NFPA Technical Committee on Residential Occupancies NFPA 101 and NFPA 5000 FIRST DRAFT MEETING AGENDA Monday-Tuesday, August 13-14, 2012 St. Louis Union Station Marriott St. Louis, Missouri 1. Call to order. Call meeting to order by Chair Warren Bonisch at 8:00 AM (CDT) on Monday, August 13, 2012. 2. Introduction of committee members and guests. For a current committee roster, see page 03. 3. Approval of previous meeting minutes. Approve the October 19, 2010 meeting minutes, see page 06. 4. Review re-engineered NFPA codes and standards development process. See page 10. 5. Correlating Committee: Accessibility scoping. Topic of appeal to NFPA Standards Council involving jurisdiction of BSY and RES on visitability issue. Do Occupancy TCs have the ability to modify BSY actions on this subject? See page 26. 6. Correlating Committee: Dormitory requirements. Evaluate whether dormitory requirements justify their own chapters, independent of those for hotels. (See related public input.) 7. CO Detection Task Group report – J. Versteeg. 8. NFPA 101 new construction/NFPA 5000 requirements correlation. Create first revisions to NFPA 101/5000 as directed by correlating committees. (Draft first revisions (FRs) to be provided via separate distribution prior to meeting.) 9. Review of NFPA 101 and NFPA 5000 core chapter first revisions (FRs). Drafts to be provided via separate distribution prior to meeting. 10. NFPA 101 public input (formerly public proposals). For public input review, see page 28. 11. NFPA 5000 public input (formerly public proposals). For public input review, see page 45. 12. Other business. Page 1 of 53

NFPA Technical Committee on Residential Occupancies NFPA ... · Zurich Services Corporation PO Box 15844 Pittburgh, PA 15244 NFPA Lodging Industry Section U 9/30/2004 BLD-RES Joseph

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

  •  

    NFPA Technical Committee on Residential Occupancies NFPA 101 and NFPA 5000 FIRST DRAFT MEETING AGENDA

    Monday-Tuesday, August 13-14, 2012 St. Louis Union Station Marriott

    St. Louis, Missouri

    1. Call to order. Call meeting to order by Chair Warren Bonisch at 8:00 AM (CDT) on

    Monday, August 13, 2012.

    2. Introduction of committee members and guests. For a current committee roster, see page 03.

    3. Approval of previous meeting minutes. Approve the October 19, 2010 meeting

    minutes, see page 06.

    4. Review re-engineered NFPA codes and standards development process. See page 10.

    5. Correlating Committee: Accessibility scoping. Topic of appeal to NFPA Standards Council involving jurisdiction of BSY and RES on visitability issue. Do Occupancy TCs have the ability to modify BSY actions on this subject? See page 26.

    6. Correlating Committee: Dormitory requirements. Evaluate whether dormitory

    requirements justify their own chapters, independent of those for hotels. (See related public input.)

    7. CO Detection Task Group report – J. Versteeg.

    8. NFPA 101 new construction/NFPA 5000 requirements correlation. Create first revisions to NFPA 101/5000 as directed by correlating committees. (Draft first revisions (FRs) to be provided via separate distribution prior to meeting.)

    9. Review of NFPA 101 and NFPA 5000 core chapter first revisions (FRs). Drafts to be

    provided via separate distribution prior to meeting.

    10. NFPA 101 public input (formerly public proposals). For public input review, see page 28.

     11. NFPA 5000 public input (formerly public proposals). For public input review, see

    page 45.

    12. Other business.

    Page 1 of 53

  • 13. Future meetings.

    14. Adjournment. Adjourn by 12:00 Noon (CDT), Tuesday, August 14, 2012.

    Page 2 of 53

  • Address List No PhoneResidential Occupancies BLD-RESBuilding Code

    Gregory E. Harrington07/24/2012

    BLD-RESWarren D. BonischChairAon/Schirmer Engineering Corporation1701 North Collins Blvd., Suite 235Richardson, TX 75080-3553

    I 11/14/1997BLD-RES

    Gregory E. HarringtonSecretary (Staff-Nonvoting)National Fire Protection Association1 Batterymarch ParkQuincy, MA 02169-7471

    BLD-RESH. Wayne BoydPrincipalUS Safety & Engineering Corporation2365 El Camino AvenueSacramento, CA 95821-5647

    M 7/17/1998BLD-RES

    Harry L. BradleyPrincipalMaryland State Fire Marshals Office5 West Riding DriveBel-Air, MD 21014International Fire Marshals Association

    E 1/1/1982

    BLD-RESPhillip A. BrownPrincipalAmerican Fire Sprinkler Association, Inc.12750 Merit Drive, Suite 350Dallas, TX 75251

    IM 10/6/2000BLD-RES

    Bradford T. CroninPrincipalNewport Fire Department21 West Marlborough StreetNewport, RI 02840Rhode Island Association of Fire Marshals

    E 03/05/2012

    BLD-RESDaniel P. FinneganPrincipalSiemens Industry, Inc.Building Technology DivisionFire Safety Unit8 Fernwood RoadFlorham Park, NJ 07932Automatic Fire Alarm Association, Inc.

    M 8/5/2009BLD-RES

    Sam W. FrancisPrincipalAmerican Wood Council1 Dutton Farm LaneWest Grove, PA 19390American Forest & Paper AssociationAlternate: Dennis L. Pitts

    M 4/1/1996

    BLD-RESRalph D. GerdesPrincipalRalph Gerdes Consultants, LLC5510 South East Street, Suite EIndianapolis, IN 46227Alternate: David Cook

    SE 1/1/1987BLD-RES

    Stanley C. HarbuckPrincipalSchool of Building InspectionPO Box 1643Salt Lake City, UT 84110American Public Health AssociationAlternate: Jake Pauls

    C 10/4/2001

    BLD-RESKenneth E. IsmanPrincipalNational Fire Sprinkler Association, Inc.40 Jon Barrett RoadPatterson, NY 12563Alternate: Donald J. Pamplin

    M 1/1/1987BLD-RES

    Marshall A. KleinPrincipalMarshall A. Klein & Associates, Inc.6815 Autumn View DriveEldersburg, MD 21784-6304Alternate: David M. Hammerman

    SE 1/1/1981

    BLD-RESJames K. LathropPrincipalKoffel Associates, Inc.81 Pennsylvania AvenueNiantic, CT 06357Alternate: Diana E. Hugue

    SE 1/1/1992BLD-RES

    Richard T. Long, Jr.PrincipalExponent, Inc.17000 Science Drive, Suite 200Bowie, MD 20715Upholstered Furniture Action Council

    M 10/18/2011

    1Page 3 of 53

  • Address List No PhoneResidential Occupancies BLD-RESBuilding Code

    Gregory E. Harrington07/24/2012

    BLD-RESAlfred J. LonghitanoPrincipalAlfred J. Longhitano, P.E., LLC26 Salem RoadChappaqua, NY 10514

    SE 10/20/2010BLD-RES

    Eric N. MaylPrincipalCore Engineers Consulting Group, LLC5171 MacArthur Blvd., Suite 200Washington, DC 20016

    SE 3/21/2006

    BLD-RESRonald G. NicksonPrincipalNational Multi Housing Council1850 M Street NW, Suite 540Washington, DC 20036

    U 4/1/1995BLD-RES

    Steven OrlowskiPrincipalNational Association of Home Builders1201 15th Street, NWWashington, DC 20005-2800Alternate: Lawrence Brown

    U 7/26/2007

    BLD-RESHenry PaszczukPrincipalConnecticut Department of Public Safety1111 Country Club RoadMiddletown, CT 06457

    E 4/15/2004BLD-RES

    Peter PuhlickPrincipalUniversity of ConnecticutFacilities OperationsUnit 3038 Co-Generation/Central Utilities PlantStorrs, CT 06269-3038

    U 1/1/1988

    BLD-RESRichard Jay RobertsPrincipalHoneywell Life Safety3825 Ohio AvenueSt. Charles, IL 60174National Electrical Manufacturers Association

    M 7/23/2008BLD-RES

    Robert C. Schultz, Jr.PrincipalUniversity of Texas at AustinFire Prevention ServicesPO Box 7729Austin, TX 78713-7729Alternate: Waymon Jackson

    U 3/1/2011

    BLD-RESJohn A. SharryPrincipalBeakmann PropertiesSharry & Associates, Inc.1958 Winward PointDiscovery Bay, CA 94514-9510

    U 7/16/2003BLD-RES

    Jeffrey L. ShearmanPrincipalZurich Services CorporationPO Box 15844Pittburgh, PA 15244NFPA Lodging Industry Section

    U 9/30/2004

    BLD-RESJoseph H. VersteegPrincipalVersteeg Associates86 University DriveTorrington, CT 06790

    SE 7/14/2004BLD-RES

    Andrew F. WeisfieldPrincipalMichael Baker Jr. Corporation100 Airside DriveMoon Township, PA 15108

    SE 10/20/2010

    BLD-RESBartholomew T. WrightPrincipalMaitland Fire Rescue Department1776 Independence LaneMaitland, FL 32751

    E 03/05/2012BLD-RES

    Jeffrey D. ZwirnPrincipalIDS Research & Development, Inc.405 Cedar LaneTeaneck, NJ 07666

    SE 3/1/2011

    2Page 4 of 53

  • Address List No PhoneResidential Occupancies BLD-RESBuilding Code

    Gregory E. Harrington07/24/2012

    BLD-RESLawrence BrownAlternateNational Association of Home Builders1201 15th Street, NWWashington, DC 20005-2800Principal: Steven Orlowski

    U 1/15/1999BLD-RES

    David CookAlternateRalph Gerdes Consultants, LLC5510 South East Street, Suite EIndianapolis, IN 46227Principal: Ralph D. Gerdes

    SE 10/1/1995

    BLD-RESDavid M. HammermanAlternateMarshall A. Klein and Associates, Inc.3950 Chaffey RoadRandallstown, MD 21133Principal: Marshall A. Klein

    SE 4/5/2001BLD-RES

    Diana E. HugueAlternateKoffel Associates, Inc.8815 Centre Park Drive, Suite 200Columbia, MD 21045-2107Principal: James K. Lathrop

    SE 3/1/2011

    BLD-RESWaymon JacksonAlternateUniversity of Texas at Austin1 University Station, Stop C2600PO Box 7729Austin, TX 78713Principal: Robert C. Schultz, Jr.

