168
DETAILS OF WORKS FOR HIGHWAYS DETAILS OF WORKS FOR HIGHWAYS DETAILS OF WORKS FOR HIGHWAYS DETAILS OF WORKS FOR HIGHWAYS DEMAND No.21 DEMAND No.21 DEMAND No.21 DEMAND No.21 - HIGHWAYS HIGHWAYS HIGHWAYS HIGHWAYS AND MINOR PORTS AND MINOR PORTS AND MINOR PORTS AND MINOR PORTS DEPARTMENT DEPARTMENT DEPARTMENT DEPARTMENT HEADS OF DEPARTMENT Page Number 21 02. CHIEF ENGINEER - NATIONAL HIGHWAYS 1-- 41 21 03. CHIEF ENGINEER (CONSTRUCTION AND MAINTENANCE ) - HIGHWAYS 42—86 21 04. CHIEF ENGINEER (HIGHWAYS) - PROJECTS 87— 138 21 05. PROJECT DIRECTOR - TAMIL NADU ROAD SECTOR PROJECT 139—142 21 07. CHIEF ENGINEER (HIGHWAYS) - NABARD AND RURAL ROADS 143—152 21 10. CHIEF ENGINEER (METRO) 153—161

No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

  • Upload
    vannhu

  • View
    234

  • Download
    0

Embed Size (px)

Citation preview

Page 1: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

DETAILS OF WORKS FOR HIGHWAYSDETAILS OF WORKS FOR HIGHWAYSDETAILS OF WORKS FOR HIGHWAYSDETAILS OF WORKS FOR HIGHWAYS

DEMAND No.21 DEMAND No.21 DEMAND No.21 DEMAND No.21 ---- HIGHWAYS HIGHWAYS HIGHWAYS HIGHWAYS AND MINOR PORTS AND MINOR PORTS AND MINOR PORTS AND MINOR PORTS DEPARTMENTDEPARTMENTDEPARTMENTDEPARTMENT

HEADS OF DEPARTMENT Page

Number

21 02. CHIEF ENGINEER - NATIONAL HIGHWAYS 1-- 41

21 03. CHIEF ENGINEER (CONSTRUCTION AND MAINTENANCE ) - HIGHWAYS 42—86

21 04. CHIEF ENGINEER (HIGHWAYS) - PROJECTS 87— 138

21 05. PROJECT DIRECTOR - TAMIL NADU ROAD SECTOR PROJECT

139—142

21 07. CHIEF ENGINEER (HIGHWAYS) - NABARD AND RURAL ROADS

143—152

21 10. CHIEF ENGINEER (METRO) 153—161

Page 2: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

DEMAND No.21 – HIGHWAYS AND MINOR PORTS DEPARTMENT

21 02. CHIEF ENGINEER - NATIONAL HIGHWAYS

Page 3: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

01 National Highways

337 Road Works

JA Original works

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 01 337 JA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 01 337 JA 16 00( DPC )

New Works likely to be sanctioned

01. AS / TS / RAS:

... ... ... ... 1

Shifting of Electric Poles and Transformers for the work Widening from double lane to 10.0 Metre width in Km 25/0-45/0 and Strengthening and Improvements to wearing surface of Srivilliputhur - Sivakasi - Virudunager - Aruppukottai - Tiruchuli- road.

44002.

Tirunelveli (NH) Division

AS / TS / RAS:

44,00 ... 1 1 ...

G.O (D) No 62 Highways and Minor Porsts (HV2) Department dated 4.3.2016

64 Lands

5054 01 337 JA 64 09( DPC )

LAOP Case 58/1987- National Highways - Madurai (NH) Division-Lands acquired for Widening Of NH 7 in Thadi Kombu Village Dindugul District - Enhanced Compensation.

1541.

Madurai(NH) Division

AS / TS / RAS:

1,54 ... 1 1 ...

G.O (D) No 93 Highways and Minor Porsts (HV2) Department dated 21.7.2016

45,54 ... 2 2 15054 01 337 JATOTAL -

1

Page 4: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

New works likely to be sanctioned in 2018-19

01. AS / TS / RAS:

... ... ... ... 550,00,00

Improvement to Chittor-Tirutani-Renigunda road kanchipadi road km0/0-2/0

101002.

Chennai (NH)Division

AS / TS / RAS:

1,01,00 65 98,00 1,00,35 ...

CRF-TN-2016-17-113

Construction of box culverts at Km 18/10,19/8,20/4,20/8(i) 20/8(ii) 21/10,29/2,29/8,29/10 & 31/10 of Maduranthagam-Vennangupattu Road

55863. AS / TS / RAS:

55,86 37 59,00 55,49 ...

CRF-TN-2016-17-81

Improvements to Echur Thiruporur Road to Thirunilai Harijan Colony Road km 0/0 – 2/0

88004. AS / TS / RAS:

88,00 60 1,05,00 87,40 ...

CRF-TN-2016-17-78

Construction of Bridge at km 3/8 of pinjivakkam Harijan Colony Road

937405. AS / TS / RAS:

9,37,40 ... ... 25,00 9,12,40

CRF-TN-2017-18-26

Strengthening to Chidambaram - Pitchavaram Tourist Centre road km 10/4 - 13/0

125006. AS / TS / RAS:

1,25,00 74 1,00,00 1,24,26 ...

CRF-TN-2016-17-80

Improvements to East Coast Road to Vaswa Samudhram Road km 0/0 – 2/6

138007. AS / TS / RAS:

1,38,00 87 1,47,00 1,37,13 ...

CRF-TN-2016-17-118

2

Page 5: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements to GNT road to Ayyanallur road km0/0-3/0

19300/ 199508.

Chennai (NH)Division

AS / TS / RAS:

1,99,50 1,29 1,53,00 1,98,21 ...

CRF-TN-2016-17-77

Widening to SL to IL Chunambedu – Perumbair road in km 7/2-12/0

456009. AS / TS / RAS:

4,56,00 2,89 3,66,00 4,53,11 ...

CRF-TN-2016-17-72

Strengthening to Keerapalayam - Sethiyathope Road km 5/0 - 12/6

3840010. AS / TS / RAS:

3,84,00 2,34 3,44,00 3,81,66 ...

CRF-TN-2016-17-73

Providing CC pavement in Km 50/8-54/0 of Virudhachalam-Ulundurpet-Villupuram Road

64400/ 7060011. AS / TS / RAS:

7,06,00 8,47 6,04,00 6,97,52 ...

CRF-TN-2016-17-75

Improvements to Km 8/6 of Cuddalore - Thirukovilur - Sankarapuram road to Sathankuppam road (via) Thirumanikuzhi road km 0/0 - 5/6.

2188912. AS / TS / RAS:

2,18,89 1,28 2,11,00 2,17,61 ...

CRF-TN-2016-17-121

Widening single lane to intermediate and strengthening Agaram colony – Gangaiyadikuppam road km0/0-3/2

24700/ 2610013. AS / TS / RAS:

2,61,00 1,72 2,07,00 2,59,28 ...

CRF-TN-2016-17-76

Improvements to Periyapattu-Andarmullipallam - Poochimedu road km 0/0-4/8

2890014. AS / TS / RAS:

2,89,00 1,69 2,61,00 2,87,31 ...

CRF-TN-2016-17-74

3

Page 6: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Widening single lane to intermediate and strengthening GNT road – Agaram colony km0/0-4/0

31200/ 3250015.

Chennai (NH)Division

AS / TS / RAS:

3,25,00 2,12 2,72,00 3,22,87 ...

CRF-TN-2016-17-71

Improvements to Ottivakkam to Manappakkam Road km 0/0 – 2/8

1568116. AS / TS / RAS:

1,56,81 1,02 1,56,00 1,55,79 ...

CRF-TN-2016-17-79

Improvements to km 13/0- 19/0 of Kumaratchi - Vallam Padhugai Road

2333717. AS / TS / RAS:

2,33,37 ... ... 25,00 91,69

CRF-TN-2017-18-45

Reconstruction of High level bridge in lieu of existing causeway at Km.25/2 of Thiruvannamalai - Thiyagadurgam road

20000/ 21894018. AS / TS / RAS:

21,89,40 11,92,38 1 9,97,01 ...

CRF-TN-2015-893, dt.14.05.15

Construction of Bridge at km 44/8 of Thirumazhisai- Uthukkottai Road

27891019. AS / TS / RAS:

27,89,10 ... ... 25,00 27,64,10

CRF-TN-2017-18-41

Widening from SL to IL in Km.0/0 - 7/2, 12/0 - 13/0 and 19/0 - 19/8 of Chunambedu - Perumbair road

7240020. AS / TS / RAS:

7,24,00 5,78,38 1 ... ...

CRF-TN-2015-882, dt.14.05.15

Providing paved shoulders and strengthening in Km 18/0 - 25/0 of Thandalam - Perambakkam road to Thakolam - Arugilpadi road

10980021. AS / TS / RAS:

10,98,00 8,49,42 1 ... ...

CRF-TN-2015-874, dt.14.05.15

4

Page 7: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements in Km.48/0-51/0 & 52/0-58/0 of Cuddalore - Thirukovilur - Sankarapuram road

7400022.

Chennai (NH)Division

AS / TS / RAS:

7,40,00 5,07,49 1 2,32,50 ...

CRF-TN-2015-863, dt.14.05.15

Strengthening from km 39/2-51/04 of Thiruvannamalai - Thiyagadurgam road

6120023. AS / TS / RAS:

6,12,00 ... ... 25,00 5,87,00

CRF-TN-2017-18-27

Improvements to km 5/6- 19/0 of Cuddalore - Chittur Road

5014024. AS / TS / RAS:

5,01,40 ... ... 25,00 4,76,40

CRF-TN-2017-18-33

Widening from SL to IL Moogilthuraipattu to Thiruvarangam Km 0/0-18/8

10400/ 10770025. AS / TS / RAS:

10,77,00 2,33 10,00,00 10,74,66 ...

CRF-TN-2016-17-135

Strengthening to Thiruvannamalai Thiyagadurgam road km 19/2 - 39/20

10770026. AS / TS / RAS:

10,77,00 2,33 11,49,00 10,74,66 ...

CRF-TN-2016-17-70

Widening from SL to IL and Improvements to Km 5/4 - 14/4 of Central Jail - Amirthi Road .

49950/ 5000027.

Vellore (NH) Division

AS / TS / RAS:

5,00,00 ... ... 25,00 4,75,00

CRF-TN-2017-18-44

Improvements to Km 30/0-34/0, 46/6-48/4 & 56/0-64/0 of Abdullapuram - Asanampattu - Alangayam - Tirupattur road.

10004028. AS / TS / RAS:

10,00,40 ... ... 25,00 9,75,40

CRF-TN-2017-18-23

5

Page 8: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Widening from IL to DL and Improvements to Km 0/0-2/0 & 7/8-10/6 of Patchur - Kothur Road to A.P. Border Road

33950/ 3400029.

Vellore (NH) Division

AS / TS / RAS:

3,40,00 ... ... 25,00 3,15,00

CRF-TN-2017-18-43

Improvements for curves at km 3/6 Realignment of Tank Bund Portion at km 13/6 of Tirupattur - Singarapet Road

10000/ 1050030. AS / TS / RAS:

1,05,00 23 60,00 60,00 ...

CRF-TN-2016-17-122

Widening from IL to DL in Km 11/0-16/4, 18/0-20/4, 21/4-24/0 and improvements in Km 8/0 - 20/4 & 21/4 - 24/250 of Abdullapuram - Moranam road (M564) .

13200031. AS / TS / RAS:

13,20,00 10,56,09 1 ... ...

CRF-TN-2015-873, dt.14.05.15

Improvements to Ponnur road to Thellar Mazhaiyur road (Via) Kilputhur Km 0/0-2/6 & 5/0-8/8

3200032. AS / TS / RAS:

3,20,00 1,78 2,80,00 2,80,00 ...

CRF-TN-2016-17-138

Strengthening from Km 11/0 - 19/8 & Improvements to Km 11/0 - 19/8 of Arcot-Tidivanam Road

10600033. AS / TS / RAS:

10,60,00 ... ... 25,00 10,17,89

CRF-TN-2017-18-25

Improvements of Abdullapuram-Asanampattur-Alangayam-Tirupattur road Km 65/0-71/6

6000034. AS / TS / RAS:

6,00,00 2,86 5,60,00 5,60,00 ...

CRF-TN-2016-17-85

Improvements to Sembur S.katteri road (via) Theyyar Km 7/0-15/2

4100035. AS / TS / RAS:

4,10,00 2,92 3,70,00 3,70,00 ...

CRF-TN-2016-17-139

6

Page 9: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements to Cheyyar Vandavasi Polur road to Desur road (Via) Kuthampattu Kandavaratti Km 0/0-8/2

4100036.

Vellore (NH) Division

AS / TS / RAS:

4,10,00 3,01 3,70,00 3,70,00 ...

CRF-TN-2016-17-137

Improvements to Km 5/0 - 9/2 & 10/4 - 14/6 of Arni -Padavedu Road.

5500037. AS / TS / RAS:

5,50,00 ... ... 25,00 5,25,00

CRF-TN-2017-18-24

Widening from SL to DL and Improvements to Km 2/0 - 8/0 of Jaffrabad - Velathigamanibenda Road

50050/ 5010038. AS / TS / RAS:

5,01,00 ... ... 25,00 4,76,00

CRF-TN-2017-18-42

Junction Improvements at Km 4/4( (Kunnumurinji), Km 10/2(Randam ), Km 15/4 (Mangalam ), Km 16/8 (Arpakkam )& Km 17/8 (Vedanthavadi) of Tiruvannamalai Avalurpet road.

1700039. AS / TS / RAS:

1,70,00 68 1,30,00 1,30,00 ...

CRF-TN-2016-17-129

Improvement of Gudiyattam- Gadambur- Kailasagiri - Vaniyambadi Road Km.22/570- 30/4 & 37/6 - 42/0

10250040. AS / TS / RAS:

10,25,00 1,06 10,30,00 10,23,94 ...

CRF-TN-2016-17-116

Strenghening to Sanipoondi Kilpennathur Avalurpet Chetpet road Km 0/0-21/0

20620041. AS / TS / RAS:

20,62,00 7,26 20,30,00 20,54,74 ...

CRF-TN-2016-17-82

Widening & Improvements to Thellar Mazhaiyur road Km. 0/0 - 14/20

109500/ 11000042. AS / TS / RAS:

11,00,00 4,23 10,55,00 10,55,00 ...

CRF-TN-2016-17-83

7

Page 10: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements to Arcot - Kannamangalam Road (SH-129) Km 3/0 - 8/9 including reconstruction of Culverts at Km 4/2, 4/6, 4/8, 6/8, 8/8 & 8/10

10500043.

Vellore (NH) Division

AS / TS / RAS:

10,50,00 1,26 10,60,00 10,48,74 ...

CRF-TN-2016-17-84

Strengthening from Kolapalur to Avaniyapuram road Km 0/0-9/0

6760044. AS / TS / RAS:

6,76,00 4,16 6,36,00 6,36,00 ...

CRF-TN-2016-17-136

Improvements in Km 0/0-5/6 of Thalaivasal - Sitheri road

2780045.

Salem (NH) Division

AS / TS / RAS:

2,78,00 2,78,00 1 ... ...

CRF-TN-2015-865, dt.14.05.15

Wdg Minor Bridge at Km. 0/8 of Komarapalayam - Bhavani Road

750046. AS / TS / RAS:

75,00 ... ... 25,00 5,00

CRF-TN-2017-18 -48

Strengthening from Km.9/0-13/540 of Kamalapuram - Thinnappatti - Pannappatti road including Construction of retaining wall and drain

3000047. AS / TS / RAS:

3,00,00 1,28,05 2,00,00 1,71,95 ...

CRF-TN-2016-17-49

Wdg to SL to IL and Stg. From Km. 0/0-15/0 of Pagandai - X road to Mamandhur road

10500048. AS / TS / RAS:

10,50,00 ... ... 25,00 10,25,00

CRF-TN-2017-18 -12

Improvements in Km.0/0-6/6 of Theerpatti - Thallipatti road

4500049. AS / TS / RAS:

4,50,00 3,69,89 1 ... ...

CRF-TN-2015-876, dt.14.05.15

8

Page 11: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Widening from SL to IL and Strengthening of Mamandur - Kachirapalayam road from Km.0/0-11/840

7900050.

Salem (NH) Division

AS / TS / RAS:

7,90,00 5,82 7,50,00 7,14,18 ...

CRF-TN-2016-17-59

Widening from SL-IL and Thiyagadurgam-Sankarapuram road Km /0-13/0

10000051. AS / TS / RAS:

10,00,00 2,22 9,60,00 9,97,78 ...

CRF-TN-2016-17-141

Widening from SL to IL and Improvements to the road Branching from Km.5/0 of Salem - Veeranam road to Japthiveeranam, Vedapatty, D.Perumapalayam road in Km.0/0-8/6 (OSA 039)

7000052. AS / TS / RAS:

7,00,00 5,95,54 1 ... ...

CRF-TN-2015-886, dt.14.05.15

Strengthening from Km 0/0-4/8 Vellaiyur road,including construction of minor bridge at Km 3/4,4/2 construction of protective wall at Km 0/6,0/8,4/2 and 4/4.

2600053. AS / TS / RAS:

2,60,00 1,23 1,10,00 2,58,77 ...

CRF-TN-2016-17-55

Strengthening from Km.0/0-5/8 Top Sengattupatty - Periyanapur Road

2000054. AS / TS / RAS:

2,00,00 1,64 1,60,00 1,98,34 ...

CRF-TN-2016-17-50

Reconstruction of Culverts at Km 1/8,4/4,5/8,6/4,7/6,& 13/6 of VCC road to Bagalur-Bergei road(Via)Muthali & Palavanapalli

1200055. AS / TS / RAS:

1,20,00 2,26 1 1,17,74 ...

CRF-TN-2016-17-62

Geometric Impts at Km. 6/6 - 7/4 of Parali - Aniyapuram - Pudupalayam road including reconstn., of Narrow Culvert at Km. 5/10

400056. AS / TS / RAS:

40,00 ... ... 25,00 15,00

crf-tn-2017-18 -47

9

Page 12: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Strengthening from Km 0/0-2/8 pagadapadi-Vellaiyur road,including construction of minor bridge at Km 2/6

1200057.

Salem (NH) Division

AS / TS / RAS:

1,20,00 15 1 1,19,85 ...

CRF-TN-2016-17-53

Rebuilding in Km 0/0-0/7 and Widening and rebuilding from IL to DL in Km 0/7-10/0 and Widening from SL to DL rebuilding in Km 11/0-11/8,12/0-12/2,12/6-13/6,14/0-14/8 and 15/2-17/0 of VCC road to Bagalur-Berigai road via Muthali.

14960058. AS / TS / RAS:

14,96,00 5,18 14,56,00 14,90,82 ...

CRF-TN-2016-17-140

Strengthening from Km 0/0-4/0 of Manmalai Road

1500059. AS / TS / RAS:

1,50,00 1,01 1,10,00 1,48,99 ...

CRF-TN-2016-17-52

Strengthening from Km 0/0-3/885 Attur-Paithur Road

1600060. AS / TS / RAS:

1,60,00 1,85 1,20,00 1,58,15 ...

CRF-TN-2016-17-54

Widening & Strengthening from SL to IL in Km 0/0-10/0 including construction of retaining wall and reconstruction of culverts and widening of Culverts of Pennagaram-Dasampatty road

10000061. AS / TS / RAS:

10,00,00 5,14 8,54,72 9,94,86 ...

CRF-TN-2016-17-117

Improving the "S" curve at km 24/0 - 24/8 of Kallakurichi - Koothakudi road.

1500062. AS / TS / RAS:

1,50,00 2,11 1,10,00 1,47,89 ...

CRF-TN-2016-17-63

Widening from SL to IL and improvements to Km.7/6-8/6 & 9/0-13/0 of Serukkalai Cross Road including Construction of Culverts

2500063. AS / TS / RAS:

2,50,00 3,49 2,10,00 2,46,31 ...

CRF-TN-2016-17-120

10

Page 13: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Wdg from IL to DL and Stg from Km. 2/6 - 9/0 & Impts to Km. 0/0-2/6 of Thiruchengode - Kumarapalayam road including CD works and Reconstn., of Minor Bridge in lieu of Piped caused at Km. 4/2 and Dip raising at Km. 1/6

6750064.

Salem (NH) Division

AS / TS / RAS:

6,75,00 ... ... 25,00 5,80,00

CRF-TN-2017-18 -13

Widening Single Lane to Intermediate Lane and Improvements to Kalagani-Thirumalaipatty Road Km 0/0-10/4 including CD Works.

5400065. AS / TS / RAS:

5,40,00 6,96 5,00,00 5,33,04 ...

CRF-TN-2016-17-58

Widening & Rebuilding from SL to DL in Km.2/0-7/0 of Perandapalli - Athimugam road to Muthali (via) Meduasandoddi and Venkatesapuram including CD works

5550066. AS / TS / RAS:

5,55,00 5,18 2,50,00 5,49,82 ...

CRF-TN-2016-17-110

Curve Improvement at km 92/10 of Malliakarai - Rasipuram - Tiruchengodu - Erode road (SH 79)

300067. AS / TS / RAS:

30,00 ... ... 25,00 5,00

CRF-TN-2017-18 -36

Widening & Strengthening from SL to IL in Km 21/4 - 28/0 of Nagadasampatty - Pennagaram Road including Constructon of Retaining wall and Reconstruction of Culvert and Widening of Culverts.

6000068. AS / TS / RAS:

6,00,00 5,36 5,60,00 5,94,62 ...

CRF-TN-2016-17-56

Constn., of Retg wall at Km. 0/10,3/2,3/6,3/8,4/10 of Mohanur - Oruvandur road

500069. AS / TS / RAS:

50,00 ... ... 25,00 25,00

crf-tn-2017-18 -46

Widening and improvements to Kadampuliyur-Silambinathanpettai Road at km 0/0-9/4.

6500070. AS / TS / RAS:

6,50,00 4,83 6,10,00 6,45,17 ...

CRF-TN-2016-17-57

11

Page 14: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Widening from SL to DL and strengthening of Kallakurichi-Pavanthur road at Km 0/0-6/4

6000071.

Salem (NH) Division

AS / TS / RAS:

6,00,00 2,67 5,60,00 5,97,33 ...

CRF-TN-2016-17-114

Widening from SL to IL and improvements in Km 14/735-15/735, 16/135-16/735, 17/935-19/935, 22/935-24/935 including construction of protective works of Edappady - Poolampatty - Mettur road (M-591)

11000072. AS / TS / RAS:

11,00,00 11,00,00 1 ... ...

CRF-TN-2015-866, dt.14.05.15

Strengthening from Km 9/2-11/4 of Puthur-Unathur-Kallanatham road

900073. AS / TS / RAS:

90,00 1,57 20,00 88,43 ...

CRF-TN-2016-17-51

Improvements to Pennadam-Vridhachalam road Km 11/0-18/750

4000074. AS / TS / RAS:

4,00,00 1,31 2,00,00 3,98,69 ...

CRF-TN-2016-17-64

Widening from IL to DL and Strengthening in Km 0/55-3/4 & 4/1-7/0 of Nainamalai-Sendamangalam road.

4515075. AS / TS / RAS:

4,51,50 3,71,06 1 ... ...

CRF-TN-2015-875, dt.14.05.15

Reconstruction of Culverts at Km 1/6 & Km 9/2 of Shoolagiri -Rayakottai road

800076. AS / TS / RAS:

80,00 2,22 20,00 77,78 ...

CRF-TN-2016-17-61

Impts to Km. 0/0-11/0 of Pennadam - Virudhachalam road

5500077. AS / TS / RAS:

5,50,00 ... ... 25,00 2,50,00

crf-tn-2017-18 -14

12

Page 15: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Widening and improvement from SL to IL Km.0/0-10/0 of Kolathur – Guruvareddiyur Road

8000078.

Salem (NH) Division

AS / TS / RAS:

8,00,00 6,73,64 1 ... ...

CRF-TN-2015-884, dt.14.05.15

Junction Improvement at Km.23/6-24/0 including Widening of slab culvert at Km 23/8 of Namakkal -Kannanur road

1000079. AS / TS / RAS:

1,00,00 ... ... 25,00 25,00

CRF-TN-2017-18 -35

Junction Impts at Km. 14/4 including wdg of culvert at Km. 14/4 of Namakkal - Kannanur rod

900080. AS / TS / RAS:

90,00 ... ... 25,00 20,00

crf-tn-2017-18 -34

Widening from SL to IL and Strengthening of Venkatapuram Dasiripalli road from Km 2/8-7/4 including Reconstruction of CD Works

4500081. AS / TS / RAS:

4,50,00 3,66 4,10,00 4,46,34 ...

CRF-TN-2016-17-60

Rebuilding the road from Km 11/100-17/450 of Hellan -Yellamalai-Periyasholai Road

5347082.

Coimbatore (NH)Division

AS / TS / RAS:

5,34,70 ... ... 50,00 75,00

CRF-TN-2017-18-31

Strengthening the Pothapatty - Kosur road Km.14/4-18/4

1490083. AS / TS / RAS:

1,49,00 1,22 70,00 1,47,78 ...

CRF-TN-2016-17-91

Construction of High level Bridge at Km 14/8 of Kamanaickenpalayam - Negamam - Chettipalayam road

1480084. AS / TS / RAS:

1,48,00 31 1,08,00 1,47,69 ...

CRF-TN-2016-17-125

13

Page 16: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Construction of Retaining wall along the high embankment in Km 8/6 - 11/6 of Gobi - Savandapur Road

5000085.

Coimbatore (NH)Division

AS / TS / RAS:

5,00,00 ... ... 25,00 75,00

CRF-TN-2017-18-29

Improvements in Km 8/0-13/8, 16/0-20/10 including reconstruction of the narrow Bridge at Km 19/4 of Erode - Thingalore road

10590086. AS / TS / RAS:

10,59,00 8,63,60 1 ... ...

CRF-TN-2015-888, dt.14.05.15

Widening from IL to DL and improvements in Km 0/0 - 24/712 of Udumalai - Senjeri Hills road.

14500087. AS / TS / RAS:

14,50,00 12,42,18 1,00 39,55 ...

CRF-TN-2015-891, dt.14.05.15

Providing Hard Shoulders from Km 0/0-11/0 of Anthiyur -Ammapet road including reconstruction of Minor bridge at Km 9/2.

9992088. AS / TS / RAS:

9,99,20 ... ... 50,00 50,00

CRF-TN-2017-18-50

Improvements to Km 1/8 - 10/120 of Elayamuthur - Amaravathi Nagar road

2748089. AS / TS / RAS:

2,74,80 ... ... 50,00 75,00

CRF-TN-2017-18-49

Junction improvements at Km.165/8 of Salem Cochin Road (Road Safety)

1500090. AS / TS / RAS:

1,50,00 3 80,00 1,49,70 ...

CRF-TN-2016-17-92

Widening from SL to IL and Improvements to Km 0/0 - 4/4 of Kothumudi - Ebbanadu Road.

4349091. AS / TS / RAS:

4,34,90 ... ... 50,00 75,00

CRF-TN-2017-18-30

14

Page 17: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Widening from SL to DL in Km.0/0-8/4 & Improvements in km.0/0- 3/8, 4/2-4/6 & 6/6-7/6 of Bujangannur- Vanabadrakaliamman kovil road (via) Thekkampatty

5500092.

Coimbatore (NH)Division

AS / TS / RAS:

5,50,00 4,43,59 1 2,00 ...

CRF-TN-2015-869, dt.14.05.15

Improvements to Km 0/0 - 10/0 of Udhagai Kothagiri Mettupalayam Sathy Gobi Erode road including CD works & Protective works

10890093. AS / TS / RAS:

10,89,00 3,48 6,00,00 8,00,00 2,85,52

CRF-TN-2016-17-89

Widening and Improvements to Km 0/0 - 2/8 Including Construction of High level Bridge at Km 1/2 of Km 173/10 of Salem Cochin Road to Ettimadai Railway Station Road

5000094. AS / TS / RAS:

5,00,00 1,20 4,60,00 4,00,00 98,80

CRF-TN-2016-17-88

Widening from SL to IL and Improvements in Km 0/0-24/4 of Vellitiruppur-Thottikinaru road

14740095. AS / TS / RAS:

14,74,00 6,36 9,00,00 14,67,64 ...

CRF-TN-2016-17-142

Widening from SL to IL at km 0/0 - 9/500 & Improvements at km 0/0 - 5/0 & km 7/0 - 9/500 of Periapatti-Negamam (via) Ammapatti Road

4950096. AS / TS / RAS:

4,95,00 1,40 4,55,00 4,93,60 ...

CRF-TN-2016-17-133

Widening from SL to IL and Improvements in Km 0/0 – 7/4 of Nallagoundenpalayam – Kurumandhur Market Road

4030097. AS / TS / RAS:

4,03,00 4,79 3,63,00 3,98,21 ...

CRF-TN-2016-17-86

Widening from SL to DL in Km 0/0-5/0 and improvements to Km 3/6-5/6 of Dayanur-Velliyankadu road

3960098. AS / TS / RAS:

3,96,00 95 3,56,00 3,95,05 ...

CRF-TN-2016-17-93

15

Page 18: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Widening from SL to IL in Km 0/0-4/6 and improvements to Km 0/0-3/8 Velliyankadu -Athimathayanur road

3960099.

Coimbatore (NH)Division

AS / TS / RAS:

3,96,00 1,04 2,82,00 3,94,96 ...

CRF-TN-2016-17-94

Widening from SL to IL in Km.1/0-9/6 and improvements to Km.7/8-9/6 of Annur - Othimalai road

29700100. AS / TS / RAS:

2,97,00 75 1,00,00 2,96,25 ...

CRF-TN-2016-17-124

Widening from IL to DL Km.2/2-9/8 and Improvements in Km 2/2-9/0 of Thudiyalur - Maruthamalai road

65000101. AS / TS / RAS:

6,50,00 5,34,98 1 ... ...

CRF-TN-2015-870, dt.14.05.15

Construction of High Level bridge across Bhavani river in between Periakodivery & Akkarai Kodiveri including construction of bridge across Arakkankottai & Thadapalli canal connecting two Major District Roads.

132000102. AS / TS / RAS:

13,20,00 10,66,13 1 2,50,00 ...

CRF-TN-2013-816, dt: 13.11.2013

Improvements including providing paved shoulders in Km 8/6-17/4 of Erode - Perundurai - Kangeyam road

225000103. AS / TS / RAS:

22,50,00 19,06,96 1 6,04 ...

CRF-TN-2015-887, dt.14.05.15

Widening from SL to DL and Improvements to Km 0/0 - 12/0 of branching road from Km 58/6 of Erode - Karur Road and join in Km 282/6 & NH 7 (Via.) Attor - Moorthypalayam - Nanaparappu Road including construction of CD works

89940104. AS / TS / RAS:

8,99,40 ... ... 50,00 75,00

CRF-TN-2017-18-32

Improvements in km 10/0 - 22/0, 24/0-29/0 of Coimbatore Anaikatty road. (SH 164)

117000/ 120500105. AS / TS / RAS:

12,05,00 9,34,08 1 ... ...

CRF-TN-2015-877, dt.14.05.15

16

Page 19: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Construction of Highlevel Bridge in lieu of Damaged Bridge at Km 5/2 of Pollachi Palaghat road

25000106.

Coimbatore (NH)Division

AS / TS / RAS:

2,50,00 2,30,04 1 5,00 ...

CRF-TN-2015-878, dt.14.05.15

Widening from SL to DL and Improvements in Km. 0/0 – 8/8 of Vijayamangalam - Thingalore road.

77250107. AS / TS / RAS:

7,72,50 5,67,28 1 ... ...

CRF-TN-2015-879, dt.14.05.15

Widening to paved shoulders and improvements to Km.39/4-52/8 of Sathy - Athani - Bhavani road

98000/ 107600108. AS / TS / RAS:

10,76,00 5,52 5,00,00 10,70,48 ...

CRF-TN-2016-17-87

Road safety measures at Km.13/4 (&) 6, 15/4 (&) 6, 37/10 & 38/2 of Udhagai - Kothagiri Sathy Gobi Erode Road (Road Safety)

17800109. AS / TS / RAS:

1,78,00 1,29 50,00 1,76,71 ...

CRF-TN-2016-17-90

Widening and Improvements from Km 39/0-51/560 of Erode-Perundurai-Kangeyam road

134700110. AS / TS / RAS:

13,47,00 3,99 13,07,00 10,00,00 3,43,01

CRF-TN-2016-17-143

Widening and Improvements from 20/0-26/4 of Tiruppur-Kangeyam Road

103018111. AS / TS / RAS:

10,30,18 3,27 10,04,00 8,00,00 2,26,91

CRF-TN-2016-17-123

Widening from SL to IL and improvements in Km. 16/4 - 21/6 of Periyapatty - Negamam (via) Ammapatty road

38000112. AS / TS / RAS:

3,80,00 3,24,55 1,00 ... ...

CRF-TN-2015-883, dt.14.05.15

17

Page 20: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Widening from SL to IL and improvements to Km.7/0-9/350 of Seripalayam-Thamaraikulam road

29700113.

