North Carolina Northeast

State of the Region

February 25, 2011

Page 2: North Carolina Northeast State of the Region February 25, 2011

Agenda

• Iberdrola Renewables overview

• Introduction to wind energy

• Economic impacts

• Questions

2

Page 3: North Carolina Northeast State of the Region February 25, 2011

The World Leader in Wind Energy

• #1 in the world for installed renewables; >12,500 MW

• #2 in the United States; > 4,600 MW

• 1,043 MW installed in the 2010

• 41 operating wind projects in 17 states

• Committed to invest $6B in the US over 2010-2012

3

Page 4: North Carolina Northeast State of the Region February 25, 2011

North American Wind Assets

Pleasant Valley144 MW PPA

Twin Buttes75 MW Owned

High Winds 162 MW PPA

Shiloh150 MW Owned

Mountain View III 25 MW Owned

Dillon45 MW Owned MID-CONTINENT MID-CONTINENT

REGIONREGION

Elk River150 MW Owned

WESTERN REGION

Locust Ridge26MW OwnedLocust Ridge II102MW OwnedCasselman35 MW Owned

Maple Ridge II45 MW Owned (91 MW Project)

EASTERN EASTERN REGIONREGION

Current as of May 1, 2010

Colorado Green81 MW Owned

(162 MW Project)

Lempster 24 MW Owned

Maple Ridge 1116 MW Owned

(231 MW Project)

Peñascal202 MW Owned

146 MW Owned

Barton Chapel120 MW Owned

Farmers City

Dry Lake63 MW Owned

Providence Heights72 MW Owned

StreatorCayuga Ridge300 MW owned

Rugby149.1 MW owned

1 - Buffalo Ridge 50.4 MW owned2 - MinnDakota 150 MW owned3 - Moraine 51 MW owned4 - Moraine II 49.5 MW owned5 - Trimont 101 MW owned

6 - Elm Creek 99 MW owned7 - Flying Cloud 43.5 MW owned8 - Winnebago 20 MW owned9 - Top of Iowa II 80 MW owned10 - Barton 160 MW owned

1 - Klondike III a 76.5 MW owned2 - Hay Canyon 100.8 MW owned3 - Klondike 24 MW owned4 - Klondike III 223.6 MW owned5 - Star Point 99 MW owned6 - Klondike II 75 MW owned7 - Big Horn 199.5 MW owned8 - Pebble Springs 98.7 MW owned

Peñascal II202 MW owned

Page 5: North Carolina Northeast State of the Region February 25, 2011

NC wind market drivers…

• NC Renewable Energy & Energy Efficiency Portfolio Standard (REPS) – passed August 20, 2007

– Investor Owned Utilities must provide 12.5% by 2021

• People and businesses prefer Green Power

• Fixed fuel cost

• Wind power is a local resource…not imported!

5

Page 6: North Carolina Northeast State of the Region February 25, 2011

3 requirements for a wind project…

• Wind

–Annual average speed > 15 mph

• Transmission

–Location and capacity

• Land

–Unconstrained, buildable, privately owned

6

Page 7: North Carolina Northeast State of the Region February 25, 2011

~330’

~475’

Swept area = 1.6 acres

Typical Wind Turbine (Gamesa G90)

~295’

• 2.0MW capacity• Energy for 500-

600 homes• 9-19 RPMs• Senses wind

speed & direction

• Rotates 360˚• Blades have

adjustable pitch

Page 8: North Carolina Northeast State of the Region February 25, 2011

Trim

Trimont - MN

Page 9: North Carolina Northeast State of the Region February 25, 2011

Win

Winnebago – IA

Page 10: North Carolina Northeast State of the Region February 25, 2011

Klondike (OR)

Page 11: North Carolina Northeast State of the Region February 25, 2011

Wind energy projects are…

• An economic driver

–Turbine lease payments to landowners

–Property tax revenue with minimal cost

–Construction jobs and supplies sourced locally & regionally

–NC Dept of Commerce estimates that a 300MW project in NE NC would create 48-139 new jobs and generate $89-108 MM annually.

11

Page 12: North Carolina Northeast State of the Region February 25, 2011

12

Wind energy projects are… widely accepted

Page 13: North Carolina Northeast State of the Region February 25, 2011

Questions???

13

Craig PoffSenior Business [email protected]

Page 14: North Carolina Northeast State of the Region February 25, 2011

Wind energy development process

• Find the wind & transmission

• Measure the wind’s characteristics

• Obtain rights to land

• Permitting & engineering

• Construction

• Commissioning & Commercial Operation

Page 15: North Carolina Northeast State of the Region February 25, 2011

What about hurricanes?

• We have first hand experience developing coastal sites– Penascal – Kennedy County TX

– Jersey Atlantic – New Jersey

• The project design will consider frequency and intensity of hurricanes

• Design contemplates storm surge/flooding

• Over ~ 50 mph, turbine shuts down– Blades are feathered

– Turbine faces into and follows the wind

15

Page 16: North Carolina Northeast State of the Region February 25, 2011

16

Compare the impacts…

Page 17: North Carolina Northeast State of the Region February 25, 2011

Electricity expenditures are rising…

17

Source: Bureau of Labor Statistics, http://www.bls.gov/opub/mlr/2008/04/art1full.pdf

Page 18: North Carolina Northeast State of the Region February 25, 2011

Energy Subsidies Black, Not GreenFederal Subsidies (2002-08)

Fossil Fuels$72.5 billion

Renewable Energy$29.0 billion

$12.2 billionTraditional Renewables

$16.8 billionCorn Ethanol

$2.3 billionCarbon Capture& Storage

$70.2 billionTraditional Fossil Fuels

$2.0 $6.0 $6.2$0.3

Tax Breaks(Outer Ring)

Direct Spending(inner circle)

$5.0 $11.8

$16.3$53.9

All Subtotals in $ Billions

Climate Protecting

DamagingSource: Tommy McCall, Environmental Law Institute (compiled from IRS, U.S. DOE, Congressional Joint Committee on Taxation, Office of Management and Budget, & U.S. Department of Agriculture data)

Page 19: North Carolina Northeast State of the Region February 25, 2011

Transm

ission Line

Page 20: North Carolina Northeast State of the Region February 25, 2011

Transmiss

ion Line