54
Choosing Us make a difference SALES & SERVICE INFRASTRUCTURE PROJECTS HIRE-LEASE-RENTAL EMPOWERING GROWTH NITYANAND INFRASTRUCTURE LIMITED

NITYANAND INFRASTRUCTURE LIMITED

  • Upload
    lenhi

  • View
    243

  • Download
    1

Embed Size (px)

Citation preview

Page 1: NITYANAND INFRASTRUCTURE LIMITED

ChoosingUsmake a difference

SALES & SERVICE

INFRASTRUCTURE PROJECTS

HIRE-LEASE-RENTAL

EMPOWERING GROWTH

NITYANAND INFRASTRUCTURE LIMITED

Page 2: NITYANAND INFRASTRUCTURE LIMITED

COMPANY

MACHINERY, EQUIPMENT & PROJECTS

WORK DONE CERTIFICATES

NITYANAND INFRASTRUCTURE LIMITEDNITYANAND

Page 3: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND INFRASTRUCTURE LIMITED

ABOUT US

GENERAL DETAILS

CERTIFICATES - GENERAL

ROCISO CERTIFICATE- 9001:2008Quality PolicyService Tax CertificatePF Registration Certificates PF Registration CertificatesProfession Tax Registration Certificate PWD Registration - Maharashtra PRED Registration - KarnatakaPWD Registration - Karnataka VAT Registration Certificate - Karnataka CST Registration Certificate - Karnataka Trademark Registry CertificateMVAT - MaharashtraCSTDIRECTORATE of INDUSTRIES - MaharashtraNSIC-CRISIL Performance and Credit Rating for Small Scale Industries

INFRASTRUCTURE – CIVIL PROJECTS

i) Mangalore Refinery and Petrochemical Limitedii) Madhucon Projects Limitediii) Pratik Enterprisesiv) K. Raheja Corp Pvt Ltd.v) Antilia Commercial Pvt Ltdvi) Nagarjuna Construction Company Ltdvii) Powai Developers-1viii) Shapoorji Pallonji & Co Ltd.ix) Reliance Engineering Associates (P) Limited x) Unity Infra Projects Limitedxi) UP State Bridge Corporation Ltdxii) YATES – DESBUILD JOINT VENTURExiii) Atlanta Limitedxiv) Powai Developers -2

INDEX

DG SETS - MACHINERY, EQUIPMENT & PROJECTS

LIST OF GENSETS AVAILABLE: - Ranging From 30 KVA to 1250 KVA

GENSETS - CLIENTS & PROJECTS

INFRASTRUCTURE - MACHINERY, EQUIPMENT & PROJECTS

LIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES

INFRASTRUCTURE - CLIENTS & PROJECTS

Page 4: NITYANAND INFRASTRUCTURE LIMITED

ONGOING PROJECTS – CIVIL PROJECTS

i) MANGALORE REFINERY AND PETROCHEMICALS LTDii) TECHNIMONT ICBiii) MANGALORE SEZ LIMITEDiv) TOYO ENGINEERING INDIA LIMITED

FINANCIALS

2008 - 2009

AUDIT REPORT - 2008- 09 – PAGE 1AUDIT REPORT - 2008- 09 – PAGE 2AUDIT REPORT - 2008- 09 – PAGE 3BALANCE SHEET - 2008-09PROFIT & LOSS – 2008-09IT – RETURN VERIFICATION FORM – 2008-09

2009 – 2010

AUDIT REPORT - 2009- 10 – PAGE 1AUDIT REPORT - 2009- 10 – PAGE 2AUDIT REPORT - 2009- 10 – PAGE 3BALANCE SHEET - 2009-10PROFIT & LOSS – 2009-10IT – RETURN VERIFICATION FORM – 2009-10

NITYANAND INFRASTRUCTURE LIMITED

INDEX

Page 5: NITYANAND INFRASTRUCTURE LIMITED

ABOUT US

Since 1976, we have been at the forefront of major infrastructure development in the areas of Road Work Contracts, Excavations and Equipment supplies for large-scale projects around the country.

