16
16.07.2014 1 Author Title of project NORWEGIAN ARMED FORCES Army staff 16.07.2014 1 NORWEGIAN ARMED FORCES Army staff Army staff/ Force Development Division Norwegian Army Future development Norwegian upgrade program for Leopard 2, MBT, CV90 and M-113 Armoured Vehicles Northern Europe 28 30 April 2014 Major Rune Oyen and Major Gaute Indseth/ Norwegian Army staff

Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

Embed Size (px)

Citation preview

Page 1: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 1 Author Title of project

NORWEGIAN ARMED FORCES Army staff

16.07.2014 1

NORWEGIAN ARMED FORCES Army staff

Army staff/ Force Development Division Norwegian Army – Future development

Norwegian upgrade program for Leopard

2, MBT, CV90 and M-113

Armoured Vehicles Northern Europe 28 – 30 April 2014

Major Rune Oyen and Major Gaute Indseth/ Norwegian Army staff

Page 2: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 2 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff

Topic

Norwegian upgrade program for LEO 2 MBT fleet, CV90 fleet and M-113 fleet with the purpose to:

– Optimize crew and vehicle protection

– Optimize life cycle cost

Page 3: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 4 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff

Chief of Staff

of the

Norwegian

Army

Brigade North Border Guard

GSV

His Majesty

the King’s

Guard

Army Staff

Special

Operations

Command

Military

Academy

Operation

Support

Land Warfare

Center The Norwegian

Armed Forces

Training Centre

for Joint Logistic

Support

Current Army structure

Numbers: Active

- 4500 employees, 4500 conscripts.

- 300 deployed in international operations.

-Operating Budget: 5,6 mrd (NOK) / $1 billion.

- 3000 vehicles, fuel consumtion: 3,5mill ltrs.

- 800 000m2 buidlings

Deployed units:

Task group

Task units

Mission tailored.

Page 4: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 5 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff

Brigade North

CSS

CBT

MP

INT

339 SQN

ASCC

NORTG

HV

Page 5: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

Armour bn / Brigade North

HST/ ORG OG MATERIELLAVD/ SSO STRUKTURUTVIKLING

Telemark bn / Brigade North

Mechanized battalions

High readiness units / enlisted soldiers

Able to operate in battle groups/ task groups/ task units - taliored to mission

Page 6: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 7 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff

2nd Infantry Battalion/ Brigade North

Light Infantry capability:

Javelin AT system, snipers, mortars, heavy and medium machine guns.

Winter warfare specialists. Able to operate in battle groups/ task groups/

task units as mission requires.

Page 7: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 8 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff

Artillery Bn: New artillery system and Air Defence system - more enlisted soldiers.

Brigade Combat Support and CSS untis

Engineer Bn: CBRN capability, replace Leo 1, replace parts of M113s - more enlisted soldiers.

CSS bn: Replace all types of trucks, armour/ and armour capable – more enlisted soldiers.

Medical Bn: More enlisted soldiers, field PASI 203 wheeled ambulances.

Page 8: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 24 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff

P5436 Combat fighting vehicle project

Infantry Fighting

Vehicle

Combat Command

Vehicle

Armd Recce

Vehicle

Cbt Engr

vehicle

Multi-role support

Vehicle (mortar)

Page 9: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 25 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff

– Increase NorArmys capabilities • Give mechanized battalion future-oriented capabilities

located on medium armoured platforms

– Increase protection on all vehicles

– Establish network capacity on all vehicles – Control of the logistic costs – Contract signed 2012, deliveries 2014-2018 – 1st vehicle delivered for testing feb 2014

Combat Fighting Vehicle Project

Page 10: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 29 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff

M113 armoured support vehicles New upgraded models (F3 and F4)

• Workhorse ( 50 years service)

• Several ongoing and planned projects

• Total rebuild and capabilities equal to modern

vehicles in same class

The advantage with the M113:

• Offers protection and mobility

• Easy to operate

• Is flexible and can fill different support roles

• Very low operating costs compared to new vehicles

Page 11: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 30 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff

M113F3 program • Specialised versions include:

– Ambulance, medical treatment, command post, forward command vehicle, cbt engineer vehicle and anti-tank (Javelin)

• Reliability and mobility equal to modern vehicles in same weight class

• Modern powerpack

• Rubber band tracks

• Digitalized C2/SOTAS intercom/BMS

• Increased protection against mine/IED and ballistic threats

• More than 100 vehicles in service/planned

Page 12: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 31 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff

M113F4 program • Program planned for 2014-2019

• Stretched versions (6 or 7 roadwheels) for:

– C3IS functions,

– Logistics carrier

– Forward repair teams

– Air-defense

– Artillery location radar system

• Increased interior volume and height of roof

• Increased Mine/IED protection compared to M113F3

• More than 75-150 vehicles planned

Page 13: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 32 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff

6-roadwheel version

w/10’ ARTHUR mock-up

M113F4 program

7-roadwheel version

w/10’ capacity

• Technical demonstrators for 6- and 7- roadwheel versions produced

and undergoing trials

Page 14: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 33 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff

M113F4 program

Page 15: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 34 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff Armoured wheeled vehicle fleet:

• Product of our deployments in peace support operations, and especially urgent operational needs in Afghanistan.

• Most likely need for such vehicles in future operations.

• SISU/PASI will be upgraded – fill ambulance and EOD roles.

• DINGO will be used in Afghanistan until end of 2014.

• IVECO LMV will enter service in national structure (60%) and be based in stockpiles for future ops (40%) – the procurement will be completed with the last 62 vehicles in 2014.

• No plans for further larger investments as of now.

FUCHS /CBRN SISUXA / PASI203N DINGO-2 IVECO LMV MULTI

Page 16: Norwegian upgrade program for Leopard 2, MBT, CV90 and · PDF fileArmy staff/ Force Development Division Norwegian Army – Future development 16.07.2014 2 NORWEGIAN ARMED FORCES Army

16.07.2014 38 Army staff/ Force Development Division Norwegian Army – Future development

NORWEGIAN ARMED FORCES Army staff

Q & A

or comments ?

Norwegian Army Staff / Force development