Newsletter Agarwal’s Carriers Corporation of India Page 1 Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD SACHIN LOGISTICS PVT. LTD HARSHVARDAN REAL ESTATE LTD. SHREE HEAVY LIFTERS Jan-Dec.2017 Long distance transportation of Super ODC Consignment of CO2 Absorber Dimension – 14.63mtr x 6.77mtr x 6.40mtr – 213 MT from Dahej to CFCL, Kota – 1400 Kms. and delivery in record time of 52 days.

Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 1

Project Division

ACCI

AGARWAL’S CARRIERS CORPORATION OF INDIA

ACCI GLOBAL CARRIERS PVT. LTD

SACHIN LOGISTICS PVT. LTD

HARSHVARDAN REAL ESTATE LTD.

SHREE HEAVY LIFTERS

Jan-Dec.2017

Long distance transportation of Super ODC Consignment of CO2 Absorber Dimension – 14.63mtr x 6.77mtr x 6.40mtr – 213 MT from Dahej to CFCL, Kota – 1400 Kms. and delivery

in record time of 52 days.

Page 2: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 2

Project Division

ACCI

Contents of this Issue

1. Overview

2. First for India - Specialised transportation

3. Current Projects

4. Recently completed major Projects / Nearing Completion – Mission Bharat Yatra

5. Major Bypass construction

6. Bharat Darshan

7. Licence, Certification and EHS

8. Gallery

9. Media report

10. Our strength

11. Fleet

TURNKEY PROJECTS

HEAVY HAULAGE

CONVENTIONAL TRANSPORTATION AND

WAREHOUSING

EQUIPMENT RENTALS,

ERECTION AND CONSULTANCY

SERVICES

RIVER, COASTAL SHIPPING AND

PROJECT FORWARDING

ACCI

GIRDER BRIDGE TRANSPORTATION

CORE BUSINESS

Page 3: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 3

Project Division

ACCI

1. OVERVIEW

A Year of achievements

A lot has happened in 2017 and yet we feel many more things still to be achieved in logistics. Though the growth was stagnant in heavylift transportation industry, there are few remarkable achievements made by ACCI in multimodal coastal movement and Girder bridge movement for India’s heaviest T. G. Stator across India. With innovative logistics solution, ACCI had accepted the challenge to deliver 4 nos T. G. Stators each weighing 466 M. Tons for three power project sites in Western, Central and Eastern part of India which give us immense satisfaction in terms of serving clients and making small contribution to the Nation for safe movement of critical equipments for setting up of 800 MW power projects. Thanks to the vision of our Group Chairman Mr. R. K. Agarwal, dedicated work force, adverse market conditions, demonetisation and flood situation in Gujarat and Rajasthan during last monsoon we could overcome all the problems.

Last year we have seen two remarkable regulatory changes in logistics, One is implementation of GST and another grant of Industry status for logistics (Infrastructure status) which will help industry in the long run. Implementation of GST not only act as a major tool in strengthening transportation but also brings down logistics cost with availability of Input tax credit for GTA services under forward charge if opted.

With ACCI’s Technical team’s endeavour to find logistics solution for safe & economical mode of transportation, our company is the First Company to move India’s heaviest T. G. Stator for a cumulative distance of 10500 Kms. across India. We have also crossed 100000 Km mark in feasibility study / route survey for various projects executed and upcoming projects for weight upto 1570 MT and have extended our support to clients in their decision making process over safe movement of super heavy and larger dimension equipments.

H. S. Acharya

Page 4: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 4

Project Division

ACCI

2. FIRST FOR INDIA

LONGEST DISTANCE – 10,506 KMS.

LONGEST TRAILER – 105 MTRS.

