Upload
tejas-shah
View
219
Download
6
Tags:
Embed Size (px)
DESCRIPTION
the profolio for njit
Citation preview
PORTFOLIOFALL 2011
BRICK PROJECTFIRMITAS & VENUSTAS
THE TASKED TO CONSTRUCT A STRUCTURE THAT WILL SUPPORT THE LOAD (WEIGHT) OF A STANDARD BRICK.
ARCHITECTURAL COMPONENTSBARRIERS &THRESHOLDS
USING A SERIES OF POINTS,LINE AND PLANES,DEFINE A 6”CUBE IN MODEL FORM.A MAXI-MUM OF 50% OF THE CUBE IS DEFINED EXPLICITLY.
TO EMBARK ON A SIMILAR STUDY WITH THIS MODLE HOLDING THE GEMETRY OF 2 IMPLIED CUBES AND AN IMPLIED SPHERE.
ARCHITECTURAL COMPONENTSPLANES, SURFACES + DATUMS
EXPLORE THE SPATIAL EFFECTS OF LIGHT ON A VARIETY OF CURVED, TWISTED, AND FOLDED SURFACES.
FINAL MODELPLANES, SURFACES + DATUMS
4 HAND DRAWINGS OF THE FINAL MODEL IN VARIOUS LIGHTING CONDITIONS
INSIDE VIEW
DRAFTS OF INSIDE VIEW
TOP VIEW
FRONT VIEW
SITE ANALYSIS OF SUMMIT STREET (NJIT)PHYSICAL (TOPOGRAPHY)
FOR EACH CONTOUR LINES THE SLOPE CHANGES BY TWO FEET.
SUMMIT STREET
WARREN STREET
SITE SECTIONS
ENVIRONMENTAL
LANDSCAPE STRUCTURES & RAIN ABSORPTION
SUNRISE 12 NOON SUNSET
AUTUMN EQUINOX
1.OCCURS ON SEPT 21 ST2.SUNRISE AT 7.003.SUNSET AT 18:45
EXPERIENTIAL
PEDESTRIAN & VEHICULAR TRAFFIC PATTERNS
REDEFINING SUMMIT STREET (NJIT)
DIAGRAM
GAS COMPANY TOWER CALIFORNIA (USA )& RICE TERRACES IN THE MOUNTAIN (CHINA)
GAS COMPANY TOWER CALIFORNIA (USA )& RICE TERRACES IN THE MOUNTAIN (CHINA)
THE PLATFORMS ARE USED TO MAKE A PATH THAT LEAD TO THE MAIN HIER-ARCHY.
PHYSICAL MODEL (TOP VIEW)
BEGIN OF THE SUMMIT STREET
NEXT TO THE PARKING LOT & END OF THE SUMMIT STREET
DRAWING OF SUMMIT STREET (PLAN VIEW & SECTION A + B)
SCALE 1/160”=1’-0”
SCALE 1/160”=1’-0”
SECTION A
SECTION B
RENDERING OF REDEFINING SUMMIT STREET (TOP VIEW & MAIN HIERARCHY )
INFORMATION KIOSK & CENTRAL KING BUILDING
EYE LEVEL VIEW
AERIAL VIEW
BY:- TEJAS SHAH