7
DRAWING: COVER SHEET DRAWN BY: CGB SCALE: N.T.S. R-001 SHEET 1 OF 7 UNIVERSITY OF SOUTH CAROLINA COLUMBIA, SC REI PROJECT #: 14CHS-078 DATE: 03/04/2015 RE BID WILLIAMS BRICE BUILDING AND ENGINEERS REVISION # REVISION DATE 2 1 3 4 ROOFING, WATERPROOFING & BUILDING ENVELOPE ENGINEERS & CONSULTANTS www.reiengineers.com RE BID WILLIAMS BRICE BUILDING AND AUDITORIUM ROOF REPLACEMENT UNIVERSITY OF SOUTH CAROLINA 1601 GREENE ST. COLUMBIA, SC 29208 VICINITY MAP SITE MAP SEAL: DRAWING INDEX R-001 COVER SHEET R-101 ROOF PLAN R-102 INSULATION ATTACHMENT PLAN R-201 R-202 ROOF DETAILS ROOF DETAILS R-203 ROOF DETAILS ABBREVIATION LIST MAX. MAXIMUM MIN. MINIMUM N.I.C. NOT IN CONTRACT O.C. S.S. STAINLESS STEEL TERMINATION TERM. TYPICAL TYP. ON CENTER SIM. SIMILAR NORTH N.T.S. NOT TO SCALE These documents are the property of REI Engineers, Inc. (REI) and retains all rights therein, including copyrights. It may only be used in a manner consistent with REI's rights while REI is providing service for the specific project identified or referred to herein or extensions thereto. It may not be used for any other purpose except with the express written agreement of, and compensation to, REI Engineers, Inc. CODE COMPLIANCE REFERENCE LIST 2012 INTERNATIONAL BUILDING CODE WITH SC MODIFICATIONS 2012 INTERNATIONAL FIRE CODE WITH SC MODIFICATIONS 2012 INTERNATIONAL PLUMBING CODE 2012 INTERNATIONAL MECHANICAL CODE 2009 INTERNATIONAL ENERGY CONSERVATION CODE 2012 INTERNATIONAL FUEL GAS CODE WITH SC MODIFICATIONS 2011 NATIONAL ELECTRIC CODE AUDITORIUM ROOF REPLACEMENT R-103 LOADING PLAN

NORTH ROOFING, WATERPROOFING & BUILDING ENVELOPE …purchasing.sc.edu/solicitations/RE BID Williams...5.contractor shall become familiar with and verify the condition, dimension, and

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NORTH ROOFING, WATERPROOFING & BUILDING ENVELOPE …purchasing.sc.edu/solicitations/RE BID Williams...5.contractor shall become familiar with and verify the condition, dimension, and

DRAWING:

COVER SHEET

DRAWN BY: CGB

SCALE: N.T.S.

R-001

SHEET 1 OF 7

UN

IV

ER

SIT

Y O

F S

OU

TH

C

AR

OLIN

A

CO

LU

MB

IA

, S

C

RE

I P

RO

JE

CT

#: 14C

HS

-078

DATE: 03/04/2015

RE

B

ID

W

IL

LIA

MS

B

RIC

E B

UIL

DIN

G A

ND

EN

GIN

EE

RS

REVISION # REVISION DATE

2

1

3

4

RO

OF

IN

G, W

AT

ER

PR

OO

FIN

G &

B

UILD

IN

G

EN

VE

LO

PE

E

NG

IN

EE

RS

&

C

ON

SU

LT

AN

TS

ww

w.reiengineers.com

RE BID WILLIAMS BRICE

BUILDING AND AUDITORIUM

ROOF REPLACEMENT

UNIVERSITY OF SOUTH CAROLINA

1601 GREENE ST.

COLUMBIA, SC 29208

VICINITY MAP SITE MAP

SEAL:

DRAWING INDEX

R-001 COVER SHEET

R-101 ROOF PLAN

R-102 INSULATION ATTACHMENT PLAN

R-201

R-202 ROOF DETAILS

ROOF DETAILSR-203

ROOF DETAILS

ABBREVIATION LIST

MAX. MAXIMUM

MIN. MINIMUM

N.I.C. NOT IN CONTRACT

O.C.