HEAVIEST CARGO – 466 MT

ANOTHER FIRST FOR INDIA - 4 NOS 466T TG STATOR TRANSPORTATION BY

GIRDER BRIDGE + 1 ½ AXLES + BARGE / SHIP FOR CUMULATIVE DISTANCE

OF OVER 10,000 KMS. 1 ½ YEARS DURATION – STARTING OCT.2016

ACCI has immense pleasure to announce that it has successfully transported 4 Nos. Turbine Generator Stators

each weighing 466t from BHEL-Haridwar Unit (3 Nos.) and from Kandla Port (1 No.) to following sites 2

each by Multimodal and Road :

Item

Project From To Mode

1 2 x 800 MW NTPC- Gadarwara -1

Kandla

Gadarwara

(MP)

Multimodal

2 2 x 800 MW NTPC- Gadarwara -2

BHEL-Haridwar

Gadarwara

(MP)

Road

3 1 x 800 MW Wanakbori Thermal

Power Station

BHEL-Haridwar Wanakbori

(Gujarat)

Road

4 1 x 800 MW Kothagudem Thermal

Power Station

BHEL-Haridwar Kothagudem

(Telangana)

Multimodal

BHEL-WANAKBORI PROJECT GADARWARA-2 PROJECT

Page 5: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 5

Project Division

ACCI

Transporting such super heavy cargo for 3 different sites for cumulative distance of 6459 kms. by

road and 4047 Kms. (2158NM) by sea had many challenges including monsoon, flood in Gujarat &

Rajasthan, foul weather, road infra for moving 105 mtr. long Girder Bridge Trailer, but ACCI

through its experienced Technical Team managed to overcome all the hurdles and executed the

projects successfully. BHEL after thorough technical scrutiny of the bid, both technical & financial

competency and after physical inspection and witnessing load test for 500t capacity Girder Bridge,

selected ACCI for all four projects. ACCI had deployed 128 Goldhofer THP/SL45 series axles

including split axles, 13 prime movers, 500t Girder Bridge and 120 employees for these projects.

Girder bridge movement for BHEL cargo happened for the first time in India and movement of 4 TG

Stators of such Heavy weight of 466t in 16 months period is a record in Indian logistics services

industry and ACCI is proud to be the Logistics Service Partner for such large power projects In

India.

BHEL-WANAKBORI PROJECT GADARWARA-2 PROJECT

Page 6: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 6

Project Division

ACCI

SPECIALISED TRANSPORTATION

ACCI own and operate 2 Nos. heavy duty Girder bridge with carrying capacity upto 500 MT suitable

for transportation of Power Plant equipments like transformers, Generator and stators and in the

last 3 years 15 packages for approx. 15000 Kms have been moved from North to West, North &

West to Central India. Team ACCI both Engineering and Operations are well versed in movement of

105 mtrs. long trailer on Indian roads and delivered heavylifts safely on time.

Page 7: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 7

Project Division

ACCI

3. CURRENT PROJECTS

OPERATION CHAMBAL 707

Multimodal and road transportation job for Chambal Fertilizer Project, Client

Toyo Engineering India Pvt. Ltd.

ACCI was awarded 2 years contract for multimodal and road transportation of SODCs, ODCs and general cargo (both imported and indigenous) from over a dozen locations :

Heavylifts Achad

Hazira

Dahej

Anand

Ahmedabad / Rakanpur

Kandla / Mundra

Yamunanagar

General Cargo & Containers

From locations mentioned above

Plus 5 more locations given below.

• Mumbai,

• JNPT,

• Tarapur,

• New Delhi airport

• Pune

Project Summary No.of heavylifts

Locati-ons

Heaviest package (L x W x H mtrs) - MT

Longest package (L x W x H mtrs) - MT

Widest package (L x W x H mtrs) - MT

Tallest package (L x W x H mtrs) - MT

Commencement & Completion

Avg. Distance (Kms)

70 7 Ammonia Unitized Chiller 28.506m x 4.77m x 5.53m – 310 MT

Process Condensate Stripper 37.85m x 4m x 3.75m – 66.4 MT

CO2 Absorber 14.63m x 6.77m x 6.40 – 213 MT

CO2 Absorber 14.63m x 6.77m x 6.40 – 213 MT

Since March,2017

1000+

700+ LOADS 7000+ METRIC TONNES OF HEAVYLIFTS 70000+ HEAVY LIFT-RUNNING KM & FREIGHT TONNES TRANSPORTED 700000+ GENERAL CARGO RUNNING KM

Page 8: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 8

Project Division

ACCI

Fastest delivery Equipment Qty Days Distance

Final Separators 16.835m x 6.66m x 6.20m – 50.050 MT from GMM Pfaudler Anand, Gujarat.