    U 10/18/2011BLD-RES

    Michael F. MeehanAlternateVSC Fire & Security1417 Miller Store Road, Suite CVirginia Beach, VA 23455American Fire Sprinkler AssociationPrincipal: Phillip A. Brown

    IM 4/15/2004

    BLD-RESDonald J. PamplinAlternateNational Fire Sprinkler Association, Inc.1436 Harrison AvenueBlaine, WA 98230Principal: Kenneth E. Isman

    M 10/23/2003BLD-RES

    Jake PaulsAlternateJake Pauls Consulting Services in Building Use & Safety12507 Winexburg Manor Drive, Suite 201Silver Spring, MD 20906American Public Health AssociationPrincipal: Stanley C. Harbuck

    C 7/12/2001

    BLD-RESDennis L. PittsAlternateAmerican Wood Council1721 West Plano Parkway, #224Plano, TX 75075American Forest & Paper AssociationPrincipal: Sam W. Francis

    M 5/15/2000BLD-RES

    Gregory E. HarringtonStaff LiaisonNational Fire Protection Association1 Batterymarch ParkQuincy, MA 02169-7471

    3Page 5 of 53

  • BLD/SAF-RES October 19, 2010 Meeting Minutes / Page 1

    Building Code – Life Safety Technical Committee on Residential Occupancies

    ROC MEETING MINUTES

    Tuesday, October 19, 2010

    Hotel Monteleone New Orleans, Louisiana

    1. Call to order. The meeting was called to order by Chair Warren Bonisch at 8:00 AM.

    2. Introduction of attendees. The following committee members and guests were in attendance:

    TECHNICAL COMMITTEE MEMBERS PRESENT

    NAME REPRESENTINGWarren Bonisch, Chair Aon Fire Protection Engineering

    Corporation

    Harry Bradley, Principal Maryland State Fire Marshals Office - Rep. International Fire Marshals Assn.

    Phillip Brown, Principal American Fire Sprinkler Assn., Inc.

    Daniel Finnegan, Principal Siemens Industry, Inc. – Rep. Automatic Fire Alarm Assn., Inc.

    Sam Francis, Principal American Wood Council

    Marshall Klein, Principal Marshall A. Klein & Associates, Inc.

    James Lathrop, Principal Koffel Associates, Inc.

    Eric Mayl, Principal Core Engineers Consulting Group, LLC

    Page 6 of 53

  • BLD/SAF-RES October 19, 2010 Meeting Minutes / Page 2

    Ronald Nickson, Principal National Multi Housing Council

    Steven Orlowski, Principal National Assn. of Home Builders

    Henry Paszczuk, Principal Connecticut Department of Public Safety

    Jake Pauls, Alt. to S. Harbuck Jake Pauls Consulting Services in Building Use & Safety – Rep. American Public Health Assn.

    Dennis Pitts, Alt. to S. Francis American Forest & Paper Assn.

    Richard Roberts, Principal Honeywell Life Safety – Rep. National Electrical Manufacturers Assn.

    John Sharry, Principal Beakmann Properties – Sharry & Associates, Inc.

    Joseph Versteeg, Principal Versteeg Associates

    Gregory Harrington, Nonvoting Secretary NFPA

    GUESTS

    NAME REPRESENTINGTracy Golinveaux NFPA

    Barbara Rose Concrete Change

    Eleanor Smith Concrete Change

    Robert Solomon NFPA

    Karl Wiegand National Fire Sprinkler Assn.

    TECHNICAL COMMITTEE MEMBERS NOT PRESENT

    NAME REPRESENTING

    Gordon Bates, Principal Minneapolis Fire Department

    James Bell, Principal Marriott International, Inc. Rep. American Hotel & Lodging Assn.

    H. Wayne Boyd, Principal US Safety & Engineering Corp.

    Page 7 of 53

  • BLD/SAF-RES October 19, 2010 Meeting Minutes / Page 3

    Ralph Gerdes, Principal Ralph Gerdes Consultants, LLC

    Ken Isman, Principal National Fire Sprinkler Assn.

    Peter Puhlick, Principal University of Connecticut

    Jeffrey Shearman, Principal Zurich Services Corporation – Rep. NFPA Lodging Industry Section

    Stephen Skalko, Principal Portland Cement Assn.

    T. Hugh Talley, Principal Hugh Talley Company – Rep. American Furniture Manufacturers Assn.

    3. Approval of previous meeting minutes. The minutes of the December 9, 2009 meeting were approved as written and distributed.

    4. Chair’s report – W. Bonisch. The chair welcomed and thanked the committee for attending the ROC meeting for the 2012 editions of NFPA 101 and NFPA 5000.

    5. Staff liaison’s report – G. Harrington.a. Added his thanks and welcome to the committee. b. Gave a brief presentation on the document revision process, ROC meeting

    procedures, and the letter ballot process.

    6. CO Detection Task Group Report – J. Versteeg. The task group held several teleconference meetings following the ROP meeting and developed several draft comments for review by the committee. The draft comments modified the proposed requirements for carbon monoxide alarms in one- and two-family dwellings and lodging or rooming houses. In addition, draft comments were submitted to the committee for review to add requirements for carbon monoxide detection in hotels and dormitories and apartment buildings. The draft comments were discussed and modified by the committee. See the A2011 Report on Comments (ROC) for the accepted committee comments.

    7. NFPA 101 ROC preparation. The committee reviewed and acted on the public comments on NFPA 101. See the A2011 Report on Comments for the committee actions.

    8. NFPA 5000 ROC preparation. The committee reviewed and acted on the public comments on NFPA 5000. See the A2011 Report on Comments for the committee actions.

    Page 8 of 53

  • BLD/SAF-RES October 19, 2010 Meeting Minutes / Page 4

    9. Other business. J. Pauls requested the minutes reflect if an intra-committee task group is established by the NFPA 5000 TCC to address the issue of visitability in one- and two-family dwellings, this committee should participate. (So noted.)

    10. Future meetings. The committee will likely next meet late 2012, at a location to be determined, to prepare the Reports on Proposals (ROPs) for the 2015 editions of NFPA 101 and NFPA 5000. Meeting notices will be distributed when the dates and location have been determined.

    11. Adjournment. The meeting adjourned at 12:30 PM.

    Page 9 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    1

    TC on Residential Occupancies

    First Draft (Public Input)

    NFPA 101 / 5000

    7/19/2012

    ( p )Technical Committee Meeting

    NFPA First Draft Meetings

    At this and all NFPA committee meetings we are concerned with your safety. If the fire alarm sounds,concerned with your safety. If the fire alarm sounds, please proceed to an exit.

    7/19/2012

    Page 10 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    2

    NFPA First Draft Meetings

    Members, please verify/update your contact informationinformation

    Use of tape recorders or other means capable of reproducing verbatim transcriptions of this or any NFPA meeting is not permitted

    7/19/2012

    NFPA First Draft Meetings

    Guests All guests are required to sign in and identify All guests are required to sign in and identify

    their affiliations. Participation is limited to those individuals who

    have previously requested of the chair time to address the committee on a particular subject or individuals who wish to speak to Public Input they have submitted

    7/19/2012

    they have submitted.Guest chairs are located around the room as a

    courtesy.

    Page 11 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    3

    NFPA First Draft Meetings

    Members categorized in ANY interest category who have been retained to represent thewho have been retained to represent the interests of ANOTHER interest category (with respect to a specific issue or issues that are to be addressed by a TC/CC) shall declare those interests to the committee and refrain from voting on any Public Input Comment or other

    7/19/2012

    voting on any Public Input, Comment, or other matter relating to those issues.

    NFPA First Draft MeetingsNew Process

    General ProceduresFollow Robert’s Rules of OrderDiscussion requires a motion

    7/19/2012

    Page 12 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    4

    Motions for Ending Debate Previous Question or “Call the Question”

    NFPA First Draft Meetings

    Call the Question Not in order when another has the floor Requires a second This motion is not debatable and DOES NOT

    automatically stop debate A 2/3 affirmative vote will immediately close debate and

    7/19/2012

    return to the original motion on the floor. Less then 2/3 will allow debate to continue.