Coimbatore (NH)Division

AS / TS / RAS:

2,97,00 75 2,57,00 2,96,25 ...

CRF-TN-2016-17-95

Construction of Retaining wall at Km.8/6 and 11/4 of Sitharevu - Chinnalapatti road

2357114.

Madurai(NH) Division

AS / TS / RAS:

23,57 ... 10,00 23,57 ...

CRF-TN-2016-17-132

Providing Road Safety measures in in km 0/0-2/0, 7/0-15/4 of Thirumangalam- Pallapatti - Silukuvarpatti road inlcuding CD works and construction of retaining wall

16032115. AS / TS / RAS:

1,60,32 12 1,50,00 1,60,20 ...

CRF-TN-2016-17-103

Widening from IL to DL and Improvements in km 0/0-7/2 of Thayamangalam road.

75117116. AS / TS / RAS:

7,51,17 ... 7,90,00 7,48,06 ...

CRF-TN-2016-17-99

Widening from Single lane to Intermediate lane of Vedasandur - Kovilur road from Km. 0/0 - 17/935 including Reconstruction / Widening of Culverts.

46500117. AS / TS / RAS:

4,65,00 ... ... 65,00 4,00,00

CRF-TN-2017-18-22

Widening from SL to IL in Km 0/0-16/210 & improvements in Km 0/0 -2/0, 2/4-4/6 & 15/0-15/900 of Thanjakoor-Thiruppuvanam- Pulvaikkarai road and including reconstruction of 14 culverts.

88897118. AS / TS / RAS:

8,88,97 81,25 1,00 8,07,72 ...

CRF-TN-2015-881, dt.14.05.15

Strengthening from Km 0/0-18/0 of Manjanaickenpatti-Kallimandayam Road

108000119. AS / TS / RAS:

10,80,00 ... ... 25,00 7,15,03

CRF-TN-2017-18-39

18

Page 21: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Widening IL to DL and Strengthening in Km 8/300 - 18/900 of Thummakkundu- Ulaipatti road including CD works and construction of retaining wall

88319120.

Madurai(NH) Division

AS / TS / RAS:

8,83,19 ... 9,10,00 3,87,20 4,95,99

CRF-TN-2016-17-97

Strengthening in Km.5/7-14/0 of Sitharevu - Chinnalapatty road

38351121. AS / TS / RAS:

3,83,51 3,06 3,78,00 3,80,45 ...

CRF-TN-2016-17-127

Providing Paved shoulder and Improvements in Km0/0-2/0 & 7/0- 11/5 of Thirumangalam-Pallapatti-Silukuvarpatti road including CD works

74540122. AS / TS / RAS:

7,45,40 5 7,35,00 7,45,35 ...

CRF-TN-2016-17-148

Strengthening in Km.17/0-19/0 of Thadikombu-Pallapatty - Aravakuruchi road

10700/ 10379123. AS / TS / RAS:

1,03,79 1 40,00 1,03,78 ...

CRF-TN-2016-17-100

Widening from SL to DL in Km 3/0-11/0 & IL to DL in Km 0/0-3/0 and Strengthening in km.0/0- 3/0, 5/0-8/0, 9/0-11/0 of Kopperimadam – Athankarai road

141700124. AS / TS / RAS:

14,17,00 12,36,28 1 ... ...

CRF-TN-2015-861 dt.14.05.15

Construction of Retaining wall at Km 1/4 (both side), 1/6 (both side), 4/2(R/S), 4/6 (L/S) of Puthendal to Earwadi in km 0/0-18/8 of NH 49

18142125. AS / TS / RAS:

1,81,42 64 1,63,00 1,80,78 ...

CRF-TN-2016-17-102

Improvements in Km 9/715-14/490 of Kallupatti-Virudhunagar including CD works and Construction of Retaining wall

74764126. AS / TS / RAS:

7,47,64 63 7,60,00 7,47,01 ...

CRF-TN-2016-17-144

19

Page 22: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements to Km 10/0-30/0 of Thalaiyuthu-Kallimandayam-Edayakottai road including Reconstruction of culverts and Reconstruction of Retaining wall

132000127.

Madurai(NH) Division

AS / TS / RAS:

13,20,00 ... ... 50,00 5,75,00

CRF-TN-2017-18-21

Widening and Strengthening from Km 0/0-10/0 of Ramanathapuram-Keelakkarai road to Rengunathapuram road

100000128. AS / TS / RAS:

10,00,00 ... ... 50,00 4,75,00

CRF-TN-2017-18-20

Widening from SL to IL in Km 9/8-21/6 and Strengthening in Km 9/8 -18/4, 21/4- 21/6 of Peraiyur - Perunazhi - Vilathikulam road.

124500129. AS / TS / RAS:

12,45,00 11,27,47 1 1,17,53 ...

CRF-TN-2015-862 dt.14.05.15

Providing paved shoulder and improvements in Km 80/8- 89/896 of Ramanathapuram - Nainarkoil - Andakudi - Elayankudi - Sivagangai - Melur road including widening of culverts

132000130. AS / TS / RAS:

13,20,00 11,29,21 1 1,90,79 ...

CRF-TN-2015-871, dt.14.05.15

Improvements to Km 7/4-21/0 of Kokkulam-Uthappanaikanur road

150000131. AS / TS / RAS:

15,00,00 ... ... 50,00 14,50,00

CRF-TN-2017-18-40

Improvements in Km 3/0 - 19/0 of Melur -Seikkipatti (Via Samuthirapatti) including CD works and construction of retaining wall

92349132. AS / TS / RAS:

9,23,49 64 9,60,00 9,22,85 ...

CRF-TN-2016-17-96

Improvements in Km.21/6-28/6 of Uppur - Kottaiyur road

52000/ 52524133. AS / TS / RAS:

5,25,24 2,31 4,80,00 5,22,93 ...

CRF-TN-2016-17-130

20

Page 23: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Widening and Strengthening from Km 2/0-11/0 & Km 13/0-16/0. of Puthendal to Earwadi road

145000134.

Madurai(NH) Division

AS / TS / RAS:

14,50,00 ... ... 50,00 6,75,00

CRF-TN-2017-18-17

Providing Road Safety measures in Thayamangalam road km 0/0-7/2 (Construction of Breast wall and Retaining wall)

15000/ 15402135. AS / TS / RAS:

1,54,02 1,01 1,10,00 1,53,01 ...

CRF-TN-2016-17-101

Widening and Strengthening Kalukoorani - Palankulam road from Km 0/0-8/4

93672136. AS / TS / RAS:

9,36,72 3,29 9,65,00 9,33,43 ...

CRF-TN-2016-17-98

Strengthening in Km 0/1 - 3/4 of Mettur - Palakkanuthu - Oddanchatram - Dharapuram - Thiruppur Road

15694137. AS / TS / RAS:

1,56,94 2,91 1,37,00 1,54,03 ...

CRF-TN-2016-17-119

Providing Paved shoulder and Improvements in Km43/8-54/2 of Ramanathapuram-Nainarkoil-Andakudi-Elayangudi-Sivagangai-Melur road including CD works and protective work

95325138. AS / TS / RAS:

9,53,25 3,35 9,60,00 9,49,90 ...

CRF-TN-2016-17-145

Strengthening of Trichy - Namakkal Road km.25/0-27/0, 45/0-46/0 , 56/0-58/0.

50000 /51900139.

Thanjavur (NH) Division

AS / TS / RAS:

5,19,00 4,32 4,60,00 5,14,68 ...

CRF-TN-2016-17-107

Strengthening of Grand anaicut Cauverypattinam road Km 96/0-100/2

40000/ 41600140. AS / TS / RAS:

4,16,00 10 3,60,00 4,15,90 ...

CRF-TN-2016-17-108

21

Page 24: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Formation of Byepass road to Myladuthurai Town

141600141.

Thanjavur (NH) Division

AS / TS / RAS:

14,16,00 ... 1,31,85 ... ...

CRF-TN-2011-758,

Strengthening from Km 1/6 – 16/8 of Left Bank of work Vennar - Palliagraharam -Kalanchery road

409220142. AS / TS / RAS:

40,92,20 ... ... 50,00 19,75,00

CRF-TN-2017-18-38

Strengthening from Muthupet-Voimedu road Km 4/0-11/0

60000/ 60600143. AS / TS / RAS:

6,06,00 11 5,60,00 6,05,89 ...

CRF-TN-2016-17-147

Improvements in Km 1/2-8/0 of Velankanni - Vedaranyam road Including Reconstruction of culvert and protective works. (M737).

52000144. AS / TS / RAS:

5,20,00 4,12,33 1,00 ... ...

CRF-TN-2015-872, dt.14.05.15

Strengthening of Mannargudi - Sethubavachatram road Km.0/0 - 7/0

84000145. AS / TS / RAS:

8,40,00 29 8,00,00 3,00,00 5,39,71

CRF-TN-2016-17-126

Improvements to black spot at Km 58/4 of Thanjavur - Mannargudi - Muthupet road (SH 202)junction with Nagore - Nagapattinam - Tuticorin - Ramanathapuram (SH 200) road.

18000/ 19800146. AS / TS / RAS:

1,98,00 11 1,40,00 1,97,89 ...

CRF-TN-2016-17-109

Strengthening of Mayiladuthurai-Thiruthuraipoondi road Km 60/0-68/4

100000147. AS / TS / RAS:

10,00,00 37 6,00,00 9,99,63 ...

CRF-TN-2016-17-146

22

Page 25: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Junction Improvements to at Km.62/2 of Thanjavur - Mannargudi - Thiruthuraipoondi - Vedaranyam - Kodiakkarai road

18000/ 19536148.

Thanjavur (NH) Division

AS / TS / RAS:

1,95,36 6 1,40,00 1,95,30 ...

CRF-TN-2016-17-111

Widening from SL to IL and rebuilding Irugalur - Senganthi road from km 0/0 - 10/60

97500/ 106900149. AS / TS / RAS:

10,69,00 4,46 5,00,00 5,00,00 5,64,54

CRF-TN-2016-17-106

Strengthening Grand Anaicut - Cauveripattinam Road Km 15/4-32/4

129000/ 134200150. AS / TS / RAS:

13,42,00 42 12,50,00 13,41,58 ...

CRF-TN-2016-17-104

Strengthening of Thanjavur - Pattukottai - Aranthangi - Karaikkudi - Kallal - Kalaiyarkoil - Maravamangalam - Ilayankudi - Paramakudi - Mudukulathur - Sayalkudi Road at Km 11/4 - 18/4

62000/ 63300151. AS / TS / RAS:

6,33,00 ... 5,80,00 6,32,85 ...

CRF-TN-2016-17-105

Junction at Km 75/4 & 75/6 of Perambalur - Manamadurai Road

6000/6510152. AS / TS / RAS:

65,10 3 20,00 65,07 ...

CRF-TN-2016-17-131

Junction at Km 87/6 & 87/8 of Nagai - Gudalur - Mysore Road

6000/ 6600153. AS / TS / RAS:

66,00 3 20,00 65,97 ...

CRF-TN-2016-17-134

Strengthening from Km 24/8- 37/0 & 38/4-47/8 of Kumbakonam - Mannargudi - Adirampattinam road

259240154. AS / TS / RAS:

25,92,40 ... ... 50,00 9,75,00

CRF-TN-2017-18 -28

23

Page 26: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Junction at Km 4/6 of Thanjavur - Vallam Road

7000/ 7364155.

Thanjavur (NH) Division

AS / TS / RAS:

73,64 4 20,00 73,60 ...

CRF-TN-2016-17-128

Strengthening in Km 2/0-8/0,9/0-9/2,10/2-10/4,11/4-12/0, 13/0-14/6, 17/0-20/4, 25/0-29/6 of Rajapalayam-Vembakottai Road

130000156.

Tirunelveli (NH) Division

AS / TS / RAS:

13,00,00 4,13 12,60,00 6,00,00 6,95,87

CRF-TN-2016-17-66

Widening and Strengthening from Km 0/0-13/8 of Idaikal – Sendamaram road including CD works.

120000157. AS / TS / RAS:

12,00,00 ... ... 50,00 1,90,00

CRF-TN-2017-18-16

Road safety works in Km.101/6 of SH 43

3500158. AS / TS / RAS:

35,00 92 10,00 34,08 ...

CRF-TN-2016-17-115

Strengthening in Km 12/0-15/0, 22/0-23/0, 28/0-29/4 and 31/8-37/4 of Watrap – Maharajapuram – Azhagapuri – Virudhunagar road.

105270159. AS / TS / RAS:

10,52,70 ... ... 50,00 1,60,50

CRF-TN-2017-18-15

Widening from SL – IL Km 0/0-17/0 and improvement to Km 0/0-4/6, 6/0-8/0, 11/0-14/0, 15/0-17/0 of Radhapuram – Idayankudi road including CD works.

105000160. AS / TS / RAS:

10,50,00 ... ... 50,00 1,60,00

CRF-TN-2017-18-19

Road Safety works in Km.129/4 of SH 40

7500161. AS / TS / RAS:

75,00 1,86 10,00 73,14 ...

CRF-TN-2016-17-69

24

Page 27: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Widening & Strengthening of Tenkasi -Sundarapandipuram road in Km.0/0-9/2 including CD works

100000162.

Tirunelveli (NH) Division

AS / TS / RAS:

10,00,00 25 6,00,00 4,00,00 5,95,30

CRF-TN-2016-17-112

Widening and Strengthening from Km 0/0-18/120 of Sankarankovil – Vasudevanallur road in including CD works

160000163. AS / TS / RAS:

16,00,00 ... ... 50,00 2,70,00

CRF-TN-2017-18-18

Widening from IL to DL including improvements from Km 0/0-9/0& 10/700-14/800 except improvements from km12/0 - 13/20 of Krishnan kovil Koomapatti road including CD works

100000164. AS / TS / RAS:

10,00,00 3,17 5,71,80 9,96,83 ...

CRF-TN-2016-17-65

Widening and Strengthening of road branching from Km 112/2 of NH 208 to Sambavarvadakarai road in Km 0/0-8/6 including CD works.

80000165. AS / TS / RAS:

8,00,00 ... ... 50,00 1,10,00

CRF-TN-2017-18-37

Widening from IL to DL and improvements in Km 8/0-31/550 of Sattur -Thiruvengadapuram Road including CD works

179000166. AS / TS / RAS:

17,90,00 6,01 17,50,00 6,00,00 10,43,99

CRF-TN-2016-17-68

Widening and Strengthening of Surandai - Sendamaram road via Anaikulam in Km.14/2-23/2 including CD works

100000167. AS / TS / RAS:

10,00,00 41 6,00,00 9,99,59 ...

CRF-TN-2016-17-67

Improvements to Km 0/0-2/0 of Manjalumoodu market road

8400168.

Nagercoil (NH) Division

AS / TS / RAS:

84,00 ... ... 25,00 59,00

CRF-TN-2017-18-06

25

Page 28: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements in Km 0/0 - 2/1 of Kumaracoil road

13300169.

Nagercoil (NH) Division

AS / TS / RAS:

1,33,00 96,61 1 ... ...

CRF-TN-2015-849 dt.14.05.15

Improvements in Km 0/0 -4/0 of Perumsilambu road ODR

17500170. AS / TS / RAS:

1,75,00 1,64,19 ... 2,00 ...

CRF-TN-2015-16-859

Improvements to Km 4/0 - 6/8 of Marthandam - Karungal road

18800171. AS / TS / RAS:

1,88,00 ... ... 25,00 1,63,00

CRF-TN-2017-18-01

Strengthening in Km 0/0 - 3/6 of Marthandam - Karungal road MDR 250

17000172. AS / TS / RAS:

1,70,00 1,54,02 ... 2,00 ...

CRF-TN-2015-826

Strengthening in Km 2/0 - 3/0, 6/1 - 8/1 of Kottar - Dharmapuram road MDR 187

16500173. AS / TS / RAS:

1,65,00 1,30,61 ... 2,00 ...

CRF-TN-2015-825

Improvements to Km 0/0-2/2 of Kuzhivilai - Vilacheri road

15000174. AS / TS / RAS:

1,50,00 ... ... 25,00 1,25,00

CRF-TN-2017-18-03

Improvements to Mulagumoodu - Colachel Road Km 1/0 - 2/0.

4990175. AS / TS / RAS:

49,90 42 12,00 49,40 ...

CRF-TN-2016-17-07

26

Page 29: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements in Km 0/0 - 3/6 of Muttam - Kadiapattanam - Manavalakurichi road

11800176.

Nagercoil (NH) Division

AS / TS / RAS:

1,18,00 95,35 1 4,00 ...

CRF-TN-2015-852 dt.14.05.15

Strengthening in Km 223/030 - 226/275 of abandoned NH road (NH7) (Anjugramam) SH

19990177. AS / TS / RAS:

1,99,90 1,61,40 ... 2,00 ...

CRF-TN-2015-819

Improvements in Km 0/0 - 3/0 of Eraniel Chattram - Kalkurichy road

9000178. AS / TS / RAS:

90,00 83,47 ... 1,00 ...

CRF-TN-2015-851

Improvements to Km 6/0-8/2 of old veeranamangalam road.

20000179. AS / TS / RAS:

2,00,00 ... ... 25,00 1,75,00

CRF-TN-2017-18-05

Improvements in Km 0/0 - 2/9 of Pottalkulam - Azhagappapuram road ODR

8000180. AS / TS / RAS:

80,00 73,98 ... 1,00 ...

CRF-TN-2015-846

Improvements in Km 0/0 - 2/0 of Peruvilai road ODR

7300181. AS / TS / RAS:

73,00 68,14 ... 50 ...

CRF-TN-2015-842

Improvements to Km 11/0-11/5 of Kuzhithurai-Thengaipattinam road

4750182. AS / TS / RAS:

47,50 ... ... 25,00 22,50

CRF-TN-2017-18-02

27

Page 30: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements to Km 0/0-1/8 of Therkkutherivilai -Veerabagubathy road

4713183.

Nagercoil (NH) Division

AS / TS / RAS:

47,13 ... ... 47,13 ...

CRF-TN-2017-18-09

Improvements to Km 9/8-10/0 & 12/2-12/8 of Kuzhithurai-Alancholai-Aarukani road including CD works

4500184. AS / TS / RAS:

45,00 ... ... 25,00 20,00

CRF-TN-2017-18-04

Improvements to Km 0/0-1/0 of Vadiveeswaram-Karuppukatti road( Via ootuvalmadam)

2750185. AS / TS / RAS:

27,50 ... ... 27,50 ...

CRF-TN-2017-18-11

Improvements in Km 0/0 - 1/77 of KM 6/2 of Kottar - Manakudy road to Keezhakattuvilai road ODR

3800186. AS / TS / RAS:

38,00 35,39 ... 1,00 ...

CRF-TN-2015-843

Improvements to Km 0/0-0/7 of Pantivaikal bridge -Rajakkamangalam thurai road

2910187. AS / TS / RAS:

29,10 ... ... 29,10 ...

CRF-TN-2017-18-10

Improvements to Km 2/0-4/0 of Choozal-Nadaikavoo road

11000188. AS / TS / RAS:

1,10,00 ... ... 50,00 60,00

CRF-TN-2017-18-07

Strengthening in Km 0/0 - 5/0 of Eravipudurkadai - Karungal road

22500189. AS / TS / RAS:

2,25,00 1,81,48 1 2,00 ...

CRF-TN-2015-837, dt.14.05.15

28

Page 31: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Strengthening in km 1/0-2/6, 3/2-3/4 & 4/0-10/3 of Anjugramam road

50000190.

Nagercoil (NH) Division

AS / TS / RAS:

5,00,00 3,89,94 1 15,00 ...

CRF-TN-2015-821, dt.14.05.15

Strengthening in Km 0/0 - 3/6 of Eraniel - Rajakkamangalam road

19900191. AS / TS / RAS:

1,99,00 1,68,03 1 ... ...

CRF-TN-2015-822, dt.14.05.15

Strengthening in Km 3/0 - 8/6 of Thuckalay - Thadikarankonam road

18300192. AS / TS / RAS:

1,83,00 1,22,01 1 3,00 ...

CRF-TN-2015-823, dt.14.05.15

Strengthening in Km 0/0 - 6/9 of Swamiyarmadam - Meycode road

32400193. AS / TS / RAS:

3,24,00 2,36,64 1 3,00 ...

CRF-TN-2015-827, dt.14.05.15

Strengthening in Km 0/6- 6/1 & 7/6-10/9 of Derisanamcope - Shurulacode road

39140194. AS / TS / RAS:

3,91,40 2,45,89 1 1,19,00 ...

CRF-TN-2015-828, dt.14.05.15

Strengthening in Km 0/0 - 7/0 & 11/0 - 11/5 of Kuzhithurai - Thenkapattinam road

42800195. AS / TS / RAS:

4,28,00 3,45,98 1 4,00 ...

CRF-TN-2015-829, dt.14.05.15

Strengthening in Km 0/0 -4/0 of Eraniel- Thuckalay road

22000196. AS / TS / RAS:

2,20,00 1,75,17 1 ... ...

CRF-TN-2015-831, dt.14.05.15

29

Page 32: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Strengthening in Km 5/0 - 9/6 of Eraniel - Muttom road

25700197.

Nagercoil (NH) Division

AS / TS / RAS:

2,57,00 1,77,11 1 3,00 ...

CRF-TN-2015-832, dt.14.05.15

Improvements in Km 0/0 - 3/6 of Thoovachi road ODR

18600198. AS / TS / RAS:

1,86,00 1,53,75 ... 2,00 ...

CRF-TN-2015-847

Strengthening in Km 0/0 - 2/8 of Lakshmipuram - Mandaikkadu road

15800199. AS / TS / RAS:

1,58,00 1,21,87 1 2,00 ...

CRF-TN-2015-836, dt.14.05.15

Strengthening in Km 0/0 - 4/0, 10/8 - 17/0, 20/8 - 21/2, 36/6 - 40/0 , 44/0 - 45/0 of Aralvoimozhi - Nedumangadu road

89800200. AS / TS / RAS:

8,98,00 6,79,95 1 15,00 ...

CRF-TN-2015-817, dt.14.05.15

Widening from SL to IL and Improvements in Km 0/0-5/1 of Kumarapuram road

33900201. AS / TS / RAS:

3,39,00 2,90,38 1 6,00 ...

CRF-TN-2015-838, dt.14.05.15

Improvements in Km 0/0-5/7 of Mankuzhi road

22500202. AS / TS / RAS:

2,25,00 ... 1 ... ...

CRF-TN-2015-839, dt.14.05.15

Improvements in Km 0/0-5/17 of Keralapuram - Kuzhicode road

15000203. AS / TS / RAS:

1,50,00 1,26,94 1 3,00 ...

CRF-TN-2015-840 dt.14.05.15

30

Page 33: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements in Km 0/0 - 3/6 of Kottaram - Agasteeswaram road to Samathanapuram road ODR

12000/ 12600204.

Nagercoil (NH) Division

AS / TS / RAS:

1,26,00 99,72 ... 1,00 ...

CRF-TN-2015-845

Strengthening in Km 0/0 - 6/0 & 8/0-10/0 of Kuzhithurai -Alancholai - Arukani road MDR 941

48000205. AS / TS / RAS:

4,80,00 3,72,90 ... 5,00 ...

CRF-TN-2015-820

Strengthening in Km 3/8 - 11/2 of Mulagumoodu - Cholachal road MDR

30200206. AS / TS / RAS:

3,02,00 2,41,60 ... 1,00 ...

CRF-TN-2015-834

Strengthening in Km 2/0 - 7/0 of Santhapuram road MDR

26100207. AS / TS / RAS:

2,61,00 2,10,80 ... 2,00 ...

CRF-TN-2015-833

Strengthening in Km 4/0 - 7/6 of Kottar - Manakudy road MDR 188

21500208. AS / TS / RAS:

2,15,00 1,97,95 ... 4,00 ...

CRF-TN-2015-824

Strengthening in Km 0/0 - 5/0 of Maycode - Kulasekaram road

19990209. AS / TS / RAS:

1,99,90 1,71,71 1 2,00 ...

CRF-TN-2015-835, dt.14.05.15

Improvements to Km 4/4 of Mangadu road to Nadaikavoo road km 0/0 - 3/0

10100210. AS / TS / RAS:

1,01,00 43 40,00 1,00,50 ...

CRF-TN-2016-17-22

31

Page 34: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements to Kadambanvilai road Km.0/0-1/310

4520211.

Nagercoil (NH) Division

AS / TS / RAS:

45,20 58 7,00 44,60 ...

CRF-TN-2016-17-39

Improvements to Parakkani - Harijan colony road Km.0/0-2/0

5700212. AS / TS / RAS:

57,00 50 17,00 56,50 ...

CRF-TN-2016-17-36

Improvements to Mathempalai -Karumanoor -Parsuvaikkal road km 0/0-1/6

6440213. AS / TS / RAS:

64,40 40 20,00 64,00 ...

CRF-TN-2016-17-24

Improvements to Mangadu road km.4/0-5/0 and 6/6 -8/0

6550214. AS / TS / RAS:

65,50 58 25,00 64,90 ...

CRF-TN-2016-17-34

Improvements to Thaiyalumoodu check post to Annaikarai Uthayanoor road Km 0/0 - 2/0

6700215. AS / TS / RAS:

67,00 51 20,00 66,49 ...

CRF-TN-2016-17-21

Improvements to Asaripallam-Mela Asaripallam Road Km 0/0-1/4

7900216. AS / TS / RAS:

79,00 32 83,00 78,60 ...

CRF-TN-2016-17-47

Improvements to Thenghamputhoor - Parakkai Kulakkarai Road Km 0/0 - 1/6

8100217. AS / TS / RAS:

81,00 36 40,00 80,60 ...

CRF-TN-2016-17-11

32

Page 35: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements to Parappu - Pootetty -Keezhkulam Pidagai Road Km 0/0-2/4 including drainage

8139218.

Nagercoil (NH) Division

AS / TS / RAS:

81,39 52 40,00 80,80 ...

CRF-TN-2016-17-27

Improvements to Manjalumoodu - Mookuttukal - Keezhamangcode road km 2/0 - 5/2

8750219. AS / TS / RAS:

87,50 53 35,00 86,90 ...

CRF-TN-2016-17-19

Improvements to Melpalai - Tholadi road km 0/0-2/7 including reconstruction of culvert at Km 0/8.

8900220. AS / TS / RAS:

89,00 ... 40,00 88,40 ...

CRF-TN-2016-17-23

Improvements to Thalakulam road Km 0/0 - 1/0

8950221. AS / TS / RAS:

89,50 37 40,00 89,10 ...

CRF-TN-2016-17-16

Improvements to Vattakottai - Arnsi road Km.4/0-6/0

5550222. AS / TS / RAS:

55,50 43 17,00 55,00 ...

CRF-TN-2016-17-35

Improvements to Choozhal - Nadaikavoo road km 0/0 - 2/0

9700223. AS / TS / RAS:

97,00 37 40,00 96,60 ...

CRF-TN-2016-17-20

Improvements to Panavilai - Alanchi Road Km 0/0 - 1/6.

5500224. AS / TS / RAS:

55,00 37 15,00 54,60 ...

CRF-TN-2016-17-17

33

Page 36: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements to Mullanginavillai-Tholayavattai-Kanancheri road km 3/0-6/2

11100225.

Nagercoil (NH) Division

AS / TS / RAS:

1,11,00 1,62 71,00 1,09,30 ...

CRF-TN-2016-17-18

Improvements to Devicode -Erukkalampadu Harijan colony Road km 0/0-2/2 and providing hard bed at Km 0/6.

11150226. AS / TS / RAS:

1,11,50 52 25,00 1,10,90 ...

CRF-TN-2016-17-25

Improvements to Soorangudi - Pillayarpuram Road Km 0/0 - 3/7

15750227. AS / TS / RAS:

1,57,50 1,27 1,18,00 1,56,20 ...

CRF-TN-2016-17-10

Improvements to Thiruvattar - Thirparappu Road Km 0/0 - 3/7

16500228. AS / TS / RAS:

1,65,00 1,56 1,25,00 1,63,40 ...

CRF-TN-2016-17-06

Widening and Improvements to Tap road connecting Monday Market - Thiruvattar Road and Marthandam - Pechipparai Road Km 0/0 - 3/9

19266229. AS / TS / RAS:

1,92,66 1,30 1,92,20 1,91,30 ...

CRF-TN-2016-17-12

Improvements to Thuckalay - Thadikarankonam Road Km 0/0 - 5/2

28500230. AS / TS / RAS:

2,85,00 1,46 2,93,00 2,83,50 ...

CRF-TN-2016-17-05

Widening & Strengthening SL - IL of Padmanabhapuram - Mekkamandapam Road Km 0/0 - 4/7.

30700231. AS / TS / RAS:

3,07,00 1,08 2,67,00 3,05,90 ...

CRF-TN-2016-17-14

34

Page 37: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Widening from Km 3/7-5/0 and Improvements from Km. 0/2-5/1 including reconstruction of culverts at Km. 3/10, 4/4 and Construction of Retaining wall at Km. 4/6 and widening of culvert at Km 3/8 of Marungoor road.

37075232.

Nagercoil (NH) Division

AS / TS / RAS:

3,70,75 1,12 2,00,00 3,69,60 ...

CRF-TN-2016-17-08

Improvements to Marthandam- Panachamoodu road at km 1/0 - 7/2 and 11/0 - 11/2

39500233. AS / TS / RAS:

3,95,00 1,76 4,22,00 3,93,20 ...

CRF-TN-2016-17-04

Improvements to Marthandam - Pechipparai Road Km 3/2 - 6/0, 7/0 - 10/0, 13/0 - 16/4.

48400/ 49800234. AS / TS / RAS:

4,98,00 1,27 4,44,00 4,96,70 ...

CRF-TN-2016-17-03

Improvements to Colachel - Thiruvattar Road Km 4/2 - 7/4, 8/4 - 11/0, 14/4 - 18/4.

55800235. AS / TS / RAS:

5,58,00 8,17 5,24,00 5,49,80 ...

CRF-TN-2016-17-01

Rebuilding of Mondaymarket - Manavalakurichi (Via) Mankuzhi Road from Km 2/7 - 5/7 including construction of drain.

73200236. AS / TS / RAS:

7,32,00 8,42 6,92,00 7,23,50 ...

CRF-TN-2016-17-33

Improvements to Saral-Orappanavilai road Km 0/8-2/0

9100237. AS / TS / RAS:

91,00 45 40,00 90,50 ...

CRF-TN-2016-17-43

Improvements to Devicode - Chettivilai Road km 0/0-1/2

3270238. AS / TS / RAS:

32,70 54 20,00 32,10 ...

CRF-TN-2016-17-28

35

Page 38: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements in Km 0/0 - 3/0 of Kaliyangadu road

19200239.

Nagercoil (NH) Division

AS / TS / RAS:

1,92,00 ... 1 2,00 ...

CRF-TN-2015-860 dt.14.05.15

Improvements in Km 0/0 - 2/6 of Melangalam road

8000240. AS / TS / RAS:

80,00 66,22 3,02 ... ...

CRF-TN-2015-858 dt.14.05.15

Improvements in Km 0/0 - 3/3 of Charukkai road

11500241. AS / TS / RAS:

1,15,00 85,53 1 1,00 ...

CRF-TN-2015-857 dt.14.05.15

Improvements in Km 0/0 - 3/0 of Maruthencode road

18700242. AS / TS / RAS:

1,87,00 1,62,20 1 1,00 ...

CRF-TN-2015-856 dt.14.05.15

Improvements in Km 0/0 - 4/1 of Kulasekaram - Thiruvarampu road

18500243. AS / TS / RAS:

1,85,00 1,51,39 1 ... ...

CRF-TN-2015-855 dt.14.05.15

Improvements in Km0/0-2/1 of Manalikkarai Branch road

6400244. AS / TS / RAS:

64,00 62,86 5,34 ... ...

CRF-TN-2015-854 dt.14.05.15

Improvements to Mundavilai-Marankonam Road Km 0/0-1/0

2550245. AS / TS / RAS:

25,50 33 10,00 25,00 ...

CRF-TN-2016-17-45

36

Page 39: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements to Thazhakkanvilai - Mankuzhi road Km.0/0-1/0

2610246.

Nagercoil (NH) Division

AS / TS / RAS:

26,10 43 20,00 25,67 ...

CRF-TN-2016-17-41

Improvements to Athencode - Charappazhinji road Km.0/0-1/2

2650247. AS / TS / RAS:

26,50 42 20,00 26,00 ...

CRF-TN-2016-17-40

Improvements to Vattakottai - Pilankannuvilai road km 0/0 - 0/8

2860248. AS / TS / RAS:

28,60 40 15,00 28,20 ...

CRF-TN-2016-17-32

Improvements to Mangadu-Vavarai road Km 0/0-1/2

3040249. AS / TS / RAS:

30,40 41 5,00 29,99 ...

CRF-TN-2016-17-26

Improvements to Unnamalaikadai - Thatchanvilagham road Km 0/0 - 2/0

5700250. AS / TS / RAS:

57,00 66 25,00 56,30 ...

CRF-TN-2016-17-30

Improvements to Kavoomadam-Konamkadu Road Km 0/0-1/2

3200251. AS / TS / RAS:

32,00 39 20,00 31,60 ...