2 Nos 7 904 Kms

HTS Effluent/BFW Preheater 9.68m x 3.07m x 3.32m – 73.65 MT from L & T Hazira

1 No. 4 900 Kms

Page 9: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 9

Project Division

ACCI

2 Barge trips were undertaken one from Dahej and another from Hazira to Mundra Port for further transportation of Ammonia Convertor sections and Unitized Chiller weighing 269 MT, 299 MT and 310 MT to Project site at Gadepan, Kota. ISGEC-Dahej / Adani-Dahej Jetty to CFCL, Kota Via-Mundra Port

L&T Hazira Jetty to CFCL, Kota Via-Mundra Port

L &T Ro – Ro jetty

1

Dahej Ro-Ro jetty

Mundra Ro-Ro jetty

Page 10: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 10

Project Division

ACCI

Road Transportation of Ammonia Synthesis Converter 18.903m x 4.70m x 4.20m – 296 MT from ISGEC Dahej to to

CFCL Gadepan through tunnel at Sokhriyanal

Carbomate Condenser having dimension 25.659m x 4.6m x 4.974m – 274 MT from Mundra to port to CFCL Gadepan

Page 11: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 11

Project Division

ACCI

TRANSPORTATION OF 32 NOS TRANSFORMERS FOR CKL2 PROJECT :

ACCI bagged second project from GE T & D India Limited (Formerly Alstom T & D India Limited) in December, 2016 for transportation of 32 nos Transformers and accessories for CKL2 HVDC project, destined to Power Grid Corporation of India Limited, Kurukshetra and Champa sites and over 50% of the project already completed till now. PROJECT SUMMARY :

Sr. No.

Equipments Weight (MT)

Qty. from To Mode

1. 800 KV Transformers

325 8 Kandla Kurukshetra Road

2

800 KV Transformers

325 8 Baroda / Mumbai

Champa Multimodal

3

400 KV Transformers

231 8 Kandla / Baroda

Kurukshetra Road

4 400 KV Transformers

231 8 Baroda / Mumbai

Champa Road

The project involves multimodal transportation of 8 transformers of 325 MT by multimodal out of which 3 from Baroda and 2 from Mumbai already delivered

Page 12: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 12

Project Division

ACCI

Road Transportation of 800 KV Transformer of 325 MT on Girder Bridge

Bypass constructed at Disa for transportation of 800 KV Transformer of 325 MT

Page 13: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 13

Project Division

ACCI

4. RECENTLY COMPLETED MAJOR PROJECTS / NEARING

COMPLETION :

4.1 MISSION BHARAT YATRA -

TRANSPORTATION OF 4 NOS T.G. STATORS 11.6m x 5.1m x

4.8m – 462 MT

GADARWARA – 1 PROJECT

From Kandla Port To Gadarwara Mode of Transportation

Multimodal Road – Barge – Road

Total Distance 2130 Kms

GADARWARA – 2 PROJECT

From BHEL Haridwar To Gadarwara Mode of Transportation

Road (1 + ½ axles + Girder bridge)

Total Distance 1122 Kms

Page 14: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 14

Project Division

ACCI

WANAKBORI PROJECT

From BHEL Haridwar To Wanakbori, Gujarat Mode of Transportation

Road (1 + ½ axles + Girder bridge)

Total Distance 1541 Kms

KOTHAGUDEM PROJECT

From BHEL Haridwar To Kothagudem Mode of Transportation

Road – Ship - Road

Total Distance 5620 Kms

4.2. NUCLEAR POWER CORPORATION OF INDIA LIMITED RAWATBATA TO KAKARAPARA

.

ACCI executed PSU contract for

transportation of 2 nos Steam Generators

having dimension 24.2m x 4.3m x 4.3m –

Wt 225 MT from NPCIL RAPP-7&8 site to

KAPP-3&4 Kakrapar site

Page 15: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 15

Project Division

ACCI

5 . MAJOR BYPASS CONSTRUCTION - 16 NOS.

ACCI Civil Engineering Department built total 16 nos. major bypasses which includes one km.

long bypass twice Over Shakkar River before and after monsoon as detailed below :

Sr. No.

