Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 1
Project Division
ACCI
AGARWAL’S CARRIERS CORPORATION OF INDIA
ACCI GLOBAL CARRIERS PVT. LTD
SACHIN LOGISTICS PVT. LTD
HARSHVARDAN REAL ESTATE LTD.
SHREE HEAVY LIFTERS
Jan-Dec.2017
Long distance transportation of Super ODC Consignment of CO2 Absorber Dimension – 14.63mtr x 6.77mtr x 6.40mtr – 213 MT from Dahej to CFCL, Kota – 1400 Kms. and delivery
in record time of 52 days.
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 2
Project Division
ACCI
Contents of this Issue
1. Overview
2. First for India - Specialised transportation
3. Current Projects
4. Recently completed major Projects / Nearing Completion – Mission Bharat Yatra
5. Major Bypass construction
6. Bharat Darshan
7. Licence, Certification and EHS
8. Gallery
9. Media report
10. Our strength
11. Fleet
TURNKEY PROJECTS
HEAVY HAULAGE
CONVENTIONAL TRANSPORTATION AND
WAREHOUSING
EQUIPMENT RENTALS,
ERECTION AND CONSULTANCY
SERVICES
RIVER, COASTAL SHIPPING AND
PROJECT FORWARDING
ACCI
GIRDER BRIDGE TRANSPORTATION
CORE BUSINESS
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 3
Project Division
ACCI
1. OVERVIEW
A Year of achievements
A lot has happened in 2017 and yet we feel many more things still to be achieved in logistics. Though the growth was stagnant in heavylift transportation industry, there are few remarkable achievements made by ACCI in multimodal coastal movement and Girder bridge movement for India’s heaviest T. G. Stator across India. With innovative logistics solution, ACCI had accepted the challenge to deliver 4 nos T. G. Stators each weighing 466 M. Tons for three power project sites in Western, Central and Eastern part of India which give us immense satisfaction in terms of serving clients and making small contribution to the Nation for safe movement of critical equipments for setting up of 800 MW power projects. Thanks to the vision of our Group Chairman Mr. R. K. Agarwal, dedicated work force, adverse market conditions, demonetisation and flood situation in Gujarat and Rajasthan during last monsoon we could overcome all the problems.
Last year we have seen two remarkable regulatory changes in logistics, One is implementation of GST and another grant of Industry status for logistics (Infrastructure status) which will help industry in the long run. Implementation of GST not only act as a major tool in strengthening transportation but also brings down logistics cost with availability of Input tax credit for GTA services under forward charge if opted.
With ACCI’s Technical team’s endeavour to find logistics solution for safe & economical mode of transportation, our company is the First Company to move India’s heaviest T. G. Stator for a cumulative distance of 10500 Kms. across India. We have also crossed 100000 Km mark in feasibility study / route survey for various projects executed and upcoming projects for weight upto 1570 MT and have extended our support to clients in their decision making process over safe movement of super heavy and larger dimension equipments.
H. S. Acharya
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 4
Project Division
ACCI
2. FIRST FOR INDIA
LONGEST DISTANCE – 10,506 KMS.
LONGEST TRAILER – 105 MTRS.
