NJ BTM REC Platform Transition Update

Updated April 1, 2009

Page 2: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Presentation Outline

• Temporary REC/SREC Platform Selection• Notice - Plans Subject to Change!• Early Transition Options• Default Transition• Frequently Asked Questions• Training Opportunities• Documentation Plan/Posting/Website• Key Contacts

Page 3: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Temporary REC/SREC Platform Selection Method

• Starting with projects submitting final paperwork March 1 through May 31, <10 kW projects may elect a platform (CPM or GATS) on which to establish a REC/SREC account

• S/REC Platform Election Form– Posted to NJCEP website and to RE and installer

email lists this week– Due with final paperwork– If not received with final paperwork, will assume

selection of GATS

Page 4: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Plans Subject to Change

• Transition plans and mechanics are subject to change.

• This presentation presents transition plans in their current form and highlights some areas of current uncertainty.

• Please check back for updates by attending future calls and/or checking the Transition section of the njcleanenergy.com website.

Page 5: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Early Transition - Overview

• Early transition is voluntary• Objectives

– Enable account holders (account holders with multiple generating units, large generating units, and/or accounts in both platforms) to transition CPM accounts to GATS prior to default transition date

– Provide account holders with more time to learn GATS prior to end of EY2009 true-up period

– Enable transition team (BPU, GATS, CPM, Market Manager) to gain experience with transition administration with a smaller set of participants

Page 6: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Early Transition OptionsGroup A• Eligibility: CPM account holders

with multiple generating units which report metered production data and no generating units which utilize estimated production data.

– ~ 24 account holders – ~ 22 MW capacity

• Will be notified of eligibility for early transition on February 20, 2009

• Must elect early transition by March 13, 2009

• GATS account available for viewing/trading and March generation entry on April 1

Groups B and C• Eligibility: All current CPM account

holders• Will be notified of eligibility for early

transition by March 20, 2009 (B) or April 20, 2009 (C)

• Must elect early transition by April 15 (B) or May 15 (C)

• GATS account available for viewing/trading and generation entry on May 1 (B) or June 1 (C)

Page 7: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Early Transition Key DatesGroup A• March 3 – Last day to

enter February production data into CPM

• March 13 – Deadline for requesting Group A early transition

• March 16-30 – Account blackout period

• April 1 – GATS account open for viewing/trading

• April 1-29 – GATS data entry period opens for March production reporting

Group B • April 3 – Last day to

enter March production data into CPM

• April 15 – Deadline for requesting Group B early transition

• April 16-30 – Account blackout period

• May 1 – GATS account open for viewing/trading

• May 1-28 – GATS data entry period opens for April production reporting

Group C • May 3 – Last day to

enter March production data into CPM

• May 15 – Deadline for requesting Group C early transition

• May 16-31 – Account blackout period

• June 1 – GATS account open for viewing/trading

• June 1-30 – GATS data entry period opens for May production reporting

Page 8: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Early Transition - Mechanics

• “Clean cutover” to GATS– After the applicable Early Transition Blackout Period, all NJ BTM

RECs will be issued by PJM-EIS and traded through GATS.– No further account activity will occur through CPM

• RECs in escrow:– Account holders will be informed that they must clear RECs out

of escrow prior to the start of the transition blackout period.– CPM will screen accounts to be transferred for RECs in escrow.

If there are RECs in escrow, the account will not be transferred.

Page 9: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Default Transition• Default transition is not voluntary• Applies to all CPM account holders who did not elect

early transition• Enables continued use of CPM platform for settlement of

EY09 RECs or SRECs created on or prior to June 5, 2009 through EY09 true-up period (ending September 30, 2009)

• Ensures no unretired RECs or SRECs at end of EY09 true-up period are “stranded” at CPM

Page 10: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Default Transition - Details• All EY2010 NJ BTM RECs will be issued by PJM-EIS

through GATS.• Treatment of RECs in Escrow on Transfer Date (9/30)

– GATS will not (initially) support the escrow functionality.– Account holders will be informed that they must clear RECs out of

escrow prior to the transition or those escrowed RECs will revert to the seller’s GATS account.

– Trades will need to be re-initiated and completed using GATS.

Page 11: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Default Transition – Key DatesAccount Holders Clean Power Markets GATS

June 3 Account holders enter 

generation data pertaining 

to production occurring on 

May 31 or earlier into CPM 

platform.

Last day to enter generation data pertaining to 

production occurring on May 31 or earlier into 

CPM platform. After June 3, no production data 

may be entered into the CPM platform, but 

must instead be entered into GATS.

June 5 CPM creates RECs

based on production data 

entered by June 3.

June 6‐30 Account holders sign and 

submit GATS Terms of Use 

and required 

documents/schedules to 

GATS Administrator to 

enable account setup.

CPM transfers account information to GATS. 

Information transferred includes account 

holder, generating unit, and partial MWh

balances. REC balances are not transferred and remain in 

CPM system. CPM account holders may 

experience a disruption in service during this 

period.

GATS receives account 

information from CPM.

