Northern Line Extension

Nine Elms and Oval

Community Liaison Group 15.01.15

Page 2: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Update

2

• Following Ferrovial Agroman Laing O'Rourke (FLO)

appointment in Sept 2014 and TWAO approval in

Nov., enabling works have now started in KG and KP

areas.

• Main works to start during 2015 following CoCP B

approval.

• Four Community Drop in Sessions held during first

week of December for comments on CoCP B.

• FLO is now in the process of gaining approval for the

CoCP B by the Local Authorities.

Page 3: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

NLE Project Draft timetable

3

Year Key milestones

2014 Transport and Works Act Order decision,

Design & Build contract signed

2015 Agreement on Code of Construction Practice Part B,

Start of main works at all sites

2016 Start of Tunnel Boring Machines

2017 Completion of tunnelling

2018

Fit out of new stations, Kennington shafts complete inc

reinstatement, work at Kennington station complete

2019

Testing, commissioning, trial operations

2020

NLE complete and in service

Page 4: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Nine Elms progress

4

What it’s been done until now

Sept - Dec

14 • FLO (Ferrovial Agroman Laing O’Rourke) awarded NLE

• TWAO approval 12th November 2014

• Start date on site due in early 2015

• Design / Procurement on going

• Liaison with Councils and Communities on going, i.e. Drop in

session (CoCP Part B) held on 3rd December 2014

• Introduction meetings with stakeholders (CGMA, Banhams

and Barratt / Sainsbury’s) already held

Page 5: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Nine Elms look ahead

5

Enabling Works

Jan –

March 15 • Heras fencing and Hoarding installation / Site Accommodation

• Asbestos surveys

• Demolition works to Boiler House and the Chimney

• New Access for Vehicles and Pedestrians onto Pascal Street

• Establishment of temporary haul road

• Parking Restrictions and Footpath / Crossing points Closures

Pascal Street

• Relocation of Sub-station at Sainsbury’s Car Park

• Buried services surveys incl. services protection and Trial holes

• Set up monitoring equipment (noise, dust vibration)

Page 6: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Nine Elms. Road Scheme

6

Page 7: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Ground Investigation

7

• No further ground investigation/ boreholes are

currently planned.

• FLO is now in concept design process with TfL

developing more effective solutions to carry out the

works.

• Ground conditions for tunnelling predominantly

London Clay. An ideal tunnelling medium.

• Groundwater/ step plate junction within a full face of

impermeable London Clay.

• Local de-pressurisation was from within the tunnel

maybe utilised.

Page 8: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Nine Elms

8

Preliminary Settlement Contours

Page 9: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

9

Preliminary Settlement Contours

Nine Elms

Page 10: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Measuring & Monitoring

• Monitoring outline design completed end January 2015

• Consultants currently carrying out damage assessments which

will inform the detailed monitoring scope.

• Monitoring tender package to market at the end of January, and

award to follow around March.

• Monitoring installation to start May-June 2015

• A minimum of 4 weeks notice will be given to building owners

prior to the installation of monitoring equipment.

• Envisaged that the monitoring equipment will comprise BRE

studs (structure levelling studs) and 3D geodetic prisms.

10

Page 11: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Monitoring techniques

Buildings – Real time data: 3D geodetic prisms

Automatic Total Station (ATS) Prisms

ATS: an electrical/optical instrument used in modern building construction

to measure slope distances from the instrument to a particular point.

Page 12: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Monitoring techniques

Buildings – Manual data: BRE studs (structure levelling studs)

Page 13: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Defect Surveys

13

• Defect Surveys to be undertaken by a qualified chartered building

surveyor or engineer on properties predicted to experience 1mm or more

settlement.

• Defect Surveys around the station box commence in May/June to ensure

that the surveys are undertaken within 6 months of piling works

programmed for August 2015.

• Defect Surveys in areas of the running tunnels to be undertaken at a later

date in advance of construction (second half of 2016 and first half of

2017).

• TfL to contact affected properties via letter.

• A minimum of 4 weeks notice will be given to building owners prior to the

defect survey being carried out.

• Where necessary a second survey will be undertaken to establish the

difference between the two assessments.

• There will be a written and photographic record and a copy will be

available to the property owner.

Page 14: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Code of Construction Practice Part B

• Four drop in sessions w/c 01.12.14 hosted by FLO senior

leadership

• Information boards on programme of works, environmental

mitigation, site layout and finished schemes

• 47 registered attendees

• 145 comments raised through the paper and online questionnaire

• Feedback from Kennington Green Supporter Group (KGSG), and

further meetings held with Kennington and Wandsworth

Neighbourhood Action Group (KNWAG) and residents to discuss

specific issues

14

Page 15: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

• Discussion process closed on 19.12.14

• CoCP B being updated to incorporate comments prior to formal

submission to the local authorities end of January.

• Summary of feedback and responses will be produced.

15

Code of Construction Practice Part B

Page 16: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

16

Code of Construction Practice Part B

Page 17: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

17

Traffic Management Plans

• Meetings with Local Authorities on-going.

• First draft of Traffic Management Plans (drawings) to be ready

w/c 12 Jan

• Traffic Management Plan (document) include a schedule

forecast for temporary traffic management plans (drawings)

for next six months.