    NFPA First Draft Meetings

    Committee member actions: Member addresses the chair Receives recognition from the chair Introduces the motion Another member seconds the motion

    7/19/2012

    Page 13 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    5

    Committee chair actions:

    NFPA First Draft Meetings

    States the motionCalls for discussionEnsures all issues have been heardTakes the vote

    7/19/2012

    Announces the result of the vote

    NFPA First Draft Meetings

    Technical Committee on Residential Occupancies (27)(27) Consumers, 1 Member: 4% Enforcers, 4 Members: 15% Insurance, 1 Member: 4% Installer/Maintainer, 1 Member: 4% Manufacturers, 6 Members: 22%

    S i l E t 8 M b 30%

    7/19/2012

    Special Experts, 8 Members: 30% Users, 6 Members: 22%

    Page 14 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    6

    NFPA 101/NFPA 5000 – New Process

    Timeline Public Input Stage (First Draft):

    PI Cl i D t M 4 2012 PI Closing Date: May 4, 2012 First Draft Meeting:

    Core Chapters: May 21-25, 2012 Occupancy Chapters: August 12-16, 2012 Correlating Committees: November 5-7, 2012

    Posting of First Draft for Balloting Date: Varies by TC Posting of First Draft for Public Comment: February 22, 2013

    Comment Stage (Second Draft): Public Comment Closing Date: May 3, 2013 Second Draft Meeting:

    7/19/2012

    g Core Chapters: May 20-23, 2013 Occupancy Chapters: June 24-27, 2013 Correlating Committees: October 2013

    Posting of Second Draft for Balloting Date: Varies by TC Posting of Second Draft for NITMAM: January 3, 2014

    NFPA 101/NFPA 5000 – New Process

    Tech Session Preparation:NITMAM Closing Date: February 7, 2014g yNITMAM /CAM Posting Date: April 4, 2014NFPA Annual Meeting: June 9-12, 2014

    Standards Council Issuance: Issuance of Documents with CAM: August 14, 2014

    with 2015 edition date

    Page 15 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    7

    NFPA First Draft MeetingsNew Process – What’s New?

    Changes in Terms:

    New Term Old TermInput Stage ROP StagePublic Input Proposal

    First Draft Meeting ROP Meeting

    Committee Input “Trial Balloon” (or later, FR that fails ballot)Committee Statement (CS) Committee Statement

    7/19/2012

    Committee Statement (CS) Committee Statement

    First Revision (FR) Committee Proposal or Accepted Public ProposalFirst Draft Report ROP

    First Draft ROP Draft

    NFPA First Draft MeetingsNew Process – What’s New?

    Changes in Terms:

    New Term Old TermComment Stage ROC StagePublic Comment Public Comment

    Second Draft Meeting ROC Meeting

    Committee CommentComment that Failed Ballot

    (Second Revision that failed ballot)

    7/19/2012

    ( )

    Second Revision Committee Comment or Accepted Public CommentSecond Draft Report ROC

    Second Draft ROC Draft

    Page 16 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    8

    Flowchart

    See page 4 for flowchart overview

    7/19/2012

    NFPA First Draft MeetingsNew Process

    NEW Committee Actions and Motions:Resolve Public InputCreate a First RevisionCreate a Committee Input (Trial Balloon)

    7/19/2012

    Page 17 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    9

    First DraftNew Process

    • Resolve a Public Input (No Change to Text): Committee does not want to incorporate the Public

    Input as a revision. Committee develops a Committee Statement (CS)

    to respond (resolve) a Public Input. Committee must clearly indicate reasons for not

    ti th d ti i CS

    7/19/2012

    accepting the recommendation in CS. Does not get balloted

    First DraftNew Process

    • Create a First Revision (FR) Committee wants to make a change to a current

    section. Committee develops a Committee Statement (CS)

    substantiating the change. If the revision is associated with one or more

    P bli I t ( ) th C itt d l CS t

    7/19/2012

    Public Input (s), the Committee develops a CS to respond to each PI.

    Each FR gets balloted

    Page 18 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    10

    First DraftNew Process

    • Create a Committee Input (Trial B ll )Balloon) Committee wants to receive Public Comment on a

    topic, but not ready to incorporate it into the draft Need to have a Committee Statement Does not get balloted

    7/19/2012

    First DraftNew Process

    Committee Statements (Substantiation):All P bli I t t h C ittAll Public Input must have a Committee Statement

    Must include a valid technical reasonNo vague references to “intent”

    Explain how the submitter’s substantiation

    7/19/2012

    Explain how the submitter’s substantiation is inadequate

    Page 19 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    11

    First DraftNew Process

    Committee Statements (Substantiation):Sh ld f th Fi t R i i if itShould reference the First Revision if it addresses the intent of the Submitter’s Public Input

    7/19/2012

    First DraftNew Process

    Formal Voting Voting during meeting is used to establish

    a sense of agreement (simple majority)Secured by letter ballot (2/3 agreement)Only the results of the formal ballot

    determine the official position of the

    7/19/2012

    determine the official position of the committee on the First Draft

    Page 20 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    12

    First DraftNew Process

    Ballots are on the First Revisions (FR) ONLY Public Input and Committee Input not balloted Public Input and Committee Input not balloted Reference materials are available:

    First Draft, PI, CI, CS, etc

    Ballot form allows you to vote: Affirmative on all FR Affirmative on all FR with exceptions specifically noted

    Ballot form provides a column for affirmative

    7/19/2012

    Ballot form provides a column for affirmative with comment Note: This box only needs to be checked if there is an

    accompanying comment. Reject or abstain requires a reason

    First DraftNew Process

    Initial ballot Initial ballotCirculation of negatives and commentsMembers may change votes during

    circulation First Revision that fails letter ballot

    7/19/2012

    becomes Committee Input (CI) – just like the trial balloon version of CI – so as to solicit Public Comment

    Page 21 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    13

    First DraftNew Process

    BallotingBallots will be an online formatBallots will be an online formatAlternates are strongly encouraged to

    return ballots

    7/19/2012

    NFPA First Draft Meetings

    No New Material after the Public Input Stage

    What constitutes new material is to some extent a judgment call

    7/19/2012

    Page 22 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    14

    TC Struggles with an Issue

    Code Fund Lends a Hand

    Research Project Carried Outwith an Issue

    • TC needs data on a new technology or emerging issue

    • Two opposing views on an issue with no real data

    a Hand

    • TC rep and/or staff liaison submits a Code Fund Request

    • Requests are reviewed by a Panel and chosen based

    Carried Out

    • Funding for project is provided by the Code Fund and/or industry sponsors

    • Project is completed real data

    • Data presented is not trusted by committee

    chosen based on need / feasibility

    completed and data is available to TC

    www.nfpa.org/codefund7/19/2012

    Legal

    Antitrust: the single most important provision-Federal law prohibits contracts combinationsFederal law prohibits contracts, combinations, or conspiracies which unreasonably restrain trade or commerce. Section 1 of the Sherman Act

    Patent: Disclosures of essential patent claims should be made by the patent holder, but others may also notify NFPA if they believe that a

    7/19/2012

    y y yproposed or existing NFPA standard includes an essential patent claim.

    Page 23 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    15

    Legal

    Activities Disapproved by the CourtsP ki ti Packing meetings

    Hiding commercial interest throwing the committees out of balance

    No final decision-making authority to unbalanced Task Groups; include all interested parties.

    7/19/2012

    Hiding scientific or technical information from committees

    Doc Info Pages

    Document Information Next Edition Technical Committee

    • Document scope• Current/Previous

    Edition information• Issued TIAs, FIs and

    Errata• Archived revision

    information• Standard Council

    Decisions

    • Meetings and Ballots• ROP/ROC or First

    Draft Report and Second Draft Report

    • NITMAM and Standard Council Decisions

    • Submission of Public Input/Comment

    f

    • Committee name, responsibility and scope

    • Staff liaison• Committee list

    • Private committee contact information

    • Current committee documents in PDF f

    7/19/2012

    • Articles and Reports• Read only document

    • Private TC info• Ballot circulations,

    informational ballots and other committee info

    format• Committees seeking

    members and committee online application

    Page 24 of 53

  • NFPA 101/5000 First Draft MeetingBLD/SAF‐RES

    16

    NFPA First Draft Meetings

    Questions

    7/19/2012

    Page 25 of 53

  • BLD‐AACandSAF‐AACpre‐FirstDraftplanningmeeting–March13,2012 Page6 

    Sprinkler Project. Bill Koffel reported.

    Revisions to NFPA 13, 13D and 13R are reporting to the Association at the 2012 Conference and Expo in Las Vegas in June.

    The NFPA 13/13R/13D revision process will result in the 2013 editions of each document being released in August 2012.

    Progress has been made relative to permitting sprinklers to be omitted from elevator machine rooms, in recognition of provisions in NFPA 101, 5000 (and proposed for NFPA 72) relative to occupant evacuation elevators. The text proposed for NFPA 13 should move forward to address the subject. Refinement of text can be made for the subsequent edition of NFPA 13.

    The sprinkler committee acted favorably to change NFPA 13 to recognize the omission of sprinklers in health care occupancy patient sleeping room clothes closets where the back wall is within discharge range of room sprinklers, regardless of the presence of closet doors.

    No other sprinkler issues were identified as needing consideration by the NFPA 101/5000 technical committees during the Annual 2014 revision cycle.

    5. Assembly Technical Committee Name Change. A motion carried, with no dissenting

    votes, to request the Standards Council to approve the change in name of the BLD/SAF-AXM committee from “Technical Committee on Assembly Occupancies and Membrane Structures” to “Technical Committee on Assembly Occupancies”.

    6. Scope of Furnishings and Contents TC. Following some discussion, it was informally agreed that staff would draft changes to the BLD/SAF-FUR committee scope to add, preferably as the first item before any mention of furnishings and contents, responsibility for interior finish materials. The draft scope is to be reviewed by the BLD/SAF-FUR committee at its May 2012 Public Input meeting. The draft scope, with any amendments suggested by BLD/SAF-FUR, would be presented to the Correlating Committees at their November 2012 meetings before transmittal to the Standards Council.

