December 19, 2013 Robert Stein, Chairman Connecticut Siting Council Ten Franklin Square New Britain, CT 06051 RE: Dockets 370A and 370A-MR Post-construction EMF Monitoring Report Greater Springfield Reliability Project (“GSRP” and Manchester to Meekville Junction Project (“MMP”) Dear Chairman Stein:
In accordance with condition 3(i) in the March 16, 2010 Decision and Order of the Connecticut Siting Council (“Council”) in Docket 370A, condition 2(i) in the July 20, 2010 Decision and Order of the Council in Docket 370A-MR, and the Council’s subsequent D&M Plan approvals in each Docket, The Connecticut Light and Power Company (“Company”) submitted a Post-construction EMF Monitoring Plan (“Plan”) on July 21, 2011, which the Council approved on August 11, 2011. The planned electric and magnetic field (“EMF”) measurements have since been completed, and this letter provides a report per Section V of the Plan.
The GSRP 345-kV line (circuit # 3216) entered service on March 5, 2013 and the new MMP 345-kV line (circuit # 3557) entered service on September 28, 2012. The post-construction field measurements were performed on dates in August, November and December, 2013 by Mr. Christopher Soderman, a Senior Engineer at the Northeast Utilities Service Company. Mr. Soderman’s measurements of electric and magnetic fields were taken in accordance with IEEE Standard 644-1994 (R2008), Standard Procedures for Measurement of Power Frequency Electric and Magnetic Fields from AC Power Lines. The measurements were taken with an EMDEX II meter manufactured by Enertech Consultants, Campbell, CA. This meter and its accessories meet the associated instrumentation standards. The meter was last calibrated on December 28, 2012 by the manufacturer using methods like those described in IEEE Standard 644- 1994(R2008).
Northeast Utilities System
107 Selden St, Berlin, CT 06037 Robert E. Carberry, P.E. Project Manager NEEWS Projects Northeast Utilities Service Company P.O. Box 270 Hartford, CT 06141-0270 (860)-665-5000
2
The EMF monitoring locations specified in the Plan are shown below in Table 1, and
aerial photographs are attached to this report marking each measurement location.1
Table 1
SiteCross Section
#Municipality
Project Portion
Location
1 1 Bloomfield GSRPOff of Tunxis Ave, CT Route 189
2 1 East Granby GSRP South of Holcomb St3 2 East Granby GSRP South of Turkey Hills Rd
4 2 Split-Phase East Granby GSRPBeyond the End of Copper Hill Terrace
5 2 Suffield GSRP Field East of Ratley Rd6 23 Manchester MMP South of Tolland 7 24 Manchester MMP Meekville Jct Location
At each of the seven sites, field measurements were made beneath and to each side of the transmission line on the right-of-way. In some locations, however, vegetation made measurements away from the transmission line not practical. In addition to taking EF and MF measurements twice at each of the seven sites, magnetic fields were also measured once around the perimeter of the North Bloomfield Substation.
RESULTS FOR GSRP Electric and/or magnetic fields were measured at the GSRP sites 1 through 5 on August
22, 2013, November 26, 2013 and on December 12, 2013. The current flows over each transmission line when magnetic fields were measured at each of the five sites, as recorded by the CONVEX SCADA system, are listed in Table 2 for August 22, 2013 and Table 3 for November 26, 2013. In these tables circuit 3216 is the new 345-kV line, and circuit 1768 is the modified 115-kV line north of Granby Junction.
1 Note on the aerial photographs that Site 1 off of Tunxis Avenue, Bloomfield was relocated to a structure work pad as the side slope at the planned location would make measurements not representative of level terrain as shown to the Council in previous calculations. Also, Site 2 south of Holcomb Street, East Granby was found to have interfering vegetation growth at the time of the measurements, so this site was moved to a location to the north of Holcomb Street.
