www.nemermetal.com

COMPANY PROFILE

You Draw itWe Make it

www.nemermetal.com

p.1

p.3

p.9

p.13

p.21

p.25

Introduction & Company Information• Our Services

Facts & Figures• Company Information• Workshop Information• Bank Information• Ministry of Business & Trade

- Commercial License- Certificate of Registration- Chamber of Commerce- ISO Certificate

Project Management

Standard Operating Procedure

Featured Projects

Nemer’s Clients

Table of Content

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

Our customer service is second to none. Here at NMW we’re proud to say that our reliability, competitiveness & high standard of work usually leads to repeat business and/or recommendations. At every stage of your relationship with us, our experienced & friendly staff will be on hand to visit, advise& help with estimations or any problems that may arise.

Regardless of the size or cost of your project, we aim to provide you with a personal, as well as a professional service. This is why each project undertaken by us is overseen by a contract manager from start to finish, ensuring continuity & a single point of contact.

Exceptional Customer Service

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

1

IntroductionSponsored by Shk. Khaled Bin Sultan H. Al Thani, Nemer For Metal Works was founded in 2001 and was since built on an uncompromising reputation for expertise, competitiveness and customer service throughout the state of Qatar and the GCC.

Our Quality Promise

NMW is committed to improving quality & reducing costs by manufacturing products in the most efficient & precise way. This means keeping up-to-date with both the latest technology and your project requirements.

Our Quality Assurance program complies with high standard safety procedures & to ensure our products meet our own strict requirements for quality, integrity and accuracy, the manufacturing process is thoroughly and continuously checked.

Our strong reputation was earned by our professionally equipped and highly capable staff, supported by their extensive experience, market awareness not to mention their impeccable

ability to anticipate client's needs.

Operating from its modern & extensively equipped Workshops in the Industrial Area, NMW's highly skilled workforce can offer a full range of technical solutions for all your steel and metal design requirements.

NMW specializes in the construction field & has proven experience within various industries. We are practiced in precise stainless steel construction and also capable of batch production, architectural features and other specialist works.

Our comprehensive service provides everything from a simple repair to a "one-stop" metal-works solution for large-scale projects, including design, engineering, fabrication, assembly and erecting. Whatever your project entails, our track record shows that our expert workforce and advanced equipment means we can meet the most demanding metal fabrication project specifications and schedules on time and within budget.

Our Services

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

2

Structural Steel Building Steel (columns, beams,bracing, girts, sag rods)Industrial Equipment Support SteelPipe SupportsPipe Racks & BracketsStaircase & HandrailsSpiral Staircase

•••••

Access LaddersPergolas & Canopy’sStone Cladding StructurePlatform & WalkwaysTensile Structure & Car ShedConcrete Slip Forms & Shuttering

••••••

Wrought Iron and WeldingHandrails & BalustradesBalcony’s & Window GrillsWall FencingGates & Doors

••••

Our welding department can provide many welding processes that include general fabrication from steel, stainless steel & aluminum products as well as Pipe Cutting & weld preparation on request.

Metal DoorsFire & Non Fire Rated DoorsArchitectural HardwareStainless Steel Doors (Fire & Non Fire Rated)

•••

Industrial & Residential CabinetsLockers & ShelvesSpecial Cladded Doors & Hatches

•••

Block and Plaster AccessoriesMetal Beads (Angle Beads, Plaster Beads, Architrave Beads, Movement Beads, Control Joint Beads, etc.)Expanded Metal Lath (Corner Lath, Coil Lath, Rib Lath,etc.)

Block Work Expanded MeshReinforcement MeshWall TiesLintel

••••

Ceiling & Partition SystemConcealed / Clip-In SystemsOpen Cell SystemsExposed Ceiling SystemsCeiling Tiles (Plain / Decorative / Perforated Tiles, Special Decorative Tiles, Gypsum Tiles, Sound Absorption Tiles

••••

Ceiling Strip Systems Drywall Partitioning SystemsDryline Furring Channel SystemsAccess PanelsMesh CeilingsPipe Ceilings

••••••

3

PROGRESS THROUGH INNOVATION

Facts & FiguresCompany Name:

Sponsor

General Manager

Commercial Manager

Address (Head Office)

Tel.

Fax.

Email.

Website.

C.R. Nr.

Ministry of Business & Trade Nr.