    7. Scope of Building Systems TC. Following some discussion, it was informally agreed that the BLD/BSY building systems committee would discuss, at its May 2012 Public Input meeting, the issue of whether it could require an occupancy chapter to adopt an accessibility provision deemed needed by BLD/BSY. Then, the subject would be addressed by the BLD/SAF-RES residential occupancy committee at its August 2012 Public Input meeting. A report is to be presented to the Correlating Committees at their November 2012 meetings.

    8. Increasing Enforcer (E) Representation on TCs. Robert Solomon reported on on-going efforts to attract additional Enforcers to technical committee membership. The Enforcer travel expense funding project has attracted new Enforcer members. A recent request for Principal members to have Alternates has attracted additional Enforcer members. Additional means are being considered.

    Page 26 of 53

    gharringtonHighlight

  • Report on First Revision – June 2014 NFPA 5000_______________________________________________________________________________________________5000- Log #FR700 BLD-BSY Final Action:(12.33.1.1, 12.33.1.2, 12.33.1.2.1, 12.33.1.2.2)_______________________________________________________________________________________________Submitter: Technical Committee Building SystemsRecommendation: Revise text to read as follows:

    12.33.1 General.

    12.33.1.1 Residential dwelling units in lodging or rooming house and apartment building occupancies shall comply withSection 12.33.

    12.33.1.2 One & two family dwelling units shall comply with section 12.33.

    12.33.1.2.1 For new one and two family dwellings, a minimum of one entrance for each dwelling unit shall comply withICC/ANSI A117.1, section 1005, requirements for Type C Dwellings.

    12.33.1.2.2 The critera of ICC/ANSI A117.1, section 1005, requirements for Type C Dwellings shall not apply wherethere is site impracticality as determined by 12.33.3.2.4.Statement: The committee agrees with the intent of the submitter and made revisions on that basis. The insertion ofnew section 12.33.1.2.2 is conceptually where the committee is headed, but the committee will assign a task group tofurther look at this provision and the potential effects of including all the other requirements of ANSI 117.1 section 1005and will report back as a public comment prior to the next phase. The committee also seeks public comments for otherson this provision.

    1Printed on 7/9/2012

    Page 27 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #528 SAF-RES

    _______________________________________________________________________________________________Steven Orlowski, National Association of Home Builders

    Delete the following:24.1.3 Multiple Occupancies.24.1.3.1 Multiple occupancies shall be in accordance with 6.1.14.24.1.3.2 No dwelling unit of a residential occupancy shall have its sole means of egress pass through any

    nonresidential occupancy in the same building, unless otherwise permitted by 24.1.3.2.1 or 24.1.3.2.2.24.1.3.2.1 In buildings that are protected by an automatic sprinkler system in accordance with Section 9.7, dwelling

    units of a residential occupancy shall be permitted to have their sole means of egress pass through a nonresidentialoccupancy in the same building, provided that all of the following criteria are met:(1) The dwelling unit of the residential occupancy shall comply with Chapter 24.(2) The sole means of egress from the dwelling unit of the residential occupancy shall not pass through a high hazardcontents area, as defined in 6.2.2.4.24.1.3.2.2 In buildings that are not protected by an automatic sprinkler system in accordance with Section 9.7,

    dwelling units of a residential occupancy shall be permitted to have their sole means of egress pass through anonresidential occupancy in the same building, provided that all of the following criteria are met:(1) The sole means of egress from the dwelling unit of the residential occupancy to the exterior shall be separated fromthe remainder of the building by fire barriers having a minimum 1-hour fire resistance rating.(2) The dwelling unit of the residential occupancy shall comply with Chapter 24.(3) The sole means of egress from the dwelling unit of the residential occupancy shall not pass through a high hazardcontents area, as defined in 6.2.2.4.24.1.3.3 Multiple dwelling units of a residential occupancy shall be permitted to be located above a nonresidential

    occupancy only where one of the following conditions exists:(1) Where the dwelling unit of the residential occupancy and exits therefrom are separated from the nonresidentialoccupancy by construction having a minimum 1-hour fire resistance rating(2) Where the nonresidential occupancy is protected throughout by an approved, supervised automatic sprinkler systemin accordance with Section 9.7(3) Where the nonresidential occupancy is protected by an automatic fire detection system in accordance with Section9.6

    Based upon the defition of a one- and two- family dwelling there is no need for this entire sectionregarding multiple occupancies. One and two family dwellings, by defition are buildings that contain no more than twodwelling units with independent cooking and bathroom facilities, hence no other occupancies are permitted within thebuilding. If other occupancies are present within the same building it no longer can be classified as a one- and two-family dwelling.

    _______________________________________________________________________________________________101- Log #489 SAF-RES

    _______________________________________________________________________________________________Anthony C. Apfelbeck, Altamonte Springs Building/Fire Safety Division

    Extract the provisions of NFPA 1 2012 edition section 20.11.4 into NFPA 101/5000 section 24.1.6Minimum Constuction Requirements.

    The extract of this text from NFPA 1 into NFPA 101/5000 would provide improved correlation betweenthe NFPA codes and standards documents that address building construction. This would assist the AHJ, designer andend user in ensuring compliance with the NFPA code set.

    1Printed on 7/24/2012

    Page 28 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #69 SAF-RES

    _______________________________________________________________________________________________Doug Hohbein, Northcentral Regional Fire Code Development Committee

    Revise to read:(No special requirements.)

    These chapters include the word “special” under construction requirements. There doesn’t appear tobe a reason to include this word as it could cause confusion. Chapters 14, 15, 16, 38, 39, 40 and 42 do not include theword “special”.

    _______________________________________________________________________________________________101- Log #21 SAF-RES

    _______________________________________________________________________________________________Alfred J. Longhitano, Alfred J. Longhitano, P.E., LLC

    Add new text to read as follows:Smoke detectors in 1- and 2-family dwellings shall not transmit an alarm of “FIRE” to the public fire

    department or a central station alarm company.alarm initiated by a smoke detector in my volunteer fire district is an unwarranted alarm

    from a 1- or 2-family residence (i.e. an alarm for a condition for which a human being of ordinary intelligence would nothave dialed 911). Alarms in my fire district have more than tripled from 150+/- in 1988 to over 500 in 2011.of the growth is attributable to smoke detectors activated by dust from contractors' work, steam from showers, spiders inthe detector, faulty detectors, overdone toast, and smoke from frying.This demoralizes members, discourages businesses from allowing employees to respond to alarms during daytime

    hours. Our experience with alarms from residential heat detectors and residential sprinkler water flow alarms has beenexcellent.

    _______________________________________________________________________________________________101- Log #274 SAF-RES

    _______________________________________________________________________________________________Joseph H. Versteeg, Versteeg Associates

    Revise text to read as follows:26.1 .6 Minimum Construction Requirements. (No special requirements.)

    Standardizes the wording in the residential occupancy chapters with all the other occupancies. Norequirements means no requirements. Current wording appears to indicate that although there are no specialrequirements, there might be some requirements.

    _______________________________________________________________________________________________101- Log #70 SAF-RES

    _______________________________________________________________________________________________Doug Hohbein, Northcentral Regional Fire Code Development Committee

    Revise to read:(No special requirements.)

    These chapters include the word “special” under construction requirements. There doesn’t appear tobe a reason to include this word as it could cause confusion. Chapters 14, 15, 16, 38, 39, 40 and 42 do not include theword “special”.

    2Printed on 7/24/2012

    Page 29 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #149 SAF-RES

    _______________________________________________________________________________________________Vince Baclawski, National Electrical Manufacturers Association (NEMA)

    Delete text:26.3.4.7* Protection of Fire Alarm System. The provision of 9.6.1.8.1.3 shall not apply to the smoke detection required

    at each fire alarm control unit by 9.6.1.8.1(1).There is no section 9.6.1.8.1.3 sprinkler exemption. The proposal seeks to delete the exception for the

    fire alarm control equipment to be protected by automatic smoke detection when the building is protected throughout byan approved, supervised automatic sprinkler system. The requirement for automatic smoke detection above controlequipment is a fundamental reliability concept of the fire alarm system and not a building or fire code issue. Protection ofthe fire alarm control equipment is essential to insure the system generates the occupant emergency evacuation signalprior to the activation of the automatic sprinkler system because once the automatic sprinkler system activates it willrender the fire alarm control equipment non-operational due to water and heat damage because of the followingreasons:• Fire alarm control equipment is listed for “Indoor Dry” (NEMA 1 Enclosure) not wet, mist or waterproof. Water and

    electronics do not mix.• Heat generated by a fire will trigger a sprinkler head at around 150 degrees f. Fire alarm control panels operate at a

    maximum of 120 degrees f. This excess heat can affect the operation of the fire alarm system.• At typical sprinkler activation takes a maximum of 90 seconds of discharge before it triggers the control panel, then the

    control panel takes an addition maximum of 10 seconds to notify occupants and alert 1st responders. Electronics andwater don’t mix. Water could be flowing on the control panel or other critical Fire Alarm system components for up to110 seconds, almost 2 minutes prior to activating the system.

    _______________________________________________________________________________________________101- Log #87 SAF-RES

    _______________________________________________________________________________________________Bill Galloway, Southern Regional Fire Code Development Committee

    Revise text as follows:All new lodging or rooming houses, other than those meeting the requirements of 26.3.6.2, shall be protected

    throughout by an approved automatic sprinkler system in accordance with 26.3.6.3.An automatic sprinkler system shall not be required where every sleeping room has a door opening directly to

    the outside of the building at street or the finished ground level, or has a door opening directly to the outside leading toan exterior stairway that meets the requirements of 26.2.1.1.2.