Nityanand Infrastructure Ltd. understands that the success and development of Infrastructure of a country is one of its most essential Underpinning And innovation in infrastructure is a means for building assets that support the economy. Investments in equipment and personnel training have ensured a track record that has associated us with many renowned projects. We also have a Construction Equipment Bank that provides machinery and support, on rental basis for large-scale projects across the country.

Our company stems from a vision that the boundaries between products and services fade rapidly too. As a market leader today, we must be able to integrate in a balanced way different types of know-how that would transform stand-alone processes, products and services into a seamless, value-rich solution. These challenges have been overcome by our experience, which today stands as our core strength:

CONTRACTS: Taking this ideology we have developed a competence that today extends to handle consultation, design, installation Fabrication. Excavation, Building Roads, dams, canals and other related Civil Works.

Equipment Bank: which is the backbone to the construction contract business provides Rental Solution for all type Machinery to projects regardless of the application, size, duration, industry and location.

Our ancillary businesses have developed from an expertise to meet every need in the Infrastructure scenario. Where innovative thought has led to a cross-functional diversification in providing the following services: Resource Consultancy Services: Our manpower services, establishes communication and mobilizes personnel in project implementation as per client requirements. This support encompasses operational & maintenance support for construction machines, mainly D.G sets for supporting construction Power.

Nityanand Automobiles: State of the Art workshop for Repair equipments through the use of modern technology, we have set up a workshop at Navi Mumbai and Panvel, dedicated to the maintenance Repair Refurbish and supply of spares through an authorized dealership agreement with MICO Bosch for next generation Fuel pumps.

Nityanand Multitrade Pvt Ltd: This Company is engaged in Banking and Non Banking Finance facility for Construction Equipments and other Management guidance, and ensured that the documentation and procedures are adequately in place for all policies and activities.

NITYANAND INFRASTRUCTURE LIMITED

About Us

Page 6: NITYANAND INFRASTRUCTURE LIMITED
Page 7: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND INFRASTRUCTURE LIMITED

General Details

INCORPORATION CERTIFICATE NO. & DATE 11- 84676 DT. 16.01.1995

ISO 9001 : 2008 REG. NO. MAH/ Q - 1079/C1 dt. 08.09.2011 valid till 07.09.2014

PERMANENT ACCOUNT NO. AAACN1981E DATED 16/01/1995

TAN NO. MUMN05238C

SERVICE TAX NO. AAACN1981EST001 Dated 16/09/2008

Provident Fund No. MH/PF/Circle V/42827/361Dated 23-10-2007

PROFESSION TAX NO. PT/R/ VI / 25/ 8055 Dated 05/05/05

BOMBAY SHOP ESTABLISHMENT REG. NO. 760014732/ Commercial II/ PS Dated 19.07.2007

MAHARASHTRA PWD REG. NO. 2/ 2008-09 Class-1 (A) Dated 05/04/2008.

KARNATAKA PWD REG. NO. . CBS 8403 CEVIL 2005 DT. 31.01.2009

VAT TIN – MAHARASHTRA 27230544719 V W.E.F. 19.06.2006

CST TIN – MAHARASHTRA 27230544719 C W.E.F. 19.06.2006

VAT TIN - KARNATAKA 29880820245 W.E.F. 22.10.2008

Page 8: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND INFRASTRUCTURE LIMITED

General Details

CST TIN - KARNATAKA 29880820245 W.E.F. 22.10.2008

CERTIFICATE OF REGISTRATION OF TRADE MARKS

Trade Mark No:1366172 - Dated 22-06-2005

DIRECTORATE of INDUSTRIES - Maharashtra

Enterpreneur Memorandum no.27222200649 dt 24.08.2011

NSIC-CRISIL Performance and Credit Rating for Small Scale Industries

Rating SE 2BDated 17-11-2011 valid 16-11-2012

Page 9: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND INFRASTRUCTURE LIMITEDNITYANAND

Page 10: NITYANAND INFRASTRUCTURE LIMITED
Page 11: NITYANAND INFRASTRUCTURE LIMITED
Page 12: NITYANAND INFRASTRUCTURE LIMITED
Page 13: NITYANAND INFRASTRUCTURE LIMITED
Page 14: NITYANAND INFRASTRUCTURE LIMITED
Page 15: NITYANAND INFRASTRUCTURE LIMITED
Page 16: NITYANAND INFRASTRUCTURE LIMITED
Page 17: NITYANAND INFRASTRUCTURE LIMITED
Page 18: NITYANAND INFRASTRUCTURE LIMITED
Page 19: NITYANAND INFRASTRUCTURE LIMITED
Page 20: NITYANAND INFRASTRUCTURE LIMITED
Page 21: NITYANAND INFRASTRUCTURE LIMITED
Page 22: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND

