48 NORTH LANARKSHIRE COUNCIL AGENDA ITEM No. .!..-L. To: HOUSING COMMITTEE From: DIRECTOR OF HOUSING AND DIRECTOR OF CONSTRUCTION SERVICES Date: 28THAUGUST 1996 ReF- MPICABIS I REPORT Subject: 1996/97 HOUSING CAPITAL MONITORING & PROGRESS STATUS REPORT 1. INTRODUCTION 1.1 A copy of the above report is attached for Committee’s consideration. The report reviews progress against the 1996197 Capital Programme, which was approved by the Housing Committee on 1st May 1996. 2. RECOMMENDATION 2.1 Committee is asked to note this report. 3. BACKGROUND 3.1 Available from the Housing Department. G Whitefield Director of Housing U G Forsyth Director of Construction Services Encl. cap.doc

North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

48

NORTH LANARKSHIRE COUNCIL AGENDA ITEM No. .!..-L.

To: HOUSING COMMITTEE

From: DIRECTOR OF HOUSING AND DIRECTOR OF CONSTRUCTION SERVICES

Date: 28THAUGUST 1996 ReF- MPICABIS I

REPORT

Subject: 1996/97 HOUSING CAPITAL MONITORING & PROGRESS STATUS REPORT

1. INTRODUCTION

1.1 A copy of the above report is attached for Committee’s consideration. The report reviews progress against the 1996197 Capital Programme, which was approved by the Housing Committee on 1st May 1996.

2. RECOMMENDA TION

2.1 Committee is asked to note this report.

3. BACKGROUND

3.1 Available from the Housing Department.

G Whitefield Director of Housing

U G Forsyth Director of Construction Services

Encl.

cap.doc

Page 2: North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

49

1996/97 HRA - HOUSING CAPITAL PROGRAMME MONITORING REPORT

Estate Regeneration

Energy Efficiency Heating Insulation Tower Blocks WindondDoors Energy Efficiency

Major Repairs & Environmentals L&s Major Repairs Modernisation etc Non-Traditional Housing Rosemary Roof Tiles Re-Rookg (Flat Roofs) Water Mains Shop Improvements Refuse Disposal Metal Fencing External PainterworURoughcast

Home Safety & Security Door Entry/CCTV Rewinng Concierge to High Flats Emergency Lighting

Community Care community Alarms Aids & Adaptations Special Needs Conversion- Sheltered Housing New Build

Homeless Initiatives Homelessness

Housing Management Decentralisation

1

4 4 5 5 5-6 6-7 7

7 7

8 8 8

10

11

Construction Resources

Page 3: North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

50

HOUSING CAPITAL MONITORING REPORT

PROJECT CONTRACTOR fooos PROGRESS

GOWRTHRAPPLE 'Tenders to be obtained for proposed environmental 500 ENVIRONMENTAL mztovmmmslimprovements, with a projected start by January 97.1 ' AND UPGRADING OF SHOPS GCIWKTHRAPPLE Construction Services liaising with Housing on 1 1481 UPGRADING OF LOCK-UPS (74) ,specification and implementation.

Ishops deferred to next financial year. I

I I I

JEWEL SCHEME Icontract complete. Contract extended for the ' I 32 /Lanrec Contracts Ltd

TANNOCH SIDE WINDSOR WALK, 30 TERRACED HOUSES initched roofs

I Letter of acceptance to be issued by Administration /for external upgrade and the construction of new

MUIRHOUSE ENVIRONMENTAL WORKS

231 EMOLITION SHIELDS DRIVE

Angus Group Ltd

WIRHOUSE

F H I E m s m/MUImOUSE m) lconsultant preparing encasement proposals. MUIRHOUSE REFURBISH MEN^^ WORKS, 7

Contractor on site 12 August, site levels started. Site works delayed by discovery of unknown pipe.

ITender documents in preparation for issue by the end of September.

PLACEMEWI SHOP UNITS

Joint Venture proposals being pursued. i NORTH MOTHERWELL

452 iG F Sharp 8 CO Ltd

I

488 IBuilding 8 Roads DLO

Scheme prepared for environmental works at entrance to Muirhouse. Tender documents being prepared for issue by mid September. Demolition of one block has been delayed awaiting the relocation of tenant from shop.