    This proposal eliminates the exemption for fire sprinklers in new lodgings in rooming houses. NFPA101 now requires fire sprinkler protection in all new one-and-two family dwellings and does not contain a similarexemption to the exception in 26.3.6.2. If this level of care is established in new one-and two-family dwellings, a similarlevel of protection should be provided for all new lodging and rooming houses, an arguably similar or greater hazardoccupancy since the occupants may be transient and a fire in one sleeping room could compromise the safety of anoccupant in an adjacent space. In addition, section 30.3.5 for new apartments, does not contain this exemption either.The TC on residential occupancies removed this provision for apartments last cycle. Lastly, the IBC/IFC has requiredcomplete fire sprinkler protection for all new residential occupancies for the last four code cycles. There is no similarsprinkler exemption provided in the IBC/IFC.

    3Printed on 7/24/2012

    Page 30 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #413 SAF-RES

    _______________________________________________________________________________________________Keith E. Pardoe, Door and Hardware Institute

    Add a new section to read:Door openings shall be inspected in accordance with Section 7.2.1.15, Inspection of

    Door Openings.

    In the 2012 edition of the NFPA 101, Section 7.2.1.15, Inspection of Door Openings was revised fromrequiring the inspection of all door assemblies where the door leaves where required to swing in the direction of egresstravel to Access-Controlled Egress Door Assemblies, Electrically-Controlled Egress Door Assemblies, Doors withSpecial Locking Arrangements, and doors equipped with fire exit hardware or panic hardware. A new requirement toinspect smoke door assemblies in accordance with NFPA 105, Standard for Smoke Doors and Other OpeningProtectives was also added in the 2012 edition.

    _______________________________________________________________________________________________101- Log #274a SAF-RES

    _______________________________________________________________________________________________Joseph H. Versteeg, Versteeg Associates

    Revise text to read as follows:28.1.6 Minimum Construction Requirements. (No special requirements.)

    Standardizes the wording in the residential occupancy chapters with all the other occupancies. Norequirements means no requirements. Current wording appears to indicate that although there are no specialrequirements, there might be some requirements.

    _______________________________________________________________________________________________101- Log #279 SAF-RES

    _______________________________________________________________________________________________Joseph H. Versteeg, Versteeg Associates

    Revise text to read as follows:28.2.2.2.2.2 Delayed-egress locks complying with 7.2.1.6.1 shall be permitted, provided that not more than one such

    device is located in any one egress path.The limitation of a single delayed egress lock in any one egress path is overly restrictive since the

    assembly and educational occupancy chapters that address occupants egressing in mass do not contain the samelimitation. Additionally, the Healthcare occupancy chapter removed an identical limitation for the 2012 edition of theCode based on the same logic.

    4Printed on 7/24/2012

    Page 31 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #289 SAF-RES

    _______________________________________________________________________________________________Thomas P. Hammerberg, Automatic Fire Alarm Association, Inc.

    Revise text to read as follows:A corridor smoke detection system in accordance with Section 9.6 shall be provided in interior

    corridors.in buildings other than those protected throughout by an approved, supervised automatic sprinkler system inaccordance with 28.3.5.3.

    This proposal supports both the use of fire sprinklers and early warning smoke detection in HotelOccupancies were people sleep and live. The corridor is the primary means of egress and building occupants and fireservice members need knowledge of a smoke condition in the corridors

    Report by Dr. Milke of Department of Fire ProtectionEngineering University of Maryland. The report states “The review of data obtained in several experimental programsunanimously indicates that smoke detectors respond prior to sprinklers. In addition, tenability analyses conducted usingdata from several of the experimental programs concluded that sufficient egress time is provided by smoke detectors,considering conditions existing at the time of their response”. This document can be downloaded athttp://www.afaa.org/pdf/Performance of Smoke Detectors and Sprinklers in Residential and Healthcare Facilities.pdfThis proposal will provide both fire sprinklers and smoke detection in corridors which are one of the key elements of lifesafety in our buildings of this occupancy. There are reports of loss of life when corridors are untenable due to smokeand fire in corridors, this will allow for early detection, notification and suppression to save the lives of occupants and fireservice responders.

    _______________________________________________________________________________________________101- Log #88 SAF-RES

    _______________________________________________________________________________________________Bill Galloway, Southern Regional Fire Code Development Committee

    Revise text as follows:All buildings, other than those complying with 28.3.5.2, shall be protected throughout by an approved,

    supervised automatic sprinkler system in accordance with 28.3.5.3.Automatic sprinkler protection shall not be required in buildings where all guest sleeping rooms or guest

    suites have a door opening directly to either of the following:(1) Outside at the street or the finished ground level(2) Exterior exit access arranged in accordance with 7.5.3 in buildings three or fewer stories in height

    This proposal eliminates the exemption for fire sprinklers in new hotels and dormitories. NFPA 101now requires fire sprinkler protection in all new one-and-two family dwellings and does not contain a similar exemptionto the exception in 28.3.5.1. If this level of care is established in new one-and two-family dwellings, a similar level ofprotection should be provided for all new hotels and dormitories, an arguably similar or greater hazard occupancy sincethe occupants may be transient and a fire in one sleeping room could compromise the safety of an occupant in anadjacent space. In addition, section 30.3.5 for new apartments, does not contain this exemption either. The TC onresidential occupancies removed this provision for apartments last cycle. Lastly, the IBC/IFC has required complete firesprinkler protection for all new residential occupancies for the last four code cycles. There is no similar sprinklerexemption provided in the IBC/IFC.

    5Printed on 7/24/2012

    Page 32 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #411 SAF-RES

    _______________________________________________________________________________________________Keith E. Pardoe, Door and Hardware Institute

    Add a new section to read:Door openings shall be inspected in accordance with Section 7.2.1.15, Inspection of

    Door Openings.In the 2012 edition of the NFPA 101, Section 7.2.1.15, Inspection of Door Openings was revised from

    requiring the inspection of all door assemblies where the door leaves where required to swing in the direction of egresstravel to Access-Controlled Egress Door Assemblies, Electrically-Controlled Egress Door Assemblies, Doors withSpecial Locking Arrangements, and doors equipped with fire exit hardware or panic hardware. A new requirement toinspect smoke door assemblies in accordance with NFPA 105, Standard for Smoke Doors and Other OpeningProtectives was also added in the 2012 edition.

    _______________________________________________________________________________________________101- Log #274b SAF-RES

    _______________________________________________________________________________________________Joseph H. Versteeg, Versteeg Associates

    Revise text to read as follows:29.1.6 Minimum Construction Requirements. (No special requirements.)

    Standardizes the wording in the residential occupancy chapters with all the other occupancies. Norequirements means no requirements. Current wording appears to indicate that although there are no specialrequirements, there might be some requirements.

    _______________________________________________________________________________________________101- Log #279a SAF-RES

    _______________________________________________________________________________________________Joseph H. Versteeg, Versteeg Associates

    Revise text to read as follows:29.2.2.2.2.2 Delayed-egress locks complying with 7.2.1.6.1 shall be permitted, provided that not more than one such

    device is located in any one egress path.The limitation of a single delayed egress lock in any one egress path is overly restrictive since the

    assembly and educational occupancy chapters that address occupants egressing in mass do not contain the samelimitation. Additionally, the Healthcare occupancy chapter removed an identical limitation for the 2012 edition of theCode based on the same logic.

    6Printed on 7/24/2012

    Page 33 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #4 SAF-RES

    _______________________________________________________________________________________________Thomas G. Daly, The Hospitality Security Consulting Group, LLC

    Delete as follows:AII high-rise buildings, other than those where each guest room or guest suite has exterior exit access in

    accordance with Section 7.5.3, shall be protected throughout by an approved, supervised automatic sprinkler system inaccordance with Section 29.3.5.3.

    A. Background:In the United States civilian fire deaths in hotels and motels over the past two decades have occurred exclusively in

    non-sprinklered low-rise hotels and motels as predicted by the hotel industry1.Notable National Fire Protection Association (NFPA) and/or media reported multiple loss of life low-rise hotel/motel

    fires include:1. Fontana Hotel – Miami Beach, FL – three stories – 9 civilian fire deaths – 4/6/19902. Paxton Hotel – Chicago, IL – four stories – 21 civilian fire deaths - 3/23/19933. Howard Johnson Hotel - Bowling Green, KY – two stories – 4 civilian deaths - 1/6/19964. Comfort Inn Hotel – Greenville, SC – three stories – 6 civilian deaths – 1/25/20045. Mason Hotel – San Diego, CA – three stories – 2 civilian deaths – 12/17/20046. Mitzpah Hotel – Reno, NV – three stories – 12 civilian deaths – 10/31/20067. Zanzibar Motel – Reno, NV – two stories – 2 civilian deaths – 12/10/20078. Days Inn Hotel – Hoover, AL – two stories – 4 civilian deaths - 1/16/2010Civilian fire deaths in hotels/motels averaged 7.7 per 1000 fires with no automatic suppression system present for the

    1994-1998 timeframe2. Civilian fire deaths in hotel/motel fires averaged 11 each year from 2003-2007.4

    Civilian fire injuries in hotel/motel fires averaged 151 per year for the period 2003-2007.B. Code provisions remain inadequate to address hazardDespite fire safety improvements for existing buildings mandated by the Life Safety Code over the past two decades,

    those changes have not resulted in a reduction in the annual civilian fire death statistics in non-sprinkleredhotels/motels.Comparatively, no fire civilian fire deaths have been reported in sprinklered hotels/motels5.After a decade of these codes changes fire deaths and injuries continue to occur in low-rise non-sprinklered

    hotels/motels. Without further code enhancements for existing hotels/motels, this carnage will continue. As such, adistinct hazard continues to be present to occupants of non-sprinklered hotels and motels with regard to fires therein.