CRF-TN-2016-17-44

Construction of Bypass to Suchindram town (branching at Km.639/820 and joining at Km.643/6 of NH 47)

245000252. AS / TS / RAS:

24,50,00 4,13,49 1 15,00,00 3,64,45

CRF-TN-2015-892 dt.14.05.15

37

Page 40: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements to Parasery - Colachel Road to Konamkadu Road Km 0/0 - 1/260.

3300253.

Nagercoil (NH) Division

AS / TS / RAS:

33,00 39 20,00 32,60 ...

CRF-TN-2016-17-15

Improvements to Rajakkamangalam-Eathamozhi Road to Nasuvanvilai Road Km 0/0-1/2

3400254. AS / TS / RAS:

34,00 41 20,00 33,40 ...

CRF-TN-2016-17-48

Improvements to Mangarai - Thazhakkanvilai road Km.0/0-1/4

3450255. AS / TS / RAS:

34,50 54 2,00 33,96 ...

CRF-TN-2016-17-38

Improvements to Sangai-Kottakam road Km0/0-1/2

3500256. AS / TS / RAS:

35,00 54 20,00 34,46 ...

CRF-TN-2016-17-42

Improvements to Pullipanam-Valvachagostam Road Km 0/0-1/4

3600257. AS / TS / RAS:

36,00 42 8,00 35,50 ...

CRF-TN-2016-17-46

Improvements to Kadetti Harijan colony road km 0/0 - 1/2

4200258. AS / TS / RAS:

42,00 46 9,00 41,50 ...

CRF-TN-2016-17-09

Improvements to Thuckalay - Thiruvithancode Road Km 0/0 - 1/0 & 2/0 - 2/7.

4356259. AS / TS / RAS:

43,56 3,70 3,60 43,19 ...

CRF-TN-2016-17-13

38

Page 41: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

800 Other Expenditure

SA Revamped Central Road Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 800 SA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 05 800 SA 16 04( DPC )

Improvements to Km 0/0-1/0 of Christober nagar road

2710260.

Nagercoil (NH) Division

AS / TS / RAS:

27,10 ... ... 27,10 ...

CRF-TN-2017-18-08

Improvements to Mundavilai - Vellivilagam road Km.0/0-1/6

4700/ 4900261. AS / TS / RAS:

49,00 68 7,00 48,32 ...

CRF-TN-2016-17-37

Strengthening in Km 0/0- 1/0, 1/6- 4/2, 11/0-23/9 of Colachel - Thiruvattur road (SH 180)

87590262. AS / TS / RAS:

8,75,90 6,80,41 ... 22,00 ...

CRF-TN-2015-818

Improvements to Mootuvilai road (via) Moontrumugam road km 0/0-1/2

5500263. AS / TS / RAS:

55,00 55 15,00 54,40 ...

CRF-TN-2016-17-29

Improvements to Aralvoimozhi - Nedumangadu Road Km 34/0 - 34/6

5500264. AS / TS / RAS:

55,00 35 16,00 54,60 ...

CRF-TN-2016-17-02

Improvements to Venkanji - Vallavilai road km 0/0 - 1/0

3200265. AS / TS / RAS:

32,00 47 20,00 31,50 ...

CRF-TN-2016-17-31

Improvements in Km 0/0 - 3/2 & 0/0 - 1/2 of Link road to Vembathoor Harijan colony road and Beemanagari Harijan colony road

12300266. AS / TS / RAS:

1,23,00 94,93 1 2,00 ...

CRF-TN-2015-848 dt.14.05.15

1,334,82,94 275,46,14 500,00,00 600,00,00 800,00,005054 05 800 SATOTAL -

39

Page 42: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JS Road Works under Bharath Nirman

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JS

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 80 800 JS 16 06( DPC )

Bharat Nirman Phase I (2006-2007) Additional allotment for additional expenditure accorded by State Government of Tamilnadu.

1364001. AS / TS / RAS:

13,64,00 7,57,03 8,83 60,37 ...

G.O. Ms. No.295, 34, 124 & 14, Highways & Minor Ports (HV2) Dept, dt 08.12.2008, 28.02.09, 06.07.09 & 18.01.10 respectively

Bharat Nirman Phase V Additional allotment for additional expenditure accorded by State Government of Tamilnadu.

298002. AS / TS / RAS:

2,98,00 ... ... ... 29,62

G.O. M.S No 90, Rural Development & Panchayat Raj (CGS2) Department, dated 01.8.2016.

Bharat Nirman Phase IV Additional allotment for additional expenditure accorded by State Government of Tamilnadu.

394003. AS / TS / RAS:

3,94,00 ... ... 38,10 49,54

G.O. (D) No.21, Rural Development & Panchayat Raj (CGS2) Department, dated 13.2.2015

Bharat Nirman Phase III Additional allotment for additional expenditure accorded by State Government of Tamilnadu.

2232004. AS / TS / RAS:

22,32,00 1,75,88 4,80,51 4,50,09 6,64,93

G.O. (D) No.116, Rural Development & Panchayat Raj (CGS2) Department, dt.19.3.2013

Bharat Nirman Phase II -Additional allotment for additional expenditure accorded by State Government of Tamilnadu.

241155. AS / TS / RAS:

2,41,15 82,65 14,18 26,02 ...

G.O. Ms. No.200, Highways & Minor Ports (HV2) Dept, dt 07.06.2010

45,29,15 10,15,56 5,03,52 5,74,58 7,44,095054 80 800 JSTOTAL -

40

Page 43: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

UA Works under Economic Importance Scheme

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 UA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 2 Chief Engineer, National Highways

16 Major Works

5054 80 800 UA 16 01( DPC )

G.O.(2D) No.36, HW&MP Dept, Dt.21.12.2017

101. AS / TS / RAS:

10 ... ... 10 ...

10 ... ... 10 ...5054 80 800 UATOTAL -

41

Page 44: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

DEMAND No.21 – HIGHWAYS AND MINOR PORTS DEPARTMENT

21 03. CHIEF ENGINEER

(CONSTRUCTION AND MAINTENANCE) – HIGHWAYS

Page 45: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

4059 CAPITAL OUTLAY ON PUBLIC WORKS

01 Office Buildings

051 Construction

KT Construction of Buildings - Chief Engineer (General) Highways

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]4059 01 051 KT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

4059 01 051 KT 16 04( DPC )

Construction of Trining Centre in the campus of Q.A&R of Highways Department, Guindy, Chennai. G.O.Ms.No.173/H&MP (HF.1) dept/dt.23.10.2013.

1416001.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

14,16,00 12,07,89 1 1 1

Part-II-2013-14

Construction of Combined Highways Office Complex in Chennai for all Chief Engineer in Highways Department

1321292. AS / TS / RAS:

13,21,29 ... 1 1 1

G.O.Ms.No.207, Highways and Minor Ports Department, dated:17-12-2012

Construction of Combined Highways Office Complex in Chennai for all Chief Engineer in Highways Department - Addle.Sanction

2161003. AS / TS / RAS:

21,61,00 21,61,00 1 1 1

Part II.2014-15

The upgradation of Highways Research Station like modernization of library and construction of compound wall at Guindy.

131884. AS / TS / RAS:

1,31,88 ... 1 36,50 1

G.O.Ms.No.134/H&M.P (HF.1) / dt.25.11.2015.

Construction of covered parking shed for Two Advanced Data Collection Equipment (ADCE) vehicles and IT Cell Vehicles

13005. AS / TS / RAS:

13,00 13,00 1 1 1

Part II.2014-15

Construction of Quality Control Sub-Division building at Tiruvallur. (Part.2015-2016)

25006.

Thiuvallur(H) C&M Division

AS / TS / RAS:

25,00 13,02 1 2,53 1

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Quality Control Sub-Division building at Chengalpet. (Part.2015-2016)

25007.

Chengalpattu (H) C&M Division

AS / TS / RAS:

25,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

42

Page 46: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

4059 CAPITAL OUTLAY ON PUBLIC WORKS

01 Office Buildings

051 Construction

KT Construction of Buildings - Chief Engineer (General) Highways

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]4059 01 051 KT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

4059 01 051 KT 16 04( DPC )

Construction of Sub-Division Office and section Office(c&m) Building at Vellore

25008.

Vellore (H) C&M Division

AS / TS / RAS:

25,00 25,00 1 ... ...

Part II.2014-15

Construction of Quality Control Sub-Division building at Vellore. (Part.2015-2016)

25009. AS / TS / RAS:

25,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Quality Control Sub-Division building at Villupuram. (Part.2015-2016)

250010.

Villupuram (H) C&M Division

AS / TS / RAS:

25,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Quality Control Sub-Division and Section Office (c&m) Building at Kallakurichi, Villupuram District..

250011.

Kallakurichi (H) C&M Division

AS / TS / RAS:

25,00 25,00 1 ... ...

Part II.2014-15

Construction of Quality Control Sub-Division building at Cuddalore. (Part.2015-2016)

250012.

Cuddalore (H) C&M Division

AS / TS / RAS:

25,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Traveller's Bungalow at Valangaiman, Tiruvarur district.

350013.

Thiruvarur (H) C&M Division

AS / TS / RAS:

35,00 35,00 1 ... ...

Part II.2014-15

Construction of Traveller's Bungalow at Thalaivasal, Salem district.

350014.

Salem (H) C&M Division

AS / TS / RAS:

35,00 35,00 1 ... ...

Part II.2014-15

43

Page 47: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

4059 CAPITAL OUTLAY ON PUBLIC WORKS

01 Office Buildings

051 Construction

KT Construction of Buildings - Chief Engineer (General) Highways

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]4059 01 051 KT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

4059 01 051 KT 16 04( DPC )

Construction of Quality Control Sub-Division building at Salem. (Part.2015-2016)

200015.

Salem (H) C&M Division

AS / TS / RAS:

20,00 8,33 1 1 1

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Quality Control Division building at Salem. (Part.2015-2016)

500016. AS / TS / RAS:

50,00 32,27 1 1 1

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Quality Control Sub-Division building at Krishnagiri. (Part.2015-2016)

250017.

Krishnagiri (H) C&M Division

AS / TS / RAS:

25,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Quality Control Sub-Division building at Karur. (Part.2015-2016)

200018.

Karur (H) C&M Division

AS / TS / RAS:

20,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Division Office (c&m) Building at Karur

500019. AS / TS / RAS:

50,00 50,00 1 ... ...

Part II.2014-15

Construction of Quality Control Sub-Division building at Erode. (Part.2015-2016)

250020.

Erode (H) C&M Division

AS / TS / RAS:

25,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Quality Control Division building at Madurai. (Part.2015-2016)

500021.

Madurai (H) C&M Division

AS / TS / RAS:

50,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

44

Page 48: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

4059 CAPITAL OUTLAY ON PUBLIC WORKS

01 Office Buildings

051 Construction

KT Construction of Buildings - Chief Engineer (General) Highways

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]4059 01 051 KT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

4059 01 051 KT 16 04( DPC )

Construction of Quality Control Sub-Division building at Madurai. (Part.2015-2016)

200022.

Madurai (H) C&M Division

AS / TS / RAS:

20,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Quality Control Sub-Division building at Ramnad. (Part.2015-2016)

250023.

Ramnad (H) C&M Division

AS / TS / RAS:

25,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Traveller's Bungalow at alankulam.

350024.

Tirunelveli (H) C&M Division

AS / TS / RAS:

35,00 35,00 1 ... ...

Part II.2013-14

Construction of Quality Control Division building at Tirunelveli. (Part.2015-2016)

500025. AS / TS / RAS:

50,00 ... 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Quality Control Sub-Division building at Tirunelveli. (Part.2015-2016)

200026. AS / TS / RAS:

20,00 ... 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Sub-Division Office and section Office(c&m) Building at Oddapidaram, Thoothukudi District.

250027.

Tuticorin (H) C&M Division

AS / TS / RAS:

25,00 18,76 1 6,24 1

Part II.2014-15

Construction of Quality Control Sub-Division building at Tutucorin. (Part.2015-2016)

250028. AS / TS / RAS:

25,00 23,28 1 1,72 1

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

45

Page 49: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

4059 CAPITAL OUTLAY ON PUBLIC WORKS

01 Office Buildings

051 Construction

KT Construction of Buildings - Chief Engineer (General) Highways

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]4059 01 051 KT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

4059 01 051 KT 16 04( DPC )

Construction of Quality Control Sub-Division building at Virudhunagar. (Part.2015-2016)

200029.

Virudhunagar (H) C&M Division

AS / TS / RAS:

20,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Division Office (c&m) Building at Virudhunagar

500030. AS / TS / RAS:

50,00 50,00 1 ... ...

Part II.2014-15

Construction of Quality Control Sub-Division building at Nagecoil. (Part.2015-2016)

250031.

Nagercoil (H) C&M Division

AS / TS / RAS:

25,00 ... 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Quality Control Sub-Division building at Vaniyambadi. (Part.2015-2016)

250032.

Vaniyambadi (H) C&M Division

AS / TS / RAS:

25,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Sub-Division Office and section Office(c&m) Building at Palacot, Dharmapuri district.

250033.

Dharmapuri (H) C&M Division

AS / TS / RAS:

25,00 25,00 1 ... ...

Part II.2014-15

Construction of Travellers Bungalow at Uthukuli. (Part.2015-2016)

350034.

Tirupur (H) C&M Division

AS / TS / RAS:

35,00 14,67 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Quality Control Sub-Division building at Thenkasi. (Part.2015-2016)

250035.

Thenkasi (H) C&M Division

AS / TS / RAS:

25,00 19,45 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

46

Page 50: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

4059 CAPITAL OUTLAY ON PUBLIC WORKS

01 Office Buildings

051 Construction

KT Construction of Buildings - Chief Engineer (General) Highways

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]4059 01 051 KT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

4059 01 051 KT 16 04( DPC )

Construction of Quality Control Sub-Division building at Edappady. (Part.2015-2016)

250036.

Edapadi (H) C&M Division

AS / TS / RAS:

25,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Quality Control Sub-Division building at Perambalur. (Part.2015-2016)

200037.

Perambalur (H) C&M Division

AS / TS / RAS:

20,00 17,54 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Division Office building at Perambalur. (Part.2015-2016)

500038. AS / TS / RAS:

50,00 22,45 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Quality Control Sub-Division building at Cheyyar. (Part.2015-2016)

200039.

Cheyyar (H) C&M Division

AS / TS / RAS:

20,00 ... 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

Construction of Division Office building at Cheyyar. (Part.2015-2016)

500040. AS / TS / RAS:

50,00 20,00 1 ... ...

G.O.Ms.No.95/H&M.P (HN.1) / dt.28.04.2015

60,98,17 41,11,66 40 47,05 104059 01 051 KTTOTAL -

47

Page 51: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

4216 CAPITAL OUTLAY ON HOUSING

80 General

800 Other Expenditure

KB Highways Department

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]4216 80 800 KB

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

4216 80 800 KB 16 05( DPC )

Construction of Highways House at HRS campus, Guindy.

50001.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

50,00 22,25 1 27,75 1

G.O.Ms.No.26,H&M.P (HR.1) Department, dated.10.02.2016.

50,00 22,25 1 27,75 14216 80 800 KBTOTAL -

48

Page 52: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

101 Bridges

JA Original works

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 101 JA 16 07( DPC )

Construction of new 4 l;ane HLB at Km.69/300 of ECR acriss seaback at Illayankuppam near Kalpakkam.

2377851.

Chengalpattu (H) C&M Division

AS / TS / RAS:

23,77,85 ... ... ... 11,88,92

G.O.(RT).No.10/Hw&MP dept/dt.30.01.2018.

Land Acquisition for forming bye pass road at K.M.0/0-0/7 and Widening the Tiruchirappalli— Coimbatore Road— G.O.Ms.No.2660, P.W., dt. 1.10.84

8802.

Trichy (H) C&M Division

AS / TS / RAS:

8,80 6,84 1 ... ...

Reconstruction of Bridge across Uppar river at Km.14/8 of Trichy-Thuraiyur road (SH-62) in lieu of existing brick arch bridge.

123003. AS / TS / RAS:

1,23,00 1,11,83 1 ... ...

Part II scheme 2009-10

Construction of over bridge at KM.1/4 Tirunelveli-Shencottah Road-G.O.Ms.No.2126/P.W.,dated 30th January 1967 and G.O.Ms.No.40, P.W., dated 9th January 1973.

144804.

Tirunelveli (H) C&M Division

AS / TS / RAS:

1,44,80 ... 1 1 ...

Construction of high level bridge at 7/10 of nanguneri-eruvadi-valliyur-vijayapathy road

300005. AS / TS / RAS:

3,00,00 1,81,20 1 1 ...

Reconstruction of weak and narrow bridge at K.M. 45/6 of Madurai Kanyakumari Road (within Virudhunagar Town Limits)—G.O.Ms.No.702, P.W., dated 15th may 1992.

94606.

Virudhunagar (H) C&M Division

AS / TS / RAS:

94,60 94,60 1 1 ...

Reconstruction of High level bridge across Nasuvankarai Odai at Km.20/4 of Kangeyam-Kodumudi road in lieu of existing piped causeway.

240007.

Dharapuram (H) C&M Division

AS / TS / RAS:

2,40,00 2,40,00 1 ... ...

Part II scheme 2009-10

49

Page 53: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

101 Bridges

JA Original works

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 101 JA 16 07( DPC )

Reconstruction of Bridge across chithar at Km.51\2 of in tirunelveli -shenkottai -kollam road

300008.

Thenkasi (H) C&M Division

AS / TS / RAS:

3,00,00 2,91,19 1 1 ...

35,89,05 9,25,66 7 4 11,88,925054 03 101 JATOTAL -

50

Page 54: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

101 Bridges

JE Construction of Palar Bridge in ECR executed by TNRDC

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JE

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 101 JE 16 09( DPC )

Widening of ECR from Two lane to Four lane from Akkarai to Mahabalipuram.

27210001.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

272,10,00 ... ... ... ...

Construction of High Level Bridges across Palar River at Km.76/000 in ECR.

8519002. AS / TS / RAS:

85,19,00 ... 1 1 1

357,29,00 ... 1 1 15054 03 101 JETOTAL -

51

Page 55: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

101 Bridges

JF Construction of Flyover at Salem Junction - Yercaud Road

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JF

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 101 JF 16 07( DPC )

Construction of combined flyover for Kuranguchavadi and AVR roundana junction.

11140001.

Salem (H) C&M Division

AS / TS / RAS:

111,40,00 19,40,60 38,23,00 46,60,85 45,37,65

G.O.Ms.No.7/ H&M.P (HP.1) / dt.07.01.2016.

Construction of Flyover in Thiruvagoundanur Junction in Salem City.

2677002. AS / TS / RAS:

26,77,00 8,89,55 11,77,00 15,56,90 2,30,55

G.O.Ms.No.7/ H&M.P (HP.1) / dt.07.01.2016.

Construction of Flyover at Salem junction -Yercaud road.

32000003. AS / TS / RAS:

320,00,00 72,62,64 150,00,00 77,82,25 169,56,01

G.O.Ms.No.56/ H&M.P (HP.1) / dt.14.05.2015.

458,17,00 100,92,79 200,00,00 140,00,00 217,24,215054 03 101 JFTOTAL -

52

Page 56: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

337 Road Works

JA Original works

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

64 Lands

5054 03 337 JA 64 07( DPC )

LA Cost for Trichy Thuvakudi to Palpannai Rowndana

8450001.

Thiruvarur (H) C&M Division

AS / TS / RAS:

84,50,00 ... 1 ... 1

G.O.Ms.No.104, Highways Dept.dated. 29-08-2011.

L.A cost for Thiruthuraipoondi Bye-pass

2162/ 500002. AS / TS / RAS:

5,00,00 21,62 1 4,78,38 1

G.O.Ms.No.174, Highways(HP.2) Dept.dated. 08-07-2008. / G.O. MS. No.75 HW&MP Dept., Dt.23.09.17

Land Accuisition for the work of widening double lane to four lane in Km.1/6-2/2 of Coimbatore-siruvani Road

245513. AS / TS / RAS:

2,45,51 ... 1 ... 1

G.O.Ms.No.80, Highways Dept.dated. 25-05-2016.

Land Acquisition for the work of improvements to geomatric curve in km.0/0-2/0 of Tiruppur-Somanur road (SH 169).

704004.

Tirupur (H) C&M Division

AS / TS / RAS:

7,04,00 5,04,00 1 1,68,64 1

GO Ms No.80, HW&M.P (HP.2) dept dt.25.05.2016.

Land Acquisition for the work of widening to four lane in km.0/0-2/0 (usha theatre to DSK Hospital) of Tiruppur-Kangeyam road (SH 172).

502005. AS / TS / RAS:

5,02,00 3,02,00 1 2,00,00 1

GO Ms No.80, HW&M.P (HP.2) dept dt.25.05.2016.

104,01,51 8,27,62 5 8,47,02 55054 03 337 JATOTAL -

53

Page 57: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

337 Road Works

JD City Traffic Improvement Works - controlled by Chief Engineer (General) Highways

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JD

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 337 JD 16 02( DPC )

Improvement to Pallavaram - Thoraipakkam road at Km.5/0-7/2 and 9/7-10/5.

1386001.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

13,86,00 ... 10,00,00 4,00,00 7,86,00

G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

Improvement to IRR road at Km.11/0 - 17/1.

1220002. AS / TS / RAS:

12,20,00 10,20,00 1,34,00 1,00,00 1,00,00

G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

Improvements and construction of drain, footpath in Km.11/0 - 17/1 of Inner Ring Road in selected stretches including widening existing road for 6m width (ave) both side and stengthening in Km.16/5-17/1 (left side) (SHU 02)

4440003. AS / TS / RAS:

44,40,00 29,90,00 3,50,00 1,00,00 3,50,00

G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015.

Improvement to GNT road at Km.3/8 - 11/4.

1214004. AS / TS / RAS:

12,14,00 9,54,00 1 2,60,00 ...

G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

Widening available width and Improvements at Km.0/0-2/9 and providing footpath at Km.0/0 - 5/0 of southern sector of Inner Ring road.

1270005. AS / TS / RAS:

12,70,00 8,70,00 1 80,00 3,20,00

G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015.

Improvement to ECR at Km.11/8 - 12/6 (SH-49)

330006. AS / TS / RAS:

3,30,00 2,50,00 1 80,00 ...

G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

Improvement to Marmalong Bridge - Irumbuliyur road at Km.5/0-5/7, 6/5-8/0 and 10/8-12/3.

1530007. AS / TS / RAS:

15,30,00 ... 15,30,00 2,60,00 3,70,00

G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

54

Page 58: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

337 Road Works

JD City Traffic Improvement Works - controlled by Chief Engineer (General) Highways

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JD

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 337 JD 16 02( DPC )

Improvements and construction of drain, footpath in selected stretches in Km.7/2 - 11/4 of GNT side in selected stretches including widening end to end and impts to road in Km.7/2-8/0, 10/4-11/4 and impts in Km.7/7-8/0 of GNT road (SHU87)

2520008.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

25,20,00 20,70,00 1,40,00 1,00,00 2,50,00

G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015.

Improvement to Southern Sector of IRR at Km.3/3-4/8.

510009. AS / TS / RAS:

5,10,00 1,20,00 3,90,00 1,20,00 2,70,00

G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

Improvements and construction of drain, footpath in selected stretches in Km.11/7 - 16/9 including impts to Kathipara gradesseparator interior sservice roads, Meenambakkam ROB approaches including service roads and impts in GST road Km.15/9-16/9(SHU88)

31500010. AS / TS / RAS:

31,50,00 17,50,00 1 8,00,00 4,00,00

G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015.

Improvement to GST road at Km.10/0 - 14/4.

9300011. AS / TS / RAS:

9,30,00 7,10,00 1 1 2,20,00

G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

impts to MRTS bridges and Pallikaranai Grade Separator approaches incl service roads. Widening to Six lane at Km.8/540-9/0 (BS) 9/8-10/0.10/410/6 LS,10/2-10/6 RS & footpath in selected stretches at Km.5/7-10/8 of Marmalong bridge Irumbuliyur road.

21500012. AS / TS / RAS:

21,50,00 13,00,00 1 6,00,00 2,50,00

G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015.

Widening end to end and Construction of Storm Water Drain and Improvements to Vanagaram - Ambathur - Puzhal Road at Km.6/4 - 10/0.

37700013.

Thiuvallur(H) C&M Division

AS / TS / RAS:

37,70,00 27,46,23 4,91,26 7,03,82 2,19,95

G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015.

Widening end to end and Construction of Storm Water Drain cum Duct in selected stretches and Improvements to Mount - Poonamallee - Avadi Road at Km.0/0 - 5/9 and 6/8 - 7/0

40000014. AS / TS / RAS:

40,00,00 27,44,49 10,50,70 9,82,20 2,42,42

G.O.Ms.No.23/H & M.P (HW.2)/dt.20.02.2015.

55

Page 59: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

337 Road Works

JD City Traffic Improvement Works - controlled by Chief Engineer (General) Highways

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JD

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 337 JD 16 02( DPC )

Widening end to end providing footbath cum drain in Kodambakkam - Sriperumadur road at Km.5/0-6/7.

9300015.

Chengalpattu (H) C&M Division

AS / TS / RAS:

9,30,00 3,35,54 1 5,00,00 94,46

G.O.Ms.No.11/H&M.P (HW.2) / dt.11.01.2016

293,50,00 178,60,26 50,86,03 50,86,03 38,72,835054 03 337 JDTOTAL -

56

Page 60: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

337 Road Works

JI Comprehensive Road Infrastructure Development Programme (CRIDP) - State Highways

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JI

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 337 JI 16 02( DPC )

CRIDP

9975400/98134001. AS / TS / RAS:

997,54,00 ... 1,249,48,07 1,316,50,00 1,249,48,00

GO Ms No.6, H&M.P (HF.2) dept dt.13.01.2017 and GO Ms No.86, HW&M.P (HF.2) dept dt.24.10.2017.

64 Lands

5054 03 337 JI 64 01( DPC )

Acquisition of lands for widining of NH-45 between Km.26 and 28 to provide free access from chennai bypass

34961. AS / TS / RAS:

34,96 ... ... 34,96 ...

GO Ms No.90, H&M.P dept dt.03.11.2017

997,88,96 ... 1,249,48,07 1,316,84,96 1,249,48,005054 03 337 JITOTAL -

57

Page 61: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

337 Road Works

JJ Improvement of vital roads in developing industrial areas through Tamil Nadu Road Infrastructure Development Corporation

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 337 JJ 16 00( DPC )

Improvement from Four lane to Six laning of Vandalur - Wallajabad road at Km.47/0 - 63/8.

18009381.

TNRIDC

AS / TS / RAS:

180,09,38 ... ... 10,00,00 103,29,93

G.O.Ms.No.94, HW&MP(HS.1) Dept, dated:21-11-2017.

Widening and Improvement of Singaperumalkoil-Sriperumbuthur road and Vandalur-Walajabad Road leading to Oragadam Industrial Park by TNRIDC

2440000 / 2778000 / 3610000/-329942. AS / TS / RAS:

357,70,06 340,37,00 3,31,00 1 17,33,06

GO Ms No.205, Highways (HW.2) dt.5.10.06 & G.O.Ms.No.48/H&M.P (HS.1)dept/28.03.12 & GO Ms No.80/H&MP (HS.1)/09.10.2017.

Improvement of roads from Four Laning to Six Laning for a length of 20.00 Km. from Vandalur to Oragadam including formation of Bye pass road to Padappai Village for a length of 3.80Km.

15781003. AS / TS / RAS:

157,81,00 102,93,00 87,81,00 54,88,00 1

G.O.Ms.No.8, HW&MP (HS.1) Dept, dated:07--01--2016.

Widening and Improvement of four lane to six lane in Singaperumalkoil-Sriperumbuthur road Km 12/6 to 24/6- to Oragadam Industrial Park by TNRIDC

866500 / 10866004. AS / TS / RAS:

108,66,00 97,05,00 1,00 1 11,61,00

G.O.Ms.No.40, HW&MP Dept, dated:01--03--2011.

Improvements from four laning to six laning of SingaperumalKoil-Sriperumpudur road Km.0/6-12/6 (SH-57) for a part of development of Oragadam Industrial Corridor Project.

11500005. AS / TS / RAS:

115,00,00 110,00,00 1,00,00 5,00,00 1

GO Ms No.1, Highways (HS.1) dt02.01.2015

64 Lands

5054 03 337 JJ 64 09( DPC )

Improvement of roads from Four Laning to Six Laning for a length of 20.00 Km. from Vandalur to Oragadam including formation of Bye pass road to Padappai Village for a length of 3.80Km.

3200001.

TNRIDC

AS / TS / RAS:

32,00,00 ... 12,80,00 1 32,00,01

G.O.Ms.No.8, HW&MP (HS.1) Dept, dated:07--01--2016.

Widening and Improvement of Singaperumalkoil-Sriperumbuthur road and Vandalur-Walajabad Road leading to Oragadam Industrial Park by TNRIDC & G.O.Ms.No.48/H&M.P (H.S.1) dept/28.03.12.

560000 / 1868100/6830002. AS / TS / RAS:

255,11,00 186,81,00 1,00 65,00,01 3,30,00

GO Ms No.205, Highways (HW.2) dt.5.10.06 & GO Ms No.80/H&MP (HS.1)/09.10.2017.

58

Page 62: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

337 Road Works

JJ Improvement of vital roads in developing industrial areas through Tamil Nadu Road Infrastructure Development Corporation

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

1,206,37,44 837,16,00 104,94,00 134,88,04 167,54,025054 03 337 JJTOTAL -

59

Page 63: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

337 Road Works

JK Outer Ring Road

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JK

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 337 JK 16 08( DPC )

Outer Ring Road (Project Support Fund) Phase-I

8642200/108140001.

TNRDC

AS / TS / RAS:

1,081,40,00 ... 161,95,45 161,95,45 152,16,04

G.O.Ms.No.32, HW&MP Department, dated:25-02-2009, G.O.Ms.No.200, HW&MP Department, dated:08-10-2009,

64 Lands

5054 03 337 JK 64 07( DPC )

Land acquisition for Outer Ring Road Project-Phase-I.

31343001.

TNRDC

AS / TS / RAS:

313,43,00 ... 1 ... ...

G.O.Ms.No.42, HW&MP (HN.2) Department, dated:26-03-2013, G.O.Ms.No.97, HW&MP (HF.2) Department, dated:14-08-2015 and G.O.Ms.No.177, HW&MP (HF.2) Department, dated:13-10-2013.

1,394,83,00 ... 161,95,46 161,95,45 152,16,045054 03 337 JKTOTAL -

60

Page 64: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

337 Road Works

JM Widening to four lane of Madurai Ring Road through TNRIDC

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JM

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 337 JM 16 04( DPC )

Widening the Madurai Ring Road from double lane to four lane from 0/0 - 27/2.

20000001.

TNRIDC

AS / TS / RAS:

200,00,00 ... ... 12,00,00 50,00,00

G.O.Ms.No.76, HW&MP (HS.1) Dept, dated:25-09-2017.

200,00,00 ... ... 12,00,00 50,00,005054 03 337 JMTOTAL -

61

Page 65: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

337 Road Works

JN Comprehensive Road Infrastructure Development Programme (CRIDP) - Performance based maintenance contract

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 JN

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 337 JN 16 02( DPC )

Works of initial rectifications including widening, strengthening improvement and in Virudhunagar.

61198001.

Virudhunagar (H) C&M Division

AS / TS / RAS:

611,98,00 ... ... ... 275,85,00

PBMC - G.O.No.Ms.No.106/HW&MP/dt.26.12.2017.

611,98,00 ... ... ... 275,85,005054 03 337 JNTOTAL -

62

Page 66: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

337 Road Works

PA Bye-Pass at Kelambakkam and Tiruporur in Rajiv Gandhi Salai with JICA Assistance - TNIPP Phase-2

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 PA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 337 PA 16 02( DPC )

Formation of Bye-Pass at Kelambakkam and Tiruporur in Rajiv Gandhi Salai with JICA Assistance-TNIPP Phase-2

24370001. AS / TS / RAS:

243,70,00 ... 50,00,00 40,00,00 100,00,00

G.O. Ms No.64/ HW&MP Dept., / 21.08.17

243,70,00 ... 50,00,00 40,00,00 100,00,005054 03 337 PATOTAL -

63

Page 67: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

337 Road Works

PB Asian Development Bank assisted Chennai - Kanyakumari Industrial Corridor Project

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 337 PB

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 03 337 PB 16 00( DPC )

Asian Development Bank Assisted Chennai - Kannyakumari Industrial Corridor Project

644824001. AS / TS / RAS:

... ... ... ... 50,00,00

64 Lands

5054 03 337 PB 64 09( DPC )

Asian Development Bank Assisted Chennai - Kannyakumari Industrial Corridor Project

01. AS / TS / RAS:

... ... ... ... 75,00,00

... ... ... ... 125,00,005054 03 337 PBTOTAL -

64

Page 68: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

JE High density corridor

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JE

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 337 JE 16 09( DPC )

Improvement to Nanganallur road at Km.0/0-1/0.

150001.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

1,50,00 1,20,00 1 1 30,00

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Widening avalable width and improvements at Km.2/5-5/4 and providing drain and foot path in selected stretches at Km.2/5-5/4 of GST loop road.

