Agenda

1. Business Case

2. Stakeholder Engagement

3. Scope

4. Schedule

5. Status

2

6. Managing Risks

7. Controlling Changes

8. Ensuring Quality

9. Summary

10.Questions

Page 3: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

1. Business Case

• New system for managing GAZCars conversions• Fully specified in 15 weeks• Cost of inaction is much higher than action• Existing system is unreliable• Instil customer confidence (conversion choices)• Contact with existing customers simplified

3

Page 4: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

2. Stakeholder Engagement

• Stakeholders identified via GAZCars Industry Briefing Paper and liaising with client representatives

• Online forums• Stakeholders documented in Project

Management Plan• Stakeholder engagement outlined in

Communications Plan

4

Page 5: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska5

Page 6: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

3a. Scope

IN SCOPE• Database design• Decision support system

OUT OF SCOPE• Online booking system

6

Page 7: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

3b. Scope (deliverables)

IN SCOPE• Complete project document suite

– Project planning documentation– Requirements analysis documentation– Design documentation

OUT OF SCOPE• Working prototype

7

Page 8: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

4a. Schedule

8

• Four phases– Project Planning– Requirements Analysis– Design– Project Closure

Page 9: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

4b. Schedule (link)

9

Page 10: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

5. Status

Project Planning

• Project Charter

• Project Management Plan

• Risk Mgt Plan

• Change Mgt Plan

• Project Quality Plan

• Communication Plan

• Configuration Plan

• Project Closure Document

Requirements Analysis

• Use Case Diagram

• Use Case Narratives

• Sequence Diagrams

• Data Flow Diagrams

• Domain Diagram

Design• Functional

Specifications

• System Architecture

• Database Design Specification

• Data Migration Strategy

• GUI Specification

10

Complete

In Progress

Overdue

Page 11: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

6a. Managing Risks

Risk identification

Risk assessment

Risk controls

Risk triggers

Risk monitoring

11

Page 12: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

6b. Key Project Risks

• Team members with limited time and availability• Loss of team members• Unclear requirements• Uncertainty over responsibilities

12

Page 13: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

6c. Risk Register (link)

Description Likelihood ConsequenceRisk

RatingRisk Triggers

Risk Controls

C=consequence control

L=likelihood control

Residual Risk

Team members with limited time

Almost certain

Major Extreme Not meeting deliverables milestones

Lack of feedback on documents requiring review

Inactivity on Wikispaces

Clear action items each week (C)

Review progress weekly: identify delays, formulate action to address (C)

Communicate requests for help through Wikispaces (C)

High

Loss of team members

Unlikely Major High Team member advises dropping out

Team member not contactable

Negotiate reduced scope with client (C)

Medium

Page 14: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

7a. Controlling changes

What is the change?

What is the benefit?

What will it take

?

What if we don’t

?

Quality

and risk?

Page 15: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

7b. Controlling changes

What is the change?

What is the benefit?

What will it take

?

What if we don’t

?

Quality

and risk?

Ada

pt to

Los

t Tea

m M

embe

r

Com

plet

e Pr

omis

ed D

eliv

erab

les

On-

Tim

e

Red

uctio

n in

Pro

ject

Sco

pe

Poss

ible

Pro

ject

Fai

lure

Ris

k M

itiga

tion

Mea

sure

Page 16: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

8. Ensuring Quality

Product Descriptions

Deliverable Quality Assurance Checklists

Agreed with client

Quality Reviews

Product Descriptions

Deliverable Quality Assurance Checklists

Final team review

Sign-off by client

Page 17: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

9. Summary

Issues:• Existing database is a mess• GAZCars’ business is expanding• Require increased functionality and reliability

Solution :

PG Project Maniacs GAZCars EMS 2.0

17

Page 18: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

ReferencesDuncan, WR 1996, A Guide to the Project Management Body of

Knowledge, Project Management Institute, Sylva, North Carolina

Object Management Group 2009, Unified Modelling Language Infrastructure Version 2.2

Standards Australia 2004, AS/NZS 4360:2004 Risk Management

Stumpf, R and Teague, L 2005, Object-Oriented Systems Analysis and Design with UML, Pearson, New Jersey

18

Page 19: Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1

Nick Small, Shawn Boughey, Karolina Latkoska

10. Questions...