S.S. STAINLESS STEEL

TERMINATIONTERM.

TYPICALTYP.

ON CENTER

SIM. SIMILAR

N

O

R

T

H

N.T.S. NOT TO SCALE

These documents are the property of REI Engineers, Inc. (REI) and retains all rights therein, including copyrights. It may only be used in a manner

consistent with REI's rights while REI is providing service for the specific project identified or referred to herein or extensions thereto. It may not be used for

any other purpose except with the express written agreement of, and compensation to, REI Engineers, Inc.

CODE COMPLIANCE REFERENCE LIST

2012 INTERNATIONAL BUILDING CODE WITH SC MODIFICATIONS

2012 INTERNATIONAL FIRE CODE WITH SC MODIFICATIONS

2012 INTERNATIONAL PLUMBING CODE

2012 INTERNATIONAL MECHANICAL CODE

2009 INTERNATIONAL ENERGY CONSERVATION CODE

2012 INTERNATIONAL FUEL GAS CODE WITH SC MODIFICATIONS

2011 NATIONAL ELECTRIC CODE

AU

DIT

OR

IU

M R

OO

F R

EP

LA

CE

ME

NT

R-103 LOADING PLAN

Page 2: NORTH ROOFING, WATERPROOFING & BUILDING ENVELOPE …purchasing.sc.edu/solicitations/RE BID Williams...5.contractor shall become familiar with and verify the condition, dimension, and

S S

C

D

S

1

1

2

:12

H

H

H

A

B

R-201

1

R-201

2

R-201

3

R-202

8

R-202

9R-202

10

R-202

11

R-202

12

R-203

13

R-203

15

8

88

8

7

R-201

3

R-201

3

8 8

S S

C

D

S

R-201

4

R-201

5

R-201

6

R-202

7

R-202

9

R-202

9

R-201

4

1

1

2

:12

7

7

R-203

16

R-203

16

12

12

R-201

3

SIM.

R-201

3

SIM.

R-201

3

R-201

3

SIM.SIM.

R-203

17

R-203

17

R-203

17

R-203

17

R-203

17

R-203

17

8

8

8

8

8

88

8

8

8

DRAWING:

ROOF PLAN

DRAWN BY: CGB

SCALE: 1"=10'-0"

R-101

SHEET 2 OF 7

DATE: 03/04/2015

EN

GIN

EE

RS

REVISION # REVISION DATE

2

1

3

4

RO

OF

IN

G, W

AT

ER

PR

OO

FIN

G &

B

UILD

IN

G

EN

VE

LO

PE

E

NG

IN

EE

RS

&

C

ON

SU

LT

AN

TS

ww

w.reiengineers.com

SEAL:

AREA (SQUARE FEET)SECTOR

±2,857

±527

A

B

C

D

±17,344

TOTAL

**CONTRACTOR TO VERIFY ALL

QUANTITIES PRIOR TO BIDDING**

PARAPET WALL

EQUIPMENT CURB

PIPE PENETRATION

STRUCTURAL SLOPES

KEY

HOT STACK

ROOF DRAIN

EQUIPMENT SUPPORT CURB

RIDGE-HIP-VALLEY

ROOF EDGE

TAPERED SLOPE

H

ROOF ACCESS LADDER

THROUGH WALL SCUPPER

SKYLIGHTS

NOTES:

1. RESECURE EXISTING NAILERS IN ACCORDANCE WITH FM DATA SHEET 1-49.

2. SECURE NEW NAILERS IN ACCORDANCE WITH FM DATA SHEET 1-49.

3. INSTALL NEW NAILERS AS REQUIRED TO MATCH SPECIFIED INSULATION THICKNESS. ADJUST NAILERS AS REQUIRED FOR SMOOTH

TRANSITIONS. MAINTAIN LEVEL HEIGHT ALONG PERIMETER EDGE. ADJUST AS REQUIRED TO PREVENT PONDING WATER.