983002. AS / TS / RAS:

9,83,00 6,93,00 1 1 2,90,00

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Improvement to Puzhthivakkam road at Km. 0/0-1/2.

139003. AS / TS / RAS:

1,39,00 64,00 1 1 75,00

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Providing foot path and improvements in selected stretches at Km.0/6-2/3 of Nanganallur road.

326004. AS / TS / RAS:

3,26,00 36,00 1 1 2,90,00

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Providing Drain, footpath in selected strtches at Km.0/6-3/7 of Mount - Medavakkam road.

800005. AS / TS / RAS:

8,00,00 2,30,00 1 1 5,70,00

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Providing Drain, footpath in selected stretches at Km.0/0-3/6 and widening to available width at Km.2/0-2/3 of Madipakkam - Velachery road.

664006. AS / TS / RAS:

6,64,00 2,64,00 1,46,00 1,46,00 74,00

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Improvement to Taramani -Perungudi road at 0/0-2/010.

250007. AS / TS / RAS:

2,50,00 1,60,00 1 1 90,00

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

65

Page 69: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

JE High density corridor

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JE

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 337 JE 16 09( DPC )

Widening to available width and impts at Km.0/0-0/7 and providing drain and foot path in selected stretches at Km.0/0-0/7 of Chidambaram stroes to SBI colony road.

258008.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

2,58,00 48,00 1 1 2,10,00

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Improvements at Km.1/2-1/850 and providing CC pavement at Km.1/2-1/4 of Velachery bypass.

286009. AS / TS / RAS:

2,86,00 1,16,00 1 1 1,70,00

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Improvement to Medavakkam - Sholinganallur road at Km. 0/0-2/6 & 3/5-4/5.

23000010. AS / TS / RAS:

23,00,00 ... 7,51,82 7,51,82 7,28,07

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Rebuilding at Km.0/0-1/0 and providing footpath, drain and construction of culvert in selected stretches at Km.0/0-3/2 of MBI road to S.Kolathur road.

3830011. AS / TS / RAS:

3,83,00 1,00,00 1,02,00 1,02,00 18,00

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Providing pavement with block and constructionof Storm water drain in K.S.Road to MPA Road (via) Valluvar Nagar to Ramapuram Km0/0-1/4.

8200012.

Thiuvallur(H) C&M Division

AS / TS / RAS:

8,20,00 5,39,35 1 1 2,80,65

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Improvements to Chinnasekkadu Road Km.0/0-1/8.

4200013. AS / TS / RAS:

4,20,00 72,12 1 1 3,47,88

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Improvement to Vadaperumbakkam - Chettimedy - Gnayiru Road Km.6/2-10/2.

2700014. AS / TS / RAS:

2,70,00 2,59,52 1 1 10,48

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

66

Page 70: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

JE High density corridor

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JE

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 337 JE 16 09( DPC )

Improvements to Perambur Cross Road Km.0/0-0/2.

610015.

Thiuvallur(H) C&M Division

AS / TS / RAS:

61,00 10,89 1 1 50,11

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Improvement to AVP Road to Vichoor (Via) Kanniyampettai Km.0/0-2/0.

2000016. AS / TS / RAS:

2,00,00 13,94,70 1 1 60,35

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Improvements to AMMroad to Puthagaram Road Km.0/0-2/135.

2200017. AS / TS / RAS:

2,20,00 86,49 1 1 1,33,51

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Improvements to Km.0/450-6/4 Ariyalur - Vilangadupakkam Road.

11000018. AS / TS / RAS:

11,00,00 9,19,60 1 1 1,80,40

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Improvement mount Poonmallee road to Mugalivakkam Km0/7-1/0 including providing drain cum footpath and paved shoulders in Km0/0-1/0.

1000019.

Chengalpattu (H) C&M Division

AS / TS / RAS:

1,00,00 39,34 1 1 60,66

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Improvements in Chennai- Kodampakkam- Sriperumbudur road to Mugalivakkam road inculding paved shoulders and drain cum foorpath in Km.0/0-2/3.

7050020. AS / TS / RAS:

7,05,00 3,81,24 1 1 3,23,76

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

Providing paved shoulder in Kodambakkam - Sriperumbudur road to Manapakkam (via) Kolapakkam at 3/2-5/6 (MDR1026) right side only.

2150021. AS / TS / RAS:

2,15,00 ... 1 1 2,15,00

G.O.Ms.No.23/H&M.P (HW.2)/dt.20.02.2015.

106,50,00 55,34,25 10,00,00 10,00,00 42,07,875054 04 337 JETOTAL -

67

Page 71: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

JP Improvements to Chennai Radial Roads

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JP

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 337 JP 16 07( DPC )

As per G.O.Ms.No.46 / H&M.P (HS.1)/ 16.04.2015.

36741.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

36,74 ... ... ... ...

To make payment to the contractor Thiur.P.Janakiraman as per the Judgement in respect of the work of widening of four lane and strengthening Tambaram-Mudichur road km.3/0 to km.7/5.

652712. AS / TS / RAS:

6,52,71 ... 2 1 1

GO.Ms No.62, HW&M.P (HW.2) dept dt.04.03.2016.

64 Lands

5054 04 337 JP 64 06( DPC )

Token Provision

01.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

... ... 1 1 ...

6,89,45 ... 3 2 15054 04 337 JPTOTAL -

68

Page 72: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

JT Comprehensive Road Infrastructure Development Programme (CRIDP) - Major District Roads

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 337 JT 16 09( DPC )

CRIDP

4854600/6073500/ 109281001. AS / TS / RAS:

1,092,81,00 ... 847,34,22 610,34,00 617,87,00

GO Ms No.6, H&M.P (HF.2) dept dt.13.01.2017 and GO Ms No.86, HW&M.P (HF.2) dept dt.24.10.2017.

1,092,81,00 ... 847,34,22 610,34,00 617,87,005054 04 337 JTTOTAL -

69

Page 73: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

JU Comprehensive Road Infrastructure Development Programme (CRIDP) - Other District Roads

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JU

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 337 JU 16 07( DPC )

CRIDP

8118700/11794500/ 199132001. AS / TS / RAS:

1,991,32,00 ... 790,55,71 960,54,00 994,84,00

GO Ms No.6, H&M.P (HF.2) dept dt.13.01.2017 and GO Ms No.86, HW&M.P (HF.2) dept dt.24.10.2017.

1,991,32,00 ... 790,55,71 960,54,00 994,84,005054 04 337 JUTOTAL -

70

Page 74: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

KB Schemes implemented under State Infrastructure and Amenities Fund - Controlled by Chief Engineer (Construction and Maintenance), Highways

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KB

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 337 KB 16 04( DPC )

Construction of Bridge at Km.11/4 of Palaiyur Anukkur vaalikanpuram road including improvement of road at Km.1/6 , 12/0 under state infrastructure Amenities fund.

39600001.

Perambalur (H) C&M Division

AS / TS / RAS:

396,00,00 ... ... ... 3,93,00

396,00,00 ... ... ... 3,93,005054 04 337 KBTOTAL -

71

Page 75: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

KC Acquisition of Lands for Bye Passes

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KC

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 337 KC 16 02( DPC )

Formation of Bye pass road to Illuppur town in Km.0/0-5/4 in Pudukottai District.

2147001.

Pudukottai (H) C&M Division

AS / TS / RAS:

21,47,00 ... 1 1,00,00 20,47,00

G.O.Ms.No.53, Highways and Minor Ports (HP.1) Department, dated:04-03-2016.

Construction of Fly over along Athupalam and Ukkadam juntion up to Oppanakara Street in Coimbatore City

12182002.

Coimbatore (H) C&M Division

AS / TS / RAS:

121,82,00 ... 84,36,99 1,00,00 120,82,00

G.O.Ms.No.59, Highways and Minor Ports (HS.2) Department, dated:04-03-2016.

Formation of Eastern Bye pass to Pollachi town starting from Thippampatty at Km.111/4 of NH-209 and ending Achipatty @ km.124/8 of NH-209 (Via) Alampalayam, Rasakkapalaya, Kullakkapalaym to a length of 15.40 km.

2063003.

Pollachi (H) C&M Division

AS / TS / RAS:

20,63,00 ... 15,63,00 19,53,93 4

G.O.Ms.No.61, Highways and Minor Ports (HS.2) Department, dated:04-03-2016.

64 Lands

5054 04 337 KC 64 01( DPC )

Land Acquisition for the formation of Ring Road to Vellore

3882001.

Vellore (H) C&M Division

AS / TS / RAS:

38,82,00 ... ... 2,00,00 36,82,00

G.O.Ms.No.29, Highways and Minor Ports (HQ.2) Department, dated:12-04-2017.

Land aquisition for formation of Kumbakonam bypass in Km.0/0-9/420 Phase.II in Thanjavur Dt.

2800002.

Thanjavur (H) C&M Division

AS / TS / RAS:

28,00,00 ... 10,00,00 30,00 10,00,00

G.O.Ms.No.135, Highways and Minor Ports (HP.2) Department, dated:26-11-2015.

Land aquisition for formation of bypass to Valaingaima town in Tiruvarur Dt.

314003.

Thiruvarur (H) C&M Division

AS / TS / RAS:

3,14,00 ... 3,14,00 1 3,14,00

G.O.Ms.No.136, Highways and Minor Ports (HP.2) Department, dated:26-11-2015.

72

Page 76: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

KC Acquisition of Lands for Bye Passes

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KC

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

64 Lands

5054 04 337 KC 64 01( DPC )

Land aquisition for formation of Western Ring road to Coimbatore city..

32000004.

Coimbatore (H) C&M Division

AS / TS / RAS:

320,00,00 ... 125,00,00 1 25,00,00

G.O.Ms.No.52, Highways and Minor Ports (HS.2) Department, dated:04-03-2016.

Land aquisition for the formation of Bye pass to Mettupalayam town.

9935005. AS / TS / RAS:

99,35,00 ... 28,65,00 25,00 99,10,00

G.O.Ms.No.46, Highways and Minor Ports (HS.2) Department, dated:04-03-2016.

Land aquisition for the widening and ground level improvement of Dindigul Bangalore road (NH-209), Pollachi Palaghat road (SH-78A), Municipal bus route road (ODR) and new scheme road (Pollachi Municipal road) in Pollachi town.

3357006.

Pollachi (H) C&M Division

AS / TS / RAS:

33,57,00 ... 10 82,00 11,18,01

G.O.Ms.No.60, Highways and Minor Ports (HS.2) Department, dated:04-03-2016.

Land aquisition for Construction of Fly over at Goripalayam junction in Madurai town..

16428007.

Madurai (H) C&M Division

AS / TS / RAS:

164,28,00 ... 33,20,90 33,00 10,17,00

G.O.Ms.No.47, Highways and Minor Ports (HS.1) Department, dated:04-03-2016.

851,08,00 ... 300,00,00 25,23,95 336,70,055054 04 337 KCTOTAL -

73

Page 77: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

KF Improvement of Road Quality under Comprehensive Road Infrastructure Development Programme (CRIDP)

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KF

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 337 KF 16 06( DPC )

Improvement of Road Quality under Comprenshive Road Infrastructure Development Programme

40000001. AS / TS / RAS:

400,00,00 ... ... ... 400,00,00

400,00,00 ... ... ... 400,00,005054 04 337 KFTOTAL -

74

Page 78: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

PB Widening from Intermediate lane to Four lane and Strengthening of Puduvoyal - Pulicat road with JICA Assistance - TNIPP Phase -2

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 PB

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 337 PB 16 09( DPC )

Widening from Intermediate Lane to Fort lane and Strengthening of Puduvayal - Pulicat road with JICA Assistance - TNIPP-Phase-II

4500001. AS / TS / RAS:

45,00,00 ... ... 1 25,00,00

G.O.MS.No.67, HWMP Dept. Dt.05.09.17

45,00,00 ... ... 1 25,00,005054 04 337 PBTOTAL -

75

Page 79: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

789 Special Component Plan for Scheduled Castes

JC Comprehensive Road Infrastructure Development Programme (CRIDP) - Other District Roads under Special Component Plan

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 789 JC

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 789 JC 16 06( DPC )

CRIDP

2051200/23186001. AS / TS / RAS:

231,86,00 ... 212,62,00 212,62,00 261,96,00

GO Ms No.6, H&M.P (HF.2) dept dt.13.01.2017 and GO Ms No.86, HW&M.P (HF.2) dept dt.24.10.2017.

231,86,00 ... 212,62,00 212,62,00 261,96,005054 04 789 JCTOTAL -

76

Page 80: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

800 Other Expenditure

JC District and other roads

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 800 JC

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 800 JC 16 00( DPC )

Widening and repairing Cauveri Left Bank road (Thiruvanaikaval to Kallanai Road) breaching at Km. 314/4 of Madras-Tiruchirappalli-Dindigul Road Km. 2/0 14/2 (Tiruchirappalli district).

35201.

Trichy (H) C&M Division

AS / TS / RAS:

35,20 ... ... ... ...

Construction of a high level bridge across Coloroon river connecting Sengaraiyur Village in Trichy District and Poondi Alamelupuram Village in Thanjavur District

4600002.

Thanjavur (H) C&M Division

AS / TS / RAS:

46,00,00 ... ... ... ...

GO Ms No.13, Highways (HP.2) dt.25.1.06

Replacement of existing cart-cum-foot across Koriayar at Km. 1/6 of Velacheri Villagettagam-Sithambur Road G.O. Ms. No. 623, Transport, dated 29th May 1981.

14303.

Thiruvarur (H) C&M Division

AS / TS / RAS:

14,30 ... ... ... ...

Reconstruction of the collapsed bridge at Km. 0/10 of Malavarayanallur Veeraki road-G.O. Ms. No. 702, P.W., dated 15th May 1992.

23104. AS / TS / RAS:

23,10 ... ... ... ...

64 Lands

5054 04 800 JC 64 09( DPC )

Land Acquisition- compensaton-Thiruvannamalai Dt-Pollur Tk - Padiyamputhur village - Chinna Kallananthal to Mansurabath road.

901.

Tiruvannamalai (H) C&M Division

AS / TS / RAS:

90 ... 1 1 1

GO Ms No.134, Highways (HQ.2) dt.27.06.2016

46,73,50 ... 1 1 15054 04 800 JCTOTAL -

77

Page 81: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

800 Other Expenditure

JD Other Roads

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 800 JD

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 800 JD 16 08( DPC )

Hosur Bypass

94907 / 1134841.

Krishnagiri (H) C&M Division

AS / TS / RAS:

11,34,84 ... ... ... ...

GO Ms No.132, Highways.MP (HQ.2)Dept dt.21.11.2011 & G.O.Ms.No.16/H&M.P(HQ.2)dept/dt.21.01.2014.

64 Lands

5054 04 800 JD 64 07( DPC )

Hosur Bypass

350001.

Krishnagiri (H) C&M Division

AS / TS / RAS:

3,50,00 ... 1 1 ...

GO Ms No.132, Highways.MP (HQ.2)Dept dt.21.11.2011.

14,84,84 ... 1 1 ...5054 04 800 JDTOTAL -

78

Page 82: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

800 Other Expenditure

JK Acquisition of Lands for Bye Passes

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 800 JK

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 04 800 JK 16 04( DPC )

Forming of Byepass Road to Thuraiyur Town from Km.0/0-3/6.

570001.

Trichy (H) C&M Division

AS / TS / RAS:

5,70,00 5,20,75 ... ... ...

GO.Ms.No.208/H & M.P/(HP.2) department /dated.06.10.2006.

64 Lands

5054 04 800 JK 64 03( DPC )

Land acquistion for forming by-pass to Tirutani Town

1161001.

Thiuvallur(H) C&M Division

AS / TS / RAS:

11,61,00 10,82,00 1 1 1

GO.Ms.No.210/H w& M.P department /dated.17-12-2012

Acquisition of land for the work widening to six lane in Km.59/6 - 81/6 of Chennai - Tiruthani - Renigunda road.

16800002. AS / TS / RAS:

168,00,00 ... 10,00,00 1 20,00,00

GO Ms No.151, Highways(HW.2)dept/dt.04.10.2013.

Forming bypass road to Walajabad Town at Km.49/2 of SCKAT.

6633003.

Chengalpattu (H) C&M Division

AS / TS / RAS:

66,33,00 ... 1 1 5,00,00

G.O.Ms.No.49/H&M.P (HV.2) / dt.23.04.2015.

Forming of ring road to Uthiramerur.

7700004. AS / TS / RAS:

77,00,00 ... 5,00,00 1 5,00,00

GO Ms No.158, Highways(HW.2)dept/dt.10.10.2013.

Acquisition of Lands for formation of bypass to Mannachanallur town starting from km 2/2 of Trichy-Thuraiyur road (SH-62) and ends at km 4/6 of the same road

1440005.

Trichy (H) C&M Division

AS / TS / RAS:

14,40,00 2,78,00 1 11,62,00 1

GO.Ms.No.209/H w& M.P department /dated.17-12-2012

Acquisition of land for forming circular and semi circular road to Pudukottai town.

1360006.

Pudukottai (H) C&M Division

AS / TS / RAS:

13,60,00 ... 10,00,00 10,00,00 3,60,00

GO Ms No.90, Highways(HP.1)dept/dt.11.06.2013.

79

Page 83: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

800 Other Expenditure

JK Acquisition of Lands for Bye Passes

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 800 JK

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

64 Lands

5054 04 800 JK 64 03( DPC )

Acquisition of Lands for forming bye-pas road in Thanjavur town.

1441007.

Thanjavur (H) C&M Division

AS / TS / RAS:

14,41,00 4,02,83 1 1 1

GO.Ms.No.230/H & M.P/(HV.2) department /dated.25.09.08

Acquisition of Lands for forming bye-pas road in Pattukottai town.

278008. AS / TS / RAS:

2,78,00 2,78,00 1 ... ...

GGO.Ms.No.230/H & M.P/(HV.2) department /dated.25.09.08

Acqusition of Lands for forming bye-pass road in Tiruvarur Town. G.O.Ms.No.307/Highways (HP.2)dept/dt.06.12.2010.

101000/4700009.

Thiruvarur (H) C&M Division

AS / TS / RAS:

47,00,00 10,00,00 10,00 17,00,00 1

RAS-GO.Ms.No.43/H w& M.P (HP.2)department /dated.14-06-2017.

Acquisition of Lands for forming ring road to Mannargudi town branching and merging at km 35/2 of Kumbakonam-Mannargudi-Adhiramapattinam road (SH-66)

10060010. AS / TS / RAS:

10,06,00 9,67,68 27,68 38,32 1

GO.Ms.No.208/H w& M.P department /dated.17-12-2012

Forming of Byepass Road to Rasipuram-Namakkal Dt.

41007 / 71179/92811/16570011.

Namakkal (H) C&M Division

AS / TS / RAS:

16,57,00 7,60,00 1,68,11 1,68,11 1

GO Ms No.90, Highways(H&MP)dept/dt.20.05.09 & RAS G.O.No.8/H&M.P (HQ.2)/dt.21.01.2014 & G.O.Ms.No.80/H&m.P (HP.2)/25.05.2016 & G.O.Ms.No.25/H&MP9HP.2)/dt.27.02.2018.

Forming of ring road to Karur.

77000012.

Karur (H) C&M Division

AS / TS / RAS:

77,00,00 ... 71,50,00 1 30,00,00

GO Ms No.164, Highways(HP.2)dept/dt.18.10.2013.

Acqusition of Land and shifting of utilities for the construction of flyover along Athupalam and Ukkadam junction in Coimbatore.

88610013.

Coimbatore (H) C&M Division

AS / TS / RAS:

88,61,00 ... 1 49,63,48 38,61,00

G.O.Ms.No.103/HW&MP (HS.2)Dept. dt.26.08.2015.

80

Page 84: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

800 Other Expenditure

JK Acquisition of Lands for Bye Passes

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 800 JK

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

64 Lands

5054 04 800 JK 64 03( DPC )

Acqusition of Lands for Construction of flyover in Madurai City Periyar bus stand to Sethupathi High school.

38000014.

Madurai (H) C&M Division

AS / TS / RAS:

38,00,00 ... 30,00,00 1,68,02 30,00,00

G.O.Ms.No.48/23.04.2015.

The enhanced compensation to the Land owner for acuisition of lands for the formation of Palani by pass road ( LAOP.No.8/2002/13/1997)

864015.

Dindigul (H) C&M Division

AS / TS / RAS:

86,40 86,40 ... ... ...

Acqusition of Land and shifting work for construction of flyover at VVD junction in Thoothukudi Dt.

4900016.

Tuticorin (H) C&M Division

AS / TS / RAS:

4,90,00 ... 2,90,00 4,90,00 1

Acquisition of land for formation of outer ring road to Sivakasi Town.

82450017.

Virudhunagar (H) C&M Division

AS / TS / RAS:

82,45,00 ... 15,00,00 1 43,50,01

GO Ms No.145, Highways(HS.1)dept/dt.24.01.2013. Ras-GO Ms No.143, Highways(HP.2)dept/dt.14.06.2017.

The enhanced compensation to the land owner for acquisition of lands for forming approach road to Ambur town across Palar river.

499018.

Vaniyambadi (H) C&M Division

AS / TS / RAS:

49,90 49,90 1 1 ...

GO (3D) No.21, HW&M.P (HQ.2) dept dt.25.05.2016.

Forming of Byepass Road to Dharapuram Town./ RAS vide G.O.Ms.No.99/H&M.P(HS.2)dept/dt.11.06.2012.

6300/2500019.

Dharapuram (H) C&M Division

AS / TS / RAS:

2,50,00 2,50,00 1 ... ...

GO.Ms.No.287/H & M.P/(HS.2) department /dated.01.12.2008

742,28,30 56,75,56 146,45,87 96,90,01 175,71,085054 04 800 JKTOTAL -

81

Page 85: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

004 Research and Development

AA Investigation/ Estimation of project work under Roads and Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 004 AA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 80 004 AA 16 09( DPC )

Investigation/Estimation of project work under Roads and Bridges-LS provision ( Revolving Fund )

60000/2556481.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

25,56,48 ... 13,92,98 19,26,53 9,32,81

25,56,48 ... 13,92,98 19,26,53 9,32,815054 80 004 AATOTAL -

82

Page 86: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JX Upgradation of IT Highways in Chennai City

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JX

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 80 800 JX 16 06( DPC )

Upgradation of IT Highways in Chennai - LS provision

01.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

... ... ... ... ...

64 Lands

5054 80 800 JX 64 05( DPC )

Upgradation of IT Highways in Chennai - Rajiv Gandhi Phase II. G.O.Ms.No.79/H&M.P (H.W.2) dept/27.03.2007.

2946800/46513001.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

465,13,00 294,68,00 1 170,45,00 1

G.O.Ms.No.130/H&M.P (H.Q.2) dept/20.07.2012. & RAS.G.O.Ms.No.43/H&M.P (H.P.2) dept/14.06.2017.

L.A. Compensation - OMR - ECR Link road

5222.

Chengalpattu (H) C&M Division

AS / TS / RAS:

5,22 ... ... ... ...

G.O.Ms.No.89/H&M.P (H.F.2) dept/17.06.2016.

L.A. Compensation - Paiyanur Village, Rajiv Gandhi P.II

21003. AS / TS / RAS:

21,00 ... ... ... ...

G.O.Ms.No.122/H&M.P (H.F.2) dept/05.12.2016.

465,39,22 294,68,00 1 170,45,00 15054 80 800 JXTOTAL -

83

Page 87: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

KI Chennai Outer Ring Road - Phase II

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 KI

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 80 800 KI 16 05( DPC )

Chennai Outer Ring Road Phase-II formation of road connecting NH 205, NH-5 and Tiruvottiyur-Ponneri-Panchetty road from Nemilichery to Minjur under Public Private Partnership - Annuity basis with Project Support Fund - Tamil Nadu Road Development Company

107500001.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

1,075,00,00 ... 277,99,80 179,37,94 268,18,24

G.O.Ms.No.10, HW&MP Department, dated:23-01-2012

1,075,00,00 ... 277,99,80 179,37,94 268,18,245054 80 800 KITOTAL -

84

Page 88: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

KN Development of Northern Port Acess Road Project

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 KN

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 80 800 KN 16 05( DPC )

Entrusting the work of updating the Detailed Project Report to the Northern Port Access Road to to the M/s.CDM Smith (earlier M/s.Wilbur Smith Associations) without format bid under section 16(b) of Tamil Nadu Transparency in Tender Act1998 as specialcase

21651.

Thiuvallur(H) C&M Division

AS / TS / RAS:

21,65 21,65 ... ... ...

G.O.Ms.No.69, HW&MP Department, dated:18-04-2013. / G.O. MS. No.126 / HW&MP Dept. Dt.28.12.16

Management Associate Fee to the Tamil Nadu Road Development Company Ltd for Northening port Access Road Project

240002. AS / TS / RAS:

2,40,00 ... 1 60,00 60,00

G.O.Ms.No.126, HW&MP Department, dated:28.12-2016.

64 Lands

5054 80 800 KN 64 04( DPC )

Acquisition of private lands and transfer of Government Lands comparised in 15 villages of Ponneri Taluk in Thiruvallur District.

95100001.

Thiuvallur(H) C&M Division

AS / TS / RAS:

951,00,00 ... 200,00,00 100,00,00 200,00,00

G.O.Ms.No.33, HW&MP Department, dated:19-02-2016.

953,61,65 21,65 200,00,01 100,60,00 200,60,005054 80 800 KNTOTAL -

85

Page 89: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

KO Special Project for attending Road Safety

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 KO

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 3 Chief Engineer (Construction & Maintenance), Highways

16 Major Works

5054 80 800 KO 16 03( DPC )

Special Project for Attending to Road Safety

1000000/27991001.

Chennai City Roads (H) C&M Division

AS / TS / RAS:

279,91,00 ... 139,95,50 130,00,00 100,00,00

279,91,00 ... 139,95,50 130,00,00 100,00,005054 80 800 KOTOTAL -

86

Page 90: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

DEMAND No.21 – HIGHWAYS AND MINOR PORTS DEPARTMENT

21 04. CHIEF ENGINEER (HIGHWAYS) - PROJECTS

Page 91: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

101 Bridges

JB Construction of Bridges with Loan Assistance from HUDCO

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JB

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

64 Lands

5054 03 101 JB 64 04( DPC )

Erode District Bhavani Taluk Land acquired to an extent of 19293 sq.ft from Bhavani Municipality to form approach road to the Bridges on Cauvery river between Bhavani and Kumarapalayam by the Highways Department compensation LA

97081.

Chennai Division-I(Projects)

AS / TS / RAS:

97,08 97,08 1 1 1

G.O.(Ms) No. 90 Highways and Minor Ports (HS1)dated 04.08.2015

97,08 97,08 1 1 15054 03 101 JBTOTAL -

87

Page 92: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

101 Bridges

JD Construction of Road over Bridges in Chennai Metro Area for Traffic Management

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JD

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 03 101 JD 16 01( DPC )

Construction of ROB at GNT road in Vyasarpadi. CE PROJECTS R.A.S. G.O.Ms.No. 222, Highways and Minor Ports Department datted: 22.9.2008.

8068001.

Chennai Division-I(Projects)

AS / TS / RAS:

80,68,00 74,46,97 3,66,01 4,65,38 1,55,66

G.O.Ms.No.229, Highways (HN 1) Department dated: 14.11.2005.

Construction of Three Lane Bridge adjacent to the Thiru-Vi-Ka bridge at Chennai. CE METRO

90000/130096/1512102.

C.E. Metro

AS / TS / RAS:

15,12,10 13,86,12 1 1 1,25,98

G.O.Ms.No. 248, HiGhways (HN1) Department dt. 30.7.2010

Providing a Grade Separator at Kodambakkam- Sriperumpudur road intersecting with Mount Poonamallee road at Porur. CE METRO

540000/540000/5805003. AS / TS / RAS:

58,05,00 43,38,76 1 14,66,24 1

G.O.Ms.No. 127, Highways and Minor Ports Department dated: 7.7.2009. RAS G.O.MS.No.75/HW&MP Dept./Dt.23.09.17

Construction of Grade Separator in the intersection of NSK Road (Arcot Road) and Inner Ring Roat at Vadapalani. CE METRO

8070654. AS / TS / RAS:

80,70,65 66,92,96 1 12,28,33 1,49,36

G.O.Ms.No. 103, Highways and Minor Ports Department dated: 12.6.2012 / G.O.MS.NO.26/HW&MP (HP2)Dept./Dt.11.04.17

Construction of Grade Separator at Moolakkadai Junction at Km 8/6 of GNT road. CE METRO

4955005. AS / TS / RAS:

49,55,00 47,11,37 1,71,60 1 2,43,62

G.O.Ms.No. 248, Hihways (HN1) Department dt. 30.7.2010

Providing a high level bridge across Ennore creek to connecting Ennore Express way road with North Chennai Thermal power plant. CE METRO

5266006. AS / TS / RAS:

52,66,00 51,48,63 1 1 1,17,35

G.O.(D) No. 235, Highways and Minor Ports Department dt. 9.12.2010

River Bridge across Coovum river at road connecting GNT road at Km 11/2 and Mugappair. CE METRO

1661007. AS / TS / RAS:

16,61,00 16,45,96 15,03 1 15,02

G.O.(D) No. 127, Highways and Minor Ports Department dt. 7.7.2009

88

Page 93: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

101 Bridges

JD Construction of Road over Bridges in Chennai Metro Area for Traffic Management

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JD

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 03 101 JD 16 01( DPC )

Construction of Grade Separator at the Intersection of Anna Nagar second avenue and Mogappair road with IRR at Thirumangalam. CE METRO

6023008.

C.E. Metro

AS / TS / RAS:

60,23,00 58,01,97 1 1 2,21,00

G.O.(D) No. 235, Highways and Minor Ports Department dt. 9.12.2010

413,60,75 371,72,74 5,52,69 31,60,00 10,28,005054 03 101 JDTOTAL -

89

Page 94: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

03 State Highways

101 Bridges

JG Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 03 101 JG

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 03 101 JG 16 05( DPC )

Construction of ROB in lieu of existing L.C.No.123 at Railway km.147/100-200 in between Vellore contonment and Kaniyampadi Railway stations at km.4/0 of Vellore..

219600/2296001.

Vellore Division(Projects)

AS / TS / RAS:

22,96,00 5,09,87 6,00,00 9,59,69 1,76,92

G.O. Ms. No. 54, Highways (HQ-2) Department, dt. 04.03.2016

Construction of ROB at KM 7/6 of Keelvithi-Ameerpet road in lieu of existing LC No 37 at Railway Km 80/6-8 near Anvarthiganpet Railway Station

1604002. AS / TS / RAS:

16,04,00 ... ... 10,00 1,30,00

G.O.(MS)No.125/ Highways and Minor Ports (HQ2) Department Dated:28.12.2016

Construction of ROB in lieu of existing L.C.No.34 at km.2/4 of Tiruvarur-Mannargudi-Muthupettai road (SH 202).

2760003.

Thanjavur Division (Projects)

AS / TS / RAS:

27,60,00 ... 43,58 5,00 27,55,00

G.O. Ms. No. 56, Highways (HP-2) Department, dt. 04.03.2016

Construction of Limited Use Subway at km 14/2 of Kumarapalayam-Pallipalayam-Jedarpalayam-Pandamangalam-Velur Road (SH-198) near SPB Mills at Pallipalayam near Cauvery Railway station.

2015004.

Salem Division (Projects)

AS / TS / RAS:

20,15,00 ... 8,06,00 12,00,00 5,00,01

G.O.Ms.No.23/Highways & Minor Ports (HQ2) department Dated.03.04.2017

Construction of ROB at km.144/2 in lieu of existing L.C.No.38 at Railway km.60/100-200 in between Shivadi and Dharmapuri Railway stations.

120750/1325005. AS / TS / RAS:

13,25,00 49 1 5,00,01 8,19,46

G.O. Ms. No. 51, Highways (HQ-2) Department, dt. 04.03.2016

Construction of ROB at km.0/8 of Sholavandhan-Valayapatti road (via Andipatty) in lieu of existing L.C.No.346 at Railway km.473/600-700 in between Madurai and Dindigul Railway stations.

181800/1976006.

Madurai Divison (Projects)

AS / TS / RAS:

19,76,00 13,15 15,16,00 12,00,00 7,62,85

G.O. Ms. No. 50, Highways (HQ-2) Department, dt. 04.03.2016

119,76,00 5,23,51 29,65,59 38,74,70 51,44,245054 03 101 JGTOTAL -

90

Page 95: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

101 Bridges

JE Construction / Reconstruction of Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JE

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 04 101 JE 16 08( DPC )

Construction of High Level Bridge across Uppanar river connnecting KM 6/8 of Chidambaram T.S. Pettai Road and Km 161/8 of PWD Coleroon river left bund road (Kodiyampalayam road) in Cuddalore District

100600/1100001.

Cuddalore Division(Projects)

AS / TS / RAS:

11,00,00 4,39,23 4,07,61 3,30,69 3,30,08

G.O.(Ms.) No. 79 Highways and Minor Ports (HP 1) Department dated: 20.07.2015.