Page 23: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND

Page 24: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND

Page 25: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND

Page 26: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND

Page 27: NITYANAND INFRASTRUCTURE LIMITED
Page 28: NITYANAND INFRASTRUCTURE LIMITED

Resources & Projects

DG Sets - Machinery, Equipment & Projects

NITYANAND INFRASTRUCTURE LIMITEDNITYANAND

LIST OF GENSETS AVAILABLE: - Ranging From 30 KVA to 1250 KVA

GENSETS - CLIENTS & PROJECTS

Infrastructure - Machinery, Equipment & ProjectsLIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES

INFRASTRUCTURE - CLIENTS & PROJECTS

Page 29: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND INFRASTRUCTURE LIMITEDNITYANAND

1 5

2 38

3 28

4 180 kva:180KVA/150KW NT –743 G (NA) or 6CTA (250(Amps) 415Volts, 3 Phase (4 Wire), 0.8 PF (LAG) 1500 Rpm, 50HZ AC Stamford Alternators, coupled to kirloskar Cummins NT 743 G, 23 BHP, 6 Cylinders, Radiator cooled Engine, Mounted on common Base Frame complete with 2 Nos Starting Batteries, Fuel Tank, Standard Control Panel along with standard Accessories like battery lead, Connection cables etc.

22

5 250 kva:A250 KVA50HZ AC Stamford Alternators, coupled to kirloskar Cummins engines NTA 855 G 2,306 BHP, 6 Cylinders, Radiator cooled Engine, Mounted on common Base Frame complete with 2 No s Starting Batteries, Fuel Tank, Standard Control Panel along with standard Accessories like battery lead, Connection cables etc

/200KW NT 855 G (NA) or 6CTB (348 Amps) 415 Volts, 3 Phase (4 Wire), 0.8 PF (LAG) 1500 Rpm, 50

6 500 kva:500 KVA / 400 KW VTA 28G NA or KT19 G (AC) D.G.Set compromising of Cummins VTA 28G Engine developing 614 BHP coupled to Stamford make Alternator 415 Volts 3 Phase (4 Wire) 0.8 PF (LAG) 1500 Rpm 50 HZ Ac. Both mounted on a common base frame through a pair of flexible coupling complete with standard Control panel, 990Ltr.Fuel Tank, 12 cylinders, 2 Nos. Starting Batteries of 12 Volts each, Connection from alternator to panel board and all other standard Accessories.

25

7 625 kva:625 KVA / 500 KW, Diesel Gen Set, Water cooled Engine make kirloskar Cummins, Model KTA 2300 – G 750 BHP Amps 869 coupled to suitable Alternator of Stamford make 415 Volts 3 Phase (4 Wire) 0.8 PF (LAG) 1500 Rpm 50 Hz AC with suitable Base Frame along with AVM Pads, Diesel Tank, Battery, Standard Panel Board, Connection up to the panel Board from Alternator with ace Maintenance Kits like Filters etc.

2

8 750 kva:750 KVA / 600KW, Diesel Gen Set, Water cooled Engine make Kirloskar Cummins, Model KTA 2300-G, 890 BHP, Amps 1042, Coupled to suitable Alternator of Stamford make 415 Volts 3 Phase (4 Wire) 0.8 PF (LAG) 1500 Rpm 50HZ AC with suitable base Frame along with AVM Pads, Diesel Tank, Battery, Standard Panel board, Connection up to the panel Board from Alternator with ace Maintenance Kits like Filters etc.