4. PROVIDE CRICKETS BEHIND CURBS 12” WIDE OR GREATER.

5. CONTRACTOR SHALL BECOME FAMILIAR WITH AND VERIFY THE CONDITION, DIMENSION, AND LOCATION OF ALL ROOF AREAS

INCLUDING ROOFTOP EQUIPMENT, FLASHINGS, PIPE LINES, CONDUIT, PIPE SUPPORTS, ETC., BEFORE SUBMITTING BID. NOT ALL

EXISTING PIPES, CONDUIT, ELECTRICAL LINES, CABLES, GUY WIRES, AND DUCTWORK ABOVE THE ROOF SURFACE HAVE BEEN SHOWN

ON THE ROOF PLAN.

6. RAISE ALL ROOFTOP MOUNTED EQUIPMENT, SUPPORT STANDS AND OTHER APPURTENANCES AS NECESSARY TO PROVIDE AN EIGHT

INCH FLASHING HEIGHT ABOVE THE FINISHED ROOF SURFACE. RAISE OR EXTEND ASSOCIATED DUCTWORK, GAS LINES, AIR

CONDITIONING LINES, ETC. TO ACCOMMODATE PROPER REINSTALLATION OF THE LINES TO THE ASSOCIATED EQUIPMENT AFTER THE

EQUIPMENT HAS BEEN RAISED. PROVIDE NECESSARY EQUIPMENT TO BLEED FREON FROM AIR CONDITIONING AND HVAC LINES

7. PROVIDE WALKWAY PAD ROUTED FROM SPLASH PAN TO NEAREST INTERIOR ROOF DRAIN AS SPECIFIED.

8. REFER TO SECTION 07 62 00 FOR FINISHED SCUPPER DIMENSIONS. SCUPPERS SHOWN AT SECTORS C AND TWO AT SECTOR A ARE

NEW.

9. SCRAPE AND PRIME EXISTING ROOFTOP EQUIPMENT AND STEEL PENETRATIONS PRIOR TO REMOVAL OF EXISTING ROOF SYSTEM.

10. PROVIDE NEW TAPERED INSULATION NOT SHOWN ON DRAWINGS AND AS REQUIRED TO PREVENT PONDING WATER AT SECTOR C.

PONDING WATER IS DEFINED IN SECTION 07 22 16.

11. EXISTING LIGHTNING PROTECTION SYSTEM NOT SHOWN. REFER TO DETAIL 14 AND SECTION 07 72 00.

12. REMOVE EXISTING DRAIN COMPONENTS ABOVE DECK. REFER TO SECTION 07 01 50 FOR NEW STEEL PLATE INSTALLATION.

13. DEMOLISH EXISTING LIGHTWEIGHT INSULATION AS REQUIRED FOR INSTALLATION OF NEW TAPERED SYSTEM AT SECTOR C.

14. PROVIDE NEW STEEL PLATE AT LOCATION OF VENT TO BE REMOVED.

15. TAPERED SLOPE IS PROVIDED BY LIGHTWEIGHT CONCRETE AT SECTOR A.DETAIL NUMBER#

#

0'-5' 5' 10' 15'

SCALE: 1" = 10' - 0"

UN

IV

ER

SIT

Y O

F S

OU

TH

C

AR

OLIN

A

CO

LU

MB

IA

, S

C

RE

I P

RO

JE

CT

#: 14C

HS

-078

N

O

R

T

H

VENT TO BE REMOVED

ROOF HATCH

±9,769

±4,191

LIGHTNING PROTECTION TERMINAL

ROOF EDGE WITH GUTTER AND DOWNSPOUT

EXISTING LIGHTWEIGHT INSULATION LAYOUT

NEW TAPERED INSULATION LAYOUT

08/18/2015

RE

B

ID

W

IL

LIA

MS

B

RIC

E B

UIL

DIN

G A

ND

AU

DIT

OR

IU

M R

OO

F R

EP

LA

CE

ME

NT

Page 3: NORTH ROOFING, WATERPROOFING & BUILDING ENVELOPE …purchasing.sc.edu/solicitations/RE BID Williams...5.contractor shall become familiar with and verify the condition, dimension, and

8' TYP.

SLOPED METAL MANSARD

D

C

8' TYP.