Year Established

Nr. of Employees

Nemer for Metal Works

Shk. Khaled Bin Sultan H.A. AlThani

Mr. Farid Abu Hejleh

Mr. Mohammad Mefleh

Kamco Tower, 7th FloorAl Sadd Area, Suhaim Bin Hamad St.P.O. Box 23229 Doha, Qatar

+974 44 32 99 91

+974 44 32 99 92

[email protected]

www.nemermetal.com

23872 / 1

83331

2001

115

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

4

Workshop 1:

Location: Industrial Area Street, Nr. 39, Gate 128Land Area: 3500 SQMWorkshop Area: 1500 SQMAccommodation Capacity: 400 SQM - 30 Bedrooms

Workshop 2:

Location: Industrial Area Street, Nr. 06, Gate 81Land Area: 3000 SQMWorkshop Area: 1200 SQMAccommodation Capacity: 300 SQM - 20 Bedrooms

Storage Facility:

Location: Al Khour CityLand Area: 50,000 SQM

Bank Account Information:

Bank: Qatar International Islamic Bank, Main BranchAccount Number: 1111 - 02 50 95 - 001

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

As we are engaging in a Multi-National Company & Projects in supplying its Miscellaneous Metal & other related Engineering services for their projects, we make sure that the key working staff who are working with us, have the capacity to deliver their vital participation in the execution of the proposed project. Keeping our harmonious working relationship & professional approach in dealing with the project technical group, we maintain our integrity as a credible supplier of various metal fabrications in the field ofconstruction world.

Increases management's effectiveness by recruiting, selecting, training, coaching, counseling, & disciplining managers.Communicating values, strategies, & objectives; assigning accountabilities; planning, monitoring, & appraising job results.Develops incentives; developing a climate for exchanging information, ideas & opinions; nevertheless providing educational opportunities.Develops a strategic plan by studying technological & financial opportunities; presenting assumptions; as well as setting objectives for the staff.Accomplishes subsidiary objectives by establishing plans & budgets; monitoring results, allocating resources, reviewing progress & making mid-course corrections.Establishes policies & best practice for the Procurement, Production, Marketing & Technical services.

Key Technical Staff

General Manager

Project Management

Assist in strategy planning, as well as monitor their implementation.Management of Sales team & working with Sales Manager & contract managers.Follow up with client's & their requirements.Oversee financial management of Projects, as well as new bids, contract negotiation, Contractual & commercial conflicts.Managing Daily operations, spread awareness & proper understanding of NMW's Quality standards & obligation towards clients.

Commercial Manager••••

5

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

WE TAKE PRIDE OF THE SYSTEM WE HAVE SET UP; IT ENSURES THAT ALL OUR PROCESSES ARE CARRIED OUT SEAMLESSLY

Preparing the required Bar chart, checking the shop drawing, quality of material samples, catalogs & brochures & also the method statements to be submitted for approval by the clients.Assist the General Manager in attending the management meeting as required by the clients.Monitoring of all the scope of works in the workshop & in the project site.Direct coordination with the technical staff & project supervisors.Preparing monthly progress billings for the project.Participate in the Inspection proceedings in the workshop & in project site prior to the initial approval & even in final handing over of project.Checking of required As-Built plans & preparing the necessary documents for final Turn-over of project.

Project Manager•

•••

Doing the design calculation & analysis to be incorporated in the shop drawings prior to the submittal.Preparing reports concerning the integrity of the proposed design.Preparing the request of material to be installed at the site.Attending the Coordination at site meeting as required by the clients.

Structural Designer•

•••

6

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

OUR VALUES REVOLVE AROUND

HONESTY, HIGH QUALITY, AND MOST IMPORTANTLY:

COMPLETE CUSTOMER SATISFACTION!

PROJECT MANAGEMENTCONTINUED

Doing the site coordination works between clients’ representative & concerning with the proper implementation of shop drawings on site.Preparing the daily accomplishment reports for billing purposes.Preparing the request of material to be installed at the site.Assigning of work load to the leadsmen that was been assigned in the work area.Attending the Coordination at site meeting as required by the clients.

Project Engineer•

••••

Preparing the required shop drawings, based on the contract, specification to be submitted to the client / consultants.Preparing the cutting list of material required of the project.Preparing the monitoring drawings for daily or monthly accomplishment.Preparing the required As-built drawing for the accomplished projects.Attending on actual site verification prior to the preparation of shop drawings to be submitted to the clients / consultant.Attending the Coordination at site meeting as required by the clients concerning approval of shop drawings & other related matters

CAD Specialist / Draftsperson•

••••

7

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

95 satisfied CLIENTS;and counting...

Arranging all the required material needed in the entire project.Securing all the necessary information needed concerning the delivery of material from point of origin to factory.Securing the necessary Mill Certificate from various suppliers on hand.Monitoring & check the availability of materials needed of the projectDirect coordination with the General Manager & project manager concerning the status of all the material requirements.