3
Table 2
Site # Town Circuit # Current Circuit # Current
1 East Granby 3216 458 ‐‐ ‐‐
2 East Granby 3216 340 ‐‐ ‐‐
3 East Granby 3216 477 1768 84
4 East Granby 3216 466 1768 68
5 Suffield 3216 503 1768 106 Current Flows on GSRP Transmission Circuits on August 22, 2013
Table 3
Site # Town Circuit # Current Circuit # Current
1 East Granby 3216 147 ‐‐ ‐‐
2 East Granby 3216 206 ‐‐ ‐‐
3 East Granby 3216 161 1768 95
4 East Granby 3216 238 1768 88
5 Suffield 3216 239 1768 89 Current Flows in GSRP Transmission Circuits on November 26, 2013
Graphs of the measured electric and magnetic fields can be found in Figures 1 through 20
included with this report. Figures 1 through 8 and 13 through 16 also include a graph of calculated field values for sites 1, 2 and 4. These sites were selected as the “true-up locations, so the calculated values reflect not-only the recorded line currents at the time of the measurements but also actual conductor heights at the measurement location. The recorded line currents on August 22 and August 26, 2013 were all less than the currents used for the Annual Average Load case modeling in the Docket 370A record, and the conductor heights at each site were higher as compared to those assumed for the modeling in the Docket 370A record.
Figure 21 provides a record of the measured magnetic fields on August 22, 2013 around
the perimeter fence of North Bloomfield Substation. As expected, the fields at the substation fenceline were highest underneath the transmission and distribution lines as they exit the substation.
RESULTS FOR MMP
Electric and/or magnetic fields were measured at sites 6 and 7 on November 23, 2013, November 26, 2013 and on December 12, 2013. The current flows over each transmission line when magnetic fields were measured at each of the two sites, as recorded by the CONVEX SCADA system, are listed in Table 4 for November 23, 2013 and Table 5 for November 26, 2013. Circuits 3642 and 3557 are the pre-existing and the new 345-kV lines respectively, and circuits 1763, 1310 and 1448 are the pre-existing 115-kV lines.
4
Table 4 Site # Town Ckt # Current Ckt # Current Ckt # Current Ckt # Current Ckt # Current
6 Manchester 3642 127 3557 408 1763 157 1310 120 1448 190
7 Manchester 3642 138 3557 297 1763 149 1310 111 1448 182 Current in MMP Transmission Circuits on November 23, 2013
Table 5 Site # Town Ckt # Current Ckt # Current Ckt # Current Ckt # Current Ckt # Current
6 Manchester 3642 556 3557 367 1763 166 1310 136 1448 289
7 Manchester 3642 559 3557 376 1763 169 1310 137 1448 263 Current Flows in MMP Transmission Circuits on November 26, 2013
Graphs of the measured electric and magnetic fields can be found in Figures 22 through 29. The recorded line currents on November 23 and 26, 2013 were all less than the currents used for the Annual Average Load case modeling in the Docket 370A record, and the conductor heights at each site were higher as compared to those assumed for the modeling in the Docket 370A record.
The following Table 6 lists the conductor sizes for the GSRP and MMP transmission circuits at each measurement site.
Table 4
Circuit Sites Conductor Size Conductor Type
3216 1, 2, 3, 5 2‐1590 kcmil ACSS
3216 4 4‐1590 kcmil† ACSS
1768 3, 4, 5 2‐556 kcmil ACSS
3462 6 2156 kcmil ACSR
3462 7 4‐1590 kcmil† ACSR
3557 6, 7 2‐1590 kcmil ACSS
1310 6, 7 795 kcmil ACSR
1763 6, 7 795 kcmil ACSR
1448 6, 7 1272 kcmil ACSR
† Split Phase Sections
Should any Council or staff member have any questions about this report, please contact me at (860) 665-6774.