05/09/96

Page 4: North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

HOUSING CAPITAL MONITORING REPORT

-

EEATIXG, AD-HOC ,Addresses identified for replacement of irreparable I 37 NORTH DISTRICT I heating systems. I

- ~ / K I L S Y T H I HEATING, AD-HOC

NORTH DISTRICT I

HEATING Tender documents in preparation. 85

I 501 Addresses identified, half of which are committed.

MOODIESBURN I

CENTRAL DISTRICT I I

HEATING, SOUTH DISTRICT COLTNESS b MOSSEND (276)

96/97 , CONTRACT 1 Site works commenced 26 August, 20 houses l 194 D Campbell

completed to date. I

I

'HEATING, 96/97, CONTRACT 2 Contract a further 285 houses (and lsolid fuel) ~ 158 lCenteiConstmt!on

SOUTE DISTRICT at Fallside, Stane, Newarthill, Newmains & Viewpar! started 5 Auaust. 80 houses comoleted to date. I I

HEATING, 96/97, CONTRACT 3 Contract documentation in preparation for I I

SOUTH DISTRICT September. I HEAIPING, 96/97 , CONTRACT -;Contract documentation in preparation for I SOUTH DISTRICT September. 1 1 I

~ I wm~ AIR ~ I N G REPL~MENT Housing identifying addresses for this programme. 1 SOUTH DISTRICT

INSULATION PROGRAMME 95/96 Contract complete except for 20 houses where HARTHILL h BELLSHILL access has to be obtained.

INSULATION PROGRAMME 96/97 Programme for loft and cavity installation - SOUTH DISTRICT

1 31 (RbreGloInsulat Ltd I

I I

125 I addresses have been identified, programme to be ~

implemented. 1 I

1 '

1 1

TOWER BLOCK REFITRBISHMENT North section - substantially complete. 2279 IM J Gleeson Group

JACKSON corn, COATBFUDGE Central section - cladding 75% complete. South section - rails started on west elevation.

TOWER BLOCK REFURBISHMENT North section - cladding 75% complete. DUNBETH COURT, COATBRIDGE Central section - cladding substantially complete.

South section - complete. TOWER BLOCK REFURBISHMENT Proposal to phase scheme over two years with a

I I

1 500 Miller Constnrctlon

~ 1500 ~

~ I G H COATS, COATBRIDGE start towards end of this year. I 1 i

05/09/96

Page 5: North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

52

TOWER BLOCK REFURBISHMENT Proposal to phase scheme over two years with a 750 1 CHEVIOT COURT, AIRDRIE har t towards end of this year.

TOWER BLOCK REFURBISHMEWT 'Scheme for proposed concierge system being 450 I MILTON COURT, AIRDRIE iprepared for implementation towards the end of ~

,this financial year. I I TOWER BLOCK REFURBISHMENT ISite works commenced 19 August.

I

1504 ArnecLtd ' 1 i GRANGE TOWER

TOWER BLOCK REFURBISHMENT kcheme to be phased over 2 years with a start I I MERRYTON TOWER !towards end of this year.

1

i

I WINDOW/DOOR FUZPLA~~IMSNT IPhase 15 (135 houses), Phase 16 (132 houses) - I 591 NORTH DISTRICT /arrangements in hand to implement programme. 1 I

HOUSING CAPITAL MONITORING REPORT Page 3

1 PHASES 15, 16 WINDOW/DOOR REPLACEMENT lsurveys in progress. ~ 479 NORTH DISTRICT

WINDOWDOOR REPLACEMENT IBridgeburn Drive/Pentland Road - windows sound - 47 MOODIESBURN / CERYSTON iproposal to service and paint.

IBalance of funds reallocated. WINDOW/DOOR REPLACEMENT

/Drawings to be prepared. I PHASES 17, 18

Letter of acceptance to be issued by Administration. 280 Building 8 Roads DLO

I I CENTRAL DISTRICT I I BARGEDDIE 2

WINDOW/DOOR REPLA~EMENT ;Drawings in preparation for further UPVC window ~ 370 ~

CENTRAL DISTRICT i replacements including various sheltered housing I

'complexes in Airdrie, Calderbank and Coatbridge. ~ 1

WINDOW/DOOR REPLACEMENT Contract complete. 1 21 0 IBuilding 8 Roads DLO

WEWMAINS/DYKEHEAD ~

WINDOW/DOOR REPLACEMENI! IWindows installed in all houses. 1 309 Building 8 Roads DLO

I I

_BELLSHILL (EAST) IExtemal render repairs to be completed to ten 1 1 CALOER VALLEY\TANNOCHSIDE ~houses. ~ I WINDOW/DOOR REP- iWindows installed in 50 houses, and render to 1 294 building 8 Roads DLO

I

NEWARTHILL, EARTHILL, 145 houses.