    C. Cost/benefitsThe U.S. lodging industry has largely completed the mostly voluntary sprinkler retrofitting of existing high-rise hotels,

    an effort which resulted in zero fire fatalities over the past two decades in such hotels6.Leading lodging operators and franchisors including Hilton, Marriott and Starwood have also completed the sprinkler

    retrofitting of their low-rise hotels, dispelling the myth that such retrofit costs are prohibitive. Those costs are no moreexpensive than the routinely scheduled replacement of furnishings, fixtures and equipment (FF&E) including mattresses,case goods, carpeting, draperies and wall covering done by the industry. A hotel/motel sprinkler retrofit project is aone-time capital cost whereas the replacement of FF&E is a continuing periodic capital cost which the industry routinelybears.A hotel/motel sprinkler retrofit provides for a reduction in property insurance premiums and reduces the risk to

    firefighters engaged in fire suppression activities therein.As a result of these sprinkler system retrofits none of those cited hotel chains has experienced a civilian fire fatality in

    any of their hotels in the last two decades. Nonetheless, some lodging chains and many independent low-rise hotelowners/operators have not taken the same proactive action to protect their guests.The cost of such retrofits for commercial buildings including hotels and motels has been mitigated significantly by the

    permitted use of NFPA 13R as the installation standard for residential occupancies including hotels and motels of 4stories and less 7, the use of listed CPVC pipe in lieu of steel pipe or copper tube, the use of extended coveragesprinklers, the lack of the need in most cases for a fire pump in low-rise Group R-1 buildings and through tax incentivesin the forms of grants, tax credits, tax deductions and/or low interest loans for doing so, see for example state statutes inAlaska 8, South Carolina 9 and California 10 as well as numerous local ordinances.

    Existing Life Safety Code provisions have failed to prevent hotel/motel fire fatalities and thus a distinct hazard to

    7Printed on 7/24/2012

    Page 34 of 53

  • Report on Proposals – June 2014 NFPA 101occupants of existing hotels and motels continues to exist. The code change proposed herein, if adopted, will eliminatethe distinct hazard to life for such occupants.

    1Tri-Data Corporation, Arlington, VA.,, December 1994, pg. 23.

    2Ahrens, Marty - National Fire Protection Association, , March2006, p. 103.

    3Flynn, Jennifer D. - National Fire Protection Association, ,March 2010, Table 2.4Ibid., Table 1.5Op cit., Ahrens, Marty NFPA, , 2006, page 103.6NFPA Journal, September-October 2010, p. 12.7See NFPA 13R8Alaska Statutes, Article 45.81.200 -210.9South Carolina Act 357 (2008), R385, H4470 AN ACT TO AMEND THE CODE OF LAWS OF SOUTH CAROLINA,

    1976, BY ADDING SECTION 58-5-390 SO AS TO PROVIDE THAT A PUBLIC OR PRIVATE UTILITY MAY NOTIMPOSE A TAP FEE, RECURRING MAINTENANCE FEE, OR OTHER FEE, HOWEVER DESCRIBED FOR THEINSTALLATION AND MAINTENANCE OF A FIRE SPRINKLER SYSTEM THAT EXCEEDS THE ACTUAL COSTSASSOCIATED WITH THE WATER LINE TO THE SYSTEM AND TO DEFINE ACTUAL COSTS; BY ADDING SECTION12-6-3622 SO AS TO ALLOW A PROPERTY TAX CREDIT, AT THE OPTION OF THE PROPERTY-TAXING ENTITYFOR TWENTY-FIVE PERCENT OF THE COSTS OF INSTALLING A FIRE SPRINKLER SYSTEM IN A COMMERCIALOR RESIDENTIAL STRUCTURE WHEN SUCH INSTALLATION IS NOT REQUIRED BY LAW, TO ALLOW ANINCOME TAX CREDIT IN THE AMOUNT OF THE PROPERTY TAX CREDIT, TO PROVIDE THE MANNER IN WHICHTHESE CREDITS ARE USED WHEN EARNED BY PASS-THROUGH ENTITIES, AND TO MAKE UNUSED CREDITSTRANSFERABLE BY THE STRUCTURE'S OWNER TO A TENANT; TO AMEND SECTION 12-37-3130, ASAMENDED, RELATING TO DEFINITIONS FOR PURPOSES OF THE SOUTH CAROLINA REAL PROPERTYVALUATION REFORM ACT, SO AS TO PROVIDE THAT THE INSTALLATION OF A FIRE SPRINKLER SYSTEM IN ACOMMERCIAL OR RESIDENTIAL STRUCTURE WHEN THE INSTALLATION IS NOT REQUIRED BY LAW IS NOTAN ADDITION OR IMPROVEMENT; BY ADDING SECTION 10-1-80 SO AS TO PROHIBIT ENFORCEMENT OF THATPORTION OF THE INTERNATIONAL FIRE CODE OR NATIONALLY RECOGNIZED FIRE CODE THAT PROHIBITSTHE USE OF NATURAL CUT TREES IN CELEBRATIONS IN HOUSES OF WORSHIP; AND TO AMEND SECTION12-37-220, AS AMENDED, RELATING TO PROPERTY TAX EXEMPTIONS, SO AS TO EXEMPT THE VALUE OFFIRE SPRINKLER SYSTEM EQUIPMENT INSTALLED IN A COMMERCIAL OR RESIDENTIAL STRUCTURE WHENTHE INSTALLATION IS NOT REQUIRED BY LAW AND TO PROVIDE THAT THIS EXEMPTION APPLIES UNTIL THEPROPERTY UNDERGOES AN ASSESSABLE TRANSFER OF INTEREST.

    10California Constitution Article 13A Tax Limitation Sec. 2(c)(2) & Taxation & Revenue Code Sec. 74(a)-(e).

    8Printed on 7/24/2012

    Page 35 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #89 SAF-RES

    _______________________________________________________________________________________________Bill Galloway, Southern Regional Fire Code Development Committee

    Add new text:29.3.5.2 Reserved. When an existing hotel has a change of occupancy to a primary use as extended stay occupancy

    shall be considered an apartment building and shall be protected throughout by an approved, supervised automaticsprinkler system in accordance with 29.3.5.3.

    There are many instances where buildings that were constructed for occupancy as a hotel with thedefinition of use by transient occupants are converting to extended stay facilities with permanent long time occupants.These buildings were not built for this use and in many instances make shift kitchen arrangements and use of hot plates,etc., are installed. The fire load in these occupancies is much more than a “normal” hotel room. Approved automaticsprinkler protection should be required in these facilities as in other residential occupancies in the code. Even if notrequired at time of construction due to the edition of code adopted and occupancy, the change of occupancy toextended stay should trigger this requirement for existing buildings.

    _______________________________________________________________________________________________101- Log #412 SAF-RES

    _______________________________________________________________________________________________Keith E. Pardoe, Door and Hardware Institute

    Add a new section to read:Door openings shall be inspected in accordance with Section 7.2.1.15, Inspection of

    Door Openings.In the 2012 edition of the NFPA 101, Section 7.2.1.15, Inspection of Door Openings was revised from

    requiring the inspection of all door assemblies where the door leaves where required to swing in the direction of egresstravel to Access-Controlled Egress Door Assemblies, Electrically-Controlled Egress Door Assemblies, Doors withSpecial Locking Arrangements, and doors equipped with fire exit hardware or panic hardware. A new requirement toinspect smoke door assemblies in accordance with NFPA 105, Standard for Smoke Doors and Other OpeningProtectives was also added in the 2012 edition.

    _______________________________________________________________________________________________101- Log #274c SAF-RES

    _______________________________________________________________________________________________Joseph H. Versteeg, Versteeg Associates

    Revise text to read as follows:30.1.6 Minimum Construction Requirements. (No special requirements.)

    Standardizes the wording in the residential occupancy chapters with all the other occupancies. Norequirements means no requirements. Current wording appears to indicate that although there are no specialrequirements, there might be some requirements.

    9Printed on 7/24/2012

    Page 36 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #71 SAF-RES

    _______________________________________________________________________________________________Doug Hohbein, Northcentral Regional Fire Code Development Committee

    Revise to read:(No special requirements.)

    These chapters include the word “special” under construction requirements. There doesn’t appear tobe a reason to include this word as it could cause confusion. Chapters 14, 15, 16, 38, 39, 40 and 42 do not include theword “special”.

    _______________________________________________________________________________________________101- Log #280 SAF-RES

    _______________________________________________________________________________________________Joseph H. Versteeg, Versteeg Associates

    Revise text to read as follows:30.2.2.2.2.2 Delayed-egress locks complying with 7.2.1.6.1 shall be permitted, provided that not more than one such

    device is located in any one egress path.The limitation of a single delayed egress lock in any one egress path is overly restrictive since the

    assembly and educational occupancy chapters that address occupants egressing in mass do not contain the samelimitation. Additionally, the Healthcare occupancy chapter removed an identical limitation for the 2012 edition of theCode based on the same logic.

    _______________________________________________________________________________________________101- Log #290 SAF-RES

    _______________________________________________________________________________________________Thomas P. Hammerberg, Automatic Fire Alarm Association, Inc.