Project Customer No. of Bypasses

Between

1 Gadarwara-1&2 BHEL 2 Haridwar to Gadarwara at Shakkar River

2 Kothagudem

BHEL 12 Haridwar to Mundra Port

3 CKL-2 GE 2 Kandla to Kurukshetra at Banas River

Cumulative length : 7500 Mtrs 6 bypasses were built during monsoon between Sirohi to Mundra just after Devastating flood

in Gujarat and Rajasthan in Aug, 2017

SHAKKAR RIVER - 1.0 KM. BYPASS CONSTRUCTED FOR BHEL-GADARWARA - 1

BYPASS CONSTRUCTED FOR BHEL-GADARWARA - 2

Page 16: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 16

Project Division

ACCI

6. FEASIBILITY STUDY CROSSES 1,00,000 KMS –

BHARAT DARSHAN

In 30 months period ending 31st Dec, 2017, ACCI Technical Department has completed

1,03,337 kms. Feasibility study for various projects executed and also against the feasibility

study contract awarded for new projects by various MNCs, EPCs and Project owners as

detailed below for dimension of 93.10m x 8.12m x 8.92m & weight upto 1570 MT.

Project From To Max.

Weight

(MT)

Mode Total Kms.

IOCL-

Panipat,

Mathura

and

Vadodara

Godrej / Mujpur /

G.R.Engg.Jetty Tarapur /

ISGEC-Dahej

Panipat,

Mathura &

Vadodara

600 MT Multimodal 13637

Bathinda

Refinery

Kandla / Vijay Tank /

Mundra Port / Godrej

Vikhroli / Mumbai Port /

Phils Padgha / ISGEC-

Dahej / Phils Mangalore /

Pune / JNPT / G.R.Tarapur

/ L&T- Hazira

Bathinda

832 MT Multimodal 8614.7

Kms.

HURL

Gorakhpur

Kandla via-Bharatpur-Agra

/

Kandla via-Kota-Jhansi /

Allahabad Jhunsi Ghat

Gorakhpur 550 MT Multimodal 4847

Kms.

HURL-

Barauni

Haldia / Kandla / Hindustan

Fertilizer -

Barauni

550 MT Multimodal 3552

Kms.

Page 17: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 17

Project Division

ACCI

Project From To Max.

Weight

(MT)

Mode Total Kms.

HURL -

Sindri

Kandla / Haldia / Zamania

/ Baktiyarpur

Hindustan

Fertilizer -

Sindri

550 MT Multimodal 3881

Kms.

HPCL-

Vizag

HSL / Lova Gardern Jetty /

Vishakhapattanam Port /

Gangavaram Port / BHEL-

HPV / Autonagar –

Fabrication Yard

HPCL-

Vizag

1500

MT

Road 59 Kms.

Export

Project

Dahej Mumbai

Port

1570

MT

Multimodal 23

Kms.

Page 18: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 18

Project Division

ACCI

7. LICENCE, CERTIFICATION AND EHS

ACCI is an ISO, OHSAS Certified Company and after the annual audit, QS Quality Service certificate was

renewed upto 21.07.2018. Company is regularly conducting training programmes both by internal trainers

and external consultants.

Company has appointed full time Chief Safety Officer Mr. Dhiraj Waghmare who is available 24 X 7.

Company has trained many company officials as internal Auditor for OHSAS to ensure strict compliance of

EHS and Company has currently 8 internal Auditors. Company is also registered with National Safety

Council.

ACCI has obtained ship agency license from Mumbai port trust under registration no.A0651

Dhiraj Waghmare –

Chief Safety Officer

“SAFETY IS OUR

RESPONSIBILITY”