A

B

DRAWING:

INSULATION ATTACHMENT PLAN

DRAWN BY: CGB

SCALE: 1"=10'-0"

R-102

SHEET 3 OF 7

DATE: 03/04/2015

EN

GIN

EE

RS

REVISION # REVISION DATE

2

1

3

4

RO

OF

IN

G, W

AT

ER

PR

OO

FIN

G &

B

UILD

IN

G

EN

VE

LO

PE

E

NG

IN

EE

RS

&

C

ON

SU

LT

AN

TS

ww

w.reiengineers.com

SEAL:

NOTES:

1. PLACEMENT OF INSULATION FASTENERS SHALL COMPLY WITH INSULATION

MANUFACTURER'S PUBLISHED LITERATURE AND THE MEMBRANE MANUFACTURER'S

REQUIREMENTS.

2. CUT OR SCORE BOARDS TO CONFORM TO ANY IRREGULAR SUBSTRATE CONDITIONS.

3. INSTALL NUMBER OF FASTENERS REQUIRED BY MEMBRANE MANUFACTURER'S TESTED

ASSEMBLY TO MEET WIND DESIGN UPLIFT PRESSURES SPECIFIED IN SECTION 07 54 00.

FIELD

PERIMETER

CORNER

UN

IV

ER

SIT

Y O

F S

OU

TH

C

AR

OLIN

A

CO

LU

MB

IA

, S

C

RE

I P

RO

JE

CT

#: 14C

HS

-078

4 A

DH

ES

IV

E R

IB

BO

NS

EQ

UA

LLY

S

PA

CE

D A

T

12" O

.C

.

MINIMUM FOAM ADHESIVE APPLICATION

8 A

DH

ES

IV

E R

IB

BO

NS

EQ

UA

LLY

S

PA

CE

D A

T

6" O

.C

.

FIELD PERIMETER

12 A

DH

ES

IV

E R

IB

BO

NS

EQ

UA

LLY

S

PA

CE

D A

T

3" O

.C

.

CORNER

08/18/2015

MINIMUM INSULATION FASTENING PATTERN

36"

6"

6" 28" 28" 6"

6"

8 FASTENERS/BD FIELD

MINIMUM INSULATION FASTENING PATTERN

52-1/2"

6"

16 FASTENERS/BD PERIMETER

45"

15" 30"

MINIMUM INSULATION FASTENING PATTERN

24"

18"

18" 6"

6"

32 FASTENERS/BD CORNER

36"12"

RE

B

ID

W

IL

LIA

MS

B

RIC

E B

UIL

DIN

G A

ND

AU

DIT

OR

IU

M R

OO

F R

EP

LA

CE

ME

NT

Page 4: NORTH ROOFING, WATERPROOFING & BUILDING ENVELOPE …purchasing.sc.edu/solicitations/RE BID Williams...5.contractor shall become familiar with and verify the condition, dimension, and

DRAWING:

LOADING PLAN

DRAWN BY: CGB

SCALE: N.T.S.

R-103

SHEET 4 OF 7

DATE: 03/04/2015

EN

GIN

EE

RS

REVISION # REVISION DATE

2

1

3

4

RO

OF

IN

G, W

AT

ER

PR

OO

FIN

G &

B

UILD

IN

G

EN

VE

LO

PE

E

NG

IN

EE

RS

&

C

ON

SU

LT

AN

TS

ww

w.reiengineers.com

SEAL:

NOTES:

1. PROVIDE TEMPORARY FENCING WITH GREEN FABRIC WHERE INDICATED IN RED.2. UTILIZE SOUTHERN HALF OF MAIN ENTRANCE, ONLY, FOR LOADING AND UNLOADING. NORTHERN HALF OF ENTRANCE SHALL BE MAINTAINED FOR FULL USE BYOWNER THROUGHOUT DURATION OF PROJECT.3. PROVIDE MINIMUM OF TWO MONITORS WHERE INDICATED IN YELLOW TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM LOADING AREA DURING LOADING ANDUNLOADING OPERATIONS.