Reconstruction of High level Bridge across Vellar river at KM 104/2 of abandoned NH 45A near Bhuvangiri in Cuddalore District

225700/2257002. AS / TS / RAS:

22,57,00 11,20,14 10,30,80 6,08,79 5,28,06

G.O.(Ms.) No. 137 Highways and Minor Ports (HP 1) Department dated: 26.11.2015.

Construction of bridge at Km 58/4 of Perambalur - Manamadurai road

723423.

Thanjavur Division (Projects)

AS / TS / RAS:

7,23,42 7,11,76 1 1 1

G.O.Ms.No. 446, Highways (HW1) Department dt. 29.10.1997

Construction of a bridge at Km 7/4 of Vaitheeswarankovil - Thirupananthal road

292494. AS / TS / RAS:

2,92,49 2,92,49 1 1 1

G.O.Ms.No. 446, Highways (HW1) Department dt. 29.10.1997

Reconstruction of HLB at Km 34/8 of Mannargudi - Orathanad - Thiruvanom Road

132005. AS / TS / RAS:

1,32,00 82,00 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

construction of High Level Bridge across the river coleroon at Kallani connecting Thiruvanaikoil road and Grant Anaicut road.

598697/6500006. AS / TS / RAS:

65,00,00 6,89,04 18,00,00 34,01,04 24,09,93

G.O.Ms.No. 55, Highways (H.P.2) department dt. 04.03.2016.

Construction of bridge at Km59/8 of Perambalur - Manamadurai road

487967. AS / TS / RAS:

4,87,96 4,87,96 1 1 1

G.O.Ms.No. 446, Highways (HW1) Department dt. 29.10.1997

91

Page 96: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

101 Bridges

JE Construction / Reconstruction of Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JE

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 04 101 JE 16 08( DPC )

Construction of High Level Bridge across Kudamuruti River connecting Manathidal and Valapakudi Village Road (Balance Work)

440898.

Thanjavur Division (Projects)

AS / TS / RAS:

4,40,89 4,35,53 1 1 1

G.O.Ms.No. 120, Highways (HS2) Department dt. 30.6.2009

Reconstruction of a bridge at Km 3/2 of Kumbakonam - Mannargudi road

349359. AS / TS / RAS:

3,49,35 3,45,34 1 1 1

G.O.Ms.No. 446, Highways (HW1) Department dt. 29.10.1997

Reconstruction of HLB across Mudikondan River at Km 12/10 of Nagore - Nannilam - Nachiyarkovil road

2156510. AS / TS / RAS:

2,15,65 2,15,64 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Reconstruction of HLB across Veeracholan River at Km 6/4 of Kuthalam - Komal road

1076111. AS / TS / RAS:

1,07,61 1,07,61 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Reconstruction of High level Bridge across Mudikondan River at Km 26/10 of Mayiladuthurai-Thiruthuraipoondi Road. (Sannanallur)

2329612. AS / TS / RAS:

2,32,96 1,91,62 1 1 1

G.O.Ms.No. 120, Highways (HS2) Department dt. 30.6.2009

Reconstruction of High Level Bridge across Arasalar River at Km 20/6 of Mayiladuthurai-Thiruthuraipoondi Road. (Poonthottam) RAS G.O.Ms.No. 240, Hihways and Minor Ports Department dated 22.12.2009

4291913. AS / TS / RAS:

4,29,19 4,29,00 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

106 Bridges Consultancy Services for Package No. V & VI Arbitration fees Arbitration Award for M/S. STUP Consultancy Services.

2053014. AS / TS / RAS:

2,05,30 2,05,30 1 1 1

G.O.Ms.No. 75, Highways and Minor (HP2) Department dt. 23.4.2012

92

Page 97: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

101 Bridges

JE Construction / Reconstruction of Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JE

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 04 101 JE 16 08( DPC )

Consturction of High Level Bridge aross Mulliyar River including forming approaches in Thiruthuraipoondi Byepass Road.

19615.

Thanjavur Division (Projects)

AS / TS / RAS:

1,96 1,96 1 1 1

G.O.Ms.No. 79, Highways and Minor Ports (HP2) Department dated: 24.4.2012.

Reconstruction of a bridge Palayaru at Km 11/2 of Mannargudi - Orathanadu road (Palayaru)

450616. AS / TS / RAS:

45,06 45,06 1 1 1

G.O.Ms.No. 446, Highways (HW1) Department dt. 29.10.1997

Arbitration 106 Bridges scheme Package VIII Construction of 4 bridges in Tiruvannamalai District Payment of Award Amount with interest to Thiru S.P.Lakshmanan, Contractor

1904417. AS / TS / RAS:

1,90,44 1,90,56 1 ... ...

G.O.(D) No. 50, Highways and Minor Ports (HQ 2) Department dated: 28.04.2014

Reconstruction of a bridges at KM 34/6 of Namanasaudran Ponnamaravathy road.

600018.

Trichy Division(Projects)

AS / TS / RAS:

60,00 37,34 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Reconstruction of a bridge at KM 120/2 of Perambalur Manamadurai road.

300019. AS / TS / RAS:

30,00 21,30 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Reconstruction of a bridge at KM 9/10 of Pudukkottai Emball road.

400020. AS / TS / RAS:

40,00 35,84 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Construction of a bridge at KM 16/2 of Thanjavur Nanjikkottai road.

880021. AS / TS / RAS:

88,00 87,53 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

93

Page 98: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

101 Bridges

JE Construction / Reconstruction of Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JE

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 04 101 JE 16 08( DPC )

Construction of a bridge at KM 21/8 of Thanjavur Nanjikkottai road.

530022.

Trichy Division(Projects)

AS / TS / RAS:

53,00 41,96 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Reconstruction of a bridge at KM 22/2 of Thanjavur Nanjikkottai road.

700023. AS / TS / RAS:

70,00 54,57 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Construction of a bridge at KM 11/8 of Arimalamthirumayam road.

870024. AS / TS / RAS:

87,00 46,40 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Reconstruction of a Bridge at KM 20/10 of Perumanadu Konnaiyur road.

661325. AS / TS / RAS:

66,13 64,03 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Reconstruction of a High level Brige at KM 10/4 of Musiri Thuraiyur-Authoor road in lieu of flood damaged Arch bridge.

1400026. AS / TS / RAS:

1,40,00 88,18 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Reconstruction of a bridge at KM 31/6 of Karaiyur Oliyamangalam road.

700027. AS / TS / RAS:

70,00 35,15 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Reconstruction of a bridge at KM 88/8 of Perambalur Manamadurai road. CR 1/04-2005

600028. AS / TS / RAS:

60,00 31,97 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

94

Page 99: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

101 Bridges

JE Construction / Reconstruction of Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JE

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 04 101 JE 16 08( DPC )

Reconstruction of a bridge at KM 1/2 of Kulamangalam Rarapuram road.

900029.

Trichy Division(Projects)

AS / TS / RAS:

90,00 55,07 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Construction of High level across pampar river with approaches near Chithrambur in Pudukottai district.

188170/16840030. AS / TS / RAS:

16,84,00 4,40,86 8,49,74 6,61,92 4,91,06

G.O.Ms.No.138, Highways (HQ.1) department dt. 26.11.2015.

Construction of Foot Over bridge with Escalator Near Railway stations at Coimbatore city

80900/8890031.

Coimbatore Division (Projects)

AS / TS / RAS:

8,89,00 3,70 5,00,00 3,05,00 5,35,30

G.O.(Ms) No. 91, Highways and Minor Ports Department dated: 04.08.2015.

Construction of Foot Over Bridge with Escalator near Nanjundapuram Junction at Coimbatore City

10720032. AS / TS / RAS:

10,72,00 2,67 10,00,00 1 1

G.O.(Ms) No. 81, Highways and Minor Ports Department dated: 22.07.2015.

Formation of Outer Ring Road for Erode Town (Phase III) KM 7/6-14/8 including Construction of Road Over Bridge at KM 11/2-11/6 in Jeeva Nagar

693000/76200033.

Salem Division (Projects)

AS / TS / RAS:

76,20,00 56,93,30 13,63,03 13,68,40 1,00

G.O.(Ms) No. 172, Highways and Minor Ports Deparment dated: 23.10.2013

Construction of Grade Separator at Km 1/8 of Erode Perundurai Kankeyam road (near Government Hospital)

22926234. AS / TS / RAS:

22,92,62 6,12,71 15,79,91 1 1

G.O. Ms.No. 5, Highways and Minor Ports (HS 1) Department dated: 20.1.2014

Construction of Foot Over Bridge with Escalator near Bus Stand Karur

11370035. AS / TS / RAS:

11,37,00 7,34 1 3,71 1

G.O. Ms.No. 82, Highways and Minor Ports (HP 2) Department dated: 22.07.2015

95

Page 100: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

101 Bridges

JE Construction / Reconstruction of Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JE

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 04 101 JE 16 08( DPC )

Construction of High Level Bridge at Km 4/8 of Pappireddipatti Mallapuram road (M328) across Vaniyar River in Dharmapuri District

72500/7600036.

Salem Division (Projects)

AS / TS / RAS:

7,60,00 2,74,95 3,07,99 3,07,99 1

G.O.(Ms) No. 89, Highways and Minor Ports (HQ 2) Department dt. 3.8.2015.

Construction /Reconstruction of 6 bridges under Packages 11 in Madurai, Theni and Dindigul districts (Arbitration Case)

882937.

Madurai Divison (Projects)

AS / TS / RAS:

88,29 88,29 1 1 1

G.O.Ms.No. 116, Highways and Minor Ports (HS1) Deparrtment dated: 19.7.2013

Construction of bridge at 5/6 of Sivakasi -Kalugumalai road.

1816438. AS / TS / RAS:

1,81,64 1,80,89 1 1 1

GO.Ms.No.242 Highways (HQ1) Department dt.25.11.2005.

Construction of a bridge at Km.0/0 -4 of Karkudi road to meet Ramnad – Nainarkoil Andakudi- Ilayankudi Sivagangai – Melur road.

1650039. AS / TS / RAS:

1,65,00 1,34,67 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Construction of bridge at 3/8 of Sivakasi -Kalugumalai road.

1199840. AS / TS / RAS:

1,19,98 1,19,98 1 1 1

G.O.Ms.No. 240, Highways and Minor Ports (HQ.2) department dt. 22.12.2009

Construction of bridge at Mettur – Palakanuthu Oddanchatram – Dharapuram – Kangeyam road.

750041. AS / TS / RAS:

75,00 70,75 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Construction of Flyover at Km 3/8 of Tirunelveli Byepass road at Vannarpettai in Palayamkottai

17750042.

Tirunelveli Division (Projects)

AS / TS / RAS:

17,75,00 16,25,14 ... ... ...

G.O.Ms.No. 293, Highways (HS.2) Department dated: 4.12.2007

96

Page 101: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

101 Bridges

JE Construction / Reconstruction of Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JE

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 04 101 JE 16 08( DPC )

Reconstruction of a High level bridge at Km10/4 Ambasamudram- Alankulam road

450043.

Tirunelveli Division (Projects)

AS / TS / RAS:

45,00 38,52 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Reconstruction of a High level bridge at Km 62/4 of Rajapalayam - Sankarankoil - Tirunelveli road.

720044. AS / TS / RAS:

72,00 68,12 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Construction of a High level bridge at Km 10/2 of Palayamkottai Ambasamudram road.

2909345. AS / TS / RAS:

2,90,93 2,90,92 1 1 1

G.O.Ms.No. 240, Highways and Minor Ports (HQ.2) department dt. 22.12.2009

Reconstruction of bridge at Km 32/6 of Palayamkottai - Ambasamudram road

3890046. AS / TS / RAS:

3,89,00 2,96,75 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

Reconstruction of a High level bridge at Km 41/8 of Cheramadevi - Panagudi road

220047. AS / TS / RAS:

22,00 19,46 1 1 1

G.O.Ms.No. 61, Highways (HQ.1) department dt. 7.4.2003

64 Lands

5054 04 101 JE 64 07( DPC )

Land Acquisition for construction of High Level Bridge across the river coleroon at Kallani connecting Thiruvanaikoil road and Grant Anaicut road.

/200001.

Thanjavur Division (Projects)

AS / TS / RAS:

2,00,00 ... 65,43 19,98 20,00

G.O.Ms.No. 55, Highways (H.P.2) department dt. 04.03.2016.

Land Acquisition for forming and improving the road connecting NH7 (Sukkaliyur ) and NH 67 (Thaneerpandal) in Karur including Construction of HLB across Amaravathi river

2345002.

Trichy Division(Projects)

AS / TS / RAS:

23,45,00 ... ... 1 2,64,00

G.O. Ms. No. 71 Highways and Minor Ports(HQ2) Department Dated 19.09.2017

97

Page 102: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

101 Bridges

JE Construction / Reconstruction of Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JE

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

64 Lands

5054 04 101 JE 64 07( DPC )

Land Acquisition for Construction of High Level bridge across the river cauvery in between unniyur in Tiruchirappali District and Nerur in Karur District

237003.

Trichy Division(Projects)

AS / TS / RAS:

2,37,00 ... ... 1 2,37,00

G.O. Ms. No. 71 Highways and Minor Ports(HQ2) Department Dated 19.09.2017

Land Compensation-106 Bridges Construction of Bridge across Thamiraparani River at Ganapathiyan Kadavu (CHARGED)

9984.

Tirunelveli Division (Projects)

AS / TS / RAS:

9,98 ... ... ... ...

G.O. Ms No 97/ Highways and Minor Ports (HS2) Department Dated 12.08.2016

Land Acquisition for forming and Improving Western bye pass Road to Aruppukottai Town From NH 45B-NH 45 B Including Construction of ROB

3540005. AS / TS / RAS:

35,40,00 ... ... 1 35,40,00

G.O. Ms. No. 71 Highways and Minor Ports(HQ2) Department Dated 19.09.2017

395,75,85 165,58,60 89,04,88 70,07,92 83,56,825054 04 101 JETOTAL -

98

Page 103: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

JQ Construction/ Reconstruction of bridges and improvement of roads with loan assistance from NABARD

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JQ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 04 337 JQ 16 05( DPC )

Construction of High level bridge across Coleroon river in between Muttam village of Cuddalore District and Manalmedu village Nagapattinam District R.A.S G.O. Ms.No.240/ Highways and Minor Ports (HQ2) Department Dated.22.12.2009

5776001.

Cuddalore Division(Projects)

AS / TS / RAS:

57,76,00 55,93,21 1 1 1

G.O. Ms.No.240/ Highways and Minor Ports (HQ2) Department Dated 22.12.2009

Reconstruction of Bridge across Palayar at Km 5/8 of Kuthalam - Pandanallur Road

125502.

Thanjavur Division (Projects)

AS / TS / RAS:

1,25,50 1,62,81 1 ... ...

G.O.Ms.No. 82, Highways Departmet dated: 24.4.2003

Reconstruction of of Bridge across Vellaiyar river at Km 14/8 of Mannargudi - Thiruvarur road. RAS G.O. Ms.No. 240, Highways and Minor Ports Department dated: 22.12.2009.

149883. AS / TS / RAS:

1,49,88 97,87 1 1 1

G.O.Ms.No. 82, Highways Departmet dated: 24.4.2003

Construction of Bridge across Vikraman river at KM 6/10 of Maapadugai-Kadalangudi

25474. AS / TS / RAS:

25,47 ... 1 ... ...

G.O.(D) No. 147, Highways and Minor Ports (HP1) Department dt. 2.8.2012

Reconstruction of of Bridge across Sullan river at Km 1/2 of Govindakkudi-Mellattur ( Thittai - Dharasuram road)

161545. AS / TS / RAS:

1,61,54 98,16 1 ... ...

G.O.Ms.No. 82, Highways Departmet dated: 24.4.2003

Reconstruction of of Bridge across Koraiyar river at Km 9/2 of Mannargudi - Thiruvarur road.

271346. AS / TS / RAS:

2,71,34 2,42,61 1 ... ...

G.O.Ms.No. 82, Highways Departmet dated: 24.4.2003

Reconstruction of Bridge across Vettar River at Km 29/4-6 of Kumbakonam - Kudavasal - Koradachery - Mavoor road RAS G.O. Ms.No. 120, Highways and Minor Ports Department dated: 30.6.2009.

30830/341887. AS / TS / RAS:

3,41,88 2,96,49 2 1 1

G.O.MS. No.82, Highways and Minor Ports (HP 2) Department Dated.25.05.2016.

99

Page 104: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

JQ Construction/ Reconstruction of bridges and improvement of roads with loan assistance from NABARD

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JQ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 04 337 JQ 16 05( DPC )

Construction of High Level Bridge across Coleroon River connecting Neelathanallur (Thanjavur District) and Madhanathur (Perambalur District).

4060008.

Thanjavur Division (Projects)

AS / TS / RAS:

40,60,00 40,48,18 1 ... ...

G.O. No.126, Highways and Minor Ports (HP 2) Department Dated.10.07.2012

Reconstruction of bridge across Vettar River at Km 10/4 of Saliyamangalam - Papanasam Raod (Papanasam Taluk)

207279. AS / TS / RAS:

2,07,27 2,12,53 1 ... ...

G.O.Ms.No. 82, Highways Departmet dated: 24.4.2003

Improvement to the badly damaged stretches from Sannasinallur - Thamaraipoondi road Km 4/0-10/0 including construction of minor bridge across Uppu odai at Km 5/4 of Sannasinallur - Thamaraipoondi road.

5600010.

Trichy Division(Projects)

AS / TS / RAS:

5,60,00 5,57,10 1 1 1

G.O.Ms.No. 1, Highways (HW1) Department dated: 3.1.2005

Construction of a High level bridge at KM 7/8 of Sannasinallur Thamaraipoondi road across Anaivari Odai.

2030011. AS / TS / RAS:

2,03,00 2,54,20 1 ... ...

G.O.Ms.No. 1, Highways (HW1) Department dated: 3.1.2005

Construction of High Level Bridge across Cauvery river Connecting Mohanur (Namakkal Dist.) and Vangal (Karur Dist)

43500012.

Salem Division (Projects)

AS / TS / RAS:

43,50,00 42,74,27 ... ... ...

G.O.Ms.No. 38, Highways Department dt. 6.2.2008.

162,31,88 158,37,43 12 4 45054 04 337 JQTOTAL -

100

Page 105: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

05 Roads

337 Road Works

JA Construction of interchange at the junction of Pondy Krishnagiri road under Interstate roads of Economic importance

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 05 337 JA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

64 Lands

5054 05 337 JA 64 05( DPC )

Construction of a ROB in lieu of existing level crossing at KM 66/8 of Pondy-Krishnagiri Road including construction of Interchange at the junction of KM 123/2 of NH45 Chennai-Trichy Dindugul Road in Tindivanam (Court Case)

4611.

Thanjavur Division (Projects)

AS / TS / RAS:

4,61 ... ... 4,61 ...

G.O.(Ms)No. 77, H & MP (HP.1) Department dated 27.09.2017

4,61 ... ... 4,61 ...5054 05 337 JATOTAL -

101

Page 106: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JJ 16 04( DPC )

Construction of Road Over Bridge at Km 0/6 of Nandiyambakkam Road in lieu of existing Level Crossing No. 14 at Railway Km 22/14-16 in bettween Attipatttu and Nandiyambakkam Railway Stations (16 Major Works) (Preliminary Sanctioned)

101671.

Chennai Division-I(Projects)

AS / TS / RAS:

1,01,67 28,64 75,48 16,03 57,00

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB in lieu of existing LC.No.13 at Railway km 31/12-14 in between Thirunindravur and Veppampattu Railway Stations.

2872002. AS / TS / RAS:

28,72,00 3,33,90 5,24,52 9,53,13 15,84,97

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of Road Over Bridge at Km 5/4 of Puduvayalpulikat Road in lieu of existing Level Crossing No. 26 at Railway Km 35/5-7 in between Ponneri and Kavaraipettai Railway Stations (16 Major Works) (Preliminary Sanctioned)

111403. AS / TS / RAS:

1,11,40 30,84 82,22 11,50 69,06

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB at LC No. 30 at Tambaram.

7884004. AS / TS / RAS:

78,84,00 74,58,12 1 ... ...

G.O.Ms.No. 307, Highways Department, Dt. 28.12.2004.

Construction of four Lane Road Over Bridge at Km 72/10 of Chennai-Ponnerikarai Kancheepuram road in lieu of existing Level Crrossing No. 29 near Kancheepuram Railwlay Station (16 Major Works)

494220/5436005.

Chengalpattu Division (Projects)

AS / TS / RAS:

54,36,00 6,83,69 20,00,00 20,41,73 27,10,58

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB in lieu of existing LC No.75 at Railway Km 97/15-16 in between Pakkam and Acharapakkam railway staions on Acharapakkam-Periakallakadi Raod (inculding Land Acquistion)

3230006. AS / TS / RAS:

32,30,00 2,28,29 4,00,00 3,99,08 2,24,02

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

102

Page 107: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JJ 16 04( DPC )

Construction of ROB in ieu ofexistingLC No.59 at Railay Km 68/16-18 in between Chengalpet and Ottivakkam Railway Stations Thirukalivakkam Raoad via Ponvilainthakalathur for Old GST Road (including Land Acquistion)

3040007.

Chengalpattu Division (Projects)

AS / TS / RAS:

30,40,00 7,04,16 4,00,00 43,36 10,00,00

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of ROB in lieu of existing LC No.64 at Railway Km 81/2-4 in between Padalam and Karunguzhi Railway stations of Kinar-Keevalam road (including Land Acquisition)

2950008. AS / TS / RAS:

29,50,00 5,74,69 5,17,78 3,52,08 28,58

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of ROB in lieu of existing L.C.No. 70 at Railway Km 4/8 of Ulli- Valathur Road

1410009.

Vellore Division(Projects)

AS / TS / RAS:

14,10,00 12,90 10,00 2,00,00 10,00

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of ROB in lieu of existing L.C.No. 78 at Railway Km 186/12-14 at Kannadikuppam - Iyyanur road

253000/27800010. AS / TS / RAS:

27,80,00 3,55,17 5,00,00 2,52,30 8,50,00

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of Road Over Bridge in lieu of existing Level Crossing No. 59 at Railway Km 142/16-18 between Latheri-Virinjipuram stations and at Km 0/4 of T.K.V.Kottah road to Virinjipuram Road (16 Major Works) (For Work)

22268911. AS / TS / RAS:

22,26,89 ... ... ... 5,00,00

G.O.2(D)No.12/HW&MP Dept/Dt.23.02.18

Construction of ROB in lieu of existing L.C.No. 126 at Railway Km 149/9-10 and L.C. 127 at Railway Km 150/9-10

363800/36500012. AS / TS / RAS:

36,50,00 8,44,26 6,00,00 9,81,22 1,69,24

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of ROB in Km. 49/2 of Wallajah – Sholinghur – Arakkonam Kaveripakkam road lieu of existing L.C.No.685-B (Railway Km. P.P.No. 1020-22) and L.C. No. 32-A ( Railway Km 10/44-46)

16200013. AS / TS / RAS:

16,20,00 10,29,36 1 ... ...

G.O.Ms.No. 172, Highways (HQ2) Department, dt 23.08.2005.

103

Page 108: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JJ 16 04( DPC )

Construction of ROB in lieu of existing L.C.No. 40 at Km . 14/0 of Sholinghur –Kaveripakkam road near Sholinghur Railway station.

11000014.

Vellore Division(Projects)

AS / TS / RAS:

11,00,00 9,59,75 1 1 ...

G.O.Ms.No. 112, Highways (HQ2) Dept. Dt. 19.07.2006.

Construction of Road Over Bridge at KM 7/6 of Keelvithi Ameerpet road in lieu of existing LC No. 37 at Railway KM 80/6-8 near Anvarhiganpet Railway Station (16 MAJOR WORKS) (Preliminary Sanctioned)

320015. AS / TS / RAS:

32,00 17,68 16,00 9,10 5,22

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

Construction of Road Ovver Bridge in lieu of existingg Level Crossing No. 80 at Railway Km 99/100-200 between Polur-Arni Railway Stations at Km 141/4 of Cuddalore-Chittoor Road (16 Major Works) (Preliminary Sanctioned)

934416. AS / TS / RAS:

93,44 47,12 45,00 5,00 35,00

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridge in lieu of existing Level Crossing No. 55 at Railway Km 67/100-200 in between Thandari and Thiruvannamalai Railway Stations and at Km 103/8 of Pondy Krishnagiri Road (16 Major Works) (Preliminary Sanctioned)

1299217. AS / TS / RAS:

1,29,92 13,74 50,00 60,98 50,00

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridge in lieu of existing Level Crossing No. 123 at Railway Km 147/100-200 between Vellore cantonment and Kaniyambadi Railway Stations at Km 4/0 of Vellore-Hosur Road (16 Major Works) (Preliminary Sanctioned)

1286818. AS / TS / RAS:

1,28,68 27,23 1 1 1

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridge in lieu of existing Level Crossing No. 59 at Railway Km 142/16-18 between Latheri-Virinjipuram stations and at Km 0/4 of T.K.V.Kottah road to Virinjipuram Road (16 Major Works) (Preliminary Sanctioned)

712419. AS / TS / RAS:

71,24 9,40 30,00 15,00 46,84

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

104

Page 109: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JJ 16 04( DPC )

Construction of ROB at Bethlegam area in Ambur Town between Ambut and Vaniyambadi Railway Stations 16 Major Works (Preliminary Sanctioned)

950020.

Vellore Division(Projects)

AS / TS / RAS:

95,00 23,87 50,00 5,00 10,00

G.O.Ms.No. 40, Highways and Minor Ports (HQ 2) Department dated: 19.12.2013

Construction of ROB in lieu of existing L.C.No. 80 at Railway Km 195/28-30 at Valayampet - Vaniyambadu road .

255000/28102021. AS / TS / RAS:

28,10,20 10,27,35 6,00,00 2,77,30 9,97,62

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of ROB at km 44/6 of Cuddalore – Chittur road in lieu of existing LC No. 144 at Railway km 182/4-5 in between Thiruvennainallur and Parikkal Railway Stations in Chennai-Trichy chord line (16 Major Works) (Preliminary Sanctioned)

786822.

Cuddalore Division(Projects)

AS / TS / RAS:

78,68 ... 1 25,00 ...

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB at km 1/6 of Olakkur – feeder road in lieu of existing LC No. 88 at Railway km 114/4-6 in between Olakkur and Tindivanam Railway stations

20960023. AS / TS / RAS:

20,96,00 8,17 6,01,87 5,08,20 13,14,71

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of ROBat km 21/0 of Vellimedupettai - Mailam road in lieu of existing LC No. 102 at Railway km 134/28-30 in between Mailam

and Perani Railway stations

224300/24570024. AS / TS / RAS:

24,57,00 13,35,67 7,19,40 3,83,41 59,13

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of ROB at km 0/4 of Vikravandi - Nemur road in lieu of existing LC No. 111 at Railway km 150/12-14 in between Mundiampakkam and Vikravandi Railway stations.

202000/21500025. AS / TS / RAS:

21,50,00 10,52,03 9,04,28 6,47,29 4,26,68

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

105

Page 110: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JJ 16 04( DPC )

Construction of Road Over Bridge at KM 21/6 of Cuddalore-Chitttur road in lieu of exising L.C. No. 138 at Railway KM 185/3-4 in between Panrutti and Nellikuppam Railway Stations (16 MAJOR WORK) (Preliminary Sanctioned)

990026.

Cuddalore Division(Projects)

AS / TS / RAS:

99,00 ... 92,51 25,00 ...

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

Construction of ROB in lieu of existing LC No. 48 at Railway km 77/700-800 between Nagore and Nagapattinam Railway Stations at km 0/2 of Nagapattinam - Akkaraipettai – Velankkanni Road (16 Major Works) (Preliminary Sanctioned)

1740427.

Thanjavur Division (Projects)

AS / TS / RAS:

1,74,04 25,93 1,48,91 5,00 1

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB in lieu of LC No. 34 at km 2/4 of Thiruvarur – Mannargudi - Muthupettai road in between Railway km 50/800 – 50/900 between Kuzhikarai – Thiruvarur Railway Stations of Thanjavur-Nagore-Karaikal Section (16 Major Works)

546828. AS / TS / RAS:

54,68 12,61 1 5,00 1

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB in lieu of LC No. 20 at km 52/4 of Nagai-Gudalore-Mysore road in between Railway km 27/700-900 at Needamangalam yard in Needamangalam Railway Station of Thanjavur-Nagore-Karaikal Section(16 Major Works)(Preliminary Sanctioned)

678829. AS / TS / RAS:

67,88 88,57 90 8,76 1

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of RoadOverBridge in lieu of Level CrossingNo. 16 at Km 16/8 of Mayiladuthurrai-Thiruvarur-Thiruthuraipoondi road between Railway Km15/500-15/600 atPeralam RailwayStationYardof MayiladuthuraiTthiruvarur Section (16Major) (Prleiminary)

594630. AS / TS / RAS:

59,46 29,04 28,65 22,91 7,51

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridge at Km 1/8 of Keelakalkandar Kottai road in lieu of existing Level Crossing No. 323 at Railway Km 399/500-600 between Manjathidal and Thiruverumbur Railway Stations (16 Major Works) (Preliminary Sanctioned)

8235031.

Trichy Division(Projects)

AS / TS / RAS:

8,23,50 4,03 7,96,83 12,00 8,07,47

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

106

Page 111: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JJ 16 04( DPC )

Construction of Road Over Bridge at Km 1/6 of Sirudhaiyur-Sengaraiyur road in lieu of existing Level Crossing No. 226 at Railway Km 311/800-900 between Kattur and Lalgudy Stations (16 Major Works)(Preliminary Sanctioned)

3327232.

Trichy Division(Projects)

AS / TS / RAS:

3,32,72 5,84 3,02,02 21,73 3,05,15

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB in lieu of existing LC.No.241 of Uthamarkoil.

11000033. AS / TS / RAS:

11,00,00 5,71,94 1 ... 1

G.O.Ms.No. 171/Highways (HP2) Department Dated: 24-06-99

Construction of Road Over Bridge at KM 0/4 of Cauvery road in lieu of exising LC No. 249 at Railway Km 331/7-8 in between Srirangam and Trichy Town Railway Stations (16 MAJOR WORKS)(Preliminary Sanctioned)

7050034. AS / TS / RAS:

7,05,00 10,50 6,44,50 1 6,94,49

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

Construction of a ROB in lieu of existing LC.No.84 between Palakarai and Fort stations in Thennur High road.

11000035. AS / TS / RAS:

11,00,00 9,14,35 1 ... 1

G.O.Ms.No. 171/Highways (HP2) Department Dated: 24-06-99

Construction of ROB in lieu of existing LC.No.85 between Palakarai and Fort stations.

16000036. AS / TS / RAS:

16,00,00 13,97,64 1 ... 1

G.O.Ms.No. 171/Highways (HP2) Department Dated: 24-06-99

Construction of a ROB in lieu of LC.No.246 at Km 326/16-17 between Trichy and Srirangam Stations.

13000037. AS / TS / RAS:

13,00,00 6,05,72 1 ... 1

G.O.Ms.No. 171/Highways (HP2) Department Dated: 24-06-99

107

Page 112: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JJ 16 04( DPC )

Construction of ROB at km. 20/6 of Kamanakenpalayam- Annur –road in lieu of existing LC.No. 139 at Railway km. 459/29-31 at Somanur. R.A.S G.O.Ms.No. 98, Highways and Minor Ports Department dated: 11.6.2012

19540038.

Coimbatore Division (Projects)

AS / TS / RAS:

19,54,00 16,32,95 80,04 1 1

G.O.Ms.No. 172, Highways (HQ2) Department, dt 23.08.2005.

Construction of Road Over Bridge with Rotary at km 0/2 of Rasipalayam – Thennampalayam road in lieu of existing LC No. 142A at Railway km 466/21-23 in between Somanur and Sulur Railway Stations (16 Major Works) (Preliminary Sanctioned)

410039. AS / TS / RAS:

41,00 9,81 1 2,50 1

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB in lieu of existing LC No.3 at Railways km.2/9-11 between Coimbatore and Irugur Railway stations on km.0/4 of Ramachandra Naidu street (Coimbatore Corporation Road)

26700040. AS / TS / RAS:

26,70,00 4,33 10,00 3,02,00 9,00,00

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of ROB in lieu of existing LC No.3 at Railways km.2/1-2 between Pollachi-Anamalai Railway stations on km.81/4 of Avinashi-Tiruppur-Palladam-Pollachi-(Via) Cochin Road

33100041. AS / TS / RAS:

33,10,00 23,72,34 1 2,00 1

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of ROB in lieu of existing LC.No.162 at Railway km.160/3 between podanur-Chettipalayam Railway stations on km.10/8 of North Coimbatore-Ramanathapuram-Podanur-Chettipalayam Road

226000/24860042. AS / TS / RAS:

24,86,00 5,93,89 13,95,21 12,92,11 1

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of ROB in lieu of existing L.C.No.10 at Railway km.25/6- between Periyanaikkenpalayam and Karamadai Railway stations on km.373/6 of Nagappattinam-Gudalore-Mysore Road

33770043. AS / TS / RAS:

33,77,00 9,79,94 19,14,94 17,35,12 1

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

108

Page 113: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JJ 16 04( DPC )

Construction of ROB at Km.1/8 of Hasthampatty Cherry road in lieu of existing LC No.184 (Railway Km.190/300-400) and LC.185 (Railway Km.190/400-500) in between Salem Market & Salem Town Railway Stations. (Cherry road LC.184)

58590044.

