8
±95,000 - ±731,561 SF FOR LEASE BUILDING 5 & 9 | RECENTLY COMPLETED DONOAN WAY LAMB BLVD 15 INTERSTATE NORTHGATE DISTRIBUTION CENTER BUILDING 9 BUILDING 5 N G

NORTHGATE BUILDING 9 DISTRIBUTION CENTER · 2018-07-23 · DISTRIBUTION CENTER BUILDING 9 BUILDING 5 NG. PROJECT HIGHLIGHTS LOCATION PROJECT ... • FedEx Ship Center - 6 Miles •

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NORTHGATE BUILDING 9 DISTRIBUTION CENTER · 2018-07-23 · DISTRIBUTION CENTER BUILDING 9 BUILDING 5 NG. PROJECT HIGHLIGHTS LOCATION PROJECT ... • FedEx Ship Center - 6 Miles •

±95,000 - ±731,561 SF FOR LEASE

BUILDING 5 & 9 | RECENTLY COMPLETED

DON

OAN

WAY

LAMB BLVD

15INTERSTATE

NOR T H GAT EDISTRIBUTION CENTER

BUILDING 9

BUILDING 5

NG

Page 2: NORTHGATE BUILDING 9 DISTRIBUTION CENTER · 2018-07-23 · DISTRIBUTION CENTER BUILDING 9 BUILDING 5 NG. PROJECT HIGHLIGHTS LOCATION PROJECT ... • FedEx Ship Center - 6 Miles •

P R O J E C THIGHLIGHTSLOCATION

PROJECT

• Immediate access to I-15 via Lamb Blvd. Interchange

• Building signage with I-15 frontage

• City of North Las Vegas jurisdiction

• Monument signage

• Buildings available from ±191,026 to ±731,561 SF

• Divisibility to ±95,000 SF

• Cross dock and rear loading configurations

• Office BTS

• 32’ - 36’ minimum clear height

• Abundant trailer parking

• ESFR sprinkler system

95

215

15

15

515 582

599

LAS

VEGA

S ST

RIP

UNIO

N PA

CIFI

C RR

PARADISE593

NORTHLAS VEGAS

SPRING VALLEY

215

McCarran International Airport

NORTH LAS VEGAS

AIRPORT

SUMMERLIN

CENTENNIAL HILLS

HENDERSON

SUNRISE MANOR

604CRAIG ROAD

N LAS VEGAS BLVD

LAS VEGAS

NOT TO SCALE

NG

Page 3: NORTHGATE BUILDING 9 DISTRIBUTION CENTER · 2018-07-23 · DISTRIBUTION CENTER BUILDING 9 BUILDING 5 NG. PROJECT HIGHLIGHTS LOCATION PROJECT ... • FedEx Ship Center - 6 Miles •

64 DO

CK D

OO

RS

60 DO

CK D

OO

RS

ELECTR

ICAL

RO

OM

POTEN

TIAL

OFFIC

E

POTEN

TIAL

OFFIC

E

POTEN

TIAL

OFFIC

E

POTEN

TIAL

OFFIC

E

81 TRAILER

S

71 TRAILER

S

BU

ILDIN

G 9

±731,561 SF

PR

I VA

TE

DR

I VE

WA

Y

D O N O VA N W AY

56’

184’- 6’

184’- 7’

185’

185’

71’- 6’ 60’

55’

72’53’

40’

40’

32’

62’

26’

38’

60’

560’

1288’

BUILDING 9±731,561 SF AVAILABLE

BUILDING 5±191,026 SF AVAILABLE

NG

Page 4: NORTHGATE BUILDING 9 DISTRIBUTION CENTER · 2018-07-23 · DISTRIBUTION CENTER BUILDING 9 BUILDING 5 NG. PROJECT HIGHLIGHTS LOCATION PROJECT ... • FedEx Ship Center - 6 Miles •

B U I L D I N GFIVE5840 DONOVAN WAY NORTH LAS VEGAS, NV 89115

• ±191,026 SF total

• Divisible to ±95,000 SF

• Office BTS

• Clear height: ±32’

• Rear loading configuration

• 39 (±9’ x ±10’) dock doors

• 4 (±12’ x ±14’) ramp to grade doors

• ±50’ x ±52’ typical column spacing

• ±52’ x ±60’ speed bay

• ESFR fire sprinklers

• 277/480v, 3-phase power

• 6” reinforced concrete floors

• 2% skylights

• Ready for tenant improvements

ALL MEASUREMENTS ARE APPROXIMATENOT TO SCALE

Page 5: NORTHGATE BUILDING 9 DISTRIBUTION CENTER · 2018-07-23 · DISTRIBUTION CENTER BUILDING 9 BUILDING 5 NG. PROJECT HIGHLIGHTS LOCATION PROJECT ... • FedEx Ship Center - 6 Miles •

B U I L D I N GNINE5340 Donovan Way North Las Vegas, NV 89115

64 DOCK DOORS

60 DOCK DOORSELECTRICAL

ROOM

POTENTIALOFFICE

POTENTIALOFFICE

POTENTIALOFFICE

POTENTIALOFFICE

81 TRAILERS

71 TRAILERS

BUILDING 9±731,561 SF

P R I V A T E D R I V E W A Y

DO

NO

VA

N W

AY

56’

