Upload
niriti-porwal
View
216
Download
0
Tags:
Embed Size (px)
DESCRIPTION
contains a brief of academic and professional work
Citation preview
NIRITI PORWALArchi tectura l Port fo l ioArchi tectura l Port fo l io
Archi tectura l Port fo l io
M.S. Arch and Urban DesignP r a t t I n s t i t u t e
The 21st Century Urban Park, Miami niriti porwalM.Arch. Spring Semester 01
The sequencing of 16 ‘episodes’ is following the model of theme parks and golf courses as an internal bulwark against the ever-present pressures of the encroaching city.
Each of the episodes presents itself as a self-contained world amplifying the strange conversations between the natural and the artificial in contemporary life.
Investigation: components, sub assemblies, super assemblies
As it continues to die a death of a thousand cuts, the last chunk of undeveloped ground in Miami is to be preserved through a theatrical sequence of carved out pockets.
Episode 12
As the Appalachian Trail against all odds preserved a continuous band of undisturbed wilderness across the eastern coast, could a chain of artificial objects leave undisturbed the last bits of wil-derness left in Miami?
The 21st Century Urban Park
Formal Experiment: Wax Model Testing
Section through Episode 12
01
Episode 3Small Gesture helps save the coast line
An Interactive Resolve niriti porwalM.Arch. Summer Semester
The project takes the conventional notion of ecology further, and establishes it as an ecosystem. The model seeks to create interaction within the natural ecology (water, and land) and man made ecology ( Built form). The interactions established would thus create new ecosystems, through interactions and generate a new morphology for the waterfront of Williamsburg.
Williamsburg Waterfront
Interactive Momemts:Ecological InteractionsProgrammatic interactionsVisual Interactions
An approach to take water through the city
02
Cultural/ Research center
Solar pod (Route A)
Commercial Intervention
Floatig Deck
E V Charging station
Recretional Space
Solar Pod(Route B)
Solar Pod channels
Towards Bedford Avenue
Solar Pod channelsTowards Lorimer Avenue
Solar Pod channelsTowards Marcy Street
WilliamsburgBridge
Residential
An Interactive Resolve Williamsburg Waterfront
Establishing Interactions
Built Mass
Interactive Section
02
Site Plan
Solar pod (Route B)
Water Stream
Green Envelopes
Pathways/Roads
Storm Water Run-off/ Sewage Water
Storm Water Run-off/ Sewage Water
Rain WaterRain Water
Output/ Recharging Channel
Pre EventThe new morphology would work in the real time frame, re-inforced by the incremental gesture of people putting plastic bags which creates a series of synchronized clogging, that would then delay and redirect the process of flow of water.
During EventThe project creates various ground and wall conditions of de-liberate clogging. The cloggings are thus supported by the floating slabs, above the level of water, for people to carry on with their daily activities.
Post EventThe unfolding of the event -floods is then followed by the pro-cess of unclogging armed by the recycling industries of Peo-ple of Dharavi (Mumbai’s Biggest Slum, where Mumbai’s 85% recycling is held)Therefore the entire system would thus help to resolve two problems a) Flash Floods b)Plastic Bags - which is a cause and after math of the event
A Plastic Morphology for Mumbai niriti porwalM.Arch. Fall Semester 03
Pre Event Scenario- Deliberate Clogging
During Event- Scenario1, Floating Slab
Post Event- Unfolding of Clogging
Scenario 2- Wall & Ground Condition
The studio inquires about the invention of alternatiove strategy that engage the construction of distributed event and which can emancipat the desire and actualization of the spectacle with problems of temporarility, maintenance, con-version, evelopment and region transformation or reinvention.
Incremental Gesture of People throwing plastic bags
Wall and Ground Condiiton Swollen Landscape
Bio retention Filtration System, Swollen Landscape
To Drainagechannel
Spot CloggingSpot Clogging
Linear Clogging
Spot CloggingSpot Clogging
Wall Condition Wall Condition
Section showing the working of Clogging and Swollen Landscape through dissipation points at regular intervals
Ground Condition
Ground Condition
A Plastic Morphology for Mumbai 03
Cross Section through the Railways showing the assembling of the event
Media Center- A Portal to Media Culture 04
Section
Aerial View
TOS +19.48 lvl
TOS +15.45 lvl
TOS +12.15 lvl
TOS +07.15 lvl
TOS +02.15 lvl+02.1 lvl
Television Center Podium Television Cultural Center
Media Center niriti porwalB.Arch. Thesis 04A Portal to Media Culture
Basement Lvl
Podium Lvl
First Floor
Second Floor
Third Floor
Podium Lvl
First Floor
Second Floor
Television Center
Television Cultural Center
Studio Vertical Circulation
Circulation Work Space Services
Television Center
Television Cultural Center
Entrance
Service Entrance
Service Exit
Creek
16 m wide internal road
Vacant Plot
Restaurant
12 m wide internal road15
m w
ide
inte
rnal
road
Pseudo Sets
12 m wide internal road
Theme Park
T.V.tower
Site Plan
Elevation
Podium Level PlanT.C. +T.V.C.C.
First Floor PlanT.C +T.V.C.C.
Second Floor PlanT.C. +T.V.C.C.
Third Floor PlanT.C.
River Edge Redevelopment niriti porwalProfessional Work 05Siddheshwar Mahadev
To Connect Ethnic and Religious activities with framework of public places.
To upgrade, repair, and revitalize the tourist destination, generating job opportunities.
Bhojanshala
Yogsadhna
Fort Wall
Temple Complex
Viewing Terrace
Jyotilinga Replica
River Edge Development
Upper Plaza
Lower Plaza
Tarpan Ghat
Cross Walk
Site Plan
Section through Entrance
Section through Temple Parisar
Section through Temple
Saputara Lake Development/ Freelance 06
Project: Wasser Terrace, IndiaFirm: Freelance
Project: Saputara LAke Development, IndiaPlaza detailFirm: Vee Design
Children’s Park
Golf Course
Compartmentalization of Program
The project aims to provide broad and diverse collection of com-munity activities and produce a waterfront which would invite resi-dential intervention, visitors and business related people through out the year.
Saputara Lake Redevelopment niriti porwalProfessional Work 06
01. Nature Park
03. Under Water Tunnel Aquarium
02. Children’s Park
04. Musical Fountain
05. Boating Deck
06. Road Side Hatt
07. Shiv temple
08. Suspended Road and Bridge
10. Roller Coaster
09. Amusement Park
11. Mini train
12. Lake Garden Landscaping near Boating Deck
13. Development of Lake Periphery Walkways and Horse
Site Plan
Fact File: Lake Area: 145000 sqmLake Perihery: 3000 mTrain Track : 1700 r mt
Nature’s Park
Shiv Temple Garden
+1500 lvl+2500 lvl
+6500 lvl
+10500 lvl
+14500 lvl
+18500 lvl
+21500 lvl
+26500 lvl
North Side ElevationCorridor Railing Detail
Title: PlanFirm: Abhikram
The Celebration Mall, for AIPL. 07
238 Bunch Grass Terrace,
Freemont, California, 94539
Ph: 408 896 5507
Email ID: nir i t [email protected]
N i r i t i P o r w a l