Salem Division (Projects)

AS / TS / RAS:

58,59,00 30,32,05 12,34,78 12,34,78 1

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of ROB at Km.203/2 of VCC road in lieu of existing LC No.187 (Railway Km.192/300-400) in between Salem Junction and Salem Market Railway Stations

46350045. AS / TS / RAS:

46,35,00 29,16,87 11,12,28 11,12,27 1

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of Road Over Bridges at KM 144/4 of Old NH 7 in lieu of existing LC No. 38 at Railway KM 60/100-200 between Sivadi and Dharmapuri Railway Station (16 Major works) (Preliminary Sanctioned)

200046. AS / TS / RAS:

20,00 ... ... 1 1

G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012

Construction of Road Over Bridges at KM 45/6 of Hogenakkal-Pennagaram-Dharmapuri-Thiruppatur in lieu of existing L.C. No. 43 at Railway KM 67/700-800 between Dharmapuri and Palacode Railway Stations. (16 MAJOR WORKS)

226000/21220047. AS / TS / RAS:

21,22,00 8,21,46 1 8,83,17 1

G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012

Construction of ROB at Km.2/2 of Salem New Bye pass in lieu of existing LC No.183 Railway Km.189/400-500 between Salem Town and Salem East Railway Stations.

45630048. AS / TS / RAS:

45,63,00 15,20,32 10,00,00 10,01,65 1

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of Rrailway Over Bridge in State Highways 79 at chainage 90/2 in Namakkal District 16 MAJOR WORKS

341600/ 35650049. AS / TS / RAS:

35,65,00 20,36,44 1,86,64 5,49,74 1

G.O.(2D) No. 21, Highways and Minor Ports (HQ2) Department dated 02.09.2013

109

Page 114: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JJ 16 04( DPC )

Construction of Road Over Bridges at KM 0/8 of Vennampatty in lieu of existing LC No. 41 at Railwlay Km 65/600-700 between Sivadi and Dharmapuri Railway Stations. (16 Major works) (Preliminary Sanctioned)

300050.

Salem Division (Projects)

AS / TS / RAS:

30,00 5,48 1 16,00 8,52

G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012

Construction of Road Over Bridges at Km 3/4 of Haledharmapuri-Papparapatty in lieu of existing LC No. 46 at railway Km 71/600-700 between Dharmapuri and Palcodu Railway Station (16 MAJOR WORKS)

203100/18900051. AS / TS / RAS:

18,90,00 10,20,79 3,97,50 5,71,09 1

G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012

Construction of ROB at km 0/6 of Bretts road in lieu of existing LC No. 185 at Railway km 190/400-500 in between Salem Market and Salem Town Railway Stations (16 Major Works) (Preliminary Sanctioned)

1750052. AS / TS / RAS:

1,75,00 99 1,64,75 1,64,41 1

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB at Km 0/8 of Sholavanthan-Valayapatty road (via) Andipati in lieu of existing L.C. 346 of Railway KM 473/500-600 in between Madurai-Dindigul Railway Stations (16 MAJOR WORKS) (Preliminary Sanctioned)

2320053.

Madurai Divison (Projects)

AS / TS / RAS:

2,32,00 69,59 ... 7,00 ...

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

Construction of ROB @ KM 0/2 of Ramanathapuram-Keelakarai road in lieu of existing L.C. No. 501 at Railway KM 615/200-300 in between Ramanathapuram and Ucchupuli Railway Stations (16 MAJOR WORKS) (Preliminary Sanctioned)

565054. AS / TS / RAS:

1,56,50 1,22,86 1,89 1,27 1

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

Construction of ROB in at Km 375/2 of BCC road in lieu of existing L.C No. 8 at Railway KM 5/300-400 in between Dindigul and Akkaraipatty Railway stations instead of Railway Km 5/700-800 (16 MAJOR WORKS

20350055. AS / TS / RAS:

20,35,00 13,51,22 5,29,29 5,29,28 1

G.O.Ms.No. 83/ Highways & Minor ports (HQ2) Dept.dated: 22.07.2015

110

Page 115: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JJ 16 04( DPC )

Construction of Limited Use Subway at KM 0/4 of Dindivul Gujiliamparai Karur road in lieu of existing L.C. No. 6 at Railway KM 3/200-300 in between Dindigul and Akkaraipatti Railwlay Stations. (16 MAJOR WORKS) (Preliminary Sanctioned)

1950056.

Madurai Divison (Projects)

AS / TS / RAS:

1,95,00 44,22 2,00 1,00 1

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

Construction of Road Over Bridge at km 203/2 of Tanjavur – Pattukottai – Aranthangi – Karaikudi – Kallal – Kalayarkoil – Maravanmangalam – Ilayankudi – Paramakudi – Mudukulathur – Sayalkudi – road – (SH-29) in lieu of existing LC.No.473 in railway km 578

371500/40850057. AS / TS / RAS:

40,85,00 27,99,99 1 3,26,04 1

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of ROB at Km.1/500-2/700 of Dindigul – Manakkattur road in lieu of existing LCNo.2 @ Railway Km.1/10-11 in between Dindigul & Akkaraipatty stations) and LC No.27 at Railway km.72/200-300 in between Eriodu & Dindigul stations and LC 308

598000/65750058. AS / TS / RAS:

65,75,00 35,80,65 20,94,07 20,50,36 8,37,84

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of Limited Use Subway at KM 0/4 of Dindigul Gujiliamparai Karur road in lieu of existing L.C. No. 6 at Railway KM 3/200-300 in between Dindigul and Akkaraipatti Railwlay Stations. (16 MAJOR WORKS) (For Work)

16180059. AS / TS / RAS:

16,18,00 ... ... 1 6,47,20

G.O.Ms.No. 104/ Highways & Minor ports (HQ2) Dept.dated: 22.12.2017

Construction of ROB at km 14/6-8 of Nanguneri – Ervadi – Valliyoor – Vijayapathy Road in lieu of existing LC No. 82B at Railway km 322/9-323/0 between Nanguneri and Valliyoor Railway Stations (16 Major Works) (For Work)

14520060.

Tirunelveli Division (Projects)

AS / TS / RAS:

14,52,00 ... ... 6,50 7,26,02

G.O. (Ms) No.103, Highways and Minor Ports (HQ2) Department Dated 22.12.2017

Chief Engineer (General) - Providing lighting arrangements to the over bridge at Km. ¼ of Tirunelveli - Shencottai road.

29561. AS / TS / RAS:

2,95 ... 1 1 ...

G.O.Ms. No.1071, P.W. dated 6th August 1974

111

Page 116: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JJ 16 04( DPC )

Construction of ROB at Km.0/0 - 8/0 Aruppukottai Virudhunagr Extension road lieu of existing level crossing 406 Km. 539/12-13 at Vpt - Tenkasi section

80000/11113962.

Tirunelveli Division (Projects)

AS / TS / RAS:

11,11,39 10,84,48 1 1 1

G.O. Ms. No 9 Highways Department dated 8.01.1998

Construction of ROB at Km.60/2 of Tirunchendur - Palayamkottai - Ambasamudram - Tenkasi - Courtalam - Shencottai Road in lieu of existing L.C. 118A at Railway Km. 357/ 400-500 in between Melapalayam and Sengulam Railway station.

32700063. AS / TS / RAS:

32,70,00 16,09,32 2,00,00 2,49,36 1,53,00

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

Construction of ROB at KM 0/8 of Palayamkottai Sivanthipatti road in lieu of existing L.C. No. 6 at Railway KM 6/600-700 in beween Palayamkottai Seidhungaanallur railway station. (16 MAJOR WORKS.) (Preliminary Sanctioned)

3730064. AS / TS / RAS:

3,73,00 3,39,49 1 3,00 1

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

Construction of ROB at km 14/6-8 of Nanguneri – Ervadi – Valliyoor – Vijayapathy Road in lieu of existing LC No. 82B at Railway km 322/9-323/0 between Nanguneri and Valliyoor Railway Stations (16 Major Works) (Preliminary Sanctioned)

2272665. AS / TS / RAS:

2,27,26 30,38 1 3,00 1

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB at KM 0/8 of Palayamkottai Sivanthipatti road in lieu of existing L.C. No. 6 at Railway KM 6/600-700 in beween Palayamkottai Seidhungaanallur railway station. (16 MAJOR WORKS.)

23910066. AS / TS / RAS:

23,91,00 90,12 11,38,29 12,70,18 7,39,00

G.O.Ms.No. 32/ Highways & Minor ports (HQ2) Dept.dated: 18.02.2016

Construction of Limited Use Subway (LUS) at Virudhunagar-Aruppukottai road as deposit work in lieu of temporary level crossing constructed during the construction of ROB at LC No.406.

10530067.

Paramakudi Division (N&RR)

AS / TS / RAS:

10,53,00 7,15,22 4,71,00 3,37,78 1

G.O.(MS) No. 83, Highways and Minor Ports (HP.2) Department, dated: 25.05.2016

112

Page 117: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JJ 16 04( DPC )

Construction of ROB at km 0/4 of Minjur - Kattur - Thirupalaivanam road in lieu of existing LC.No.16 at Railway km 24/16-18 in between Nandiyambakkam and Minjur Railway Station CE METRO

28320068.

C.E. Metro

AS / TS / RAS:

28,32,00 18,24 28,09,03 12,00 9,00,00

G.O.(D) No. 200/Highways and Minor Ports (HQ2) Department dt. 7.12.2011.

64 Lands

5054 80 800 JJ 64 03( DPC )

Construction of Road Over Bridge at Km 0/6 of Nandiyambakkam Road in lieu of existing Level Crossing No. 14 at Railway Km 22/14-16 in bettween Attipatttu and Nandiyambakkam Railway Stations (64 Lands) (Preliminary Sanctioned)

1000001.

Chennai Division-I(Projects)

AS / TS / RAS:

10,00,00 ... 1 8,85,00 1,00,00

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridge at Km 5/4 of Puduvayalpulikat Road in lieu of existing Level Crossing No. 26 at Railway Km 35/5-7 in between Ponneri and Kavaraipettai Railway Stations (64 Lands)(Preliminary Sanctioned)

60000/ 681402. AS / TS / RAS:

6,81,40 ... 1 6,26,00 1

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of four Lane Road Over Bridge at Km 72/10 of Chennai-Ponnerikarai Kancheepuram road in lieu of existing Level Crrossing No. 29 near Kancheepuram Railwlay Station (64 Lands)

300003.

Chengalpattu Division (Projects)

AS / TS / RAS:

3,00,00 ... 1 1 1

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridge in lieu of existingg Level Crossing No. 80 at Railway Km 99/100-200 between Polur-Arni Railway Stations at Km 141/4 of Cuddalore-Chittoor Road (64 Lands) (Preliminary Sanctioned)

430004.

Vellore Division(Projects)

AS / TS / RAS:

4,30,00 ... 1,00,00 1 1,00,00

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

113

Page 118: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

64 Lands

5054 80 800 JJ 64 03( DPC )

Construction of Road Over Bridge in lieu of existing Level Crossing No. 55 at Railway Km 67/100-200 in between Thandari and Thiruvannamalai Railway Stations and at Km 103/8 of Pondy Krishnagiri Road ( 64 Lands ) (Preliminary Sanctioned)

200005.

Vellore Division(Projects)

AS / TS / RAS:

2,00,00 ... 50,00 1 1,00,00

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridge in lieu of existing Level Crossing No. 123 at Railway Km 147/100-200 between Vellore cantonment and Kaniyambadi Railway Stations at Km 4/0 of Vellore-Hosur Road (64 Lands) (Preliminary Sanctioned)

500006. AS / TS / RAS:

5,00,00 ... 1 1 1

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridge at KM 7/6 of Keelvithi Ameerpet road in lieu of existing LC No. 37 at Railway KM 80/6-8 near Anvarhiganpet Railway Station (64 LANDS) (Preliminary Sanctioned)

302007. AS / TS / RAS:

3,02,00 75,00 50,00 2,00,00 27,00

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

Construction of ROB at Bethlegam area in Ambur Town between Ambut and Vaniyambadi Railway Stations 64 LANDS (Preliminary Sanctioned)

550008. AS / TS / RAS:

5,50,00 ... 1,00,00 1 10,00

G.O.Ms.No. 40, Highways and Minor Ports (HQ 2) Department dated: 19.12.2013

Construction of Road Over Bridge in lieu of existing Level Crossing No. 59 at Railway Km 142/16-18 between Latheri-Virinjipuram stations and at Km 0/4 of T.K.V.Kottah road to Virinjipuram Road (64 Lands) (Preliminary Sanctioned)

350009. AS / TS / RAS:

3,50,00 ... 50,00 1,00,01 2,00,00

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridge at KM 21/6 of Cuddalore-Chitttur road in lieu of exising L.C. No. 138 at Railway KM 185/3-4 in between Panrutti and Nellikuppam Railway Stations (64 LANDS) (Preliminary Sanctioned)

1110010.

Cuddalore Division(Projects)

AS / TS / RAS:

1,11,00 22,91 1 1 ...

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

114

Page 119: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

64 Lands

5054 80 800 JJ 64 03( DPC )

Construction of ROB at km 44/6 of Cuddalore – Chittur road in lieu of existing LC No. 144 at Railway km 182/4-5 in between Thiruvennainallur and Parikkal Railway Stations in Chennai-Trichy chord line (64 Lands) (Preliminary Sanctioned)

1250011.

Cuddalore Division(Projects)

AS / TS / RAS:

1,25,00 9,86 1,15,37 1 ...

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridge in lieu of Level Crossing No. 16 at Km 16/8 of Mayiladuthurrai-Thiruvarur-Thiruthuraipoondi road between Railway Km 15/500-15/600at Peralam Railway StationYard ofMayiladuthurai-Thiruvarur Section(64lands)(Prleiminary work)

15825012.

Thanjavur Division (Projects)

AS / TS / RAS:

15,82,50 ... 15,82,49 16,35 1

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB in lieu of LC No. 20 at km 52/4 of Nagai – Gudalore - Mysore road in between Railway km 27/700 – 900 at Needamangalam yard in Needamangalam Railway Station of Thanjavur – Nagore – Karaikal Section. (64 Lands) (Preliminary Sanctioned)

100000/ 8000013. AS / TS / RAS:

8,00,00 ... 10,00,00 2,15,78 3,00,00

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB in lieu of LC No. 34 at km 2/4 of Thiruvarur – Mannargudi - Muthupettai road in between Railway km 50/800 – 50/900 between Kuzhikarai – Thiruvarur Railway Stations of Thanjavur-Nagore-Karaikal Section (64 Lands)

20255014. AS / TS / RAS:

20,25,50 7,00,00 1 2 11,25,50

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB in lieu of existing LC No. 48 at Railway km 77/700-800 between Nagore and Nagapattinam Railway Stations at km 0/2 of Nagapattinam - Akkaraipettai – Velankkanni Road (64 Lands) (Preliminary Sanctioned)

22000015. AS / TS / RAS:

22,00,00 ... 12,00,00 2,50,00 10,00,00

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Consruction of Road Over Bridge at KM 0/4 of Cauvery road in lieu of exising LC No. 249 at Railway Km 331/7-8 in between Srirangam and Trichy Town Railway Stations (64 LANDS)(Preliminary Sanctioned)

10000016.

Trichy Division(Projects)

AS / TS / RAS:

10,00,00 ... 1 1 5,19,51

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

115

Page 120: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

64 Lands

5054 80 800 JJ 64 03( DPC )

Construction of Road Over Bridge at Km 1/8 of Keelakalkandar Kottai road in lieu of existing Level Crossing No. 323 at Railway Km 399/500-600 between Manjathidal and Thiruverumbur Railway Stations (64 Lands) (Preliminary Sanctioned)

20000017.

Trichy Division(Projects)

AS / TS / RAS:

20,00,00 ... 15,00,00 2,50,00 13,00,00

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridge at Km 1/6 of Sirudhaiyur-Sengaraiyur road in lieu nof existing Level Crossing No. 226 at Railway Km 311/800-900 between Kattur and Lalgudy Stations ( 64 Lands ) (Preliminary Sanctioned)

17000018. AS / TS / RAS:

17,00,00 ... 16,00,00 2,00,00 15,00,00

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridge with Rotary at km 0/2 of Rasipalayam – Thennampalayam road in lieu of existing LC No. 142A at Railway km 466/21-23 in between Somanur and Sulur Railway Stations (64 Lands) (Preliminary Sanctioned)

4365019.

Coimbatore Division (Projects)

AS / TS / RAS:

4,36,50 ... 1,05,00 4,36,50 1

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridges at KM 0/8 of Vennampatty in lieu of existing LC No. 41 at Railwlay Km 65/600-700 between Sivadi and Dharmapuri Railway Stations. (64 Lands) (Preliminary Sanctioned)

11600020.

Salem Division (Projects)

AS / TS / RAS:

11,60,00 ... 1 4,79,50 6,80,50

G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012

Construction of Road Over Bridges at Km 3/4 of Haledharmapuri-Papparapatty in lieu of existing LC No. 46 at railway Km 71/600-700 between Dharmapuri and Palcodu Railway Station (64 LANDS) (Preliminary Sanctioned)

3090021. AS / TS / RAS:

3,09,00 ... ... ... 1

G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012

Construction of Road Over Bridge at L.C. No. 159 at Railway KM 164/600-700 in between Valappady and Minnampalli Railway Stations in Salem District 64 LANDS (Preliminary Sanctioned)

6992022. AS / TS / RAS:

6,99,20 56,37 2,00,00 2,06,67 1

G.O.(D) No. 27, Highways and Minor Ports (HQ 2) Department dated: 12.12.2013

116

Page 121: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

64 Lands

5054 80 800 JJ 64 03( DPC )

Construction of ROB at km 0/6 of Bretts road in lieu of existing LC No. 185 at Railway km 190/400-500 in between Salem Market and Salem Town Railway Stations (64 Lands) (Preliminary Sanctioned)

41850023.

Salem Division (Projects)

AS / TS / RAS:

41,85,00 20,00,00 10,78,68 21,85,00 1

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of Road Over Bridges at KM 144/4 of Old NH 7 in lieu of existing LC No. 38 at Railway KM 60/100-200 between Sivadi and Dharmapuri Railway Station (64 Lands) (Preliminary Sanctioned)

2190024. AS / TS / RAS:

2,19,00 ... ... 1 1

G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012

Construction of Railway Over Bridge in State Highways 79 at chainage 90/2 in Namakkal District 64 LANDS

60000/8500025. AS / TS / RAS:

8,50,00 7,23,54 ... 2 ...

G.O.(2D) No. 21, Highways and Minor Ports (HQ2) Department dated 02.09.2013

Construction of Road Over Bridges at KM 45/6 of Hogenakkal-Pennagaram-Dharmapuri-Thiruppatur in lieu of existing L.C. No. 43 at Railwlay KM 67/700-800 between Dharmapuri and Palacode Railway Stations. (64 Lands) (Preliminary Sanctioned)

12940026. AS / TS / RAS:

12,94,00 ... ... 1 1

G.O.M.S.No.8/ Highways and Minor Pors (HQ2) Deparment Dated: 23.1.2012

Construction of Limited Use Subway at KM 0/4 of Dindigul Gujiliamparai Karur road in lieu of existing L.C. No. 6 at Railway KM 3/200-300 in between Dindiul and Akkaraipatti Railwlay Stations. (64 LANDS) (Preliminary Sanctioned)

15425027.

Madurai Divison (Projects)

AS / TS / RAS:

15,42,50 ... ... 1 1

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

Construction of ROB at Km 0/8 of Sholavanthan-Valayapatty road (via) Andipati in lieu of existing L.C. 346 of Railway KM 473/500-600 in between Madurai-Dindigul Railway Stations (64 LANDS.)(Preliminary Sanctioned)

12054028. AS / TS / RAS:

12,05,40 1,26,70 1,00 6,00 ...

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

117

Page 122: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JJ Construction of over and under bridges in lieu of Existing level crossings

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

64 Lands

5054 80 800 JJ 64 03( DPC )

Construction of ROB @ KM 0/2 of Ramanathapuram-Keelakarai road in lieu of existing L.C. No. 501 at Railway KM 615/200-300 in between Ramanathapuram and Ucchupuli Railway Stations (64 Lands) (Preliminary Sanctioned)

6750029.

Madurai Divison (Projects)

AS / TS / RAS:

6,75,00 5,14,00 ... 1,61,00 1

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

Construction of ROB at km 14/6-8 of Nanguneri – Ervadi – Valliyoor – Vijayapathy Road in lieu of existing LC No. 82B at Railway km 322/9-323/0 between Nanguneri and Valliyoor Railway Stations (64 Lands) (Preliminary Sanctioned)

10000030.

Tirunelveli Division (Projects)

AS / TS / RAS:

10,00,00 88,32 10,00 5,00 5,00

G.O.(2D) No. 24, Highways and Minor Ports (HQ2) Departmentt dated: 29.10.2013

Construction of ROB in liew of existing LC No.55 at Railway Km 67/100-200 in between Thandarai and Thrivannamalai Railway Station

38740031. AS / TS / RAS:

38,74,00 ... ... ... 3,00,00

Construction of ROB at KM 0/8 of Palayamkottai Sivanthipatti road in lieu of existing L.C. No. 6 at Railway KM 6/600-700 in beween Palayamkottai Seidhunganallur railway station. (64 LANDS.) (Preliminary Sanctioned)

3150032. AS / TS / RAS:

3,15,00 50,00 1 15,42 1

G.O.Ms.No. 206/ Highways & Minor ports (HQ2) Dept.dated: 17.12.2012

1,538,98,50 536,42,34 336,25,40 271,89,18 241,42,785054 80 800 JJTOTAL -

118

Page 123: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JN Provision for Road Works

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JN

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JN 16 06( DPC )

Forming Southern Sector of Inner Ring Road from Km 14/1 of NH 45 to meet Chennai Mahabalipuram road at km 14/4 in Chennai. (Works)

6791001.

Chennai Division-I(Projects)

AS / TS / RAS:

67,91,00 67,00,00 1 1 1

GO.Ms.No.7, PW, dt.3.6.1992

To make payment to Thiru.P.Ramankutty, contractor as per court award for the work of forming Northern Extension of Inner Ring Road from km.17/5-25/6 to meet Thiruvottiyur-TPP road at km.5/2 and improvements to TPP road from km.5/2-4/6 phase-I.

85672. AS / TS / RAS:

85,67 ... 1 1 1

GO.Ms.No.57, HW&MP (HW.2) Department, dt.04.03.2016

64 Lands

5054 80 800 JN 64 05( DPC )

Forming Southern Sector of inner Ring Road from Km14/1 of NH45 to meet Chennai Mahabalipuram road at Km 14/4 in Chennai (64 Lands) (LA Work)

6050001. AS / TS / RAS:

60,50,00 ... 1 ... ...

GO.Ms.No.07,PW Department, dt.03.06.1992

Land Acquisition for construction of Southern Sector of Inner Ring road between Velachery to St.Thomas Mount( Payment of Enhanced Compensation amount LAOP No 89/2013 Filled by Tmt. Chandramthi Muthaiah) (64 Lands Charged)

204912.

Chennai Division-I(Projects)

AS / TS / RAS:

2,04,91 ... ... 2,04,91 ...

G.O.(D) No.236/HW&MP Dept/Dt.13.10.17

Enhanced compensation payable to Tmt. Vallidevi and 17 others as per the orders of the sub-court Tambaram for the work of const of ROB in lieu of LC No 26 btw Chrompet and Pallavrm Rlystn vaishnava clg at palavaram thuraipakkam radial rd 64 Lands Charged

1353143. AS / TS / RAS:

13,53,14 ... ... 13,53,14 1

G.O No 79 Highways and Minor Ports HW2 Department Dated 11.04.2017

Widening to Double Lane from km 19/10 of Coimbatore-Nagapattinam road (NH 83) to km 31/2 of Palladam-Cochin Frontier road (SH 163) (Via) Mullupadi, Myleripalayam and Chettipalayam (Alternate route from Pollachi to Coimbatore) (64 Lands)

390004.

Coimbatore Division (Projects)

AS / TS / RAS:

3,90,00 ... ... 1 3,90,00

G.O. Ms. No. 3 Highways and Minor Ports(HS2) Department Dated 10.01.2018

119

Page 124: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JN Provision for Road Works

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JN

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

64 Lands

5054 80 800 JN 64 05( DPC )

Land Acquisition for Forming and Improving Western bye pass Road to Tirunelveli

7983005.

Tirunelveli Division (Projects)

AS / TS / RAS:

79,83,00 ... ... 1 39,91,01

G.O. Ms. No. 71 Highways and Minor Ports(HQ2) Department Dated 19.09.2017

228,57,72 67,00,00 3 15,58,09 43,81,045054 80 800 JNTOTAL -

120

Page 125: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of Road Over Bridge in lieu of existing at LC. No.33 at Railway km.44/28-30 near Gummidipoondi Railway Station.

3900001.

Chennai Division-I(Projects)

AS / TS / RAS:

39,00,00 17,24,66 1 1 1

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of Road Over Bridge in Obalapuram – Sunnambukkulathur Road at km 0/2 in lieu of existing LC. No.38 at Railway Km.52/8-10 in between Elavur and Akkampettai Railway

Station.

2337002. AS / TS / RAS:

23,37,00 20,34,52 2,97,48 1,33,00 1,69,48

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Construction of Road Over Bridge in lieu of existing LC. No.21 at Railway Km.47/14-16 in between Kadambathur and Thiruvalangadu Railway Stations (Near Kadambathur Railway station)

149000/ 2574003. AS / TS / RAS:

25,74,00 16,17,42 9,35,00 9,35,00 21,58

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006. RAS G.O 27 dated 11.04.2017

Construction of Road Over Bridge in lieu of Existing LC.No. 12 at Railway Km.28/ 21-23 at Km.6/0 of Korattur- Thirunindravur-Periyapalayam Road in between Pattabiram and Thirunindravur Railway Stations

1378004. AS / TS / RAS:

13,78,00 9,81,48 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of Road Over Bridge in lieu of existing LC No.10 at Railway Km.25/ 3-5 at Km.11/2of Poonamallee - Thandarai Road near Pattabiram Railway Stations.

1278005. AS / TS / RAS:

12,78,00 11,01,70 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of Pedestrian subway in lieu of existing LC.No.20 at Railway Km.20/5-6 (Near DGQA CO-OPTEX).

80006. AS / TS / RAS:

80,00 23 1 1 1

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB in lieu of existing LC.No.37 at Railway Km.37/1-2 in Km.0/4 of Railway gate road near Urapakkam Railway Station.

2968007. AS / TS / RAS:

29,68,00 25,92,80 1 1 1

G.O. Ms. No. 71 Highways and Minor Ports (HW2) Dept., Dt.18.4.2012

121

Page 126: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of Road Over Bridge in lieu of existing LC No.10 at Railway Km. 13/2-3 between Ennore and Kathivakkam Railway

Stations.

1882008.

Chennai Division-I(Projects)

AS / TS / RAS:

18,82,00 17,81,29 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB connecting Pallavaram - Thuraipakkam Radial Road with NH-45 in lieu of the proposed ROB at the existing LC.No.26 near Vaishnava College Land Acquisition.

2000009. AS / TS / RAS:

20,00,00 15,83,00 1 1 ...

G.O. Ms. No. 118, Highways (HW2) Department Dt.12.06.2003

Construction of ROB in lieu of existing LC.No. 34 at Railway Km.34/5-6 in between Perungalathur - Vandalur Railway Station.

23670010. AS / TS / RAS:

23,67,00 22,51,41 1 1 ...

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of Road Over Bridge in lieu of existing LC. No.15 at Railway Km.35/30-32 in between Sevvapet and Putlur Railway stations

24500011. AS / TS / RAS:

24,50,00 7,79,92 11,77,27 11,77,37 42,71

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB connecting Pallavaram - Thuraipakkam Radial Road with NH-45 in lieu of the proposed ROB at the existing LC.No.26 near Vaishnava College

44540012. AS / TS / RAS:

44,54,00 38,14,14 1 1 2

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 / RAS G.O.Ms.No. 240, Highways and Minor Ports Department dated: 22.12.2009

Construction of Road Over Bridge in lieu of existing at LC. No.37 at Railway Km.49/4-6 in between Gummidipoondi and Elavur Railway Stations.

17000013. AS / TS / RAS:

17,00,00 14,70,80 1 1 1

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB between Guduvanchery - Singaperumal Koil Railway Station in lieu of existing LC.No.47.

58179014.

Chengalpattu Division (Projects)

AS / TS / RAS:

58,17,90 27,11,83 2,00,00 1,99,08 2,90,00

G.O. Ms. No. 60, Highways (HQ2) Department, dt.06.03.2008

122

Page 127: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

existing LC.No.54 at Railway Km.61/1-2 in between Chengalpattu - Thirumani Railway stations at Km.27/0 of Sathurangapattinam - Kancheepuram road in Chengalpattu town.

43925215.

Chengalpattu Division (Projects)

AS / TS / RAS:

43,92,52 43,91,50 27 93 3

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / RAS G.O.(2D) No. 7 Highways and Minor Ports Department dated: 1.3.2011

Construction of ROB between Vandalur- Guduvanchery Railway Station in lieu of existing of LC.No.40. near Guguvanchery Railway Station in between Vandalur and Guduvanchery Railway Stations

31940016. AS / TS / RAS:

31,94,00 20,46,41 2,00,00 1,70,44 8,50,00

G.O. Ms. No. 60, Highways (HQ2) Department, dt.06.03.2008

Construction of ROB in lieu of LC.No.1 at Railway Km.1/700-800 in between Chengalpet and Old Seevaram railway station in Old GST road (Near Chengalpet)

34580017. AS / TS / RAS:

34,58,00 28,06,59 ... ... ...

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Construction of ROB in lieu of existing LC.No.36 in between Vandalur - Gduvanchery Railway Station at Railway Km.36/12 - 14 (Near

Urapakkam).

37950018. AS / TS / RAS:

37,95,00 23,84,77 6,90,00 6,90,00 7,00,00

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of a ROB in lieu of existing LC.No.69 near Valathur Yard at Railway Km,163/15-17 on Ulli - Kakathoppu Road at Km.0/2 (Near Ulli).

18500019.

Vellore Division(Projects)

AS / TS / RAS:

18,50,00 17,55,31 1 1 1

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of RUB in lieu of existing LC.No.66 in between Melathur Vallathur Railway Station near Railway Yard.

105000/115500/14264020. AS / TS / RAS:

14,26,40 11,93,01 1 55,06 1

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 G.O. Ms. No. 27, Highways Department, dt. 11.04.17

Construction of RUB in lieu of existing LC.No.81 in between Vaniyambadi - Keethandipatti Railway Stations near Vaniyambade Railway Yard at Railway Km.197/36-198 (Near Town Road).

13000021. AS / TS / RAS:

13,00,00 72,89 75,00 2,09,81 2,35,00

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

123

Page 128: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of ROB in lieu of existing LC.No.128 at Km.118/8 of Krishnagiri - Ranipet Railway Km.151/12-13 between vellore and Katpadi Railway Station.

226100/53350022.

Vellore Division(Projects)

AS / TS / RAS:

53,35,00 5,74,82 2,50,00 5,00 1,50,00

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Construction of Road Over Bridge at Km. 5/4 of Pallikonda - Gudiyatham road in lieu of existing LC.No.64 at Railway Km.154/2-14 between Gudiyatham and Melalathur Railway Stations.

13770023. AS / TS / RAS:

13,77,00 9,60,00 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB in lieu of existing LC.No.89 at Km.0/6 of Thirupathur Vallakkalnatham road at Railway Km.218/32-219/2 in between Jolarpet Thirupathur Railway Stations.

23450024. AS / TS / RAS:

23,45,00 22,35,59 1 1 1

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Construction of ROB in lieu existing LC.No.86 at Km.1/8 of Jolarpet - Natarpalli road at Railway Km.211/4-6 of Jolarpet - Kethandapatti Railway Stations.

23720025. AS / TS / RAS:

23,72,00 11,14,61 6,00,00 6,80,63 5,76,76

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Construction of ROB in lieu of existing LC.No.82 at Km.55/6 of Krishnagiri - Ranipet road at Railway Km.198/34-36 of Vaniyambadi Kethandapattti Railway Stations.

195400/19950026. AS / TS / RAS:

19,95,00 19,59,27 1 1 ...

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Construction of ROB between Kavanoor and Gudiyatham Railway Station in lieu of existing LC.No.63 at Km.8/2 of Kavanur Rusha Hospital to Pasumathur road.

19340027. AS / TS / RAS:

19,34,00 12,14,87 1 1 1

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Construction of Road Over Bridge at Km. 23/8 of Tirupathur - Bargur road in lieu of existing LC.No.90 at Km.222/7-9 between Tirupathur -

Moolakaranpatti Railway Stations.

11630028. AS / TS / RAS:

11,63,00 11,63,00 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

124

Page 129: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of Road Over Bridge at Km.56/0 of Dharmapuri - Tirupathur Road in lieu of existing LC.No.91 at Railway Km.223/0-1 between Tirupathur and Moolakaranpatti

13370029.