6
Figure1–MagneticFieldMeasurementsatSite#1onAugust22,2013
7
Figure2–ElectricFieldMeasurementsatSite#1onAugust22,2013
8
Figure3–MagneticFieldMeasurementsatSite#1onNovember26,2013
9
Figure4–ElectricFieldMeasurementsatSite#1onDecember12,2013
10
Figure5–MagneticFieldMeasurementsatSite#2onAugust22,2013
11
Figure6–ElectricFieldMeasurementsatSite#2onAugust22,2013
12
Figure7–MagneticFieldMeasurementsatSite#2onNovember26,2013
13
Figure8–ElectricFieldMeasurementsatSite#2onDecember12,2013
14
Figure9–MagneticFieldMeasurementsatSite#3onAugust22,2013
15
Figure10–ElectricFieldMeasurementsatSite#3onAugust22,2013
16
Figure11–MagneticFieldMeasurementsatSite#3onNovember26,2013
17
Figure12–ElectricFieldMeasurementsatSite#3onDecember12,2013
18
Figure13–MagneticFieldMeasurementsatSite#4onAugust22,2013
19
Figure14–ElectricFieldMeasurementsatSite#4onAugust22,2013
20
Figure15–MagneticFieldMeasurementsatSite#4onNovember26,2013
21
Figure16–ElectricFieldMeasurementsatSite#4onDecember12,2013
22
Figure17–MagneticFieldMeasurementsatSite#5onAugust22,2013
23
Figure18–ElectricFieldMeasurementsatSite#5onAugust22,2013
24
Figure19–MagneticFieldMeasurementsatSite#5onNovember26,2013
25
Figure20–ElectricFieldMeasurementsatSite#5onDecember12,2013
26
Figure21–MagneticFieldMeasurementsAlongtheFenceatNorthBloomfieldSubstationonAugust22,2013
0
10
20
30
40
50
60
70
80
90
100
1000 2000 3000
Mag
netic
Fie
ld (
mG
)
Distance (ft)
K:\Engineering\Transmission Engineering\NEEWS\GSRP\EMF\CSC Monitoring Plan\Measurements\August\nbloomfield2a_Cleaned Chart.mbk
2.0Aug/22/201301:31:36 PM
3067.0
Sta
rt a
t N
W C
orne
r
NE
Cor
ner
Dis
trib
utio
n Li
nes
Cen
t P
h 17
77 L
ine
Cen
t P
h 17
51 L
ine
Fen
ce C
orne
r
Cen
t P
h 32
16 L
ine
Cen
t P
h 35
57 L
ine
Fen
ce C
orne
r
Fen
ce C
orne
r
Fen
ce C
orne
r
Fen
ce C
orne
r
Fen
ce C
orne
r
Fen
ce C
orne
r
Fen
ce C
orne
r
Fen
ce C
orne
r
Cen
t P
h 17
83 L
ine
Cen
t P
h 17
84 L
ine
Fen
ce C
orne
r N
ear
Acc
ess
Gat
eF
ence
Cor
ner
Nea
r P
ropa
ne T
anks
Dis
trib
utio
n Li
nes
End
at
NW
Cor
ner
27
Figure22–MagneticFieldMeasurementsatSite#6onNovember23,2013
28
Figure23–ElectricFieldMeasurementsatSite#6onNovember23,2013
29
Figure24–MagneticFieldMeasurementsatSite#6onNovember23,2013
30
Figure25–ElectricFieldMeasurementsatSite#6onDecember12,2013
31
Figure26–MagneticFieldMeasurementsatSite#7onNovember23,2013
32
Figure27–ElectricFieldMeasurementsatSite#7onNovember23,2013
33
Figure28–MagneticFieldMeasurementsatSite#7onNovember26,2013
34
Figure29–ElectricFieldMeasurementsatSite#7onDecember12,2013
\\Esp
srv\
da
ta\D
ata
2\P
roje
cts\
NU
S\S
NE
TR
_P
roje
cts\
45
063
_S
prin
gfie
ld_
34
5kV
\En
viro
nm
ent
al\G
IS\A
RC
\Arc
MX
D\N
etw
ork
\Gre
ate
rSpr
ing
field
\An
aly
sis\
GS
RP
_E
MF
_M
oni
tori
ng
_L
oca
tion_
Ind
ex_
Ma
p.m
xd
Issued: 12/2/2013
#
#
#
#
#
#
#
Mapsheet 1
Mapsheet 2
Mapsheet 3
Mapsheet 4
Mapsheet 5
GranbyJunction
SouthwickSubstation
South AgawamJunction
North BloomfieldSubstation
South AgawamSwitching Station
Source: Bing, ESRI and Burns & McDonnell Engineering.
CO
PY
RIG
HT
© 2
013
BU
RN
S &
McD
ON
NE
LL E
NG
INE
ER
ING
CO
MP
AN
Y, I
NC
.
NORTHGreater Springfield Reliability Project
EMF Monitoring LocationsIndex Map
1.25 0 1.250.625 Miles
LegendMapsheet
Proposed Transmission Structure Centerline
# Substation or Junction
\\Esp
srv\
da
ta\D
ATA
2\P
roje
cts\
NU
S\S
NE
TR
_P
roje
cts\
45
06
3_
Sp
rin
gfie
ld_
34
5kV
\En
viro
nm
en
tal\G
IS\A
RC
\Arc
MX
D\N
etw
ork
\Gre
ate
rSp
rin
gfie
ld\A
nal
ysis
\GS
RP
_E
MF
_M
on
itori
ng_
Lo
catio
n_
Ma
ps_
20
13
.12
.02
.mxd
"
"
"
"
"
"
"
"
"
""
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.