5

9 1000 kva:1000 KVA/800 KW ,Cummins Engine Model KTA –3067,1180- BHP, Radiator cooled Engine, 415 Volts, 3 Phase (4 wire) 0.8 P.F (Lag) 1500 Rpm, 60 HZ, Stamford Alternator Mounted on sturdy Base Frame, 16 Cylinders, with

5

10 1250 kva:1250 KVA/ 1000 KW, water-cooled Cummins Engines model 38.50 G3, 1475 Amps/ 1470 Bhp

5

LIST OF GENSETS AVAILABLE: - Ranging From 30 KVA to 1250 KVA

SL No Description Units

30 Kva30KVA 25KW (Kirloskar/Oil Engine) RB33/RA33, 48BHP Radiator/Air cooled coupled to kirloskar/Stan ford Alternator, 415Volts, 3Pharse (4Wire), 0.8PF (LAG) 1500RPM, Mounted on common base frame. INOS starting battery fuel tank standard control panel 415 Volts,3 Phase(4 Wire),0.8 PF (LAG) 1500 Rpm, starting Batteries, Fuel Tank, Standard Control Panel along with standard accessories like battery leads, connection from Alternator up to panel board etc

62.5 kva:62.5 KVA,50KW82AmpsLeyland Engine model (370/400/402) Cummins Engine model 38G7,+80BHP,water cooled coupled to kirlosker/stamford ALTERNATOR 415 Volts,3 Phase(4 Wire),0.8 PF (LAG) 1500 Rpm, starting Batteries, Fuel Tank, Standard Control Panel along with standard accessories like battery leads, connection from Alternator up to panel board etc

125 kva: 125KVA/100KW Kirloskar Cummins NTC 495 G, 154 BHP, 6 Cylinders, Radiator Cooled Engine (174 Amps) coupled to KEC / Stamford Alternator 415 Volts, 3 Phase (4 wire), 0.8 PF (LAG) 1500 Rpm, 50 HZ AC mounted on common Base Frame Complete with 2 No s Starting Batteries, Fuel Tank, Standard Control Panel along with Standard Accessories like Battery leads, Connection from Alternator up to Panel Board etc.

Page 30: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND INFRASTRUCTURE LIMITEDNITYANAND

Sr. No. Name of the Client Nature/ Description of Work Duration No of D.G Sets hired

1 Reliance Engineering Associates Pvt Ltd Deployment of D.G Set capacity from 62.5 KVA to 1000 KVA at Reliance Jamnagar Site, Gujarat

2006-2009 100 nos

2 Punjlloyd Ltd Hiring Of 500 KVA & 250 KVA & 125 KVA at Heera Redevelopment Project - Offshore Site.

2008- Till Date 10 Nos

3 Om Sai Infrastructure Ltd Hiring of 625 KVA & 750 KVA- for crusher plant at Bhawadi - Wagoli, Pune

2008- Till Date 5 Nos

4 Uttam Galva Steels Ltd Hiring of 62.5 KVA to 1000 KVA Capacity D.G at Wardha Steel Project, Nagpur and Khopoli Steel Project

2008- Till Date 20 Nos

5 Zydus Nycomed Care Pvt Ltd Hiring of 125KVA & 250 KVA for emergency backup in Plant at MIDC, Pawane, Navi Mumbai

2008- Till Date 5 Nos

6 Larsen & Toubro Ltd Hiring of 62.5 KVA to 500 KVA Capacity D.G Set at L&T MONORAIL PROJECT at Wadala and SEZ Arshiya Project at Panvel

2009- Till Date 20 Nos

7 Runwal Developers Pvt Ltd Hiring of 500 KVA & 250 KVA Capacity D.G Set in RMALL Project at Mulund & Thane

2009- Till Date 5 Nos

8 Tulip Telecom Ltd Hiring of 250 KVA D.G Set for Emergency backup power at Mahape Plant, Navi Mumbai

2007- Till Date 2 Nos

9 Nagarguna Construction Ltd Deployment of 125 KVA D.G Set at Construction Site at Chakan,Pune & Mazagon Dock, Mumbai

2008- Till Date 3 Nos

10 Seto Technolog Pvt Ltd Hiring of 62.5 KVA at Mahape site ,Navi Mumbai

2007- Till Date 2 Nos

...and Many more !

Are you setting up a new enterprise and the sanction of grid power for construction activities takes time? We have the solution of rental power generators, as temporary stopgap arrangement to speed up construction activities and the timely completion of your projects. Many businesses are re-evaluating their plans and procedures for business continuity in the event of major power shortfalls. Our emergency power solutions come into rescue, to fulfil your production load by adding more power to the existing sanctioned capacity.