Purchasing Manager••

•••

Conducting the daily inspection on the fabrication workshop prior to the delivery of materials at site.Preparing the daily accomplishment reports for project status report & also for billing purposes.Direct coordination with the work shop supervisor for proper implementation of work load.Preparing the accomplishment report at the workshop.

Quality Controller•

Preparing the delivery notes & recordings of all the material to be brought to the site.Taking care of good condition of all the tools & equipments being used in the work shop & in the project sites.Monitoring the material stocks, consumables & other materials.Preparing the material requisition of needed requirements by the workers.

Warehouse Manager•

••

Conducting the daily inspection on the fabrication workshop & also to the project site top ensure that the working group are following the safety procedure imposed by the safety officer from the client.Daily inspection on all the tools & equipment which are being issued to their respective group that its in proper order & in compliance to the standard safety rules & guide lines.Assisting all the workers in attending the safety training before assigning them in the project siteCoordinating in behalf of the workers secure their hot permit & other related permit to be able maintain the safety of the working group

Safety Engineer•

8

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

Standard Operating Procedures

Preparation of shop drawing is very important in order to meet the client’s needs and satisfaction. Being committed to a high quality standard of fabrication works and turning the idea into reality, we see to it that the following procedure has been consistently applied and implemented throughout the entire project completion.

Initial shop drawing to be prepared and submitted based on the contract reference drawings and details given from the contractor to be able to emphasize the basis and the parameter of the contract agreement.

Shop drawing are being executed by showing the necessary Key plans, detail plans, elevations, detailed sections and blow-up details for easy checking; 3D drawing can also be included if there was need for more visibility and clarity.Comments and approval by the consultant(s) / client from the first submittal of shop drawings will be regularly checked and compared with the contract agreements in case of any variations, availability of the specified materials, and even some changes affecting the manner in the execution of scope of works.Necessary ocular inspection/site verification and proper site coordination to the project engineer in-charge will take place immediately to ensure that the approved shop drawings and its will be applicable to the existing site condition and to the fabrication.Engineering works, Design, Calculation and Analyzing Using the STAAD Pro 2006 Static Calculation.As-Built Drawings, Warranty and Guarantee Certificate will also be provided to be used by the client as future references after the final acceptance of works.

Shop-Drawing Preparation

Prior to the final approval of the submitted shop drawings, necessary Material submittals are normally done in two copies, concerning the, consultant and the client(s) to have a clear over view to be able to decide on the appropriate materials they want to use.Usual consideration in the preparation of submitting the required materials samples were as follows.

Materials to be presented are properly labeled according to their material specifications, sizes, and color of paint in accordance to the submitted shop drawings and approved vendor.Quality of fabrication works are properly emphasized showing the welding joint connections and finishing in which a small part of an item will be fabricated.Proper paint application on the material submittals are thoroughly checked to ensure that the quality of paint to be used is suitable for the recommended materials to be used.Other related materials to be submitted are also included such as the method statements, paint system, catalogs and brochures for us to justify that the submitted materials, and shop drawings will be applicable to the existing condition of site, availability of limited resources and mostly the limitation on the execution of works in the fabrication.Required mock-up sample at the site will be followed after the approval of the submitted shop drawings and all the material samples which was being submitted to the consultant/client(s).

Material Submittals

9

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

After securing the approved shop drawing from the consultant/client, manufacturing Instruction will be transmitted to the workshop. However, necessary coordination and supporting paper will be issued to the production manager in order to avoid any Mis-presentation and repair works in the process of fabrication .Hence, the following procedure were strictly implemented. Issuance of approved Shop Drawings

Two (2) sets of Clear and readable shop drawings will be prepared:One (1) set for the assigned workers at the work shop.One (1) set for the Installation group for counter-checking of shop drawing to the existing site condition.

Material procurementsMaterial breakdown and cutting list will be included in the issuance of manufacturing instruction which will be prepared and acknowledge by the following personnel.

Qs/ QC in- charge- for necessary canvassing/quality controllingPurchasing Manager- for securing the material procurementProject in-charge – for preparationProject Manager- for final checkingGeneral Manager- for final approvalProduction Manager-for acknowledgment of work load

Bar Chart Schedules (BCS)A copy of approved Bar Chart Schedule (BCS) will also be included in the issuance of manufacturing instruction in order to control and monitor the project process/progress.