1010
1012 1014
1015
1018
1021
1022
0011001100110011
00110011
00120012
00100010
00090009
00080008
00070007
00120012
00100010
00090009
00080008
00070007
3143
3142
3141
3140
3139
3138
11009
11007
11006
11010
11008
Tunx
is Ave
State Highway 1
89
Wynding Hills Rd
Wyom
ing Hills Rd
Source: AECOM, Coler & Colantonio, VHB, ESRI and Burns & McDonnell Engineering.
CO
PY
RIG
HT
© 2
013
BU
RN
S &
McD
ON
NE
LL E
NG
INE
ER
ING
CO
MP
AN
Y, I
NC
.
Greater Springfield Reliability ProjectEMF Monitoring Maps
December 2, 2013Hartford
Hampden
Litchfield TollandSheet 01 of 5
.
200 0 200100 Feet
Modified EMF Monitoring Location
Legend
!. Existing Structure - Remain
!. Existing Structure - Remove
!. Existing Structure - Reuse
" Distribution Pole - New
" Distribution Pole - To Remain
" Distribution Pole - To Remove
!. Proposed Structure
# Substation or Junction
Existing ROW
Expanded ROW
\ Wall
Watercourse
Vernal Pool
Wetlands
Contours (5 ft)
Vegetation Removal Limits
Substation Fence
Town Boundary
NU Owned Property
! Proposed Transmission Structure Centerline
1001 Line List Number
EMF Monitoring Location
Modified EMF Monitoring Location
\\Esp
srv\
da
ta\D
ATA
2\P
roje
cts\
NU
S\S
NE
TR
_P
roje
cts\
45
06
3_
Sp
rin
gfie
ld_
34
5kV
\En
viro
nm
en
tal\G
IS\A
RC
\Arc
MX
D\N
etw
ork
\Gre
ate
rSp
rin
gfie
ld\A
nal
ysis
\GS
RP
_E
MF
_M
on
itori
ng_
Lo
catio
n_
Ma
ps_
20
13
.12
.02
.mxd
"
"
"
"
"
"
"
"
"
" "
"
"
"
"
"
" "
"
"
"
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.!.
!.!.
!.!.
!.!.
!.
!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.!.
!.
1032
1033
10341035
1036
1037
1038
1040
1041
1042
1043
1044
1045
1038.01
0029002900290029
0030003000300030 00320032
0031003100280028 003200320031003100280028
3163
3164
3165
31663160
3161
3162
11038
11037
11036
11035
11034
11033
11032
11031
Holcomb St
Adam
s D
r
Concord Dr
Source: AECOM, Coler & Colantonio, VHB, ESRI and Burns & McDonnell Engineering.
CO
PY
RIG
HT
© 2
013
BU
RN
S &
McD
ON
NE
LL E
NG
INE
ER
ING
CO
MP
AN
Y, I
NC
.
Greater Springfield Reliability ProjectEMF Monitoring Maps
December 2, 2013Hartford
Hampden
Litchfield TollandSheet 02 of 5
.
200 0 200100 Feet
Modified EMF Monitoring Location
Legend
!. Existing Structure - Remain
!. Existing Structure - Remove
!. Existing Structure - Reuse
" Distribution Pole - New
" Distribution Pole - To Remain
" Distribution Pole - To Remove
!. Proposed Structure
# Substation or Junction
Existing ROW
Expanded ROW
\ Wall
Watercourse
Vernal Pool
Wetlands
Contours (5 ft)
Vegetation Removal Limits
Substation Fence
Town Boundary
NU Owned Property
! Proposed Transmission Structure Centerline
1001 Line List Number
EMF Monitoring Location
Modified EMF Monitoring Location
\\Esp
srv\
da
ta\D
ATA
2\P
roje
cts\
NU
S\S
NE
TR
_P
roje
cts\
45
06
3_
Sp
rin
gfie
ld_
34
5kV
\En
viro
nm
en
tal\G
IS\A
RC
\Arc
MX
D\N
etw
ork
\Gre
ate
rSp
rin
gfie
ld\A
nal
ysis
\GS
RP
_E
MF
_M
on
itori
ng_
Lo
catio
n_
Ma
ps_
20
13
.12
.02
.mxd
#
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.!.