Page 19: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 19

Project Division

ACCI

8. GALLERY

Receiving of Carbomate Condenser 25.659m x 4.6m x

4.974m – 274 MT at Mundra port for CFCL Gadepan

Carbomate Condenser 25.659m x 4.6m x 4.974m –

274 MT from Mundra to port to CFCL Gadepan

CO2 Absorber Section 1 - 19.1m x 5.30m x 5.59m – 128

MT from Godrej Dahej to CFCL Gadepan

Ammonia Unitized Chiller 28.5m x 4.77m x 5.33 –

310 MT from L & T Hazira to CFCL Gadepan

CO2 Stripper - 17.3m x 4.7m x 4.95m – 48 MT from

Godrej Dahej to CFCL Gadepan

Urea Reactor 23.75m x 4.5m x 4.65m – 192 MT

from ISGEC Dahej to CFCL Gadepan

Page 20: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 20

Project Division

ACCI

T. G. Stator 10.225m x 5.104m x 4.841m – 466.26 MT

on 16+16 Girder bridge from Krishnapatnam port to

Kothagudam project iste

Cold Box 27.1m x 6.65m x 5.24 m – 155 MT from

Mundra port to CFCL Gadepan

Flag off ceremony of T. G. Stator 10.225m x 5.104m

x 4.841m – 466.26 MT at BHEL Haridwar

2 nos . T. G. Stator 10.225m x 5.104m x 4.841m –

466.26 MT outside BHEL Haridwar.

CO2 Absorber 14.63m x 6.77m x 6.40m – 213

MT from Godrej Dahej to CFCL Gadepan

Basket Container 37.83m x 3.83m x 3.83m –

210 MT from ISGEC Dahej to CFCL Gadepan

Page 21: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 21

Project Division

ACCI

9. MEDIA REPORT

We are thankful to all those who have contributed to this edition of Newsletter. We appreciate

your comments. Please continue to send the same to

email id : [email protected] / [email protected]

Page 22: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 22

Project Division

ACCI

10. OUR STRENGTH

Goldhofer hydraulic axles THP SL /45 series under 6 years old with high bending moment. Young fleet of average 7 years of age. Just 2 years old ballastable 15 T / Sq. Mtr deck strength barge fitted with 2 powered winches and

generator on board.

2 years old, load tested 2 nos of Girder of capacity up to 500t,

Brand new + less than 10 years old 19 pullers of 400 HP and above which includes 3 nos brand new. We are the only company which own 580 HP Scania puller (Imported).

Well maintained equipments with zero breakdowns with own workshop and warehouse facilities.

Highly experienced Professional project team comprising of Mech, civil engineers, master mariners, trained drivers, heavylift operators with vast experience in girder bridge movement.

Only company which has moved India’s heaviest T. G. Stator of 466 M. Tons for a distance of 10500 Kms for

which Girder bridge moved on 3269 Kms.

Over 500 Transformers weighing up to 325t and height up to 5.30 mtrs moved in the last 10 years for

cumulative distance of over 0.50 million kms across India from 9 locations.

Excellent track record of on time delivery and major focus on project

logistics. OHSAS and ISO certified With highest standard of safety with Zero accident.

Inhouse civil Engineering team and successfully executed several multimodal transportation jobs

involving construction of jetty and bypasses.

Page 23: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 23

Project Division

ACCI

11. FLEET STRENGTH

A] Road Transportation Equipments

Hydraulic Axles

1 Goldhofer hydraulic axles THP/SL 45 74 Nos.

2 Tratec heavy duty and axles 194 Nos.

3 Hydraulic axles Drop Deck 7 Nos.

4 Spacers 3 Nos.

Prime Movers

5 Volvo and scania pullers upto 580 HP 22 Nos.

6 Heavy Duty Girder Bridge upto 500t capacity 2 Nos.

7 Heavy Duty cranes 3 Nos.

8 Ro-Ro Ramp 6 Nos.

9 Stools 110 Nos.

10 Beams 34 Nos.

B] Marine Equipments

1 Deck Loader Barge - Sanskriti 1 No.

2 Ballast Pumps upto 300t capacity 7 Nos.

3 Hydraulic jacks – 200 t capacity each 4 Nos.

Page 24: Newsletter Jan-Dec.2017 ACCI Project Divisionagarwalcarriers.com/Newsletter-2018.pdf · Project Division ACCI AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD

Newsletter

A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a

Page 24

Project Division

ACCI

AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD SACHIN LOGISTICS PVT LTD HARSHVARDAN REAL ESTATE LTD SHREE HEAVY LIFTERS

SPECIALISED SERVICES IN MULTIMODAL AND GIRDER BRIDGE TRANSPORTATION

Project Office B/412, ACME Plaza, Andheri Kurla Road, J. B. Nagar, Andheri (East), Mumbai – 4000 59.

Tel. : 022 – 40024366 / 40056768; Email : [email protected] / [email protected]

Head Office 401,Bharat Chambers,4th floor,Baroda Street,Carnac Bunder,Mumbai – 400 009.

Tel: 91-22-43664366; Email : [email protected]