4
Test Record Sheet 1/4 Disconnect Switch Field Test Report TEST PERFORMED: INSULATION RESISTANCE TEST (2.5kV DC for 1min.) CONTACT RESISTANCE TEST INSULATION RESISTANCE OF MOTOR OPERATION & AUXILIARY DEVICE CONTROL WIRING CHECKING & FUNCTIONAL TEST Project Site Supplier COELME Customer NGCP - Cruz-Na-Daan Substation 100MVA,230/69-13.8kV TESTING & COMMISSIONING Cruz-Na-Daan, San Rafael, Bulacan INSULATION POWER FACTOR TEST HIGH POTENTIAL TEST

NGCP-CND DS Field Test Report

  • Upload
    edciel

  • View
    6

  • Download
    2

Embed Size (px)

DESCRIPTION

DS Field Test Report

Citation preview

  • Test Record Sheet1/4

    Disconnect SwitchField Test Report

    TEST PERFORMED:INSULATION RESISTANCE TEST (2.5kV DC for 1min.)CONTACT RESISTANCE TEST

    INSULATION RESISTANCE OF MOTOR OPERATION &AUXILIARY DEVICE CONTROL WIRING

    CHECKING & FUNCTIONAL TEST

    Project

    SiteSupplier

    COELME

    Customer

    NGCP - Cruz-Na-Daan Substation 100MVA,230/69-13.8kV TESTING & COMMISSIONING

    Cruz-Na-Daan, San Rafael, Bulacan

    INSULATION POWER FACTOR TESTHIGH POTENTIAL TEST

  • Test RecordDescription

    DISCONNECT SWITCH TEST REPORT

    Sheet2/4

    Cont3

    Done by: Approved by:

    Engr. Jimwel C. Capillo

    Dept.:

    TestingService

    Date:

    03/28/12

    Customer Witness: Dept.: Date:

    Project

    SiteSupplier

    Customer

    3.0 Electrical Routine Tests

    3.1 Insulation Resistance Test: (with 2500V; 200,000M? Range)

    @1Min.Test Point

    Reading in Giga-Ohms

    Line - Ground

    RemarksPHASE

    BA

    C

    Test Point Resistance ImpressedCurrent RemarksPHASE

    3.2 Contact Resistance Test:

    End to End Copper StudBA

    C

    1.0 General Data and Information:

    2.0 Visual Inspection

    100MVA, 230/69-13.8kV TESTING & COMMISSIONING

    COELME

    Engr. Michael P. Gregas

    Line - GroundLine - Ground

    End to End Copper StudEnd to End Copper Stud 0.778m?

    0.805m?0.877m? 10.0A

    10.0A10.0A

    NGCP - Cruz-Na-Daan Substation

    Cruz-Na-Daan, San Rafael, Bulacan

    OkayOkayOkay

    OkayOkayOkay

  • Test RecordDescription

    DISCONNECT SWITCH TEST REPORT

    Sheet3/4

    Cont4

    Done by: Approved by:

    Engr. Jimwel C. Capillo

    Dept.:

    TestingService

    Date:

    05/16/12

    Customer Witness: Dept.: Date:

    Project

    SiteSupplier

    Customer

    100MVA, 230/69-13.8kV TESTING & COMMISSIONING

    COELME

    Engr. Michael P. Gregas

    NGCP - Cruz-Na-Daan Substation

    Cruz-Na-Daan, San Rafael, Bulacan

    TESTMODE

    TESTVOLTAGE

    12kV

    3.3 Insulation Power Factor Test:

    PHASE %PF

    A GST

    SpecimenCapacitanceCurrent

    DissipationPower

    12kVB GST12kVC GST

    0.0?AA-Gnd

    TEST POINT

    10kV B-GndC-Gnd

    TEST VOLTAGE LEAKAGECURRENT REMARKS

    A-Gnd20kV B-Gnd

    C-GndA-Gnd

    30kV B-GndC-GndA-Gnd

    40kV B-GndC-GndA-Gnd

    50kV B-GndC-Gnd

    0.0?A0.0?A0.0?A

    0.1?A0.1?A0.1?A0.3?A0.3?A0.3?A0.5?A0.5?A0.5?A

    1.450%53.65pF42.21mW242.5?A1.801%52.96pF51.93mW240.1?A1.706%54.26pF50.44mW246.3?A

    A-Gnd60kV B-Gnd

    C-Gnd

    1.2?A1.0?A0.9?A

    0.0?A0.0?A

    OkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkay

  • Test RecordDescription

    DISCONNECT SWITCH TEST REPORT

    Sheet4/4

    Cont--

    Done by: Approved by:

    Engr. Jimwel C. Capillo

    Dept.:

    TestingService

    Date: Customer Witness: Dept.: Date:

    Project

    SiteSupplier

    Customer

    5.0 CHECKING & FUNCTIONAL TEST:5.1 Operating Torque

    Remarks:

    5.2 Close / Open Operation:5.2.1 Hand/Manual Operation5.2.2 Motor Operation

    5.3 Switch Position Indicator:5.3.1 Close Position Switch5.3.2 Open Position Switch5.3.3 End Position Switch

    5.4 Mechanical Interlocking5.5 Electrical Interlocking

    100MVA, 230/69-13.8kV TESTING & COMMISSIONING

    COELME

    Engr. Michael P. Gregas04/24/12

    4.0 Operating Mechanism Electrical Routine Test:

    4.1 Motor Insulation Resistance Test: (with 1000V; 1000M? Range)

    @1Min.Test Point

    Reading in Giga-Ohms

    Line 1 - Ground

    Remarks

    Line 2 - GroundLine 3 - Ground

    Test Point Resistance ImpressedCurrent Remarks

    4.2 Motor Winding Resistance Test:

    Line 1 - Neutral 15.02? 10mALine 2 - NeutralLine 3 - NeutralLine 1 - Line 2Line 2 - Line 3Line 3 - Line 1

    4.3 Anticondensate Resistance 230Vac/60Hz(10W):4.3.1 Winding Resistance: 257.2?4.3.2 Insulation Resistance:150M??@1kV

    4.4 Anticondensate Resistance 230Vac/60Hz(10W):4.4.1 Winding Resistance: 132.9?4.4.2 Insulation Resistance: 247M??@1kV

    NGCP - Cruz-Na-Daan Substation

    Cruz-Na-Daan, San Rafael, Bulacan

    15.03?14.87?30.05?29.89?29.88?

    10mA10mA10mA10mA10mA

    OkayOkayOkay

    OkayOkayOkayOkayOkayOkay