3
8/26/2020 1 North Pleasant Valley Desalter Salinity Management Pipeline Connection aaaaaaaaaaaa aaaaaaaaaaaa aaaaaaaaaaaa aaaaaaaaaaaa aaaaaaaaaaaa aaaa August 26, 2020 Desalter Site and Pipelines Desalter Site Church Brine Line (SMP) Connection 1 2

North Pleasant Valley Desalter

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: North Pleasant Valley Desalter

8/26/2020

1

North Pleasant Valley DesalterSalinity Management Pipeline Connection

aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

August 26, 2020

Desalter Site and Pipelines

DesalterSiteChurch

Brine Line (SMP)

Connection

1

2

Page 2: North Pleasant Valley Desalter

8/26/2020

2

Desalter Site Looking East

Upland Rd.

SMP Discharge Connection

• Calleguas MWD Agreement for Construction and Use of SMP Discharge Connection

• CMWD design, construct, own and operate - City pays all costs

• Initial preliminary estimate for design and construction - $500,000

• Total deposits to CMWD to date for design and construction - $603,843

• Additional deposit required for construction - $313,440

Total estimated cost incl. 20% contingency $917,283Prior council authorizations $623,843Additional authorization required $293,440

3

4

Page 3: North Pleasant Valley Desalter

8/26/2020

3

Calleguas MWD SMP Discharge Connection

Desalter Site – August 25, 2020

5

6