Test Record Sheet1/4
Disconnect SwitchField Test Report
TEST PERFORMED:INSULATION RESISTANCE TEST (2.5kV DC for 1min.)CONTACT RESISTANCE TEST
INSULATION RESISTANCE OF MOTOR OPERATION &AUXILIARY DEVICE CONTROL WIRING
CHECKING & FUNCTIONAL TEST
Project
SiteSupplier
COELME
Customer
NGCP - Cruz-Na-Daan Substation 100MVA,230/69-13.8kV TESTING & COMMISSIONING
Cruz-Na-Daan, San Rafael, Bulacan
INSULATION POWER FACTOR TESTHIGH POTENTIAL TEST
Test RecordDescription
DISCONNECT SWITCH TEST REPORT
Sheet2/4
Cont3
Done by: Approved by:
Engr. Jimwel C. Capillo
Dept.:
TestingService
Date:
03/28/12
Customer Witness: Dept.: Date:
Project
SiteSupplier
Customer
3.0 Electrical Routine Tests
3.1 Insulation Resistance Test: (with 2500V; 200,000M? Range)
@1Min.Test Point
Reading in Giga-Ohms
Line - Ground
RemarksPHASE
BA
C
Test Point Resistance ImpressedCurrent RemarksPHASE
3.2 Contact Resistance Test:
End to End Copper StudBA
C
1.0 General Data and Information:
2.0 Visual Inspection
100MVA, 230/69-13.8kV TESTING & COMMISSIONING
COELME
Engr. Michael P. Gregas
Line - GroundLine - Ground
End to End Copper StudEnd to End Copper Stud 0.778m?
0.805m?0.877m? 10.0A
10.0A10.0A
NGCP - Cruz-Na-Daan Substation
Cruz-Na-Daan, San Rafael, Bulacan
OkayOkayOkay
OkayOkayOkay
Test RecordDescription
DISCONNECT SWITCH TEST REPORT
Sheet3/4
Cont4
Done by: Approved by:
Engr. Jimwel C. Capillo
Dept.:
TestingService
Date:
05/16/12
Customer Witness: Dept.: Date:
Project
SiteSupplier
Customer
100MVA, 230/69-13.8kV TESTING & COMMISSIONING
COELME
Engr. Michael P. Gregas
NGCP - Cruz-Na-Daan Substation
Cruz-Na-Daan, San Rafael, Bulacan
TESTMODE
TESTVOLTAGE
12kV
3.3 Insulation Power Factor Test:
PHASE %PF
A GST
SpecimenCapacitanceCurrent
DissipationPower
12kVB GST12kVC GST
0.0?AA-Gnd
TEST POINT
10kV B-GndC-Gnd
TEST VOLTAGE LEAKAGECURRENT REMARKS
A-Gnd20kV B-Gnd
C-GndA-Gnd
30kV B-GndC-GndA-Gnd
40kV B-GndC-GndA-Gnd
50kV B-GndC-Gnd
0.0?A0.0?A0.0?A
0.1?A0.1?A0.1?A0.3?A0.3?A0.3?A0.5?A0.5?A0.5?A
1.450%53.65pF42.21mW242.5?A1.801%52.96pF51.93mW240.1?A1.706%54.26pF50.44mW246.3?A
A-Gnd60kV B-Gnd
C-Gnd
1.2?A1.0?A0.9?A
0.0?A0.0?A
OkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkayOkay
Test RecordDescription
DISCONNECT SWITCH TEST REPORT
Sheet4/4
Cont--
Done by: Approved by:
Engr. Jimwel C. Capillo
Dept.:
TestingService
Date: Customer Witness: Dept.: Date:
Project
SiteSupplier
Customer
5.0 CHECKING & FUNCTIONAL TEST:5.1 Operating Torque
Remarks:
5.2 Close / Open Operation:5.2.1 Hand/Manual Operation5.2.2 Motor Operation
5.3 Switch Position Indicator:5.3.1 Close Position Switch5.3.2 Open Position Switch5.3.3 End Position Switch
5.4 Mechanical Interlocking5.5 Electrical Interlocking
100MVA, 230/69-13.8kV TESTING & COMMISSIONING
COELME
Engr. Michael P. Gregas04/24/12
4.0 Operating Mechanism Electrical Routine Test:
4.1 Motor Insulation Resistance Test: (with 1000V; 1000M? Range)
@1Min.Test Point
Reading in Giga-Ohms
Line 1 - Ground
Remarks
Line 2 - GroundLine 3 - Ground
Test Point Resistance ImpressedCurrent Remarks
4.2 Motor Winding Resistance Test:
Line 1 - Neutral 15.02? 10mALine 2 - NeutralLine 3 - NeutralLine 1 - Line 2Line 2 - Line 3Line 3 - Line 1
4.3 Anticondensate Resistance 230Vac/60Hz(10W):4.3.1 Winding Resistance: 257.2?4.3.2 Insulation Resistance:150M??@1kV
4.4 Anticondensate Resistance 230Vac/60Hz(10W):4.4.1 Winding Resistance: 132.9?4.4.2 Insulation Resistance: 247M??@1kV
NGCP - Cruz-Na-Daan Substation
Cruz-Na-Daan, San Rafael, Bulacan
15.03?14.87?30.05?29.89?29.88?
10mA10mA10mA10mA10mA
OkayOkayOkay
OkayOkayOkayOkayOkayOkay