1048 1049
1050 1051
1052
1053
1054
1057.03
1049.01
1049.02
1049.03
1049.04
1057.01
1057.02
GranbyJunction31793179
00450045
0044004400440044
00470047
00460046
00470047
00460046
3180
3179
3177
3178
3180
3181
11053
11052
11051
11054
Turk
ey H
ills
Rd
Granger Cir
Source: AECOM, Coler & Colantonio, VHB, ESRI and Burns & McDonnell Engineering.
CO
PY
RIG
HT
© 2
013
BU
RN
S &
McD
ON
NE
LL E
NG
INE
ER
ING
CO
MP
AN
Y, I
NC
.
Greater Springfield Reliability ProjectEMF Monitoring Maps
December 2, 2013Hartford
Hampden
Litchfield TollandSheet 03 of 5
.
200 0 200100 Feet
Modified EMF Monitoring Location
Legend
!. Existing Structure - Remain
!. Existing Structure - Remove
!. Existing Structure - Reuse
" Distribution Pole - New
" Distribution Pole - To Remain
" Distribution Pole - To Remove
!. Proposed Structure
# Substation or Junction
Existing ROW
Expanded ROW
\ Wall
Watercourse
Vernal Pool
Wetlands
Contours (5 ft)
Vegetation Removal Limits
Substation Fence
Town Boundary
NU Owned Property
! Proposed Transmission Structure Centerline
1001 Line List Number
EMF Monitoring Location
Modified EMF Monitoring Location
\\Esp
srv\
da
ta\D
ATA
2\P
roje
cts\
NU
S\S
NE
TR
_P
roje
cts\
45
06
3_
Sp
rin
gfie
ld_
34
5kV
\En
viro
nm
en
tal\G
IS\A
RC
\Arc
MX
D\N
etw
ork
\Gre
ate
rSp
rin
gfie
ld\A
nal
ysis
\GS
RP
_E
MF
_M
on
itori
ng_
Lo
catio
n_
Ma
ps_
20
13
.12
.02
.mxd
"
"
"
"
"
"
"
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.
!.
!.
!.
!.
1061
1062
1063 1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1078
1079
1080
1081
10821083
006200620061006100600060
0058005800590059
3197
3193
31953194
3192
3196Newgate Rd
Country Club Ln
Woodledge Dr
Copper Hill T
er Co
pp
er
Hill
Rd
Source: AECOM, Coler & Colantonio, VHB, ESRI and Burns & McDonnell Engineering.
CO
PY
RIG
HT
© 2
013
BU
RN
S &
McD
ON
NE
LL E
NG
INE
ER
ING
CO
MP
AN
Y, I
NC
.
Greater Springfield Reliability ProjectEMF Monitoring Maps
December 2, 2013Hartford
Hampden
Litchfield TollandSheet 04 of 5
.
200 0 200100 Feet
Modified EMF Monitoring Location
Legend
!. Existing Structure - Remain
!. Existing Structure - Remove
!. Existing Structure - Reuse
" Distribution Pole - New
" Distribution Pole - To Remain
" Distribution Pole - To Remove
!. Proposed Structure
# Substation or Junction
Existing ROW
Expanded ROW
\ Wall
Watercourse
Vernal Pool
Wetlands
Contours (5 ft)
Vegetation Removal Limits
Substation Fence
Town Boundary
NU Owned Property
! Proposed Transmission Structure Centerline
1001 Line List Number
EMF Monitoring Location
Modified EMF Monitoring Location
\\Esp
srv\
da
ta\D
ATA
2\P
roje
cts\
NU
S\S
NE
TR
_P
roje
cts\
45
06
3_
Sp
rin
gfie
ld_
34
5kV
\En
viro
nm
en
tal\G
IS\A
RC
\Arc
MX
D\N
etw
ork
\Gre
ate
rSp
rin
gfie
ld\A
nal
ysis
\GS
RP
_E
MF
_M
on
itori
ng_
Lo
catio
n_
Ma
ps_
20
13
.12
.02
.mxd
"
"
"
""
"
"
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!. !.
!.
!.
!.
!.
!.
!. !.
!.
!.
!.
!.
!.!.