Workshop InspectionLetter of request for workshop inspection to be able advised the General Contractor and or the consultant(s) to ensure that materials are in accordance with the approved shop drawing, and specifications prior to the schedule of delivery at site. Delivery of MaterialsPrior to the scheduled deliveries of fabricated material at site, proper coordination with the project Engineer in-charge will immediately take place.

Necessary Delivery notes and or Acknowledgment receipts will be prepared, containing the following important data:

Delivery DateProject NameJob Order ref. No.Client’s Name

Manufacturing Procedures

•••

••••••

••••

Location of the project siteMaterial DescriptionsAdditional RemarksAuthorized Signatory of delivery acknowledgment.

••••

Execution of works at the project site is very crucial for the handling over of the project.Therefore, we consistently applied and implemented the following procedure in order to attain a quality product and long range business relationship with our clients. Competent and Skill workersInstallation workers play the important role in completing the entire scope of works at the project site. Needless to say that the installation crews we assigned to meet the clients satisfaction, have the capability to read plans, and skills to implement the installation job in accordance with the approved shop drawings and site instruction from their respective immediate superior.

Installation Procedures

10

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

Standard Operating Procedures

Installation GroupingsInstallation group consist of members that harmoniously work together until the final turn-over of the project.Each group has their own set of tool box to avoid delays while performing their individual.Each group has their own individual safety gadgets and information concerning the safety procedure which is implemented at work area.

Installation Supervisor

Who will be in-charge in the mobilizationAttending Site Coordination with the Project Engineer at site.Making the weekly reports for the accomplished work at site

Leadsmen

Having Four to Six workers who will be working under himHaving different scope of works to executeWho will take care of the necessary layout works, assembly works, installation works up to Painting jobs.

Installation Procedure - Continued

•••

•••

Weekly Accomplishment report will be gathered from each group to make sure that the given schedule in the site are being followed by the installation crews.Any discrepancies on the actual site condition will immediately brought to the attention of the Engineer in-charge of the project in verbal coordination or through official letter in order to avoid any.Any changes brought about by the changes on the design, location of the requirements or even the manner of fixation that will affect the given schedules will immediately discuss and confirmed to the Engineer in-charge of the project prior to the implementation of the said changes.Necessary site coordination by the installation supervisor concerning the needed requirements in the work area will be done, such as gate pass for the assigned workers, request for the provision of scaffoldings at the site, tower crane, and hot permit and other related permit to avoid any delays on the mobilization works.Daily Inspection in the work area to see it that the approved shop drawings specifically the manner of fixation on the other trade works by other contractors are being followed to avoid any argument and or damages caused by non-compliance.

Site Coordination / Installation Monitoring

After the Installation are substantially completed, necessary letter of request for Initial inspection will be prepared to arrange together with the representative from the General Contractor and from the consultant side for Initial Inspection concerning Snag list.After arranging all the balance work included in the snag list, Turn-over letter will be submitted for Final Acceptance of works and for Handing- over of Project.

Snag List and Final Handing Over of Project

11

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

Quality Management System Certificate

12

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

Client Testimonial

13

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

Project: NBC Microwave Towers - Doha

14

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

The certificate and schedule are held in force by regular annual surveillance visits by IFC Certification. The reader should contact IFC Certification to validate its status. This certificate remains the property of IFC Certification and must be returned to them on demand.

F88 ©IFC Certification Ltd 2014

CERTIFICATED INSTALLER OF PASSIVE FIRE PROTECTION

Certificate number: IFCC 3035

This is to certify that

Nemer for Metal Works KAAMCO Building, 7th Floor, Office 7B

Al Sadd Area Doha, Qatar

Tel: 00974 4432 9991

Installers of the following passive fire protection systems:

Doorsets with Metallic Leaves and Frames have successfully completed the requirements of IFCC scheme SDI 15. This includes the installation of passive fire protection, assessment and verification of the Quality Control system, competency assessment of individuals (as listed in the company’s client secure section of the IFCC website) and continuing surveillance including random site audits.

Initial Certification: 11th April 2016

Valid to: 10 April 2021 Issue status: 1

Ian Woodhouse

Director of Certification

IFC Certification Ltd, 20 Park Street, Princes Risborough, Buckinghamshire, HP27 9AH, UK Tel: +44 (0)1844 275500 Fax: +44(0)1844 274002 E-mail: [email protected] Web: www.ifccertification.com

Registered No: 4777898 England

IFC Certified Installer

15

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

Project: Al Samrya Towers, Doha

Project: Hilton Hotel - Doha

16

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

Featured Projects

7 School Around Doha & Villages

Owner:Ministry of Municipal Affairs & AgricultureClient:ASHGHALConsultant:Khateeb & AlamiContractor:Zublin International QatarContract Value:QR. 11,65 MioManufacturing Period:07/2008 – 09/2009

Project Description:Design, Manufacturing, Painting & Installation of:

2100 LM Internal Steel Handrail Epoxy Coat Finish.600 LM External Access Ladder Epoxy Coat Finish.500 M2 External Service Gates Epoxy Coat Finish.3486 LM External Boundary Wall Epoxy Coat Finish.1282 Nos Fire Rated Doors.1750 M2 HDPE Fabric Car Shed. 2430 M2 Rectangular Shed.