WINDOW/DOOR REPLACEMENT OVXRTON

1

I 1 Tender documents being finalised. I I W E I L L , KUOW3TOP (281)

05/09/96

Page 6: North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

HOUSING CAPITAL MONITORING REPORT

PROJECT

53 page 4

CONTRACTOR fooos

PROORE S S

MAJOR REPAIRS AND ENVIRONMENTALS

LIET REPLACEMENT ICurrent contract for Anderson, Oakfield and Albion 1 90 ISchindlerLtd

SOUTH DISTRICT ITowers in progress for completion August 96. I I

I I I

I i I i

I

LIET RePLAcEMewT SOUTH DISTRICT

Addresses for the next phase of the replacement 'programme to be defined.

50

I I ,

H DISTRICT lrepairs and soffit lining removal.

I

O M RALKWATS, B'HILL

CTIVE FLUES LACKBURN HOUSES

IN0 ACQUIRED

I I

05/09/96

Page 7: North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

HOUSING CAPITAL MONITORING REPORT

PROJECT CONTRACTOR Eooos PROORE S S

MOD/ENVIRON nmtowwms Bill of Quantities prepared and costed, negotiations 250 NORTEFIEID/RENNIE ROAD to take place with private owners to encourage

participation. MOD/ENVIRON m o w w m s Drawings being prepared for improvement works to 313 BRIDGEBURN DRIVE ,back courts.

I I ,

I

MOD/ENVIRON nmtovmmms Schemes identified on chronological order of 140 SOUTH DISTRICT learly modernisation contracts. Surveys underway.

1

NON-TRADITIONAL HOUSING 'Complete 1

I CHAPELSIDE, AIRDRIE

I

I ROSEMBRP TILE PROGRAMME ILetter of acceptance for 6 blocks to be issued 1 82 Building8RoadsDLO

NORTH DISTRICT lby Administration. -ULD/KILSXTH ROSEMARP TILE PROGRAMME

MOODIESBURN ~

ROS- TILE PROORAMME

I NORTH DISTRICT occupiers identified.

~ I

NORTH DISTRICT issued by Administration. I 1 ILetter of acceptance for phase 1 (1 1 blocks) to be 124 Building&RoadsDLO

Phase 2 - addresses being defined and the owner-

I I I ~

M3ODIESBURN I

ROSEMARP TILE PROORAMME \complete 50 'Wm Watt & Sons Ltd 1 I I GARTSHERRIE 2 ( 4 ) I

-TRADITIONAL HOUSING First 2 houses complete except for some snagging. 120 lamptmllbnstr Ltd

ISF I AIRDRIE/CAIDERCRUIX

FXRHURST, 6 negotiated extension to phase 5.

05/09/96

Page 8: North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

HOUSING CAPITAL MONITORING REPORT

PROJECT CONTRACTOR Eooos PRooRess

ROSEMARY TILE PR- complete 65 1Act1on Roofing

SUNNPSIDE 2

I

COmptete

TILE PROORAMME D I E 2(3)

ROSFWLRY TILE PROGRAMME Additional block in progress in Bellsdyke Road. ! ~

I

225 klsa Building Ltd

CAIRNBILL ,

~ 85 klsa Building Ltd

~

I

~ 1 i ~ i I

ROSEMARY TILE PROGRAMME

MOTHERMELL, PHASE 1 issued by Administration. Letter of acceptance for phase I (23 blocks) to be ~

297 IBulldlng 8 Roads DLO

!

I I

RE-ROOFING FLAT, ROOFS Brief agreed, scheme in preparation. I

BRUCE S T / C A I S a ST,

I

! 1 Tender documents to be prepared subject to the I

1 - - BELLSHILL private owners hips being resolved. 1

I I

I iPhase 2 - list of addresses identified.

~

__

!

ROS- TILE PROGRAMME

MOTHEKWELL, PHASE 2

05/09/96

Page 9: North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

MAJOR REPAIRS AND ENVIRONMENTALS (CONTINUED)

1

lATER MAIWS Locations to be confirmed. 50 OUTH DISTRICT 1~ I I

~AINTERWORK/ROUGHCASTING iORTH AREA

Addresses identified, work to be progressed by Housing.