Vellore Division(Projects)

AS / TS / RAS:

13,37,00 6,31,70 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB in lieu of existing LC.No.50 in Km.4/4 of Tiruvalam Katpadi road at Railway Km.120/14-16 between Sevur and Tiruvalam Railway Station.

12260030. AS / TS / RAS:

12,26,00 9,24,96 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construciton of ROB in lieu of existing LC.No.33 at Railway Km.71A/36-38 in between Arakkonam and Thirutani Railway Stations.

13370031. AS / TS / RAS:

13,37,00 7,41,90 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB in lieu of existing LC.No.88 at Km.0/4 in Tirupathur - Natranpalli road at railway Km.217/8 - 10 in between Jolarpet - Tirupathur Railway stations.

16381032. AS / TS / RAS:

16,38,10 16,10,58 1 1 1

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / R.A.S. G.O.Ms.No. 43, Highways and Minor Ports Department dated: 26.3.2013

Construction of ROB in lieu of existing LC.No.45A & 45B at Railway Km.101/17-19 & 101/18-20 near Walajah railway station at Km.4/3 of Walajah Sholingar Arrakonam road (SH).

15500033. AS / TS / RAS:

15,50,00 11,97,57 1 1 1

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

Construction of ROB at km.194/2 of NH 45 (MTD ROAD) in lieu of existing L.C.No.156 at Railway km.190/800-900 of Ulundurpet – Puvanur Card line. (near Ulundurpet)

25000034.

Cuddalore Division(Projects)

AS / TS / RAS:

25,00,00 11,90,63 1 1 1

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB at Km.1/9 of Cuddalore – Thirukoilur Anaikut road in lieu of L.C.No.159 &160 near Thirupathiripuliyur Railway station.

22440035. AS / TS / RAS:

22,44,00 21,98,56 ... 1,03 ...

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 / RAS G.O.Ms.No. 240, Highways and Minor Ports Department dated: 22.12.2009

125

Page 130: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of ROB at Km.0/6 of Cuddalore – Vridhachalam – Salem road in lieu of existing L.C.No.166A at Railway Km.211/4-5 of Villupuram – TPJ main line

16350036.

Cuddalore Division(Projects)

AS / TS / RAS:

16,35,00 15,93,89 1 1 1

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

Contruction of ROB at Km.0/10 of Salavathi road in lieu of existing L.C.No.93 at Railway Km.124/2-3 in Villupupra – Trichy main line (Olakur – Thindivanam road)

24500037. AS / TS / RAS:

24,50,00 10,21,59 10,19,48 6,94,73 7,33,68

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB at Km.19/10 of Vridhachalam – Tholudur road in lieu of existing L.C.No.181 at Railway Km.236/1-2 of Villupuram – Trichy Junction Chord line (Pennadam – Mathur road ) near Pennadam Sugar factory

23000038. AS / TS / RAS:

23,00,00 21,86,69 1 4,52 1

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Contruction of ROB at Km.27/6 of Vikiravandi – Kumbakonam – Tanjavur road in lieu of existing L.C.No.135A at Railway Km.182/1-2 of Villupupram – Trichy main line . (Thiruthuraiyur – Panruti)

212500/23360039. AS / TS / RAS:

23,36,00 12,85,45 4,13,13 9,11,23 1,39,32

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

Construction of ROB at 0/10 of Chidambaram – Sivapuri – Gavarapattu road in lieu of LC.202 at Railway Km.247/2-3 between Villupuram and TPJ main line.

10500040. AS / TS / RAS:

10,50,00 15,22,95 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 / RAS G.O.Ms.No. 311, Highways and Minor Ports Department dated: 30.12.2008

Construction of ROB at KM 0/8 of Thanjavur – Pattukottai – Road in lieu of LC No. 303 at Railway KM 353/1-2 in between Thanjavur and Thittai Railway Stations. RAS G.O.Ms.No. 143, Highways and Minor

Ports Department dated: 22.4.2010

18440041.

Thanjavur Division (Projects)

AS / TS / RAS:

18,44,00 18,25,37 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB in lieu of LC No. 309 at Railway KM 372/7-8 in between Budalur and Ayyanapuram Railway Stations.

17900042. AS / TS / RAS:

17,90,00 17,85,00 1 1 1

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

126

Page 131: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of ROB in Nagai - Gudalore - Mysore Road in lieu of LC No. 302 at Railway at KM 351/7-8 in between Thanjavur and Thittai

Railway Stations.

26990043.

Thanjavur Division (Projects)

AS / TS / RAS:

26,99,00 23,54,08 1 1 1

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Construction of ROB at KM 26/2 of Perambalur - Manamadurai Road in lieu of LC No.201 at Railway KM 270/0-100 in between Ariyalur and Sillakgudi Railway Stations.

284000/ 31230044. AS / TS / RAS:

31,23,00 20,31 6,00,00 16,34,86 14,67,83

GO Ms. No.236 / Highways (HQ -2) Department Dated. 3.10.2008

Construction of ROB at KM 40/4 of Trichy - Chidambaram Road in lieu of LC No.206 at Railway KM 284/9 to 285/0 in between Sillakgudi and Kallagam Railway Stations.

29000045. AS / TS / RAS:

29,00,00 14,18 50,00 15,15 28,70,67

GO Ms. No.272 / Highways (HQ -2) Department Dated. 13.11.2007

Construction of R.O.B. in lieu of existing L.C.No.281 at Railway Km377/100 - 200 in between Manaparai and Chettiapatti Railway Stations at Km 1/4 of Old G.S.T. Road.

21530046.

Trichy Division(Projects)

AS / TS / RAS:

21,53,00 15,90,92 1 3,55 1

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Reconstruction of Bridge (with Four - lane Carriageway) at Km 314/10 of Chennai -Trichy - Dindigul road near Thiruvanaikoil in lieu of Old bridge (Bridge No.380-A) at Railway Km 329/10-11. (For WORKS)

42700047. AS / TS / RAS:

42,70,00 21,90,75 20,00,24 18,72,21 2,07,04

G.O.(2D) No. 2, Highways and Minor Ports (HQ2) Department dated: 2.2.2011.

Reconstruction of at Km 0/2 of M.S.P. Camp road near Thiruchirappalli Railway Junction in lieu of existing Old Bridge at Railway Km 340/4-5

(Bridge No.1136) in Trichy-Dindigul Section.(For WORKS)

70840048. AS / TS / RAS:

70,84,00 51,28,71 8,50,49 8,92,47 10,62,82

G.O.(2D) No. 2, Hihways and Minor Ports (HQ2) Department dated: 2.2.2011.

Construction of R.O.B. in lieu of existing L.C.No.325 at Railway Km 406/13-14 in between Trichy and Kumaramangalam Railway Stations at Km 1/4 of NH 45 - B. (Trichy - Viralimalai, Madurai Aruppukottai and Thuthukudi road)

285800/40200049. AS / TS / RAS:

40,20,00 33,29,69 5,64,14 1,08,18 1

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

127

Page 132: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of ROB in lieu of L.C.No.279 in between Samuthiram - Manapparai Railway station at Railway Km 375/8-9 on Musiri - Kulithalai - Pattukotai - Alankudi - Sethupavasathiram Road at Km 41/2 (Manapparai Town)

28000050.

Trichy Division(Projects)

AS / TS / RAS:

28,00,00 14,98,84 1 1,59 1

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB at KM 3/10 of Trichy Chidambaram road in lieu of existing LC.No. 234 at the Railway KM 321/6-7 between Valadi and Pitchandarkoil Stations.

14400051. AS / TS / RAS:

14,40,00 7,47,06 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB in lieu of L.C.No.228 in between Kattur - Lalgudi Railway station at Railway Km 313/3-4 on Siruthaiyur - Kollidam Anaicut Road at Km 0/4 (Lalgudi Town)

205000/26600052. AS / TS / RAS:

26,60,00 24,62,78 1 1,25,00 72,22

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 / G.O. Ms. No. 82, Highways Department, dt. 25.05.16

Construction of ROB in lieu of L.C.No.248 in between Srirangam - Trichy Railway station at Railway Km 331/0-1 on Cauveri South Bank Road at Km 0/4 (Near Trichy Town Railway Town)

445200/49500053. AS / TS / RAS:

49,50,00 47,52,76 1,47,47 54,00 1,43,24

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB. at km.0/10 of Pollachi-Valparai road in lieu of existing L.C.No.118 at Railway km.120/7-8 in between Gomangalam-

Pollachi Railway stations.Location: Pollachi Town.

16720054.

Coimbatore Division (Projects)

AS / TS / RAS:

16,72,00 12,17,42 19,99 19,99 ...

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

Construction of ROB at Km. 0/2 of Irugur Town Panchayat office road in lieu of exisiting L.C. No 2 at Railway Km. 1/11-13 in between Irugur-Peelamedu Railway Stations

25628955. AS / TS / RAS:

25,62,89 ... ... ... ...

G.O. Ms. No. 83, Highways (HP-2) Department, dt. 25.05.2016

Construction of ROB. at km.3/10 of Ramanathapuram- Podanur road in lieu of existing L.C.No.21 at Railway km.21/43-45 (B.G) Km.162/14-15 (M.G) in between Coimbatore and Podanur junction.

17220056. AS / TS / RAS:

17,22,00 12,59,97 1 1 ...

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

128

Page 133: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of ROB. at km.1/2 of Udumalpet-Chinnar road in lieu of existing L.C.No.95 at Railway km.92/16-17 in between Udumalapettai-Gomangalam Railway stations. RAS G.O.(2D) No. 7 Highways and Minor Ports Department dated: 1.3.2011

23940057.

Coimbatore Division (Projects)

AS / TS / RAS:

23,94,00 18,65,99 10,00 60,00 1

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

Construction of ROB. at km.2/10 of Kuruchi - Nachipalayam road in lieu of existing L.C.No.151 at Railway km.450/1-12 in between Podanur – Madukkarai stations.

14050058. AS / TS / RAS:

14,05,00 14,04,96 1 1 ...

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB. at km.0/10 of Irugur and Chinniampalayam road in lieu of existing L.C.No.144 at Railway km.475/22-24 in between Irugur – Podanur Railway stations..

21100059. AS / TS / RAS:

21,10,00 21,15,16 1 1 ...

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / R.A.S. G.O.Ms.No: 190, Highways Dept. Dated: 11.10.2010

Construction of ROB. at km.2/10 of Sulur-Nilambur road in lieu of existing L.C.No.143 at Railway km.468/18-20 in between Somanur and

Sulur road Railway stations.

122500/111600/12799160. AS / TS / RAS:

12,79,91 11,87,36 1,00,00 11,00 81,55

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / G.O. Ms. No. 74, Highways Department, dt. 29.03.17

Construction of ROB at km. 0/2 of Coolipalayam RS to Vavipalayam road in lieu of LC.No.130 at Railway km. 435/12-14 in between Uthukuli – Tiruppur Railway station.

17000061. AS / TS / RAS:

17,00,00 11,19,75 1 1 1

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB. at km.1/0 of Rathinapuri – Sanganur road Gandhipuram 7th street in lieu of existing L.C.No.11 at Railway km.12/19-21 in between Peelamedu and Coimbatore North Railway station.

33030062. AS / TS / RAS:

33,03,00 21,45,32 3,51,98 1 1

G.O. Ms. No. 82, HW&MP (HQ2) Department, dt. 25.05.2016

Construction of RUB. at km.0/2 of Gandhiji salai (Theirettery) to Kannapan Nagar road in lieu of existing L.C.No.13 at Railway km.13/25-27 in between Peelamedu and Coimbatore North Railway station.

15400063. AS / TS / RAS:

15,40,00 7,66,97 2,63,52 2,57,32 5,15,71

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

129

Page 134: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of ROB at km. 2/0 of Mangalam Avinashi road in lieu of LC.No. 134 at Railway km. 450/13-15 at Vanchipalayam yard.

17000064.

Coimbatore Division (Projects)

AS / TS / RAS:

17,00,00 17,22,84 1 1 ...

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB at Km 35/8 of Gobi – Uthukuli Kangeyam Road L.CNo.128 in between Uthukuli – Tiruppur Railway station.

13370065. AS / TS / RAS:

13,37,00 8,57,29 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB at km 1/2 of Valankulam bypass road in lieu of existing LC.No.20 at Railway km 18/23-25 between Coimbatore and Podanur Railway stations

140000/ 15400066. AS / TS / RAS:

15,40,00 15,51,73 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB. at km.0/6 of Singanallur - Vellalore road in lieu of existing L.C.No.146 at Railway km.476/22-24 in between Irugur and

Podanur Railway station.

25800067. AS / TS / RAS:

25,80,00 28,30,83 1,00 1 ...

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB at km 11/6 of Tiruppur – Vijayamangalam Road L.C.No.129 between Uthukuli – Tiruppur Railway Station.

13370068. AS / TS / RAS:

13,37,00 9,63,91 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB at km 334/6 of Nagapattinam – Gudalore – Mysore road in lieu of existing L.C.No.145 at Railway km.477/10-12 within Coimbatore Corporation limit (Ondipudur).

16500069. AS / TS / RAS:

16,50,00 16,45,64 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB at Km. 1/8 of Mallapuram-Mookanur Road in lieu of Existing LC.No. 105 Railway Km. 288/8-10 in between Bommidi Buddi reddipatty Railway Station.

10600070.

Salem Division (Projects)

AS / TS / RAS:

10,60,00 9,86,63 ... ... ...

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

130

Page 135: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of ROB at Km. 0/10 of Omalur-Sankagiri road in lieu of existing LC. No.9 at Railway Station.

12950071.

Salem Division (Projects)

AS / TS / RAS:

12,95,00 7,33,92 1 6,80 ...

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB at km. 6/8 of Suramangalam Road in lieu of Existing LC. 113 Railway Km. 332/8-10 Between Salem Junction and Magnesite stations)And also lies in Salem corporation limits)

22500072. AS / TS / RAS:

22,50,00 12,38,34 1 1 ...

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB at Km.17/4 of Edapady Magudan-chavadi road in lieu of existing LC.116 at Railway Km.354/32-34 between Magudan-chavadi – Maveli-palayam station

13370073. AS / TS / RAS:

13,37,00 2,62,54 1 1 ...

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB at Km.419/4 of Chennai-Trichy-Dindigul road in lieu of existing LC.No.5 at Km.3/100-200 in between Dindigul-

Akkaraipatty Railway Station.

17650074.

Madurai Divison (Projects)

AS / TS / RAS:

17,65,00 16,03,99 1 72,55 1

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Construction of ROB at Km.438/6 of BCC road (SH) in lieu of existing L.C.No.363 at Railway Km.494/4 of Madurai - Dindigul section near Sellur.

28988775. AS / TS / RAS:

28,98,87 28,97,99 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB in Thirupparan-kundram town road in lieu of existing LC No.370 at Railway Km.500/6-7 between Madurai –

Thirupparan-kundram Railway station.

22000076. AS / TS / RAS:

22,00,00 20,48,19 1 1,51,80 1

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB in lieu of LC. No. 486 &487 in between Milavittan - Tuticorin Railway station at Railway Km. 652/11-12 and 653/6-7

27500077.

Tirunelveli Division (Projects)

AS / TS / RAS:

27,50,00 17,52 1,00 2,00,00 1,00

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

131

Page 136: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of ROB at Km 1/4 of Nagercoil - Balamore road in lieu of existing L.C. No 32B at Railway Km 280/6-7 between Nagercoil Junction and Nagercoil Town (Eraniel)

21400078.

Tirunelveli Division (Projects)

AS / TS / RAS:

21,40,00 20,46,38 1 49,78 1

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

Construction of ROB at Km 0/8 of Tenkasi - Madurai road in lieu of existing L.C. No. 502 at Railway Km. 660/8-9 between Tenkasi and Shencottai Railway stations

24500079. AS / TS / RAS:

24,50,00 16,58,16 1 2,00,00 10

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

Construction of ROB at 132/6 of Madurai Tuticorin road SH in lieu of Existing L.C.No.485 at Railway Km.651/12-13 at Tuticorin between Meelavitan and Tuticorin stations

16050080. AS / TS / RAS:

16,05,00 15,04,41 1 1,00,59 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000 / RAS G.O.Ms.No. 45, Highways and Minor Ports Department dated: 26.3.2013

Construction of ROB at Km. 94/2 of Madurai - Kanyakumari road SH in lieu of existing L.C. No. 440 at Raillway Km. 588/9-10 between Kovilpatti and Kumarapuram Railway stations

12950081. AS / TS / RAS:

12,95,00 5,56,89 1 1,38,30 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB at Km 153/10 of Madurai Kanyakumari (NH7) in lieu of existing LC.4 at Railway Km 4/8-9 at Tirunelveli & Seithunganallur Railway Stations.

25510082. AS / TS / RAS:

25,51,00 13,07,70 10,00 15,35 50

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Construction of ROB at Km. 91/4 of Madurai - Kanyakumari road S.H in lieu of L.C. No. 437 at Railway Km. 586/1-2 at Kovilpatti in between Kovilpatti and Nalli Railway stations.

12950083. AS / TS / RAS:

12,95,00 5,11,37 1 1 1

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of RUB in lieu of existing L.C.No. 16 at Railway Km 38/22-4 near Putlur Railway station at Km.1/4 of Kakkalur Putlur road. (CE N & RR)

104200/33090084.

Chenglepet Division (N&RR)

AS / TS / RAS:

33,09,00 4,64,33 5,74,73 1,03,62 15,90,00

G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 / G.O.Ms.No.27, Highways and Minor Ports Dept. dated 11.04.17

132

Page 137: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of Road Over Bridge in lieu of existing L.C.No.2 at Railway Km.1034-1035 between Pattabiram and Pattabiram West Railway Station at Km.67/4 of Tirupathi Renigunta Thiruttani-Chennai road (NH.205) (CE N & RR)

334800/52110085.

Chenglepet Division (N&RR)

AS / TS / RAS:

52,11,00 7,36,24 26,06,25 2,45,35 18,93,60

G.O. Ms. No. 39/Highways & Minior Ports (HQ2) Dept. dated 01.03.11 / G.O. Ms. No. 27/Highways & Minior Ports (HP2) Dept. dated 11.04.17

Construction of ROB in lieu of existing L.C.No. 7 at Railway Km 17/34-18/2 in between Ambattur - Avadi Railways Stations (Near Annanur Railway station) (CE N & RR)

156000/52980086. AS / TS / RAS:

52,98,00 15,40,89 1 11,75,34 15,00,00

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / G.O. Ms. No. 27, Highways Department, dt. 11.04.17

Construction of RUB in lieu of existing L.C.No. 9 at Railway Km 23/22-4 in between Avadi - Pattabiram Railways Stations (Near Hindu College Railway station) (CE N & RR)

8550087. AS / TS / RAS:

8,55,00 5,05,51 3,44,54 17,35 3,00,00

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

Construction of ROB in lieu at L.C.No.2 at Railways Km 2/2-3 between Villupuram-Venkatesapuram railway of Villupuram Katpadi section at road Km.158/8 of NH.45A towards Villupuram town. (CE N & RR)

34750088.

Cuddalore Division (N&RR)

AS / TS / RAS:

34,75,00 18,39,30 11,41,92 9,50,00 6,85,70

G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010

Consultancy services for preparation of Detailed project report for the work of Construction of RUB in lieu of existing LC No.304 at Railway KM.354/4-5 between Thanjavur Railway station and Railway yard. (CE N & RR)

42850089.

Thanjavur Division (N&RR)

AS / TS / RAS:

42,85,00 24,73,35 1,90 7,36,46 1,92,46

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB at Km.50/220 of NH67 (Nagapattinam-Gudalore-Mysore road) in lieu of existing L.C.No.22 in Railway Km.31/3-4 in Koradachery Station. (CE N & RR)

231900/231900/27170090.

Nagapattinam Division (N&RR)

AS / TS / RAS:

27,17,00 9,96,28 11,57,49 17,00,73 19,99

G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 / G.O.Ms.No.78,Highways (HP2) and Minor Ports Dept. dated 28.09.17

133

Page 138: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of ROB at Km 0/6 of Thaneerpandal road in lieu of existing L.C.No.6 at Raiway Km 6/15-17 in between Singanallur - Peelamedu Railway Stations (CE N & RR)

12650091.

Coimbatore Division (N&RR)

AS / TS / RAS:

12,65,00 3,78 12,56,20 1 1

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006

Construction of ROB at Km 0/2 of Irugur Town Panchayat office road in lieu of L.C.No.2 at Railway Km 1/11-13 in between Irugur - Peelamedu Railway station. (CE N & RR)

186900/27860092. AS / TS / RAS:

27,86,00 21,26,23 5,72,19 2,80,08 50,00

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Construction of ROB in lieu of existing L.C.No.5 in between Irugur - Peelamedu Railway station at Railway Km 3/21-23 on Neelikonam palayam - SIHS Colony Road at Km 1/6 Near SIHS Colony (CE N & RR)

170000/58520093. AS / TS / RAS:

58,52,00 30,96 16,68,54 26,73,92 3,00,00

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007 / G.O. Ms. No. 27, Highways Department, dt. 11.04.17

Construction of LUS in lieu of LC No.10 at Km 11/33-35 in between Peelamedu Coimbatore North section in Irugur Coimbatore section. (CE N & RR)

11900094. AS / TS / RAS:

11,90,00 2,29 11,86,69 1 1

G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010

Construction of ROB in lieu of LC No.7 at Km 8/1-3 in between Irugur-Peelamedu station in Irugur Coimbatore section. (CE N & RR)

30500095. AS / TS / RAS:

30,50,00 24,51,06 4,62,71 5,98,94 1

G.O. Ms. No. 39/Highways & Minior Ports (HQ2) Dept. dated 01.03.11

Construction of RUB in lieu of LC No.4 at Km 3/3-5 in between Irugur-Peelamedu station in Irugur Coimbatore section. (CE N & RR)

21160096. AS / TS / RAS:

21,16,00 17,73,52 2,48,82 55,97 ...

G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010

Construction of ROB in lieu of existing LC No.9 in between Peelamedu - Coimbatore North Railway station at Railway Km 10/19-20 on Ganapathy - Avarampalayam Road at Km 0/8 (Avarampalayam). (CE N & RR)

22550097. AS / TS / RAS:

22,55,00 15,11,41 6,90,22 50,26 6,93,07

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

134

Page 139: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of ROB in lieu of existing LC No.133 in between Uthukuli - Tiruppur Railway station at Railway Km 441/9-11 on Tiruppur Kongu Main Road At Km 0/2 (Kongu Nagar) (CE N & RR)

27680098.

Erode Division (N&RR)

AS / TS / RAS:

27,68,00 24,30,26 3,57,48 3,12,01 1

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB in lieu of existing LC No.132 in between Uthukuli - Tiruppur Railway station at Railway Km 440/26-28 on Tiruppur - Vavipalayam Km Road at Km 0/2 SRC Mill Gate)

48256599. AS / TS / RAS:

48,25,65 38,06,91 10,20,45 3,05,42 1

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of ROB in at Railway Km 394/10-12 in between Erode and Thottipalayam railway station in lieu of L.C.No.124 of Erode Chennimalai road to Periyasadayampalayam Road at Km.0/2. (CE N & RR)

100980100. AS / TS / RAS:

10,09,80 7,57,83 1,80,54 1,46,00 1

G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010

Construction of ROB at Km.1/2 of Munarai-Thotti Mannarai Road in lieu of L.C. 131 at Railway Km.438/4-6 in between Uthukuli and Tiruppur Railway Station. (CE N & RR)

181890/ 133800101. AS / TS / RAS:

18,18,90 9,37 13,27,61 4,00,00 9,28,63

G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010 / G.O.Ms.No.27, Highways (HP2) and Minor Ports Dept. dated 11.04.17

Construction of RUB at Dindigul Hanumanthanagar in lieu of existing L.C. No.309 at Railway Km.431/900-432 in Dindigul yard. (CE N & RR)

264000102.

Madurai Division (N&RR)

AS / TS / RAS:

26,40,00 14,39,30 10,21,84 1,70,00 10,30,70

G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010

Construction of ROB at Km 0/2 of Madurai - Kanyakumari road in lieu of existing L.C. No.366 at Railway Km 496/18-497/1 at Palanganatham between Madurai junction and Tiruparankundram Railway Stations (CE N & RR)

330000/462750103. AS / TS / RAS:

46,27,50 32,97,98 2,11 2,00,00 11,29,00

G.O. Ms. No. 210, Highways (HQ2) Department, dt. 11.10.2006 / G.O. Ms. No. 78, Highways Department, dt.28.09.17

135

Page 140: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of ROB in lieu of L.C. No.371 at km 1/2 of Thiruparamkundram Municipal road at Railway Km 501/400-500 in between Madurai Tiruparankundram Railway Stations

245300104.

Madurai Division (N&RR)

AS / TS / RAS:

24,53,00 16,02,57 1,40,77 1,00 3,16,43

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008

Construction of ROB at railway Km 538/500-600 in lieu of existing LC No. 403 between Virudhunagar and Thulukkapatti Rly stations (Virudhunagar Town) (CE N & RR)

205300/267520105.

Paramakudi Division (N&RR)

AS / TS / RAS:

26,75,20 12,76,89 1 6,60,71 7,37,60

G.O. Ms. No. 236, Highways (HQ2) Department, dt. 03.10.2008 / G.O. Ms. No. 71, Highways Department, dt. 10.10.17

Construction of a RUB in lieu of existing L.C.No. 439 at Railway Km 587/6-7 between Kovilpatti and Kumarapuram Railway stations at Km 40/2 of paruvakudi - kovilpatti - Ettayapuram road (SH.44)

129500106.

Tirunelveli Division (N&RR)

AS / TS / RAS:

12,95,00 9,90,44 1 3,04,00 56

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

Construction of ROB at Km.147/8 of NH-7 (Madurai-Kanniyakumari Section) in lieu of existing L.C.No.18 of Railway Km 27/500-600

between Tirunelveli Junction and Yard.

291200107. AS / TS / RAS:

29,12,00 19,00,18 8,04,80 2,50,00 7,61,00

G.O.Ms.No.215, Highways (HQ2) and Minor Ports Dept. dated 10.11.2010

Construction of ROB in lieu of Existing LC No.13 in between Ennore and Athipattu Railway station at Railway KM 29/28-30 (near Athipattu Station) CE (C & M)

170000/232970108.

Thiruvallur Division (C&M)

AS / TS / RAS:

23,29,70 19,89,44 1 87,00 1,36,17

G.O. Ms. No. 272, Highways (HQ2) Department, dt. 13.11.2007

Construction of R.O.B. in lieu of L.C. 14 in between Tirunindravur Tiruvallur (Near Veppampattu railway station) CE (METRO)

295000109.

C.E. Metro

AS / TS / RAS:

29,50,00 6,89,78 19,50,22 1 22,60,22

G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010.

Construction of RUB in liew of existing LC.No.22 at Railway Km 21/10-11 near Trisulam Railway station. CE (METRO)

140000110. AS / TS / RAS:

14,00,00 4,81 13,91,19 1,00 10,00

G.O. Ms. No. 176, Highways (HQ2)Department dt. 05.10.2000

136

Page 141: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

16 Major Works

5054 80 800 JT 16 04( DPC )

Construction of Limited use RUB in lieu of existing LC No.27 at Chrompet Radha Nagar main road near chrompet Railway station. CE (METRO)

147600111.

C.E. Metro

AS / TS / RAS:

14,76,00 6,79,64 7,80,36 1,00 10,00

G.O.Ms.No.245 Highways Department Dt: 5.12.03

Construction of Road under Bridge in Lieu of existing LC No. 4 at Railway Km 11/32-34 near Korattur. (CE METRO)

199700112. AS / TS / RAS:

19,97,00 4,79,30 12,92,70 3,70,76 11,46,94

G.O. Ms. No. 60, Highways (HQ2) Department, dt.06.03.2008

Construction of ROB in LC - 3 in between Thandayarpet -Thiruvotriyur Railway Station near Thiruvotriyur Mattumandai CE (METRO)

470000/ 580500113. AS / TS / RAS:

58,05,00 43,77,27 1 12,42,82 1

G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010. / G.O.MS.No. 75, Highways (HP1) Department dt. 23.09.17

Construction of RUB in LC.No.4 in between Thiruvotriyur - Ennore (near Thiruvotriyur Railway Stations) CE (METRO)

280000114. AS / TS / RAS:

28,00,00 11,15 27,87,85 15,10,00 1,00,00

G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010.

Construction of ROB at LC No.5 in between Villivakkam & Ambatthur Railway Stations Near Pattravakkam CE (METRO)

350000115. AS / TS / RAS:

35,00,00 34,73,62 1 1 1

G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010.

Construction of RUB in LC.No.6 in between Thiruvotriyur - Wimco Nagar Railway Station. CE (METRO)

255000116. AS / TS / RAS:

25,50,00 13,43,72 12,05,28 10,00 1,00,00

G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010.

Constuction of ROB in LC.No. 32 & 33 in lieu of L.C. 33 in between Tambaram Vandalore Railway Stations (Near Standard Motors) CE (METRO)

760000117. AS / TS / RAS:

76,00,00 24,49,69 10,00,00 7,20,00 10,00,00

G.O.(D) No. 230, Highways (HQ1) Department dt. 1.12.2010.

64 Lands

5054 80 800 JT 64 03( DPC )

137

Page 142: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JT Construction of Railway Over Bridges /Railway Under Bridges

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JT

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 4 Chief Engineer (Highways) - Projects

64 Lands

5054 80 800 JT 64 03( DPC )

Construction of ROB at Km.1/9 of Cuddalore – Thirukoilur Anaikut road in lieu of L.C.No.159 &160 near Thirupathiripuliyur Railway station. (64 Lands)

225401.

Cuddalore Division(Projects)

AS / TS / RAS:

2,25,40 ... ... 2,25,40 1

G.O.Ms.No. 92, Highways and Minor Ports Department dated: 15.11.2017

Construction of ROB at Km.1/9 of Cuddalore – Thirukoilur Anaikut road in lieu of L.C.No.159 &160 near Thirupathiripuliyur Railway station. (64 Lands) CHARGED

311032. AS / TS / RAS:

3,11,03 ... ... 3,11,03 ...

G.O. (D) No 78 &96 Highways and Minor Ports (HP-1) Department Dated 11.04.2017& 26.04.2017

Reconstruction of at Km 0/2 of M.S.P. Camp road near Thiruchirappalli Railway Junction in lieu of existing Old Bridge at Railway Km 340/4-5

(Bridge No.1136) in Trichy-Dindigul Section. 64 LANDS (Land Acquisition)

1056003.

Trichy Division(Projects)

AS / TS / RAS:

10,56,00 10,56,00 1 1 1

G.O.(2D) No. 2, Highways and Minor Ports (HQ2) Department dated: 2.2.2011.

Reconstruction of Bridge (with Four - lane Carriageway) at Km 314/10 of Chennai -Trichy - Dindigul road near Thiruvanaikoil in lieu of Old bridge (Bridge No.380-A) at Railway Km 329/10-11 (Land Acquisition) 64 LANDS

460004. AS / TS / RAS:

4,60,00 4,60,00 2 2 ...

G.O.(2D) No. 2, Highways and Minor Ports (HQ2) Department dated: 2.2.2011.

2,963,32,77 1,831,35,23 380,03,48 276,74,99 272,23,865054 80 800 JTTOTAL -

138

Page 143: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

DEMAND No.21 – HIGHWAYS AND MINOR PORTS DEPARTMENT

21 05. PROJECT DIRECTOR - TAMIL NADU ROAD SECTOR PROJECT

Page 144: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

PB Tamil Nadu Road Sector Project

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 PB

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 5 Project Director, Tamil Nadu Road Sector Project

16 Major Works

5054 80 800 PB 16 04( DPC )

Upgradation Component

17220000/ 176399871. AS / TS / RAS:

1,763,99,87 1,705,97,09 1 41,99,87 1

G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010. G.O.(D) No.283 HW&MP Dept / Dt.13.12.17

Others ( R & R works and Misc.items)

2779282. AS / TS / RAS:

27,79,28 25,00,77 ... ... ...

G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010.

Institutional Strengthing

4626773. AS / TS / RAS:

46,26,77 44,08,48 ... ... ...

G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010.

Consultancy

6938044. AS / TS / RAS:

69,38,04 67,59,18 ... ... ...

G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010.

Maintenance Component

52450795. AS / TS / RAS:

524,50,79 491,75,51 ... ... ...

G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010.