HEAVIEST CARGO – 466 MT
ANOTHER FIRST FOR INDIA - 4 NOS 466T TG STATOR TRANSPORTATION BY
GIRDER BRIDGE + 1 ½ AXLES + BARGE / SHIP FOR CUMULATIVE DISTANCE
OF OVER 10,000 KMS. 1 ½ YEARS DURATION – STARTING OCT.2016
ACCI has immense pleasure to announce that it has successfully transported 4 Nos. Turbine Generator Stators
each weighing 466t from BHEL-Haridwar Unit (3 Nos.) and from Kandla Port (1 No.) to following sites 2
each by Multimodal and Road :
Item
Project From To Mode
1 2 x 800 MW NTPC- Gadarwara -1
Kandla
Gadarwara
(MP)
Multimodal
2 2 x 800 MW NTPC- Gadarwara -2
BHEL-Haridwar
Gadarwara
(MP)
Road
3 1 x 800 MW Wanakbori Thermal
Power Station
BHEL-Haridwar Wanakbori
(Gujarat)
Road
4 1 x 800 MW Kothagudem Thermal
Power Station
BHEL-Haridwar Kothagudem
(Telangana)
Multimodal
BHEL-WANAKBORI PROJECT GADARWARA-2 PROJECT
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 5
Project Division
ACCI
Transporting such super heavy cargo for 3 different sites for cumulative distance of 6459 kms. by
road and 4047 Kms. (2158NM) by sea had many challenges including monsoon, flood in Gujarat &
Rajasthan, foul weather, road infra for moving 105 mtr. long Girder Bridge Trailer, but ACCI
through its experienced Technical Team managed to overcome all the hurdles and executed the
projects successfully. BHEL after thorough technical scrutiny of the bid, both technical & financial
competency and after physical inspection and witnessing load test for 500t capacity Girder Bridge,
selected ACCI for all four projects. ACCI had deployed 128 Goldhofer THP/SL45 series axles
including split axles, 13 prime movers, 500t Girder Bridge and 120 employees for these projects.
Girder bridge movement for BHEL cargo happened for the first time in India and movement of 4 TG
Stators of such Heavy weight of 466t in 16 months period is a record in Indian logistics services
industry and ACCI is proud to be the Logistics Service Partner for such large power projects In
India.
BHEL-WANAKBORI PROJECT GADARWARA-2 PROJECT
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 6
Project Division
ACCI
SPECIALISED TRANSPORTATION
ACCI own and operate 2 Nos. heavy duty Girder bridge with carrying capacity upto 500 MT suitable
for transportation of Power Plant equipments like transformers, Generator and stators and in the
last 3 years 15 packages for approx. 15000 Kms have been moved from North to West, North &
West to Central India. Team ACCI both Engineering and Operations are well versed in movement of
105 mtrs. long trailer on Indian roads and delivered heavylifts safely on time.
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 7
Project Division
ACCI
3. CURRENT PROJECTS
OPERATION CHAMBAL 707
Multimodal and road transportation job for Chambal Fertilizer Project, Client
Toyo Engineering India Pvt. Ltd.
ACCI was awarded 2 years contract for multimodal and road transportation of SODCs, ODCs and general cargo (both imported and indigenous) from over a dozen locations :
Heavylifts Achad
Hazira
Dahej
Anand
Ahmedabad / Rakanpur
Kandla / Mundra
Yamunanagar
General Cargo & Containers
From locations mentioned above
Plus 5 more locations given below.
• Mumbai,
• JNPT,
• Tarapur,
• New Delhi airport
• Pune
Project Summary No.of heavylifts
Locati-ons
Heaviest package (L x W x H mtrs) - MT
Longest package (L x W x H mtrs) - MT
Widest package (L x W x H mtrs) - MT
Tallest package (L x W x H mtrs) - MT
Commencement & Completion
Avg. Distance (Kms)
70 7 Ammonia Unitized Chiller 28.506m x 4.77m x 5.53m – 310 MT
Process Condensate Stripper 37.85m x 4m x 3.75m – 66.4 MT
CO2 Absorber 14.63m x 6.77m x 6.40 – 213 MT
CO2 Absorber 14.63m x 6.77m x 6.40 – 213 MT
Since March,2017
1000+
700+ LOADS 7000+ METRIC TONNES OF HEAVYLIFTS 70000+ HEAVY LIFT-RUNNING KM & FREIGHT TONNES TRANSPORTED 700000+ GENERAL CARGO RUNNING KM
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 8
Project Division
ACCI
Fastest delivery Equipment Qty Days Distance
Final Separators 16.835m x 6.66m x 6.20m – 50.050 MT from GMM Pfaudler Anand, Gujarat.