#

UN

IV

ER

SIT

Y O

F S

OU

TH

C

AR

OLIN

A

CO

LU

MB

IA

, S

C

RE

I P

RO

JE

CT

#: 14C

HS

-078

N

O

R

T

H

RE

B

ID

W

IL

LIA

MS

B

RIC

E B

UIL

DIN

G A

ND

AU

DIT

OR

IU

M R

OO

F R

EP

LA

CE

ME

NT

Page 5: NORTH ROOFING, WATERPROOFING & BUILDING ENVELOPE …purchasing.sc.edu/solicitations/RE BID Williams...5.contractor shall become familiar with and verify the condition, dimension, and

CONT. EDGE

METAL CLEAT

EDGE METAL

ANCHOR

NEW WOOD NAILER

EXISTING LIGHTWEIGHT CONCRETE

EXISTING ROOF DECK

TERM. BAR

FLASHING MEMBRANE

HOT-AIR WELD

THERMOPLASTIC ROOF MEMBRANE

SPECIFIED INSULATION

FASTEN 16" O.C.

HAT CHANNEL FASTENED 24"

O.C. STAGGER FASTENERS

BETWEEN SIDES OF CHANNEL

METAL WALL PANEL

1"/

FT

. S

LO

PE

S.S. FASTENER W/ EPDM WASHER 24" O.C.

TERM BAR

2-PIECE COUNTERFLASHING

WIND CLIP 24" O.C.

8" M

IN

.

SEALANT TAPE

SHEET METAL UNDERLAYMENT

SPECIFIED INSULATION

THERMOPLASTIC ROOF MEMBRANE

SPECIFIED INSULATION

THERMOPLASTIC ROOF MEMBRANE

NEW WOOD NAILER

FLASHING MEMBRANE

HOT AIR WELD

HOT AIR WELD

HOT AIR WELD

FLASHING MEMBRANE

TERM BAR

EXISTING LIGHTWEIGHT CONCRETE

EXISTING ROOF DECK

EXISTING LIGHTWEIGHT CONCRETE

EXISTING ROOF DECK

TERM. BAR

NEW

1

2

" GYPSUM BOARD

ADHERED TO EXISTING WALL

CLOSURE CLEAT

4"

4"

EDGE METAL

GUTTER BRACKET

GUTTER SPACER

EDGE METAL COVER

FIELD CRIMP

THERMOPLASTIC ROOF MEMBRANE

HOT-AIR WELD

FLASHING MEMBRANE

SEALANT

FLASHING MEMBRANE

POLYMER-CLAD METAL

THROUGH-WALL SCUPPER

SEALANT

SEALANT

SCUPPER FACE PLATE

SEALANT

EXISTING LIGHTWEIGHT CONCRETE

EXISTING ROOF DECK

SPECIFIED INSULATION

WIND CLIP 24" O.C.

TERM BAR

2-PIECE COUNTERFLASHING

S.S. FASTENER W/

EPDM WASHER 24" O.C.

FASTEN 16" O.C.

EXISTING METAL WALL PANEL

EXISTING LIGHTWEIGHT CONCRETE

EXISTING ROOF DECK

SPECIFIED INSULATION

THERMOPLASTIC ROOF MEMBRANE

HOT AIR WELD

FLASHING MEMBRANE

TERM BAR

EXISTING METAL WALL PANEL UNDERLAYMENT

8" M

IN

.

1"/

FT

. S

LO

PE

SPECIFIED INSULATION

THERMOPLASTIC ROOF MEMBRANE

HOT AIR WELD

FLASHING MEMBRANE

TERM BAR

COPING

CONTINUOUS CLEAT

FLASHING MEMBRANE

NEW WOOD NAILERS

TAPERED EDGE STRIP

8" M

IN

.

EXISTING LIGHTWEIGHT CONCRETE

EXISTING ROOF DECK

CONTINUOUS

CLEAT

SEALANT TAPE

SPECIFIED INSULATION

THERMOPLASTIC

ROOF MEMBRANE

SPECIFIED INSULATION

THERMOPLASTIC ROOF MEMBRANE

NEW WOOD NAILER

FLASHING MEMBRANE

HOT AIR WELD

HOT AIR WELD

HOT AIR WELD

TERM BAR

FLASHING MEMBRANE

TERM BAR

EXISTING LIGHTWEIGHT CONCRETE

EXISTING ROOF DECK

6"

6"