July 1 –

September 30

Account holders login to 

GATS, choose password for 

account, verify transferred 

account information.

CPM remains open for trading and retirement 

of RECs

created by June 5.GATS open for entering 

production data.

September 30 CPM closes. Active REC or SREC balances are 

transferred to GATS.

GATS receives active REC 

or SREC balances from 

CPM. There may be a 

delay (of up to several 

weeks) in having these 

balances appear in GATS 

t

Page 12: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Default Transition – Account Holder Responsibilities

• Current (not historical) account information to be ported from CPM to GATS– GATS will be able to replicate CPM account and username– GATS will send account holders an email invitation to log in to a new

URL using their CPM username• Account holders are advised to:

– Check/print out current account information (generating units in account) and unsold REC balance information prior to default transition

– Verify GATS account balances are consistent/accurate– Obtain training/learn to use the GATS system

• Account holders will need to:– Download, read, sign and return the GATS Terms of Use and

Schedules C1 and E1 to GATS– Log in to GATS and choose a password upon receipt of notification of

account availability from GATS

Page 13: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Frequently Asked Questions

• Production Estimates– Existing systems’ production estimates will be transferred to

GATS as-is– Creation of production estimates for new systems will be

supported by GATS, using same method as used by CPM– Automated entry of estimated production will be supported by

GATS

• kWh Production Entry/Partial MWh carryover– GATS will enable generators to enter production in kWh, and will

support carryover of partial MWh to the following month

Page 14: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Frequently Asked Questions

• Transaction Escrow Period Support– GATS does not plan to support this functionality by the default

transition date

• Fees– GATS fees are listed in the GATS Terms of Use, fees are not

relevant to account holders with less than 10 MW capacity or to transactions among GATS account holders

• Username/Password Migration– GATS is working with CPM to transition usernames and

accounts; you will receive an email from GATS once the transfer is made, and you will need to create a new password

Page 15: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Training Opportunities

• Stakeholder Webinars• GATS Subscriber Calls• GATS Detailed Training

– Online training modules– Detailed in-person training

Page 16: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Early versus Default Transition• Early Transition

– Voluntary– Clean cutover from CPM to

GATS– Best for account holders

• Whose buyers are already registered at GATS

• Who are willing to learn a new system

• Default Transition– Mandatory– EY09 settled in CPM, EY10

settled at GATS– Best for account holders

• Who wish to remain with CPM through EY09

• Who depend on CPM’s escrow function for trading

Page 17: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Stakeholder Webinars• Transition Briefings/Stakeholder Webinars These

webinars will provide an update of the plans for transitioning NJ behind-the-meter REC and SREC accounts from the current platform operated by Clean Power Markets to the Generation Attributes Tracking System (GATS) platform operated by PJM- Environmental Information Systems. All sessions will cover the same topics, but later sessions may include updated information.

– Thursday March 26, 2009 - 9 -10 a.m– Thursday April 2, 2009 - 9-10 a.m.– Thursday April 9, 2009 - 9-10 a.m.

• Register here: http://www.njcleanenergy.com/gats

Page 18: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

GATS Subscriber Calls• GATS Solar Subscriber Training Calls – shorter calls

intended for solar subscribers to call and speak with the GATS Administrator on training related questions and issues. More info and training materials can be found at http://www.pjm-eis.com/gats/training.html. – Thursday, April 9, 2009 1:30 – 2:30– Thursday, May 14, 2009 1:30 – 2:30– Thursday, June 11, 2009 1:30 – 2:30

Page 19: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

GATS Detailed Training• Online GATS Training Modules – Always available at

http://www.pjm-eis.com/gats/training.html.– Part I: GATS Introduction– Part II: GATS New Account Set-Up– Part III: Managing and Using Your GATS Account

• GATS Account Setup and Use – Detailed Training– 5/18, Trenton, GATS training, hours tbd, see

http://www.njcleanenergy.com/gats for more information

Page 20: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Documentation Plan/Posting• Early Transition Notification, FAQ, and Request

Form –Email to all eligible account holders and available from CPM login page 3 weeks prior to each early transition. NJCEP website.

• Default Transition Notification and FAQ - Email to all affected account holders and available from CPM login page 3 weeks prior to each early transition. NJCEP website.

• Training Presentations and Materials – As described in the section on Training Opportunities – completed prior to training events and posted to njcleanenergy.com thereafter

Page 21: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Transition Info on Website

• www.njcleanenergy.com -> Renewable Energy -> Programs -> Solar Renewable Energy Certificates (SREC) -> GATS Transition

• http://www.njcleanenergy.com/gats

Page 22: NJ BTM REC Platform Transition Update - NJ Clean Energy · 4/1/2009  · CPM remains open for trading and retirement of RECs created by June 5. GATS open for entering production data

Key Contacts

• PJM-EIS GATSGATS Administrator, 610-666-2245, [email protected]

• Clean Power MarketsNathalie Shapiro, (201) 612-3221, [email protected]

• Market ManagerSteve Wiese, (732) 218-3409, [email protected]