• Temporary traffic management plans (drawings) will follow

when FLO have engaged statutory undertakers.

• These are submitted to Local Authorities.

Page 18: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Traffic Management Plans

Nine Elms

18

Page 19: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Traffic Management Plans

Nine Elms

19

Page 20: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Hoardings

• FLO is now procuring hoardings for all sites.

• Conversations with TfL for standards and design

options on-going

• FLO is looking for input on hoarding graphics.

• Corporate TfL standards

• Dialogue with local CLGs on proposals for each

location

• Feedback and proposals welcome from the CLG.

20

Page 21: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Hoarding at Nine Elms

21

Page 22: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

NLE Complaints / Enquiries

Summary

• 2 valid complaints received from October to December 14

22

Date Organisation Address Details of complaint Response Status

07/11/2014 Resident Kennington

Lane

Reported damaged caused by a fox

accesing patios through Compass

temporary hoarding

Response to resident within 24 hours - telephone call and meeting.

Worksite was repaired by Compass and subsequently by FLO. Closed

17/12/2014 Resident Kennington

Road

Reported disruption due to site

lighting reflection to the inside of the

beedroom.

Response to resident within 24 hours - telephone call and email.

The issue was resolved in the same day by applied shielding to the

walkway illumination lights.

Closed

Page 23: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

NLE Complaints / Enquiries

Summary

• Immediate solution given to complaint received at Kennington Rd.

23

Page 24: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Updates and newsletters

24

• Quarterly Newsletter sent at the end of November with

updates on NLE.

• Electronically sent to over 1,600 people. Advertised

on website and letter drop of 2,500 copies.

• Next quarterly newsletter due at the end of February.

• Local activity notification have been sent.

• Monthly Activity update due for end of January.

Page 25: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Updates and newsletters

25

Page 26: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Consents

26

Current applications under determination

Kennington Park and Kennington Green – partial

discharge of planning conditions 5 & 7 – works

to trees

L B Lambeth

Submitted December

2014

Approvals granted

Montford Place discharge of planning conditions

6 and 7 (boundary treatments, lighting and

CCTV)

L B Lambeth Granted December

2014

Montford Place Section 61 Consent (Control of

Pollution Act – noise and vibration)

L B Lambeth Granted December

2014

Page 27: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Consents

27

Key forthcoming applications for approval

All sites – application to discharge planning condition 10 -

archaeology

LB Lambeth and

LB Wandsworth

Planned be submitted

February 2015

All sites – application to discharge planning condition 7 –

CoCP pt B

LB Lambeth and

LB Wandsworth

Planned be submitted

late January 2015

All sites – applications for a Section 61 consent under the

Control of Pollution Act - the minimisation of construction

noise and vibration

LB Lambeth and

LB Wandsworth

Planned be submitted

late January 2015

Kennington Park - application to discharge planning

condition 18 – yellow hatched box junction – Kennington

Park Place/Road

LB Southwark Planned be submitted

late January 2015

Kennington Park and Kennington Green – application to

(initially) discharge Conservation Area Consent condition C

(reinstatement)

L B Lambeth

Planned be submitted

mid January 2015

Battersea – applications for approvals under Schedule 8

(Protective Provisions) of the TWAO – works within the

river.

EA, PLA, MMO Planned be submitted

February 2015

Kennington Station - application to discharge planning

condition 19 – Kennington Station passenger flow

monitoring protocols

LB Southwark

Planned be submitted

late January 2015 (direct

by TfL)

Page 28: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Jobs and apprenticeships

TfL’s existing programmes

• Skills & Employment Strategy, Delivery Plan for Schools and Young

People

Employment/Skills/Diversity on the NLE programme

• FlO to work in partnership with TfL and the local authorities – including the

Nine Elms Vauxhall Strategy Board Employment, Training & Business

Charter

• Make sure employment/training opportunities are advertised within the job

opportunity/brokerage schemes operated by Southwark, Lambeth &

Wandsworth councils

• Encourage jobstarts for workless people in London, placement & taster

positions, apprenticeships, skills development for staff, engagement with

schools

28

Page 29: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Skills and Youth Engagement Careers Expo for students (2/12 Wandsworth, 3/12 Lambeth)

• Co-ordinated by Wandsworth BEST. NLE and FLO in attendance at the

event.

• More than 100 students attended NLE (LU-FLO) workshop.

• Encourage young people to consider construction as professional option.

29

Page 30: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Skills and Youth Engagement • http://www.wandsworth.gov.uk/news/articl

e/12653/wandsworth_students_explore_n

ine_elms_careers

30

Careers Expo for students

organised by Southwark

• March 2015

• LU and FLO to participate

Page 31: Northern Line Extension Nine Elms and Oval Community ...content.tfl.gov.uk/presentation-nine-elms-and-oval-clg-15-1-2015.pdf · 07/11/2014 Resident Kennington Lane Reported damaged

Community engagement strategy

• Draft Strategy discussed at the June – July cycle of CLG’s

• Core CLG received all comments made

• Updated Strategy and site specific engagement plans table

• Working document CLG comments and suggestions welcome..

• Southwark Career Expo March 2015.