    Revise as follows:

    A smoke detection system in accordance with Section 9.6 shall be provided in interior corridors.This proposal supports both the use of fire sprinklers and early warning smoke detection in Residential

    Apartment Occupancies where people sleep and live. The corridor is the primary means of egress and buildingoccupants and fire service members need knowledge of a smoke condition in the corridors

    Report by Dr. Milke of Department of FireProtection Engineering University of Maryland. The report states “The review of data obtained in several experimentalprograms unanimously indicates that smoke detectors respond prior to sprinklers. In addition, tenability analysesconducted using data from several of the experimental programs concluded that sufficient egress time is provided bysmoke detectors, considering conditions existing at the time of their response”. This document can be downloaded athttp://www.afaa.org/pdf/Performance of Smoke Detectors and Sprinklers in Residential and Healthcare Facilities.pdfThis proposal will provide both fire sprinklers and smoke detection in corridors which are one of the key elements of life

    safety in our buildings of this occupancy. There are reports of loss of life when corridors are untenable due to smokeand fire in corridors, this will allow for early detection, notification and suppression to save the lives of occupants and fireservice responders.

    10Printed on 7/24/2012

    Page 37 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #291 SAF-RES

    _______________________________________________________________________________________________Michael A. Anthony, University of Michigan / Rep. APPA.ORG

    Add new text to read as follows:Interlocking of kitchen exhaust fans with cooking appliances shall be permitted in student residence facilities.

    When resident cooking sets off nuisance fire alarms in student residence facilities a fire safety problememerges when students ignore fire alarms. Also, the cost of nuisance alarms affects many colleges and universities thatuse municipal fire protection resources.Several interlocking arrangements are possible in lieu of better fire detection apparatus.This proposal is crafted in optional language to present a solution to this problem; though it is understood that

    interlocking may be costly without appliance and/or installation innovations. It may also complicate energy conservationgoals because make-up air would be necessary. This proposal is a corresponding proposal to a series presented byAPPA’s Code Advocacy Task Force to engage the fire safety problem in the education facilities industry.

    _______________________________________________________________________________________________101- Log #219 SAF-RES

    _______________________________________________________________________________________________Michael A. Anthony, University of Michigan / Rep. APPA.ORG - Leadership in Education

    Use the existing “Reserved Section 30.6 for the following:30.6.1 (NEW) Student residence facility power outlets. 120-volt branch circuits that supply 15- and 20-ampere outlets

    installed in sleeping quarters in student residence facilities shall be provided with arc-fault circuit interrupters.This proposal is intended to raise the level of debate on the suitability of AFCI protection for student

    residence facilities – particularly in sleeping quarters where, arguably, the conditions of occupancy resemble a Class 2Division 2 classified location. We believe that a corresponding requirement, coordinated with NEC Section 210.12 thatis occupancy specific belongs in NFPA 101.The cost of AFCI protection and its reliability have been broadening discussions in the past few cycles of the NEC. Asthe US education facilities industry’s representative on the NEC (CMP-1) I would like to see the cost driven downwardand the reliability upward. Broadening the discussion beyond the NEC may help create the conditions and economy ofscale among AFCI manufacturers and suppliers that will make AFCI technology cost effective in reducing electricalaccidents in student residence facilities. Student residence facilities are the highest risk occupancies on our campuses.This proposal is related to a coordinated proposal submitted to the Chapter 6 committee regarding the definition ofstudent residence facility. That proposal is also related to a proposal presented to the International Code Council, IBCGroup B committee. For the convenience of the committee the definition that has been proposed by the educationfacilities industry is shown below:“

    11Printed on 7/24/2012

    Page 38 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #292 SAF-RES

    _______________________________________________________________________________________________Michael A. Anthony, University of Michigan / Rep. APPA.ORG

    Add new text to read as follows:There shall be no fewer than four 20-ampere, 120V branch circuit outlets per bed in the sleeping quarters of

    student residence facilities.This is one of several proposals coordinated with ICC and NFPA document development by APPA’s

    Code Advocacy Task Force to reduce the fire safety risk in student residence facilities. While it may seem to thecommittee that this requirement belongs in the NEC more occupancy-specific electrical information is needed in thisdocument. The intent is to reduce the number of extension cords and to provide enough outlets for the numerouselectrical loads students bring into their bedrooms.

    _______________________________________________________________________________________________101- Log #414 SAF-RES

    _______________________________________________________________________________________________Keith E. Pardoe, Door and Hardware Institute

    Add a new section to read:Door openings shall be inspected in accordance with Section 7.2.1.15, Inspection of

    Door Openings.In the 2012 edition of the NFPA 101, Section 7.2.1.15, Inspection of Door Openings was revised from

    requiring the inspection of all door assemblies where the door leaves where required to swing in the direction of egresstravel to Access-Controlled Egress Door Assemblies, Electrically-Controlled Egress Door Assemblies, Doors withSpecial Locking Arrangements, and doors equipped with fire exit hardware or panic hardware. A new requirement toinspect smoke door assemblies in accordance with NFPA 105, Standard for Smoke Doors and Other OpeningProtectives was also added in the 2012 edition.

    _______________________________________________________________________________________________101- Log #274d SAF-RES

    _______________________________________________________________________________________________Joseph H. Versteeg, Versteeg Associates

    Revise text to read as follows:31.1 .6 Minimum Construction Requirements. (No special requirements.)

    Standardizes the wording in the residential occupancy chapters with all the other occupancies. Norequirements means no requirements. Current wording appears to indicate that although there are no specialrequirements, there might be some requirements.

    _______________________________________________________________________________________________101- Log #72 SAF-RES

    _______________________________________________________________________________________________Doug Hohbein, Northcentral Regional Fire Code Development Committee

    Revise to read:(No special requirements.)

    These chapters include the word “special” under construction requirements. There doesn’t appear tobe a reason to include this word as it could cause confusion. Chapters 14, 15, 16, 38, 39, 40 and 42 do not include theword “special”.

    12Printed on 7/24/2012

    Page 39 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #280a SAF-RES

    _______________________________________________________________________________________________Joseph H. Versteeg, Versteeg Associates

    Revise text to read as follows:31.2.2.2.2.2 Delayed-egress locks complying with 7.2.1.6.1 shall be permitted, provided that not more than one such

    device is located in any one egress path.The limitation of a single delayed egress lock in any one egress path is overly restrictive since the

    assembly and educational occupancy chapters that address occupants egressing in mass do not contain the samelimitation. Additionally, the Healthcare occupancy chapter removed an identical limitation for the 2012 edition of theCode based on the same logic.

    _______________________________________________________________________________________________101- Log #415 SAF-RES

    _______________________________________________________________________________________________Keith E. Pardoe, Door and Hardware Institute

    Add a new section to read:Door openings shall be inspected in accordance with Section 7.2.1.15, Inspection of

    Door Openings.In the 2012 edition of the NFPA 101, Section 7.2.1.15, Inspection of Door Openings was revised from

    requiring the inspection of all door assemblies where the door leaves where required to swing in the direction of egresstravel to Access-Controlled Egress Door Assemblies, Electrically-Controlled Egress Door Assemblies, Doors withSpecial Locking Arrangements, and doors equipped with fire exit hardware or panic hardware. A new requirement toinspect smoke door assemblies in accordance with NFPA 105, Standard for Smoke Doors and Other OpeningProtectives was also added in the 2012 edition.

    13Printed on 7/24/2012

    Page 40 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #255 SAF-RES

    _______________________________________________________________________________________________Michael A. Anthony, University of Michigan / Rep. APPA.ORG

    Reserve existing “Reserved” Chapter 34 for future student residence facilities requirements asfollows:

    As reported by “Campus Firewatch” (Ed Comeau, Director), the education facilities industry hasobserved about 10 fire-related fatalities per year, since 2000. As of May 4th , 16 fire-related events have occurred oncollege campuses since the beginning of the year that have resulted in either fatalities, injuries, and/or property loss.More up to date information is available at the following link:http://www.campus-firewatch.com/incidents/Most of them have occurred in off-campus housing, but not all. For the moment, the education facilities industry ismanaging the off-campus fire safety problem through the ANSI standards process as best as it can given its grimresources, uncertain liability obligations and variety in local rule. We can put our best foot forward in those facilities thatare under our control, however.This principle was one of the key drivers for submitting “complete” draft chapters to this committee during the lastrevision cycle (Proposal 101-379 and Comment 101-277). Admittedly, these draft chapters were a work in progress buthelped established the broad contours around the subtle safety concepts that apply to this occupancy class – typicallythe highest risk occupancy class in the education facilities industry. For the convenience of the committee, some of thesubstantiation from the 2012 ROP, written by Ted Weidner of the University of Nebraska, is reproduced below.“….The fire safety requirements for dormitories present unique challenges to architects, engineers, facility operators,and fire safety professionals. They fall into a unique category of facility due to ownership, occupancy (the people),organizational mission, and expectations. In the 35+ years of my involvement in higher education, I have seendormitories from virtually all sides; they are not the same as any other category of facility.