EDGE METAL

GUTTER BRACKET

GUTTER SPACER

EDGE METAL COVER

FIELD CRIMP

DRAWING:

ROOF DETAILS

DRAWN BY: CGB

SCALE: VARIES

R-201

SHEET 5 OF 7

DATE: 03/04/2015

EN

GIN

EE

RS

REVISION # REVISION DATE

2

1

3

4

RO

OF

IN

G, W

AT

ER

PR

OO

FIN

G &

B

UILD

IN

G

EN

VE

LO

PE

E

NG

IN

EE

RS

&

C

ON

SU

LT

AN

TS

ww

w.reiengineers.com

SEAL:

1

SCALE: 3"=1'-0"

PARAPET WALL

NOTES:

1. CANT STRIP NOT SHOWN FOR CLARITY.

NOTES:

1. NEW METAL WALL PANELS REQUIRED AT SECTOR A NOT SHOWN FOR CLARITY. REFER TO DETAIL 4.

2. CANT STRIP NOT SHOWN FOR CLARITY.

NOTES:

1. PROVIDE NEW WOOD NAILERS AS REQUIRED TO ACHIEVE 8" MINIMUM PARAPET HEIGHT.

2. PROVIDE EDGE METAL EXTENSION WHERE EDGE METAL FACE HEIGHT EXCEEDS 9 INCHES.

3. CANT STRIP NOT SHOWN FOR CLARITY

2

SCALE: 2"=1'-0"

ROOF EDGE

3

SCALE: 3"=1'-0"

THROUGH WALL OVERFLOW SCUPPER

4

ROOF TO WALL

5

PARAPET WALL

6

ROOF EDGE

UN

IV

ER

SIT

Y O

F S

OU

TH

C

AR

OLIN

A

CO

LU

MB

IA

, S

C

RE

I P

RO

JE

CT

#: 14C

HS

-078

SCALE: 3"=1'-0" SCALE: 3"=1'-0" SCALE: 3"=1'-0"

NOTES:

1. CANT STRIP NOT SHOWN FOR CLARITY.

NOTES:

1. CANT STRIP NOT SHOWN FOR CLARITY.

NOTES:

1. CANT STRIP NOT SHOWN FOR CLARITY.

06/04/2015

08/18/2015

RE

B

ID

W

IL

LIA

MS

B

RIC

E B

UIL

DIN

G A

ND

AU

DIT

OR

IU

M R

OO

F R

EP

LA

CE

ME

NT

Page 6: NORTH ROOFING, WATERPROOFING & BUILDING ENVELOPE …purchasing.sc.edu/solicitations/RE BID Williams...5.contractor shall become familiar with and verify the condition, dimension, and

SPECIFIED INSULATION

THERMOPLASTIC ROOF MEMBRANE

HOT AIR WELD

FLASHING MEMBRANE

TERM BAR

EXISTING LIGHTWEIGHT CONCRETE

EXISTING ROOF DECK

INNER GLAZING

8" M

IN

.

OUTER GLAZING

ALUMINUM RETAINING FRAME

BUTYL TAPE

EXPRESS TAPE

VHB TAPE

PERMATHERM CURB

RETAINER SCREW

CONT. MASTIC COMPATIBLE

WITH ROOFING MATERIAL

SLIP COUNTERFLASHING

FLASHING MEMBRANE

HOT-AIR WELD

THERMOPLASTIC ROOF MEMBRANE

NEW DRAIN CLAMPING RING

NEW DRAIN DOME

SPECIFIED ROOF INSULATION

EXISTING ROOF DECK

8" M

IN

IM

UM

SPECIFIED INSULATION

THERMOPLASTIC ROOF MEMBRANE

HOT-AIR WELD

PRE-FABRICATED BOOT FLASHING

S.S. CLAMPING RING

MULTI PURPOSE SEALANT

MULTI-PURPOSE SEALANT

EXISTING ROOF DECK

8" M

IN

.