Save on Capital Costs with a negotiated long-term rental to back up a manufacturing operation in the event of:

a) Seasonal Requirement of additional powerb) A large order to be executed and the need for additional power. Would you like to outsource your Power now! Call on us 24x7 for support and ready stock delivery.

GENSETS - CLIENTS & PROJECTS

Page 31: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND INFRASTRUCTURE LIMITEDNITYANAND

Sr no 1 Details of Plant & Machinery Model/Capacity Make/Nos

1 Dumpers & Tippers

35 nos 25 Ton ASHOK LEYLAND

5 nos 15.5 Ton TATA

2 Water Tanker

2 No LEYLAND

3 JCB- 3D

4 No 3DX Escorts

2 No 3D Escorts

4 EX - 60

2 Nos TATA

5 EX-100

1 No TATA

6 EX- 300

1 No TATA

7 EX- 200LC

1 No TATA

8 EX- 210 IES

8 Nos TATA

9 Roller

1 No Vibro soil compactor 1107D L & T

1 No Tandom IDD 90 Ingersoll Rand

10 PC- 300

1 No Komatsu

LIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES

Page 32: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND INFRASTRUCTURE LIMITEDNITYANAND

11 PC - 200-6

1 No Komatsu

12 Hyraulic Excavator 320

2 No Caterpillar

13 Dozer - D4

2 No Komatsu

14 Dozer - D3

1 No Komatsu

15 Dozer - D6

2 Nos Komatsu

16 Hydra 14 Ton

4 No 14SB-3P Escort

17 Hydra 16 Ton

2 Nos HP 216 Escort

18 Motor Grader

1 No GD 511A Komatsu

1 No GD-405 Komatsu

19 BOBCAT

2 No S 130 Ingersoll Rand

20 Hydraulic Piling Rig HR -

1 No HR 180 Mait

21 Hydraulic Piling Rig HR -

1 No HR 130 Mait

LIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES

Page 33: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND INFRASTRUCTURE LIMITEDNITYANAND

Other Equipment & Vehicles

1 Other Utility Vehicles

Mahindra Bolero - Camper

8 Nos Mahindra

2 Other Equipments

Form Work ,Shuttering & Enabling Material For 2000 Sq Mtr Area

1 Set

3 Shuttering & Scaffolding Materials 500 Nos

4 20m3 Batching Plant Univeral-20M3/Hr

5 Transit Mixer Stetter Transit Mixer Model AM 6 SHN

6 Concrete Mixer

1 Workshop Facilities Univeral-20M3/Hr

Lab Facilities 1

Cuplock Vertical 4 Cups-3.0 Mtrs

Cuplock Vertical 4 Cups-2.5 Mtrs

Cuplock Vertical 4 Cups-1.5 Mtrs

Cuplock Vertical 4 Cups-1.2 Mtrs

Cuplock Horizontal 4 Cups-1.0 Mtrs

U-head Jacks 450 mm

Flat head Jacks 500 mm

Shuttering plat

Channel Soldier

Single Clip

400 nos

1500 nos

1800 nos

500 nos

2000 nos

700 nos

300 nos

400 nos

1 No

1200 nos

2 Nos

2 Nos

2600 Sqf Workshop equipped with Overhead Crane facilities

Sand replacement Appartus

Core Cutter app

Electronic Weighing Balance

Slump Cone

Leveling Instrument

Cube Mould

Manually Operated Compression Testing machine

Standard Test Sieve - Sethi

Total Station - Topcon

Rapid Moisture Metre

2 Set

2 Set

1 Set

1 Set

1 Set

12 Nos

1 No

1 Set

1 Set

1 Set

a)

b)

c)

d)

e)

f)

g)

h)

i)

j)

LIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES

Page 34: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND INFRASTRUCTURE LIMITEDNITYANAND