•••

60 Villa Complex - Muather Area

Owner:SHK. Khalid Bin Hamad Al ThaniClient:SHK. Khalid Bin Hamad Al ThaniConsultant:Gulf Design ConceptContractor:Mougals Qatar ContractingContract Value:QR. 3,8 MioManufacturing Period:03/2010 – 07/2011

Project Description:Design, Manufacturing, Painting & Installation of:

1330 LM Wrought Iron Handrail.1050 LM Wrought Iron Balcony Handrail.630 M2 Wrought Iron Steel Gates. 1000 LM Chain Link Fence for Tennis Court Club House.

••••

17

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

Al Arabi Sport Club

Client:Al Arabi Sports ClubConsultant:The Arab ArchitectsContractor:Tadmur Trading & ContractingContract Value:QR. 1,3 MioManufacturing Period:07/2004 – 02/200

Project Description:Design, Manufacturing, Painting & Installation of:

2250 M2 Multipurpose Hall.950 LM Handrails.150 M2 Gates.

•••

Al-Baker Executive Twin Towers

Owner:Mr. Ahmed Abdulaziz Al-BakerClient:Mr. Ahmed Abdulaziz Al-BakerConsultant:James Cubitt & PartnersContractor:Construction & Re Construction CRCContract Value:QR. 4,8 MioManufacturing Period:01/2011 – 02/2012

Project Description:Design, Manufacturing, Painting & Installation of:

4120 LM Steel Handrail.190 M2 Stone Cladding Steel Structure.425 M2 Access Hatch. 100 Nos Fire Rated Doors.350 LM Trench Grating.

•••••

18

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

Featured Projects

South Site Utility Tunnel

Owner:Qatar FoundationClient:Qatar PetrolumConsultant:KEOContractor:Zublin International QatarContract Value:QR. 12,7 MioManufacturing Period:03/2010 – 05/2012

Project Description:Design, Manufacturing, Painting & Installation of:

340 Ton G.I External Pipe Support.8650 LM G.I External Access Ladder Epoxy Coat Finish.6430 M2 PVC Membrane Car Shed. 9000 LM G.I Trench Cover.199 Nos Fire Rated Doors.

••

•••

Private Air Craft Hanger

Owner:SHK. Abdoulla Bin Sultan Al ThaniClient:SHK. Abdoulla Bin Sultan Al ThaniConsultant:HYDROContractor:Nemer For Metal WorksContract Value:QR. 1.0 MioManufacturing Period:03/2009 – 12/2009

Project Description:Design, Manufacturing, Painting & Installation of:

1350 M2 Steel Structural Hanger.•

19

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

Doha Women’s Club

Client:Sport City Development CommitteeDesign Consultant:The Arab ArchitectsSupervision:Projacs InternationalContractor:Tadmur Trading & ContractingContract Value:QR. 1,75 MioManufacturing Period:01/2004 – 01/2005

Project Description:Design, Manufacturing, Painting & Installation of:

50 MT G.I Stair Case.650 LM G.I External Access Ladder Epoxy Coat Finish.450 LM G.I Stair Railing.

••

Education City Housing Development Lot 3 & 4

Owner:Qatar FoundationClient:Qatar PetrolumConsultant:KEOContractor:Zublin International QatarContract Value:QR. 1,9 MioManufacturing Period:08/2009 – 05/2010

Project Description:Design, Manufacturing, Painting & Installation of:

150 LM G.I External Access Ladder Epoxy Coat Finish.470 M2 PVC Membrane Car Shed. 200 LM Wrought Iron Handrail.350 M2 Wrought Iron Steel Gates. 300 LM Access Ladders.1500 LM Wrought Iron Boundary Wall Fence.

•••••

20

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

NMW’s Clients

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

21

Nem

er fo

r Met

al W

orks

- Co

mpa

ny P

rofil

e

22

[email protected]

Kamco Tower, 7th Floor,Al Saad Area, Suhaim Bin Hamad StP.O. Box 23229 Doha - Qatar

+974 4432 9991+974 4432 9992+974 5581 1599