EXISTING EQUIPMENT CURB

FASTENER

TERM. BAR

SLIP COUNTERFLASHING

ADD WOOD NAILER AND CONTINUOUS ZEE,

IF NECESSARY TO RAISE HEIGHT OF CURB

EXISTING WOOD NAILER

EXISTING ROOF DECK

SPECIFIED INSULATION

THERMOPLASTIC ROOF MEMBRANE

HOT AIR WELD

MEMBRANE TERMINATION

FLASHING MEMBRANE

NEW WOOD NAILER

8" M

IN

.

THERMOPLASTIC ROOF MEMBRANE

NEW ROOF HATCH

FASTEN 4" O.C.

S.S. FASTENER W/ EPDM

WASHER FASTENED 8" O.C.

SLIP COUNTERFLASHING

8" M

IN

.

SPECIFIED INSULATION

EXISTING ROOF DECK

NEW WOOD NAILERS

MEMBRANE TERMINATION

FLASHING MEMBRANE

TERM BAR

HIGH TEMP. SEALANT

S.S. BANDS

UMBRELLA

MINERAL WOOL

INSULATION

FLANGE

THERMOPLASTIC ROOF MEMBRANE

HOT-AIR WELD

MEMBRANE

TERMINATION

FLASHING

MEMBRANE

S.S. BAND

8" M

IN

.

4" M

IN

.

SPECIFIED INSULATION

EXISTING ROOF DECK

DRAWING:

ROOF DETAILS

DRAWN BY: CGB

SCALE: VARIES

R-202

SHEET 6 OF 7

DATE: 03/04/2015

EN

GIN

EE

RS

REVISION # REVISION DATE

2

1

3

4

RO

OF

IN

G, W

AT

ER

PR

OO

FIN

G &

B

UILD

IN

G

EN

VE

LO

PE

E

NG

IN

EE

RS

&

C

ON

SU

LT

AN

TS

ww

w.reiengineers.com

SEAL:

7

SCALE: 3"=1'-0"

SKYLIGHT

NOTES:

1. PROVIDE NEW WOOD BLOCKING TO ACHIEVE 8" MIN. FLASHING HEIGHT.

2. CANT STRIP NOT SHOWN FOR CLARITY.

8

SCALE: 3"=1'-0"

ROOF DRAIN

9

SCALE: 3"=1'-0"

PIPE PENETRATION

10

EQUIPMENT CURB

11

ROOF HATCH

12

HOT STACK

UN

IV

ER

SIT

Y O

F S

OU

TH

C

AR

OLIN

A

CO

LU

MB

IA

, S

C

RE

I P

RO

JE

CT

#: 14C

HS

-078

SCALE: 3"=1'-0" SCALE: 3"=1'-0" SCALE: 3"=1'-0"

NOTES:

1. PROVIDE NEW WOOD BLOCKING TO ACHIEVE 8" MIN. FLASHING HEIGHT.

2. CANT STRIP NOT SHOWN FOR CLARITY.

NOTES:

1. PROVIDE NEW WOOD BLOCKING TO ACHIEVE 8" MIN. FLASHING HEIGHT.

2. CANT STRIP NOT SHOWN FOR CLARITY.

NOTES:

1. SECURE MEMBRANE AT DRAIN AS REQUIRED BY MEMBRANE MANUFACTURER.

NOTES:

1. SECURE MEMBRANE AT PIPE PENETRATION AS REQUIRED BY MEMBRANE MANUFACTURER.

RE

B

ID

W

IL

LIA

MS

B

RIC

E B

UIL

DIN

G A

ND

AU

DIT

OR

IU

M R

OO

F R

EP

LA

CE

ME

NT

Page 7: NORTH ROOFING, WATERPROOFING & BUILDING ENVELOPE …purchasing.sc.edu/solicitations/RE BID Williams...5.contractor shall become familiar with and verify the condition, dimension, and

FASTEN 12" O.C.

STAGGERED

THERMOPLASTIC ROOF MEMBRANE

HOT-AIR WELD

MEMBRANE

TERMINATION

FLASHING

MEMBRANE

SPECIFIED INSULATION

EXISTING ROOF DECK

8" M

IN

.

