NNWManchester
NNWManchester
St PancrasSt Pancras
EastNetCambridge
EastNetCambridge
WarringtonC-PoP
WarringtonC-PoP
10G10G
ULCCULCCAmsterdamAmsterdam
10G10G
10G10G
10G10G
ChicagoChicago
10G10G
LeedsC-PoP
LeedsC-PoP
EastMANEdinburgh
EastMANEdinburgh
GlasgowC-PoP
GlasgowC-PoP
NIMANBelfast
NIMANBelfast
C&NLMANLancaster
C&NLMANLancaster
CLRC-RALCLRC-RAL
ReadingC-PoP
ReadingC-PoP
ClydeNETGlasgow
ClydeNETGlasgow
EdinburghC-PoP
EdinburghC-PoP
YHMANLeeds
YHMANLeeds
UKLight Phases 1 & 2, 3
MidMANBirmingham
MidMANBirmingham
To CERNTo CERN
To FNALTo FNAL
Based upon 10 Gbit/s core
Presents Ethernet at exit points:
- Many 100 Mbit/s for long periods times
- Few 1 Gbit/s for long periods-in practice pseudo-persistent for now-Cross bridges when (if) we come to them
- If needed, and for shorter periods, access to full 10 Gbit/s possible
HEP Connectivity RequestsHEP Connectivity Requests
Service Challenge Connection Service Challenge Connection RequestsRequests
Task/ Appl.
Start Date
End Date
Link UKLight Endpoint Site 1
UKLight Endpoint Site 2
BW (Gbit/s)
Notes
E1: ATLAS (HEP Tier
2)
15 May 05
31 Dec 05
LAN - RAL LAN RAL 0.5
1. SC3 Test and Service phases 2. This is requested in conjunction
with ESLEA
E1: ATLAS (HEP Tier
2) 1 Jan 06 30 Sep
06 LAN - RAL LAN RAL 1.0
3. SC4 Test and Service phases 4. This is requested in conjunction
with ESLEA
HEP: Tier 1 15 May 05
31 Dec 05
RAL - CERN RAL NetherLight 2.0
5. SC3 Test and Service phases 6. This link is already provisioned as
2 * 1Gbit/s connections at RAL
HEP: Tier 1 1 Jan 06 30 Sep 06
RAL - CERN RAL NetherLight 6.0
7. SC4 Test and Service phases 8. Need to be able to demonstrate
approx. 4.4Gbit/s +
HEP: Tier 1 Feb 07 Sep 07 RAL – CERN RAL NetherLight 10.0 9.
ESLEA Collaboration Connection ESLEA Collaboration Connection RequestsRequests
Task/ Appl.
Start Date
End Date
Link UKLight Endpoint Site 1
UKLight Endpoint Site 2
BW (Gbit/s)
Notes
E1: CDF Apr 05 31 Jan 07 UCL - FNAL ULCC StarLight 1.0
1. This link is already provisioned
2. Used for data transfer, with intermittent use for Monte Carlo and dataset request data transfers
E1: ATLAS Jan 06 Oct 06 LAN – MAN LAN MAN 0.5 3. Inter Tier 2 Traffic
C1:Light Path
Switching ? 31 Jan 07 All -
UCL All UK Sites UCL
2*100 Mb from
each site
4. Links from all UK HEP sites to UCL to develop and prove light path switching technologies.
Other Connection RequestsOther Connection Requests
Task/ Appl.
Start Date
End Date
Link UKLight Endpoint Site 1
UKLight Endpoint Site 2
BW (Gbit/s)
Notes
Tier 2: ? ? Intra Tier 2 Multiple Multiple 1.0
1. This is the links between the institutes that constitute a Tier 2 Group
Tier 2: ? ? Tier 2- Tier 2& Tier 1
Multiple Multiple 1.0 2. This is aggregate data flow from
the Tier 2 Group to other Tier 2 Groups and to the local Tier 1
Tier 1: 15 Feb 06
14 Feb 07
RAL- Various RAL
Other Tier 1 &
Regional Tier 2
2.0 3. This is aggregate data flow to the
Regional Tier 2 Groups and to alternate Tier 1’s
Tier 1: 15 Feb 07 ? RAL-
Various RAL
Other Tier 1 &
Regional Tier 2
4.0 4. This is aggregate data flow to the
Regional Tier 2 Groups and to alternate Tier 1’s
HEP Provision Tier1 Tier0
Today:• 2 x 1 Gbit/s in place for RAL CERN Switched through Amsterdam • 500(290) Mbit/s RAL Lancaster
1-Jan 2006• 6 x 1 Gbit/s
Feb 2007 • Requested 10 Gbit/s
HEP Provision Fermilab UCL
1 Gbit/s for foreseeable future
HEP Provision Tier1 Tier2 and Tier2 to elsewhere
Today we have said to UKERNA: ~ 1 Gbit/s between WITHIN a Tier-2 (i.e. between Tier-2 Institutes) ~ 1 Gbit/s aggregate from EACH Tier2 to Tier1
(note: this means 4 Gbit/s into RAL !!!)
Next (up to 2007): Consolidate existing differentiated Tier2 estimations by
Roget Jones & Barney Garret to revisit existing papers Visit Tier2 sites Visit experiment reps
Default is that Tier2 uses production network for now until ~2007 If clear case for dedicated connections for a Tier2 before end 2006 then we
WILL ask for it. BUT to do this is will be essential that someone at Tier2 GUARANTEES to use
the connection we cannot ask and not use. We cannot do this just based upon generalities
Post 2007 – see next slide
SuperJANET5 and Geant-2
Geant-2 Already committed to provided dedicated capacity across GN2 NRENS will be offered a 10+10 Service (10 IP + 10 GE) They plan to do this for Tier1 to CERN
SuperJANET5: Will be fully live by end 2006 Will incorporate pervasive dedicated circuits Who pays ? work ongoing ?
Messages for UK sites: Dedicated circuits can be provided If your site thinks it needs one we should ask for it – but only if you
know you will use it We must present authoritative documents to UKERNA in advance of
SJ5 as and when we know what we need.