Sr. No. Name of work Name of Organisation Date of Start / Date of Completion

AMOUN T OF WORK In Lacs 2009-2012

1 Construction of New Road For Mangalore SEZ Limited

Mangalore SEZ Ltd. 2009 to 2010 1908.00 WORK COMPLETED

2 Construction of RCC Structure for Control Room; Civil & Structural Work for Sulphur Pastilation unit at MRPL.

Mangalore Refineries & Petrochemicals Ltd Ven Code: SN425

2009 to 2010 259.00WORK COMPLETED

3 Construction for Foundation of Cooling Tower at MRPL Site

Mangalore Refineries & Petrochemicals Ltd

2009 to 2010 55.49WORK COMPLETED

4 Construction Works of Temporary Site Facilities For MRPL CHTU Project at Mangalore

TECHNIMONT ICB Pvt LTD, MUMBAI

2009 to 2010 275.00WORK COMPLETED

5 Piling Work at Guideway in 2B Series, Monorail Project for 1000mm dia

Larsen & Toubro Limited, Mumbai

2009 to 2010 111.67WORK COMPLETED

6 Excavation Work at Ambika Mills Compound. Kamala Group Of Companies, Mumbai

2009 to 2010 417.00WORK COMPLETED

7 Excavation Works From Versova to Ghatkoper Stretch in Mumbai Metro Rail Project.

Simplex Infrastructure Ltd, Mumbai

2009 to 2010 29.6WORK COMPLETED

8 Work Order for carrying out Earthwork for Foundation of proposed residential building & Allied structures at Metal Box Worli, Mumbai.

K. Raheja Corp P.L. Mumbai

2008 to 2009 87.05WORK COMPLETED

Work Order for carrying out earthwork for foundations of proposed residential building No. B3 and its ancillary structures at Hindustan Mills, Mahalaxmi, Mumbai.

2006 to 2007 124.18WORK COMPLETED

9 Piling work and Road work & allied work of New American Consulate Complex,US Embassy @ BKC.

Yates Desbuild JV 2008 to 2009 382.06WORK COMPLETED

Filling of soil borrowed from the quarry / borrow area designated by the sub contractor and apporoved by YDJV from Pali Hill. Includs Spreading & grading by by 8/10 metric ton vibro pneumatic tired roller to achieve inclusive of royalty charges.

2006 to 2007 212.72WORK COMPLETED

10 The Civil work for MLV -28, Kadav Site, Karjat EWPL Project, MH State

Reliance Industries.Ltd 2008 to 2009 64.57WORK COMPLETED

The Civil & Structural work of welder Traning center (WTC) Central Maintenance workshop (CMW) & Store P & M Building at Project, MH State Ghosalwadi, Mumbai EWPL.

2007 to 2008 140.66WORK COMPLETED

The Scope of work under this Contract is backfilling works on all sides of Bldg. excavation and back filling.

2006 to 2007 26.70WORK COMPLETED

INFRASTRUCTURE - CLIENTS & PROJECTS

Page 35: NITYANAND INFRASTRUCTURE LIMITED

NITYANAND INFRASTRUCTURE LIMITEDNITYANAND

11 Earth work and ground improvement works such as excavation in road way by mechanical means rocky soils by blasting / controlled blasting, removal and disposal of unsuitable soils earth work.

Madhucon Projects Ltd 2007 to 2010 2106.00WORK COMPLETED

12 Earthwork excavation in basement in all Types of soil, such as Murrum Soft/Hard Rock by Manual/ Mechanical/ Pnemautic wedging chiseling including carting away excavated material to approved dumping ground Excavtion Work at Plot No.21 MIDC Andheri (E) Mumbai.

Annakoot Properties Pvt. Ltd

2008 to 2009 33.44WORK COMPLETED

13 Work order for carrying out excavation and disposal of soil and Rabit from Nursery plot, Raheja Vihar, Powai Mumbai

Powai developers 2006 to 2007 133.4WORK COMPLETED

14 Work Order for carrying out earthwork for foundations of proposed residential building and its alliedstructures at bldg. No. 15, wing "E" Raheja Vihar, Near Chandivali Village: Tunga, Powai, Mumbai

Hill Crest Developers 2006 to 2007 116.56WORK COMPLETED

15 Work order for execution of earthwork as per the details given in our tender specifications for on labour basis for proposed construction of Swan Mills (||Primal) Ashok Gardens Residential Bldg Site.