64 Lands

5054 80 800 PB 64 03( DPC )

Lands

5208121. AS / TS / RAS:

52,08,12 50,61,00 1 95,91 1

G.O.Ms.No.62/HW & M.P / dt.08.04.2003. and RAS.G.O No.308 / HW&M.P / dt.08.12.2010. G.O.(D) No.168 / HW&MP Dep. Dt.20.07.17 G.O.(D) No.280 / HW&MP Dep. Dt.08.12.17

2,484,02,87 2,385,02,03 2 42,95,78 25054 80 800 PBTOTAL -

139

Page 145: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

PC Tamil Nadu Road Sector Project Phase - II

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 PC

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 5 Project Director, Tamil Nadu Road Sector Project

16 Major Works

5054 80 800 PC 16 02( DPC )

Upgrading Mohanur-Namakkal-Senthamangalam-Rasipuram Road (SH 95) Km 0/000 to 13/100 (13.10 Km) (EPC 07)

8005101. AS / TS / RAS:

80,05,10 69,97,92 6,35,41 9,14,84 92,34

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Upgrading Viruthachalam-Parankipettai Road (SH 70) Km 0/000 to Km 35/800 (35.80 Km) (EPC 04)

20762802. AS / TS / RAS:

207,62,80 27,86,49 100,00,00 88,18,50 91,57,81

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Contingencies

695003. AS / TS / RAS:

6,95,00 53,24 1,00,00 36,49 26,40

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Institutional Capacity Enhancement

6600004. AS / TS / RAS:

66,00,00 40,76 30,40,00 3,53,21 7,68,93

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Upgrading Malliyakari-Rasipuram-Thiruchengode-Erode Road (SH 79) Km 0/000 to Km 30/600 and Km 51/400 to Km 71/300 (50.50 Km) (EPC 06)

29509705. AS / TS / RAS:

295,09,70 125,04,13 82,49,36 101,06,11 11,65,41

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Four lanning and Strengthening of Ottanchathiram-Tharapuram-Thiruppur Road (SH 37) Km 37/400 to Km 126/200 (88.80 Km) (PPP 02)

64200006. AS / TS / RAS:

642,00,00 89,65,56 135,00,00 3,38,64 23,70,00

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Strengthening and widening of Thirunelveli-Sengottai-Kollam Road (SH 39) Km 5/000 to Km 50/600 (45.60 Km) (PPP 03)

51424307. AS / TS / RAS:

514,24,30 57,02 113,06,86 15,60 5,20,63

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

140

Page 146: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

PC Tamil Nadu Road Sector Project Phase - II

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 PC

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 5 Project Director, Tamil Nadu Road Sector Project

16 Major Works

5054 80 800 PC 16 02( DPC )

Upgrading Arcot-Villupuram Road (SH4) Km 29/800 to Km 110/200 and Km 113/200 to Km 114/200 and Km 113/200 to Km 114/600 (82.444 Km) (EPC 02)

49809208. AS / TS / RAS:

498,09,20 143,71,88 160,00,00 158,84,53 69,60,53

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Upgrading Nanguneri Bharathavaram - Ovari Road (SH 89) upto ECR Junction Km 0/000 to Km 35/200 (35.20 Km) (EPC 08)

18070609. AS / TS / RAS:

180,70,60 99,57,64 55,23,90 53,33,48 9,00,00

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Four lanning and Strengthening of Mettupalayam-Sathy-Gopi-Erode Road (SH 15) Km 123/000 to Km 153/400 (30.40 Km) (PPP 01)

342817010. AS / TS / RAS:

342,81,70 31,85,10 85,00,00 ... 30,00

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Road Safety

120000011. AS / TS / RAS:

120,00,00 11,60 7,00,00 21,46,79 32,80,86

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Upgrading Kanchipuram Vandavasi Road (SH116) Km 14/500 Km 36/900 (22.40 Km) & Upgrading Sadras - Chengalpattu - Kanchipuram - Arakkonam-Thiruthani Road (SH 58) Km 0/000 to Km 26/800 (26.143) (EPC 01)

254206012. AS / TS / RAS:

254,20,60 108,03,97 100,00,00 107,56,74 18,30,50

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Maintenance of Output and Performance Based Road Contract (642kms)

239000013. AS / TS / RAS:

239,00,00 54,75,03 33,09,44 81,53,13 46,09,48

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Upgrading Paruvakudi-Kovilpatti-Ettayapuram-Vilathikulam-Vembar Road (SH 44) Km 22/500 to Km 38/750 and Km 41/300 to Km 56/700 (EPC 09)

196501014. AS / TS / RAS:

196,50,10 74,54,60 57,51,95 80,58,39 19,09,25

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

141

Page 147: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

PC Tamil Nadu Road Sector Project Phase - II

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 PC

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 5 Project Director, Tamil Nadu Road Sector Project

16 Major Works

5054 80 800 PC 16 02( DPC )

Upgrading Omalur-Sankari-Thiruchengode-Paramathi Road (SH 86) Km 54/800 to Km 81/000 (26.20 Km) (EPC 05)

146390015. AS / TS / RAS:

146,39,00 57,52,58 55,15,22 42,43,75 2,68,59

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Upgrading Cuddalore-Chithoor Road (SH 4) Km 41/700 to Km 44/000 and Km 45/000 to Km 66+190 and Construction of New Link Road between SH9 and SH 137 ( 28.45 Km) (EPC 03)

137615016. AS / TS / RAS:

137,61,50 58,86,04 28,12,00 44,70,98 11,41,00

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Consultancy Services

132710017. AS / TS / RAS:

132,71,00 24,95,09 38,16,62 22,42,76 15,52,04

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

Upgrading Rajapalayam-Sankarankoil-Tiruneveli Road (SH 41) Km 2/000 to Km 28/000 and Km 33/800 to Km 82/800 (75.20 Km) (EPC 10)

417994018. AS / TS / RAS:

417,99,40 154,48,71 117,03,26 127,45,98 62,00,00

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

64 Lands

5054 80 800 PC 64 01( DPC )

Lands

45700001. AS / TS / RAS:

693,00,00 63,49,14 285,00,50 123,00,00 55,00,00

G.O.(D).No.117/HW & MP (HN.2)/ dt.29.05.2015.

5,171,00,00 1,185,96,50 1,489,64,52 1,069,19,92 482,83,775054 80 800 PCTOTAL -

142

Page 148: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

DEMAND No.21 – HIGHWAYS AND MINOR PORTS DEPARTMENT

21 07. CHIEF ENGINEER (HIGHWAYS) - NABARD AND RURAL ROADS

Page 149: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

JI Improvements to Rural Roads with loan assistance from NABARD

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JI

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

16 Major Works

5054 04 337 JI 16 01( DPC )

Improvements to Rural Roads with loan assistance from NABARD L.S Provision

550671. AS / TS / RAS:

5,50,67 4,33,36 1,17,30 90,00 27,30

G.O.Ms.No. 6, Highways (HW1)Dept., DT.4.1.2008 G.O.MS.No.76/HW&MP Dept./23.04.12

64 Lands

5054 04 337 JI 64 00( DPC )

Improvemets to Rural Roads with loan assistance from NABARD under Rural Roads Scheme - Land L.S Provision.

01. AS / TS / RAS:

... ... 1 1 ...

Enhanced compensation payable to the land owners for the acquisition of lands in Agaramcheri, Chinnacheri and Kollamangalam villages.

234212. AS / TS / RAS:

2,34,21 ... ... ... 1

G.O.Ms.No. 2,3 and 4, Highways (HQ2) Dept. dt. 3.1.2017

7,84,88 4,33,36 1,17,31 90,01 27,315054 04 337 JITOTAL -

143

Page 150: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

JJ Improvement to Bus Routes with loan assistance from NABARD

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

16 Major Works

5054 04 337 JJ 16 09( DPC )

Improvement to Bus Routes with loan assistance from NABARD. Construction of High level bridge across Koraiyur river at Km.3/6-9 of Kongarayanur-T.Edayar road (via) Paiyur and including improvements to the road Km.0/0-6/4 (LWW 300m.)

01. AS / TS / RAS:

... ... 1 1 1

64 Lands

5054 04 337 JJ 64 08( DPC )

Improvements to Bus Routes with loan assistance from NABARD Lumpsum provision

01. AS / TS / RAS:

... ... 1 1 1

... ... 2 2 25054 04 337 JJTOTAL -

144

Page 151: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

JK Improvement to District and other Roads with loan assistance from NABARD

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JK

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

16 Major Works

5054 04 337 JK 16 07( DPC )

Improvement and Strengthening of 46 road works with loan assistance from NABARD

Improvements of 32 road works with loan assistance from NABARD

11927001. AS / TS / RAS:

119,27,00 86,72,88 42,27,00 30,37,00 1,98,00

G.O.Ms.No.9, Highways (HW1)Dept., DT.08.01.2016G.O.Ms.No. 116, Highways (HW1) Dept dt. 25.11.2016

64 Lands

5054 04 337 JK 64 06( DPC )

New Works likely to be taken

01. AS / TS / RAS:

... ... 1 1 1

Enhanced compensation payble to the land owners for the acquisition of lands in Markampatti Village and Naraikinaru village.

3682. AS / TS / RAS:

3,68 ... ... ... ...

G.O.Ms.No. 107, Highways (HS1) Dept dt. 04.10.2016.

119,30,68 86,72,88 42,27,01 30,37,01 1,98,015054 04 337 JKTOTAL -

145

Page 152: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

JX Construction / Reconstruction of bridges and improvement of roads with loan assistance from NABARD

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JX

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

16 Major Works

5054 04 337 JX 16 01( DPC )

Construction / Reconstruction of bridges on Government Roads (Transferred from Regular Wing) L.S Provision.

367661. AS / TS / RAS:

3,67,66 2,19,74 ... ... ...

G.O.Ms.No. 78, Highways (HW1)Dept., DT.26.05.2006

Reconstruction of High Level Bridge at km.0/8 of Sadras-Chengalpattu-Kanchipuram-Arakkonam-Thiruthani road.

887002. AS / TS / RAS:

8,87,00 5,86,83 37,74 3,00,11 1

G.O.Ms.No.83, Highways (HP.2)Dept., Dated:.25.05.2016

12,54,66 8,06,57 37,74 3,00,11 15054 04 337 JXTOTAL -

146

Page 153: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

JZ Construction/ Reconstruction of Bridges with Loan Assistance from NABARD

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 JZ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

16 Major Works

5054 04 337 JZ 16 07( DPC )

Construction/ Reconstruction of 100 Bridges with loan assistance from NABARD - L.S Provision, Projects-127 RIDF-XV,141 RIDF-XVI,

120064001. AS / TS / RAS:

1,200,64,00 861,37,37 310,00,00 210,00,00 250,00,00

1) G.O.Ms.188, HW&MP(HW-1) Dept.,dt.8.11.122) G.O.Ms.201, HW&MP(HW-1) Dept.,dt.19.12.133) G.O.Ms.9, HWMP(HW.1) Dept.,dt:29.1.154) G.O.Ms.22, HWMP(HW.1)Dept.,dt20.2.155) G.O.Ms.28,HW&MP(HW1)Dept dt11.2.166) G.O.Ms.116,HW&MP(HW1)Dept dt.25.11.167) G.O.(Ms)No. 20,HW&MP(HW1) Dept dt. 3.4.20178) G.O.(Ms)No.11,HW&MP(HW1) Dept dt.1.2.2018 9) New Work likely to be Sanctioned

64 Lands

5054 04 337 JZ 64 06( DPC )

Acquisition of Lands

7131. AS / TS / RAS:

7,13 ... ... 7,13 1

G.O.(D) No.92, HW&MP Dept., dt.24.04.17

1,200,71,13 861,37,37 310,00,00 210,07,13 250,00,015054 04 337 JZTOTAL -

147

Page 154: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

KA Bye Pass Works

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

64 Lands

5054 04 337 KA 64 05( DPC )

Land Acquisition for forming Namakkal Bye pass.

2494611. AS / TS / RAS:

24,94,61 ... 16,79,61 ... 5,00,00

G.O.Ms.No.82, Highways (HP.2)Dept., Dated:.25.05.2016

By pass Works in Lands

15278052. AS / TS / RAS:

152,78,05 90,97,82 24,98,32 3,16,00 25,52,00

G.O.MS No.08 / HW&MP Dept / Dt.20.01.12

177,72,66 90,97,82 41,77,93 3,16,00 30,52,005054 04 337 KATOTAL -

148

Page 155: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

KD Upgradation of Panchayat Union Roads / Panchayat Roads

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KD

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

16 Major Works

5054 04 337 KD 16 00( DPC )

New Works Likely to be Sanctioned

01. AS / TS / RAS:

... ... ... ... 67,00,00

Upgradation of Panchayat Union Roads/Panchayat Roads

60800002. AS / TS / RAS:

608,00,00 ... ... 194,09,00 408,00,00

G.O.(Ms) No. 88, Highways and Minor Ports (HF 1) Dept dt. 27.10.2017

608,00,00 ... ... 194,09,00 475,00,005054 04 337 KDTOTAL -

149

Page 156: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

337 Road Works

KE Upgradation of Panchayat Union Roads / Panchayat Roads under NABARD Assistance

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 337 KE

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

16 Major Works

5054 04 337 KE 16 08( DPC )

Upgradation of Panchayat Union Roads/Panchayat Roads under NABARD Loan Assistance

01. AS / TS / RAS:

... ... ... ... 200,00,00

... ... ... ... 200,00,005054 04 337 KETOTAL -

150

Page 157: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

789 Special Component Plan for Scheduled Castes

JA Improvement to Rural Roads with loan assistance from NABARD under Special Component Plan

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 789 JA

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

16 Major Works

5054 04 789 JA 16 00( DPC )

Improvemets to Rural Roads with loan assistance from NABARD under Special Component Plan- Land L.S Provision.

01. AS / TS / RAS:

... ... 1 1 1

64 Lands

5054 04 789 JA 64 09( DPC )

Improvemets to Rural Roads with loan assistance from NABARD under Special Component Plan- Land L.S Provision.

01. AS / TS / RAS:

... ... 1 1 1

... ... 2 2 25054 04 789 JATOTAL -

151

Page 158: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

RN Construction of Bridges under Tsunami Emergency Assistance Project (TEAP) with Loan assistance from Asian Development Bank - Highways

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 RN

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 7 Chief Engineer (Highways) - NABARD and Rural Roads

16 Major Works

5054 80 800 RN 16 08( DPC )

Lands Lumpsum provision

2431. AS / TS / RAS:

2,43 ... 1 1,57 1

GO Ms No.583 & 132, Revenue (NC-IV) dept., dt.20.10.2005 & 23.2.2006.

2,43 ... 1 1,57 15054 80 800 RNTOTAL -

152

Page 159: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

DEMAND No.21 – HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10. CHIEF ENGINEER (METRO)

Page 160: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

04 District and other Roads

101 Bridges

JH Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 04 101 JH

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

16 Major Works

5054 04 101 JH 16 02( DPC )

Construction of Grade Separator at the Intersection of Mount-Medavakkam and Pallavaram-Thuraipakkam road near Kilkattalai.

582200/6400001.

CMDP Division-II

AS / TS / RAS:

64,00,00 14,23,19 27,40,00 18,78,43 30,98,38

G.O.Ms. No.144, Highways and Minor Ports (HW 2) dated: 27.11.2015

64 Lands

5054 04 101 JH 64 01( DPC )

Construction of High level bridge across coovam river connecting Km 14/4 of Mount -Poonamallee-Avadi road and Paruthipattu - Thiruverkadu Municipal road.

310001.

CMDP Division-II

AS / TS / RAS:

3,10,00 10,23 2,60,00 5,00 2,94,77

G.O.Ms. No.140, Highways and Minor Ports (HW 2) dated: 26.11.2015

67,10,00 14,33,42 30,00,00 18,83,43 33,93,155054 04 101 JHTOTAL -

153

Page 161: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JW

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

16 Major Works

5054 80 800 JW 16 08( DPC )

Formation of Tambaram Eastern By-Pass road Km 0/0-8/4(Land Acquistion only)

10000/10000/7550401.

CMDP Division-I

AS / TS / RAS:

75,50,49 23,55,99 10,00,00 40,00,00 11,94,50

G.O(Ms) No. 264/ Highways (HW1) Dept dated: 23.09.2004. RAS G.O.Ms.No.104/ HW&MP (HP2) Dept, dated.26.08.2015

Widening from two lane to four lane and strengthening of Mount-Madipakkam Road @ km 0/0-2/0.

27500/27500/2525172. AS / TS / RAS:

25,25,17 17,13,68 8,11,48 54,00 7,57,48

G.O.Ms.No.98/ Highways(HW1) Dept, dated: 09.04.2007. RAS I G.O (2D) No.8 HW&MP (HW2) Dept, dated: 20.09.2010. RAS II G.O.Ms.No.104/HW&MP (HP2) Dept, dated: 26.08.2015.

Forming link road from Chennai Marmallong bridge I rumbuliyur road at Km 17/4 Rajakilpakkam to Agaramthen salai in Land acquistion completed portions of Tambaram Eastern By-pass.

250000/2750003. AS / TS / RAS:

27,50,00 27,07,10 1 1 1

G.O.Ms.No.64/ HW&MP(HW1) dated.16.04.2012.

Widening from two lane to four lane and strengthening of Mount- Madipakkam Road @ km 1/6-3/0

20000/22000/1554204. AS / TS / RAS:

15,54,20 15,54,20 1 1 1

G.O.Ms.No.98/ Highway(HW1) Dept, dated: 09.04.2007. RAS I G.O (2D) No.8 HW&MP (HW2) Dept, dated: 20.09.2010. RAS II G.O.Ms.No.104/HW&MP (HP2) Dept, dated: 26.08.2015.

Widening from two lane to four lane and strengthening of Mount-Madipakkam Road @ km 4/4-6/6

35000/38500/2956065. AS / TS / RAS:

29,56,06 29,32,16 1 1 1

G.O.Ms.No.98/ Highways (HW1) Dept, dated: 09.04.2007. RAS I G.O (2D) No.8 HW&MP (HW2) Dept, dated: 20.09.2010. RAS II G.O.Ms.No.104/HW&MP (HP2) Dept, dated: 26.08.2015.

Widening to two lane to four lane and Strengthening of Singaperumal koil -Sriperumbudur - Tiruvallur -Redhills Road KM 43/0-51/8 (SH-57) (Tiruvallur - Keelanur).

135000/260711/2607116.

CMDP Division-II

AS / TS / RAS:

26,07,11 26,07,11 1 1 1

G.O(Ms)No. 264/ Highways (HW1) Dept, dated: 23.09.2004. RAS G.O(2D)No.8/ Highways & Minor Ports (HW2) Dept, dated: 20.09.2010.

Widening and Strengthening to double lane of Malayambakkam road km 0/0-3/3

16000/160007. AS / TS / RAS:

1,60,00 98,60 1 1 1

G.O.Ms.No.229/Highways (HW-1) dated 14-11-2005

154

Page 162: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JW

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

16 Major Works

5054 80 800 JW 16 08( DPC )

Construction of Grade Separator at the intersection of Tambaram Road, Tambaram Velachery Road and Velachery Byepass Road at Velachery - Vijayanagaram

982200/10800008.

CMDP Division-II

AS / TS / RAS:

108,00,00 37,72,80 40,00,00 36,38,67 33,88,53

G.O.Ms. No.120/ Highways & Minor Ports/HWI/Dept.dt. 29.6.12

Construction of Grade Separator connecting Medavakkam - Sholinganallur road junction, Medavakkam - Mambakkam road junction and Mount - Medavakkam road junction in Marmalong bridge - irumbuliyur road at Medavakkam.

1331000/14641009. AS / TS / RAS:

146,41,00 32,74,27 45,00,00 33,44,20 40,17,12

G.O.Ms. No.100 /Highways & Minor Port/HW2/Dept.dt. 14.08.2015.

Widening from two lane to four lane and Strengthening of Thirumazhisai - Sathyavedu Road KM 5/0-10/0 (SH-50) (Nemam -Kadapakkam)

85000/85000/13131610. AS / TS / RAS:

13,13,16 12,95,47 1 1 1

G.O(Ms)No. 264/ Highways (HW1) Dept, dated: 23.09.2004. RAS G.O(2D)No.8/ Highways & Minor Ports (HW2) Dept, dated: 20.09.2010.

Widening from two lane to four lane and strengthening of Chennai - Chithoor - Bangalore road km 18/0 - 22/6

120000/18306211. AS / TS / RAS:

18,30,62 17,53,27 77,34 65 76,70

G.O(Ms)No. 264/ Highways (HW1) Dept, dated: 23.09.2004. RAS G.O(2D)No.8/ Highways & Minor Ports (HW2) Dept, dated: 20.09.2010.

Widening to two lane to four lane and Strengthening of Singaperumal koil - Sriperumbudur - Tiruvallur Redhills Road KM 64/8-69/4 (SH-57)

67500/67500/11807112. AS / TS / RAS:

11,80,71 11,79,87 1 1 1

G.O(Ms)No. 264/ Highways (HW1) Dept, dated: 23.09.2004. RAS G.O(2D)No.8/ Highways & Minor Ports (HW2) Dept, dated: 20.09.2010.

Forming of New Link Road connectingPuzhal in Chennai GNT Road and Aamullaivoyal in Inner Ring Road at KM 20/8

200000/22000013. AS / TS / RAS:

22,00,00 3,23 1 1 1

G.O.Ms.No.64/Highways & Minor Ports (HW-1) Dept, dated: 16.04.2012.

Widening from two lane to four lane and Strengthening of Thirumazhisai - Sathyavedu Road KM 1/0-2/0 (SH-50) (Udayavarkoil- Thirumazhisai).

19900/19900/3966014. AS / TS / RAS:

3,96,60 3,88,73 1 1 1

G.O(Ms)No. 264/ Highways (HW1) Dept, dated: 23.09.2004. RAS G.O(Ms)No. 136/H & MP (HW2) Dept, dated: 16.04.2010.

155

Page 163: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JW

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

16 Major Works

5054 80 800 JW 16 08( DPC )

Construction of Grade Separator in Periyar EVR Salai connecting the junction of Nelson Manickam Road and Anna Nagar Third Avenue near Aminjikarai.

1170000/122500015.

CMDP Division-III

AS / TS / RAS:

122,50,00 92,80,33 10,00,00 8,24,72 10,00,00

G.O.(D).No.222/HW&MP (HW-1) dated 18-11-2010

Providing Grade Separator at the intersection of Kundrathur and Santhai Road @ Pallavaram

807400/82660016.

CMDP Division-IV

AS / TS / RAS:

82,66,00 13,70,45 40,00,00 23,62,86 45,32,69

G.O.Ms. No.120/ Highways & Minor Port/HWI/Dept.dt. 29.6.12

Construction of Grade separator in the Right Hand Side in Kolathur Irattai Eri at the junction of Perumbur Redhills road and Inner Ring Road.

291287/32030017.

CMDP Division-V

AS / TS / RAS:

32,03,00 8,23,73 17,11,04 13,74,16 10,05,11

G.O.Ms. No.12/Highways and Minor Ports (HW 2) Dept dated: 11.01.2016

Widening from two lane to four lane and strengthening of Chennai – Ennore Road in km 11/0 – 12/0 (SH – 114) (Ajax busstand - Vimco Nagar)

25000/27500/9860018. AS / TS / RAS:

9,86,00 8,06,38 1 1 1

G.O.Ms. No. 98, Highways (HWI) Dept, dated:09.04.2007 & RAS G.O.Ms. No.70/HW&MP(HW 1)/ dated. 18.04.2012

Widening from two lane to four lane and strengthening of Madhavaram - Red hills road Km 4/2-9/6.

80000/85700/29222319. AS / TS / RAS:

29,22,23 28,82,34 1 5,00 34,89

G.O.Ms. No. 98, Highways (HWI) Dept, dated:09.04.2007 & RAS G.O.Ms. No.2D (8) HW&MP (HWI) / dated. 20.09.2010

Widening from two lane to four lane and strengthening of Chennai – Ennore Road in km 8/0 – 9/0 (SH – 114) (Toll gate - Kaladipet)

23000/25300/4890020. AS / TS / RAS:

4,89,00 4,49,81 1 1 1

G.O.Ms. No. 98, Highways (HWI) Dept, dated:09.04.2007 & RAS G.O.Ms. No.70/HW&MP(HW 1)/ dated. 18.04.2012

Construction of Grade Separator (LHS) and Pedestrian subway near Kolathur in Irattai Eri at the Junction of Perumbur Redhills Road in Inner Ring Road.

527200/55250021. AS / TS / RAS:

55,25,00 32,84,12 4,00,00 2,50,44 1,00,00

G.O.Ms. No.120/Highways and Minor Ports (HW 1) Dept dated. 29.06.2012

156

Page 164: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JW

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

16 Major Works

5054 80 800 JW 16 08( DPC )

Re-Construction of High level bridge across "B" Canal at Km 0/6 of T.P.P road (SH-56)

533100/58640022.

CMDP Division-V

AS / TS / RAS:

58,64,00 2,53,96 25,00,00 13,75,96 24,00,00

G.O.Ms.No.13/Highways and Minor Ports (HW-2) Dept dated: 13.01.2016

Widening from two lane to four lane and strengthening of Chennai – Ennore Road in km 12/0 – 13/0 (SH – 114) (Vimco Nagar - Ernavur)

20000/22000/4706023. AS / TS / RAS:

4,70,60 4,70,58 1 1 1

G.O.Ms. No. 98, Highways (HWI) Dept, dated:09.04.2007 & RAS G.O.Ms. No.70/HW&MP(HW 1)/ dated. 18.04.2012

Widening from two lane to four lane and strengthening of Chennai – Ennore Road in km 9/0 – 11/0 (SH – 114) (Kaladipet - Ajax Bus Stand)

32000/33700/27015024. AS / TS / RAS:

27,01,50 26,70,17 1 1 1

G.O.Ms. No. 98, Highways(HWI) Dept, dated:09.04.2007 & RAS G.O.Ms. No.70/HW&MP(HW 1)/ dated. 18.04.2012

64 Lands

5054 80 800 JW 64 07( DPC )

Forming six lane of ECR from km 11/8-23/2 Thiruvanmiyur to Akkarai (LA).

100000/35466001.

CMDP Division-I

AS / TS / RAS:

354,66,00 66,65,55 100,00,00 138,51,00 101,41,30

G.O.Ms.No.104/ Highways&MP (HW1) Dept, dated.12.06.2012

Widening from two lane to four lane and strengthening of Mount-Madipakkam Road @ km 6/6-8/6.

33000/1107492. AS / TS / RAS:

11,07,49 8,21,09 2,86,39 1 1

G.O.Ms.No.98/ Highways (HW1) Dept, dated: 09.04.2007 and G.O.Ms. No.100/Highways(HWI)/ dated. 11.06.2012

Widening from two lane to four lane and strengthening of Mount-Madipakkam Road @ km 3/0-4/4.

24500/1665303. AS / TS / RAS:

16,65,30 16,65,30 1 1 1

G.O.Ms.No.98/ Highways (HW1) Dept, dated: 09.04.2007 and G.O.Ms. No.100/Highways(HWI)/ dated. 11.06.2012

Construction of HLB across coovam River at Nolambur Road junction in NH 4 (LA only)

3600004.

CMDP Division-II

AS / TS / RAS:

36,00,00 5,94 35,80,00 5,00 35,89,06

G.O.Ms. No.98/Highways & MP Dept (HW2)/ dated. 14.08.2015

157

Page 165: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

JW Chennai Metropolitan Development Plan - Traffic and Transport Improvement in Chennai City

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 JW

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

64 Lands

5054 80 800 JW 64 07( DPC )

Construction of Grade Separator at Junction of ECR and Lattice Bridge Road at Thiruvanmiyur (LA only)

5800005.

CMDP Division-II

AS / TS / RAS:

58,00,00 ... 20,00 30,38 57,69,62

G.O.Ms. No.99/Highways & MP Dept (HW2)/ dated. 14.08.2015

1,427,81,24 570,86,23 338,86,40 311,17,19 380,07,155054 80 800 JWTOTAL -

158

Page 166: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

KJ Works executed by Chief Engineer (Metro), Highways from State Infrastructure and Amenities Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 KJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

16 Major Works

5054 80 800 KJ 16 03( DPC )

Construction of Pedestrian subway at Km 7/7 near Koyembedu Bus terminous.

500001.

CMDP Division-I

AS / TS / RAS:

5,00,00 6,82 5,00 5,00 1,00,00

G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.12

Forming Link Road and Construction of bridge across Buckingham canal connecting Rajiv Gandhi Salai and East Coast Road at Neelankarai

20420002. AS / TS / RAS:

204,20,00 9,66 25,00 10,00 1,00

Go (Ms).No: 70/Highways & Minor Ports (HW2) Dept /dt. 19.06.2014

Construction of Pedestrian subway in GST road at the junction of Guindy and MKN road

350003. AS / TS / RAS:

3,50,00 6,86 3,32,92 1,00 1,00,00

G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.12

Construction of Pedestrian subway in GST road near Little Mount AG church

350004. AS / TS / RAS:

3,50,00 7,51 3,32,32 1,00 1,00,00

G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.12

Construction of Pedestrian subway in Jawaharlal Nehru road at Km 1/6 near Ekkattuthangal Malladi company.

35000/385005. AS / TS / RAS:

3,85,00 20,28 3,54,49 1,00 1,00,00

G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.12

Construction of Pedestrian subway in Jawaharlal Nehru road at Km 2/7 near Kasi theatre.

35000/385006. AS / TS / RAS:

3,85,00 10,24 3,64,53 1,00 1,00,00

G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.12

Construction of high level bridge at KM 14/4-14/8 at Karanodai - Minjur Road (2012 - 13)

900007.

CMDP Division-II

AS / TS / RAS:

9,00,00 5,70 1 1 1

G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.12

159

Page 167: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

KJ Works executed by Chief Engineer (Metro), Highways from State Infrastructure and Amenities Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 KJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

16 Major Works

5054 80 800 KJ 16 03( DPC )

Construction of additional three Lane bridge across Coovam River in EVR Salai at Km 6/6 near Aminjikarai (Upstream side)

80000/80000/1110008.

CMDP Division-III

AS / TS / RAS:

11,10,00 7,78,64 1 2,06,51 1

G.O. Ms No. 118/ H&MP (HW-1) D/ dt.28.06.2012 RAS G.O. Ms No. 75/ H&MP (HP-2) D/ dt.23.09.2017

Construction of Grade Separator at the inter section of Kaliyamman Koil Street and City Bus entrance of CMBT with Jawaharlal Nehru Salai (IRR) at Koyambedu

935000/9350009. AS / TS / RAS:

93,50,00 3,27,90 20,00,00 26,14,33 37,80,52

G.O. Ms No.118/ H&MP (HW-1) D/ dt.28.06.12 & RAS G.O. Ms No.95/ HM&P (HP2) D /dt.11.08.2015

Widening of the existing bridge at Km 3/4 of Mount - Poonamallee - Avadi road (SH-55)

10000/1000010.

CMDP Division-IV

AS / TS / RAS:

1,00,00 99,99 1 1 1

G.O.Ms. No.118/Highways&Minor Ports/HWI/Dept.dt. 28.6.2012

Construction of FOB and sky walk with escalator at Km 26/8 of Grand Southern Trunk road Tambaram , Chennai

194900/19750011. AS / TS / RAS:

19,75,00 16,31 12,00,00 1,00,00 12,00,00

G.O.Ms. No.72/Highways&Minor Port/HW2/Dept.dt. 13.07.2015

Widening of High level bridge across Adayar river at Km 2/6 from Mount Poonamallee Avadi road near Ramapuram

154600/17000012. AS / TS / RAS:

17,00,00 3,38,72 11,73,27 10,18,70 3,36,13

G.O.Ms. No.75/Highways&Minor Port/HW2/Dept.dt. 14.07.2015

Construction of High Level Bridge at Km 16/6 of Tambaram-Mudichur Road (SH 113)

20000/2100013.

CMDP Division-V

AS / TS / RAS:

2,10,00 2,10,00 1 1 1

G.O.(Ms)No. 118, Highways and Minor Ports (HW 1) Dept dated: 28.06.2012.

Construction of Additional two lane high level bridge at Km 62/2 of Singaperumal Koil - Sriperumbudur - Tiruvallur - Red hills Road (2012 - 13)

20000/2100014. AS / TS / RAS:

2,10,00 1,64,66 1 1,47 1

G.O.(Ms)No. 118, Highways and Minor Ports (HW 1) Dept dated: 28.06.2012.

160

Page 168: No_59_DETAIL… · Shifting of Electric Poles and Transformers for the work Widening from ... Details of Works Estimate Amount Expenditure upto 31-3-2017 Budget Estimate 2017-18

Details of Works

Estimate

Amount

Expenditure

upto

31-3-2017

Budget

Estimate

2017-18

Revised

Estimate

2017-18

Budget

Estimate

2018-19

5054 CAPITAL OUTLAY ON ROADS AND BRIDGES

80 General

800 Other Expenditure

KJ Works executed by Chief Engineer (Metro), Highways from State Infrastructure and Amenities Fund

[ ` in Thousands][ ` in Thousands][ ` in Thousands][ ` in Thousands]5054 80 800 KJ

DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT

21 10 Chief Engineer (Metro)

16 Major Works

5054 80 800 KJ 16 03( DPC )

Construction of Additional two lane high level bridge at KM 15/8 of Mount - Poonamallee - Avadi Road (2012 - 13)

50000/55000/6026315.

CMDP Division-V

AS / TS / RAS:

6,02,63 5,45,35 1 5,00 1

G.O.(Ms)No. 118, Highways and Minor Ports (HW 1) Dept dated: 28.06.2012. RAS G.O.(Ms)No. 27, Highways and Minor Ports (HP 2) Dept dated: 11.04.2017

385,47,63 25,48,64 57,87,59 39,65,04 58,17,715054 80 800 KJTOTAL -

161