3" WIDE MEMBRANE STRAP,

HOT-AIR WELDED IN PLACE

CABLE

WALKPAD, HOT-AIR WELDED IN PLACE

LIGHTNING ROD

METAL BASE PLATE

CABLE

LIGHTNING ROD

WALKPAD, HOT-AIR WELDED

METAL BASE PLATE

3" WIDE MEMBRANE STRAP,

HOT-AIR WELDED IN PLACE

ROOF MEMBRANE

INSULATION

STRUCTURAL DECK

EXISTING RIGID LIGHTNING

PROTECTION TERMINAL

PVC COATED FLANGE

EPDM BASE SEAL

BONDED TO METAL

SLEEVE

URETHANE INSULATION

PRE-MOLDED TO INNER

SIDE OF SLEEVE

S.S.

FLASHING

SLEEVE

S.S. CAP FOR FLASHING

SLEEVE (CAP FASTENED

USING TWO STAINLESS

STEEL SCREWS)

EPDM TRIPLE PRESSURE

GROMMET SEAL

3"

1'-6"

4"

EDGE METAL

EXISTING WOOD NAILER

NEW WOOD NAILERS

HOT-AIR WELD

EXISTING METAL WALL PANEL

HOT-AIR WELD

THERMOPLASTIC ROOF MEMBRANE

SPECIFIED INSULATION

CONT. CLEAT

6

1 2

"

SEALANT TAPE

SPRAY FOAM INSULATION

EDGE METAL COVER

NEW COLLECTOR HEAD

NEW DOWNSPOUT

NEW DOWNSPOUT

BRACKETS AS

SPECIFIED

SEALANT

SCUPPER LINER

FLASHING MEMBRANE

HOT-AIR WELD

MEMBRANE

SPECIFIED INSULATION

EXISTING ROOF DECK

EXISTING LIGHTWEIGHT CONCRETE

PARAPET BEYOND

CONTINUOUS

CLEAT

SEALANT TAPE

NEW COPING

NEW SCUPPER

NEW COLLECTOR BOX

AND DOWNSPOUT

DRAWING:

ROOF DETAILS

DRAWN BY: CGB

SCALE: VARIES

R-203

SHEET 7 OF 7

DATE: 03/04/2015

EN

GIN

EE

RS

REVISION # REVISION DATE

2

1

3

4

RO

OF

IN

G, W

AT

ER

PR

OO

FIN

G &

B

UILD

IN

G

EN

VE

LO

PE

E

NG

IN

EE

RS

&

C

ON

SU

LT

AN

TS

ww

w.reiengineers.com

SEAL:

13

SCALE: 3"=1'-0"

SUPPORT CURB

14

LIGHTNING PROTECTION

UN

IV

ER

SIT

Y O

F S

OU

TH

C

AR

OLIN

A

CO

LU

MB

IA

, S

C

RE

I P

RO

JE

CT

#: 14C

HS

-078

SCALE: N.T.S.

15

RIGID CONDUIT FLASHING

SCALE: N.T.S.

NOTES:

1. EXISTING CABLE SHALL BE CLEANED FREE OF ASPHALT CONTAMINATION PRIOR TO REINSTALLATION.

2. PROVIDE CONT. LAYER OF ASPHALT RESISTANT MEMBRANE FLASHING UNDER LOCATION OF CABLE. HOT-AIR WELD IN-PLACE.

3. REFER TO SECTION 07 72 00 FOR SUPPORT REQUIREMENTS AND FASTENERS FOR ATTACHMENT TO SHEET METAL COMPONENTS.

16

SCALE: 3"=1'-0"

ROOF EDGE

NOTES:

1. CANT STRIP NOT SHOWN FOR CLARITY.

NOTES:

1. ROOF MEMBRANE AND FLASHING NOT SHOWN FOR CLARITY.

NOTES:

1. CUT, MODIFY EXISTING CLEAT/CLOSURE AS REQUIRED FOR INSTALLATION OF NEW EDGE METAL.

2. SECURE CLEAT THROUGH OUTSIDE FACE OF EXISTING METAL ROOF PANEL.

17

SCALE: 2"=1'-0"

PRIMARY SCUPPER W/ COLLECTOR BOX

06/04/2015

RE

B

ID

W

IL

LIA

MS

B

RIC

E B

UIL

DIN

G A

ND

AU

DIT

OR

IU

M R

OO

F R

EP

LA

CE

ME

NT