D 203D 204
E 206
P 202
S-2100
From Purge Stream2 °C
166 atm
Cooling Water
S-2101
Waste Gas112 °C
166 atmS-2102
Recycled H2O123 °C
166 atm
S-2103
S-210427°C
166 atm
S-2105
S-2106
1
10
1
8
4
9
2
7
2
LC
HP STEAM
Cooling Water
LC
TC
TC
E 207
Recovered NH398 °C2 atm
80 °C2 atm
2 °C166 atm
LC
V 203
D 203NH3 Absorption
Column
D 204NH3 Stripping
Column
V203NH3 Stripper
Condenser Accumulator
E 206Ammonia Recovery Fisrt Heat Exchanger
0.383 GJ/hr
E 203NH3 Stripper Condenser
4.47 GJ/hr
E 204NH3 Stripper
Reboiler7.22 GJ/hr
P201H2O Recycle
Pump25.31 kW
E 208
S-2107
S-2108S-2109
AMMONIA PROCESSING PLANT
NH3 RECOVERY
PROCESS FLOW DIAGRAM
SECTION 2 – REMOVAL AND RECOVERY
APPROVED BY: CRYSTAL LIN, PM
PLANT LOCATION – REPUBLIC OF TATARSTAN, RUSSIA
MY CHEMICAL ROMANCE SOLUTION INC.
LOS ANGELES, CALIFORNIA
SCALE PROJECT NUMBER DRAWING NUMBER REV
NONE 01-2012 108A-PANG-108B 3
DATE 06-06-2012 CLIENT – HP CHEMICAL SHEET 2 OF 2