Unity Infra Projects Ltd 2006 to 2007 24.32WORK COMPLETED

16 Work order for Transportation and back filling of Soil / Murum at New Consulate Complex, US Embassy, Site BKC Mumbai

Shapoorji Pallonji & Co. Ltd 2006 to 2007 96.9WORK COMPLETED

17 The Scope of work under this Contract for work of training of Mithi river.(widening & Deepening from C ST Road to Powai (Gr. No. 5)

M/s. Pratik Enterprises 2006 to 2007 144.98WORK COMPLETED

18 Work Order for Excavation and Earth Works at our CSPL Vasai Site

Nagarjuna Construction Co. Ltd

2004 to 2005 97.58WORK COMPLETED

19 Widening and Construction of Western Express Highway from Times of India Flyover north end to Asha Nagar, Subway & Kulupwadi Pedestrian Subway (Km. 510.35 to 504.00)

Atlanta Ltd 2004 to 2005 650.26WORK COMPLETED

20 Widening & strengthening of Kalanagar - Vakola Road, Project Mumbai Dismantlng Work.

U.P. State Bridge Corporation Ltd.

2004 to 2005 112.7WORK COMPLETED

21 LOI for Rock Excavation & Removal of Over Burden Earthwork in th plot at Atlamont road, Mumbai

Antilia Commercial P.L 2004 to 2005 35.71WORK COMPLETED

INFRASTRUCTURE - CLIENTS & PROJECTS

Page 36: NITYANAND INFRASTRUCTURE LIMITED

projects

Infrastructure Civil Projects

NITYANAND INFRASTRUCTURE LIMITEDNITYANAND

Page 37: NITYANAND INFRASTRUCTURE LIMITED
Page 38: NITYANAND INFRASTRUCTURE LIMITED
Page 39: NITYANAND INFRASTRUCTURE LIMITED
Page 40: NITYANAND INFRASTRUCTURE LIMITED
Page 41: NITYANAND INFRASTRUCTURE LIMITED
Page 42: NITYANAND INFRASTRUCTURE LIMITED
Page 43: NITYANAND INFRASTRUCTURE LIMITED
Page 44: NITYANAND INFRASTRUCTURE LIMITED
Page 45: NITYANAND INFRASTRUCTURE LIMITED
Page 46: NITYANAND INFRASTRUCTURE LIMITED
Page 47: NITYANAND INFRASTRUCTURE LIMITED
Page 48: NITYANAND INFRASTRUCTURE LIMITED
Page 49: NITYANAND INFRASTRUCTURE LIMITED
Page 50: NITYANAND INFRASTRUCTURE LIMITED
Page 51: NITYANAND INFRASTRUCTURE LIMITED

Hire-Lease-Rental

Projects

NITYANAND INFRASTRUCTURE LIMITED

Page 52: NITYANAND INFRASTRUCTURE LIMITED
Page 53: NITYANAND INFRASTRUCTURE LIMITED

projects

Ongoing Projects

NITYANAND INFRASTRUCTURE LIMITEDNITYANAND

Page 54: NITYANAND INFRASTRUCTURE LIMITED

Corporate Office (Correspondence):

NITYANAND INFRASTRUCTURE LTD.711, Highway Commerce Centre,Off Western Express Highway,I.B. Patel Road,Goregaon (East), Mumbai - 400063,Maharashtra, India.Telephone : (+91) (22) 4088 4444Email: [email protected]

Registered Office:

NITYANAND INFRASTRUCTURE LTD.G.D. Ambekar Marg,Opp. Abhyudaya Nagar Post Office,Cottongreen (West), Mumbai - 400033,Maharashtra, India.Telefaxno : (+91) (22) 4088 4444Fax : (+91) (22) 2686 6812Email:

Works:

OM NITYANANDNear Old Mumbai - Pune toll naka,Near Raigad Petrol Pump, Thombre Wadi,Post - Poinge, Dist - Raigad,Panvel - 410206Telephone - (02143) 239108 / 107<Email:

NITYANAND INFRASTRUCTURE LTD.Plot No - A/132, MIDC,T.T.C. Industrial Area,Pawane Village,Navi Mumbai - 400705Telephone - (022) 27685195, 27689146Email: [email protected]

[email protected]

[email protected]

NITYANAND INFRASTRUCTURE LIMITED

Contact Us

[email protected]

[email protected]

General [email protected]