184’

- 6’

184’

- 7’

185’

185’

71’-

6’60

’55

72’

53’

40’

40’

32’

62’

26’

38’

60’

560’

1288’

• ±731,561 SF total

• Divisible to ±250,968 SF

• Office BTS

• Clear height: 36’

• ESFR fire sprinklers

ALL MEASUREMENTS ARE APPROXIMATENOT TO SCALE

• 2% skylights

• Cross dock configuration

• Up to 124 dock doors

• 4 ramp to grade doors

• 56’ x 60’ typical column spacing

• 277/480v, 3-phase power

• 152 trailer parking stalls

• 341 auto parking stalls

• 7” reinforced concrete slab

• Ready for tenant improvements

Page 6: NORTHGATE BUILDING 9 DISTRIBUTION CENTER · 2018-07-23 · DISTRIBUTION CENTER BUILDING 9 BUILDING 5 NG. PROJECT HIGHLIGHTS LOCATION PROJECT ... • FedEx Ship Center - 6 Miles •

• US-95 and I-15 interchange is ±7 miles from subject property

• McCarran Airport is ±15 miles from subject property

• Resort Corridor (Sahara and LV Blvd) is ±11 miles from property

• Proximity to Distribution Hubs

One Day Truck Service

Transit Analysis From Las Vegas, NV

Distance (mi.) Distance (mi.)Time (est.) Time (est.)

Two Day Truck Service

NOT TO SCALE

Los Angeles, CA 265 3 hrs, 54 minPhoenix, AZ 300 4 hrs, 39 minSan Diego, CA 327 4 hrs, 46 minSalt Lake City, UT 424 5 hrs, 50 minReno, NV 452 6 hrs, 55 minSan Francisco, CA 562 8 hrs, 20 minSacramento, CA 565 8 hrs, 14 min

Boise, ID 634 9 hrs, 31 minSanta Fe, NM 634 9 hrs, 8 minDenver, CO 752 10 hrs, 45 minCheyenne, WY 837 11 hrs, 52 minHelena, MT 907 12 hrs, 31 minPortland, OR 982 15 hrs, 44 minSeattle, WA 1,129 16 hrs, 52 min

L O C AT I O N& TRANSPORTATION

• FedEx Freight - 1 Miles

• FedEx Ship Center - 6 Miles

• FedEx Air Cargo - 17 Miles

• FedEx Ground - 30 Miles

• UPS Freight Service Center - 2 Miles

• UPS Customer Center - 8 Miles

• UPS Air Cargo - 21 Miles

• US Post Office - 6 Miles

Page 7: NORTHGATE BUILDING 9 DISTRIBUTION CENTER · 2018-07-23 · DISTRIBUTION CENTER BUILDING 9 BUILDING 5 NG. PROJECT HIGHLIGHTS LOCATION PROJECT ... • FedEx Ship Center - 6 Miles •

L A S V E G A SBUSINESS FACTS

Business Assistance Programs Nevada Tax Climate Labor

• Sales and Use Tax Abatement

• Modified Business Tax Abatement

• Personal Property Tax Abatement

• Real Property Tax Abatement for Recycling

• TRAIN Employees Now (TEN)

• Silver State Works Employee Hiring Incentive

• No Corporate Income Tax

• No Admissions Tax

• No Personal Income Tax

• No Unitary Tax

• No Franchise Tax on Income

• No Estate Tax

• Nevada has one of the lowest labor costs in the region

• The metro Las Vegas area has more than 55,000 workers in the transportation, logis-tics and manufacturing industries

• Nearly 65,000 students are enrolled in the University of Nevada Las Vegas and the Col-lege of Southern Nevada

• According to CBRE-EA manufacturing jobs are expected to grow by 1.4%, wholesale trade by 3.0%, and transportation and ware-housing by 1.8%.

• All industrial employment sectors in Las Vegas are expected to grow faster than the national averages

Page 8: NORTHGATE BUILDING 9 DISTRIBUTION CENTER · 2018-07-23 · DISTRIBUTION CENTER BUILDING 9 BUILDING 5 NG. PROJECT HIGHLIGHTS LOCATION PROJECT ... • FedEx Ship Center - 6 Miles •

KEVIN HIGGINS, SIOR

Executive Vice President+1 702 369 [email protected]. #BS.0016109

JAKE HIGGINS

Associate+1 702 369 [email protected]. #S.0176473

© 2018 CBRE, Inc. All rights reserved. This information has been obtained from sources believed reliable, but has not been verified for accuracy or completeness. You should conduct a careful, independent investigation of the property and verify all information. Any reliance on this information is solely at your own risk. CBRE and the CBRE logo are service marks of CBRE, Inc. All other marks displayed on this document are the property of their respective owners. Photos herein are the property of their respective owners. Use of these images without the express written consent of the owner is prohibited. PMStudio_July2018

NOR T H GAT EDISTRIBUTION CENTER

NG