    Dormitories are owned by colleges in and universities to support the mission of educating students. The educationcomes in several forms: socialization with people of different backgrounds, interaction with fellow students and faculty,and learning to live independently (with supervision).The occupants are familiar with the facility and can walk it in their sleep within a few days or weeks of becomingresident. However, they are often the source of safety problems due to their new-found independence and limitedsupervision. Some of the accoutrements of home, cigarettes, candles, incense burners, and other heat sources areusually prohibited items that are still found in a dormitory room. Even with automatic shut-off features, curling irons andother appliances can be used carelessly. And young, independent students can also obtain alcohol or other drugswhich inhibit their ability to react correctly in an emergency or they become the source of the emergency.Some colleges and universities have an organizational structure which places the control and operation of dormitoriesunder the student life area where students are to be supported and guided as they mature; not forced into compliancewith societal rules other than those of mutual respect. The focus individuals makes dormitory occupants more aware oftheir surroundings and attentive to things outside the norm.Despite the social independence, many dormitory occupants are not financially independent and rely on parents forsupport. Parents have an expectation that the college or university will exercise and protect the studentfrom himself and others. This expectation clashes with the independence-focus on the student and educational effortsof the institution….”For the 2015 revision cycle of NFPA 101 the APPA Code Advocacy Task Force continues its effort. It links proposalsrecently presented to the International Building Code that are coordinated with the concepts proposed for this document.We seek acknowledgement that student residence facilities are a distinct occupancy class which, once affirmed in theIBC, will begin to track technical specifics in this document and others. To paraphrase the thinking of Dana Peterson ofthe University of New Hampshire in his substantiation for changes to the IBC :“…The purpose of the proposed change is to clarify the classification of the Residential Group R occupancy typesespecially as it applies to student residence facilities, formerly commonly referred to, and sometimes still referred to asdormitories. Currently, dormitories are listed as R-2 occupancies which we feel is a correct designation for today’sstudent residence facilities. However, the definition provided for a dormitory suggests a student lifestyle and buildingtype of a bygone day. Today’s residence halls are anything but formulaic. Many are a mix of apartments, suites,double-doubles, and single occupant rooms. These kinds of facilities make for interesting architectural arrangements ofspace and complex interior floor plans that don’t always have intuitively obvious exit routes. Cooking facilities, both in

    14Printed on 7/24/2012

    Page 41 of 53

  • Report on Proposals – June 2014 NFPA 101individual rooms and communal kitchens, as well as food service facilities, are becoming increasingly more common ifnot the norm. A trend toward “Living and Learning” has created buildings that have increasing amounts of assemblyspace within them. Classrooms, recreation facilities, and movie/concert/dance venues are all becoming commonplace innewer facilities.That said, there are still buildings that are akin to the old-style dormitory, such as summer camps, hostels, homelessshelters, bunkhouses, and barracks, and the code should have a classification to recognize those facilities too. So ourproposal recognizes dormitories as a potential R-1 occupancy as well and judges the difference the same way as allother R-1 occupancies are judged, by the transient or nontransient nature of the occupants. Although it is not central toour purpose, we also took this opportunity to suggest that vacation timeshare properties also be located to the R-1occupancy for the same reason and so that the logic for classification based upon the familiarity with the buildingremains consistent.The proposal also specifically designates that nontransient student residence facilities are an R-2 occupancy, removingthe necessity for the “dormitory” definition to do double duty to both describe the defining features and giveall-encompassing examples. It also slightly modifies the definition of “transient” to put the emphasis on the definingcharacteristic of short term occupancy, with “30 days” given more as a guidepost than an absolute.APPA is also seeking this strengthening and clarification for the occupancy classification of student residence facilitiesunder IBC in support of its ongoing efforts with the National Fire Prevention Association to facilitate a change in thatcode to classify student residence facilities with apartment buildings or in a separate chapter, rather than with hotels asthey do currently. Adoption of our proposal would clarify IBC’s position that APPA is in concurrence with and strengthenAPPA’s argument for consistency in NFPA’s view of the same issue….”While that process is ongoing, we have made a number of specific technical proposals to different committees in thisrevision of NFPA 101 instead of submitting entirely new chapters as we did last cycle. We would still like to keep thepossibility open that these two chapter numbers – 34 and 35 --be set aside as “Reserved” (as 25, 27 and 41 are now) sothat dedicated workgroups can visualize where the material they develop and present to this committee in the futuremight be placed.In order to succeed in using the code-making process to increase student safety, many concepts have to move together-- in many places and in many documents. We do not undertake this work because it is easy; we undertake it becauseit part of our stewardship obligation, despite the complex interdependencies. We hope that be keeping these safetyconcepts on the table for discussion by our nation’s fire safety thought leaders, others will join the discussion andcontribute specifics that meet the challenge of providing leading practices for optimal student fire safety.

    15Printed on 7/24/2012

    Page 42 of 53

  • Report on Proposals – June 2014 NFPA 101_______________________________________________________________________________________________101- Log #256 SAF-RES

    _______________________________________________________________________________________________Michael A. Anthony, University of Michigan / Rep. APPA.ORG

    Reserve existing “Reserved” Chapter 35 for future student residence facilities requirements asfollows:

    As reported by “Campus Firewatch” (Ed Comeau, Director), the education facilities industry hasobserved about 10 fire-related fatalities per year, since 2000. As of May 4th , 16 fire-related events have occurred oncollege campuses since the beginning of the year that have resulted in either fatalities, injuries, and/or property loss.More up to date information is available at the following link:http://www.campus-firewatch.com/incidents/Most of them have occurred in off-campus housing, but not all. For the moment, the education facilities industry ismanaging the off-campus fire safety problem through the ANSI standards process as best as it can given its grimresources, uncertain liability obligations and variety in local rule. We can put our best foot forward in those facilities thatare under our control, however.This principle was one of the key drivers for submitting “complete” draft chapters to this committee during the lastrevision cycle (Proposal 101-379 and Comment 101-277). Admittedly, these draft chapters were a work in progress buthelped established the broad contours around the subtle safety concepts that apply to this occupancy class – typicallythe highest risk occupancy class in the education facilities industry. For the convenience of the committee, some of thesubstantiation from the 2012 ROP, written by Ted Weidner of the University of Nebraska, is reproduced below.“….The fire safety requirements for dormitories present unique challenges to architects, engineers, facility operators,and fire safety professionals. They fall into a unique category of facility due to ownership, occupancy (the people),organizational mission, and expectations. In the 35+ years of my involvement in higher education, I have seendormitories from virtually all sides; they are not the same as any other category of facility.Dormitories are owned by colleges in and universities to support the mission of educating students. The educationcomes in several forms: socialization with people of different backgrounds, interaction with fellow students and faculty,and learning to live independently (with supervision).The occupants are familiar with the facility and can walk it in their sleep within a few days or weeks of becomingresident. However, they are often the source of safety problems due to their new-found independence and limitedsupervision. Some of the accoutrements of home, cigarettes, candles, incense burners, and other heat sources areusually prohibited items that are still found in a dormitory room. Even with automatic shut-off features, curling irons andother appliances can be used carelessly. And young, independent students can also obtain alcohol or other drugswhich inhibit their ability to react correctly in an emergency or they become the source of the emergency.Some colleges and universities have an organizational structure which places the control and operation of dormitoriesunder the student life area where students are to be supported and guided as they mature; not forced into compliancewith societal rules other than those of mutual respect. The focus individuals makes dormitory occupants more aware oftheir surroundings and attentive to things outside the norm.Despite the social independence, many dormitory occupants are not financially independent and rely on parents forsupport. Parents have an expectation that the college or university will exercise and protect the studentfrom himself and others. This expectation clashes with the independence-focus on the student and educational effortsof the institution….”For the 2015 revision cycle of NFPA 101 the APPA Code Advocacy Task Force continues its effort. It links proposalsrecently presented to the International Building Code that are coordinated with the concepts proposed for this document.We seek acknowledgement that student residence facilities are a distinct occupancy class which, once affirmed in theIBC, will begin to track technical specifics in this document and others. To paraphrase the thinking of Dana Peterson ofthe University of New Hampshire in his substantiation for changes to the IBC :“…The purpose of the proposed change is to clarify the classification of the Residential Group R occupancy typesespecially as it applies to student residence facilities, formerly commonly referred to, and sometimes still referred to asdormitories. Currently, dormitories are listed as R-2 occupancies which we feel is a correct designation for today’sstudent residence facilities. However, the definition provided for a dormitory suggests a student lifestyle and buildingtype of a bygone day. Today’s residence halls are anything but formulaic. Many are a mix of apartments, suites,double-doubles, and single occupant rooms. These kinds of facilities make for interesting architectural arrangements ofspace and complex interior floor plans that don’t always have intuitively obvious exit routes. Cooking facilities, both inindividual rooms and communal kitchens, as well as food service facilities, are becoming increasingly more common if

    16Printed on 7/24/2012

    Page 43 of 53

  • Report on Proposals – June 2014 NFPA 101not the norm. A trend toward “Living and Learning” has created buildings that have increasing amounts of assemblyspace within them. Classrooms, recreation facilities, and movie/concert/dance venues are all becoming commonplace innewer facilities.That said, there are still buildings that are akin to the old-style dormitory, such as summer camps, hostels, homelessshelters, bunkhouses, and barracks, and the code should have a classification to recognize those facilities too. So ourproposal recognizes dormitories as a potential R-1 occupancy as well and judges the difference the same way as allother R-1 occupancies are judged, by the transient or nontransient nature of the occupants. Although it is not central toour purpose, we also took this opportunity to suggest that vacation timeshare properties also be located to the R-1occupancy for the same reason and so that the logic for classification based upon the familiarity with the buildingremains consistent.The proposal also specifically designates that nontransient student residence facilities are an R-2 occupancy, removingthe necessity for the “dormitory” definition to do double duty to both describe the defining features and giveall-encompassing examples. It also slightly modifies the definition of “transient” to put the emphasis on the definingcharacteristic of short term occupancy, with “30 days” given more as a guidepost than an absolute.APPA is also seeking this strengthening and clarification for the occupancy classification of student residence facilitiesunder IBC in support of its ongoing efforts with the National Fire Prevention Association to facilitate a change in thatcode to classify student residence facilities with apartment buildings or in a separate chapter, rather than with hotels asthey do currently. Adoption of our proposal would clarify IBC’s position that APPA is in concurrence with and strengthenAPPA’s argument for consistency in NFPA