Drawings being supplied to each tenderer unless they have been renumbered and included in 8.4.1 above or are included in 8.4.2.2 below for inspection by tenderers.]

8.4.2.2 Inspected by tenderers

The following drawings are made available for inspection by Tenderers at:

_______________________________________________________________________________

_______________________________________________________________________________

between the following dates ________________________________________________________

and at the following times ________________________________________________________

One copy will be supplied to the Contractor

Drawing No. Title Aspect required if not whole

Drawing

[Note to compiler: List here all the drawings for Communications Cabling, its associated apparatus including any fog warning systems, etc. applicable to the work required in the Contract unless listed in 8.4.2.1 above.]

Page 30: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016

Page 26

8.4.2.3 Brought Into the Contract by Reference

The Standard Construction Details (SCD) in TII Publications (Standards) contain the following drawings brought into the Contract by reference. Unless otherwise stated below the whole drawing is brought into the Contract.

Drawing No. Title Date Aspect/Alternative(s) Required if Not Whole Drawing

[Notes to compiler regarding SCD’s:

1. The drawings in the SCDs are intended to be used directly in the Contract without reproducing them in the documents and without supplying them to the Contractor. The individual drawings to be included in the Contract are to be listed in 8.4.2.3 by stating the TII Publication Number (with amendment reference i.e. A, B etc.), date, and aspect or permitted alternative(s) where the whole drawing is not required.

2. Many drawings in the SCDs contain more than one detail covering the same subject. Where alternatives are shown it is essential that the particular requirements or permitted alternatives are identified. These are to be stated in 8.4.2.3.

3. The intention is that the drawings in the SCDs should be used without amendment but if this becomes essential, approval from TII will be necessary through a Departure from Standards. A copy of the amended SCD’s is then to be incorporated in the documents and listed in Appendix 0/4 with a unique drawing number and new date inserted in the date panel.]

Page 31: Notes for Guidance on the Specification for Works NG 000 ...TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016 Page i About

TII Publications CC-GSW-00010 Notes for Guidance on the Specification for Works NG 000 - Introduction June 2016