1

RBAN REGENERWIION, 1 Complete. 297 IMelvin Bros

ETAL FENCING

I I

05/09/96

Page 10: North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

HOUSING CAPITAL MONITORING REPORT

PROJECT mm CONTRACTOR Eooof PROGRESS

HOME SAFETY AND SECURITY

DOOR ENZTtP/CCTV Locations being indentified for two installations. I 13 I I CUMBERNAULD/KILSYTH I

I 1 I

DOOR ENTRY/CCTV 'Contractor commenced on site 24 June. 51 Scotshield Ltd SOUTH DISTRICT, PHASE 1 6 Icontract on programme for completion by end of ~ I

!September. I I

I 95 DOOR m Y / C C T V SOUTH DISTRICT I conf irmed.

Replace vandalised systems, locations to be

REWIRING PROORAMME 462 houses have now been identified for inclusion 1 325 1 NORTH DISTRICT lin this programme. Tender documents being I

prepared for mid September. REWIRING PROORAMME Programme identified, specification being clarified. 400

I

I CEWTRAL DISTRICT I

I 8O1 REWIRING PROGRAMME SOUTH DISTRICT

!Barons Tower - tenders being obtained. JTenders to be lodged on 9 September.

I

/Dalziel, Shields Towers to be progressed after 160 I

Low rise housing, Hattonrigg, Bellshill, tender to be , REWIRING PROGRA?B4F,

SOUTH DISTRICT I Barons Tower.

REWIRING PROGRAMME

SOUTH DISTRICT negotiated with the DLO. I I I

I I

CONCIERGE TO HIGH FLATS /Substantially complete. I 992 i ~ i ~ c h n s t 8 Lynn

DUNBETH ,etc , COATBRIDGE 1

CONCIERGE TO HIGH FLATS complete 1 575 ~ ~ ~ e n n e t t

REOBRIDGE, etc, COA!CBWDGE

I I

I

! 1 !

i

! i ~

~

I

I i

I I I

I 1 I

05/09/96

Page 11: North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

58

HOUSING CAPITAL MONITORING REPORT

LIDS AND ADAPTATIONS 1 Progressing individual schemes.

COMMUNITY CARE

50 I

SOUTH DISTRICT I

i ~

SPECIAL NEEDS

SUNART STREET, WISHAW

SPECIAL NEEDS :LAY ROAD, BELLSHILL jcommon room.

'~ i 70 ~

Scheme in preparation for conservatory and lift installation. Working drawings almost complete, scheme to be costed. Arrangements being made for CCTV system to 1 10 1

SPECIAL NEEDS ~ S T END DRIVE, BELLSHILL

I 1

Arrangements being made for an early start on 1 55 1

I I

site. Fencing works to be done by the DLO. 1

CONVERSION, SHELTERED HSG Contractor on site, demolitions and stripping out AIRBLES ROAD, PHASE 1 /in progress.

I I

335 /Tarmac I

05/09/96

CONVERSION, SHELTERED HSG Proposals reported to committee. 69 ' VIEWPARK, PHASE 1 (22 HOUSES)

I 1 I

1 1 I

Page 12: North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

HOUSING CAPITAL MONITORING REPORT

59

page 10

HOMELESS INITIATIVES

1 I I

I i I I

05/09/96

Page 13: North Lanarkshire Council - Committee Administration System - … · 2015. 1. 9. · ITender documents in preparation for issue by the ... Arrangements being made for CCTV system

60 HOUSING CAPITAL MONITORING REPORT

PROJECT

page 11

CONTRACTOR Eooos PROGRESS

HOUSING MANAGEMENT

DECENTRALISATION IWork commenced 26 August, stripping out in 193 IElmwood

SOUTH DISTRICT MOTHERWELL 0mCE

iprogress. ~ I

DECENTRALISATION ‘Drawings prepared and schemes costed for Area I 91 1 SOUTH DISTRICT

I I , I I

Offices at Flemington, Carfin and Holytown . AREA OFFICES

I I I I

I ‘ I

I I

I

1

I I

I I

I I I

, I

I ~ I 1

I , I

I

1 I 1

I I I ~

I

I

I

I 1 , I I

1 I

I I ~

I

I

I I I

I I I i I I

05/09/96