1189
1190
1191
1192
1193
11981199 1200
1201
1202
1203
1204
1205
1206
1207
1208
0107010701070107
01100110
01090109
0108010801060106
0105010501040104
01100110
01090109
0108010801060106
0105010501040104
01070107
3245
32443240
3243
3242
3241
3239
Ratley Rd
Source: AECOM, Coler & Colantonio, VHB, ESRI and Burns & McDonnell Engineering.
CO
PY
RIG
HT
© 2
013
BU
RN
S &
McD
ON
NE
LL E
NG
INE
ER
ING
CO
MP
AN
Y, I
NC
.
Greater Springfield Reliability ProjectEMF Monitoring Maps
December 2, 2013Hartford
Hampden
Litchfield TollandSheet 05 of 5
.
200 0 200100 Feet
Modified EMF Monitoring Location
Legend
!. Existing Structure - Remain
!. Existing Structure - Remove
!. Existing Structure - Reuse
" Distribution Pole - New
" Distribution Pole - To Remain
" Distribution Pole - To Remove
!. Proposed Structure
# Substation or Junction
Existing ROW
Expanded ROW
\ Wall
Watercourse
Vernal Pool
Wetlands
Contours (5 ft)
Vegetation Removal Limits
Substation Fence
Town Boundary
NU Owned Property
! Proposed Transmission Structure Centerline
1001 Line List Number
EMF Monitoring Location
Modified EMF Monitoring Location
\\Esp
srv\
data
\Da
ta2
\Pro
ject
s\N
US
\SN
ET
R_P
roje
cts\
5685
6_M
MP
\Env
iron
me
nta
l\No
n-R
eco
rds\
Re
tain
ed
\GIS
\Da
taF
iles\
Arc
Doc
s\M
MP
_EM
F_
Mo
nito
ring_
Loc
atio
n_
Ind
ex_M
ap.m
xd
Issued: 10/17/2011
#
#MeekvilleJunction
ManchesterSubstation
Source: Bing, ESRI and Burns & McDonnell Engineering.
CO
PY
RIG
HT
© 2
011
BU
RN
S &
McD
ON
NE
LL
EN
GIN
EE
RIN
G C
OM
PA
NY,
INC
.
NORTH
Manchester to Meekville Junction Project
EMF Monitoring LocationsIndex Map
0.25 0 0.250.125 Miles
LegendMapsheets
Proposed Transmission Structure Centerline
# Substation or Junction
Mapsheet 1
\\Esp
srv\
data
\Da
ta2
\Pro
ject
s\N
US
\SN
ET
R_P
roje
cts\
5685
6_M
MP
\Env
iron
me
nta
l\No
n-R
eco
rds\
Re
tain
ed
\GIS
\Da
taF
iles\
Arc
Doc
s\M
MP
_EM
F_
Mo
nito
ring_
Loc
atio
n_
Ma
ps.m
xd
!(
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!(
!(
!(!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
5846
5847
5850
5848
5849
3717
3718
3721
6277
3719
3720
6275A
10089
25031
25024
25018
25021
25026
25027
25028
25029
25030
25031
25032
25033
25034
25035
25036
25038
25045
25033.01
W15-514
W15-515
W15-518
W15-516
W15-518 W15-513
W15-518
W15-518
W15-517
W15-518
6274
6275
6280
6279
6277
6278
10092
10091
20021
20020
10090
20019
1008810089
20018
20017
UNNAMED
TOLL
AN
D T
PK
E
CHAPEL RD Source: AECOM, VHB, Coler & Colantonio, ESRI and Burns & McDonnell Engineering.
CO
PY
RIG
HT
© 2
011
BU
RN
S &
McD
ON
NE
LL
EN
GIN
EE
RIN
G C
OM
PA
NY,
INC
.
Manchester to Meekville Junction Project
EMF Monitoring MapsOctober 17, 2011
Legend!( Proposed Structures
New Centerline
Existing Centerline
") Distribution Pole - Remain
") Distribution Pole - New
") Distribution Pole - Remove
! Distribution Centerline
Parcel Expansion
!. Existing Structure - Remain
!. Existing Structure - Remove
!. Existing Structure - Reuse
Watercourse
Ä ÄWetlands
Vernal Pool
NU Owned Property
MMP-V Veg Removal Limits
EMF Monitoring Location
200 0 200100 FeetHartford1001 Line List Number
Sheet 1 of 1.