2 Nos 7 904 Kms
HTS Effluent/BFW Preheater 9.68m x 3.07m x 3.32m – 73.65 MT from L & T Hazira
1 No. 4 900 Kms
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 9
Project Division
ACCI
2 Barge trips were undertaken one from Dahej and another from Hazira to Mundra Port for further transportation of Ammonia Convertor sections and Unitized Chiller weighing 269 MT, 299 MT and 310 MT to Project site at Gadepan, Kota. ISGEC-Dahej / Adani-Dahej Jetty to CFCL, Kota Via-Mundra Port
L&T Hazira Jetty to CFCL, Kota Via-Mundra Port
L &T Ro – Ro jetty
1
Dahej Ro-Ro jetty
Mundra Ro-Ro jetty
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 10
Project Division
ACCI
Road Transportation of Ammonia Synthesis Converter 18.903m x 4.70m x 4.20m – 296 MT from ISGEC Dahej to to
CFCL Gadepan through tunnel at Sokhriyanal
Carbomate Condenser having dimension 25.659m x 4.6m x 4.974m – 274 MT from Mundra to port to CFCL Gadepan
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 11
Project Division
ACCI
TRANSPORTATION OF 32 NOS TRANSFORMERS FOR CKL2 PROJECT :
ACCI bagged second project from GE T & D India Limited (Formerly Alstom T & D India Limited) in December, 2016 for transportation of 32 nos Transformers and accessories for CKL2 HVDC project, destined to Power Grid Corporation of India Limited, Kurukshetra and Champa sites and over 50% of the project already completed till now. PROJECT SUMMARY :
Sr. No.
Equipments Weight (MT)
Qty. from To Mode
1. 800 KV Transformers
325 8 Kandla Kurukshetra Road
2
800 KV Transformers
325 8 Baroda / Mumbai
Champa Multimodal
3
400 KV Transformers
231 8 Kandla / Baroda
Kurukshetra Road
4 400 KV Transformers
231 8 Baroda / Mumbai
Champa Road
The project involves multimodal transportation of 8 transformers of 325 MT by multimodal out of which 3 from Baroda and 2 from Mumbai already delivered
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 12
Project Division
ACCI
Road Transportation of 800 KV Transformer of 325 MT on Girder Bridge
Bypass constructed at Disa for transportation of 800 KV Transformer of 325 MT
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 13
Project Division
ACCI
4. RECENTLY COMPLETED MAJOR PROJECTS / NEARING
COMPLETION :
4.1 MISSION BHARAT YATRA -
TRANSPORTATION OF 4 NOS T.G. STATORS 11.6m x 5.1m x
4.8m – 462 MT
GADARWARA – 1 PROJECT
From Kandla Port To Gadarwara Mode of Transportation
Multimodal Road – Barge – Road
Total Distance 2130 Kms
GADARWARA – 2 PROJECT
From BHEL Haridwar To Gadarwara Mode of Transportation
Road (1 + ½ axles + Girder bridge)
Total Distance 1122 Kms
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 14
Project Division
ACCI
WANAKBORI PROJECT
From BHEL Haridwar To Wanakbori, Gujarat Mode of Transportation
Road (1 + ½ axles + Girder bridge)
Total Distance 1541 Kms
KOTHAGUDEM PROJECT
From BHEL Haridwar To Kothagudem Mode of Transportation
Road – Ship - Road
Total Distance 5620 Kms
4.2. NUCLEAR POWER CORPORATION OF INDIA LIMITED RAWATBATA TO KAKARAPARA
.
ACCI executed PSU contract for
transportation of 2 nos Steam Generators
having dimension 24.2m x 4.3m x 4.3m –
Wt 225 MT from NPCIL RAPP-7&8 site to
KAPP-3&4 Kakrapar site
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 15
Project Division
ACCI
5 . MAJOR BYPASS CONSTRUCTION - 16 NOS.
ACCI Civil Engineering Department built total 16 nos. major bypasses which includes one km.
long bypass twice Over Shakkar River before and after monsoon as detailed below :
Sr. No.
Project Customer No. of Bypasses
Between
1 Gadarwara-1&2 BHEL 2 Haridwar to Gadarwara at Shakkar River
2 Kothagudem
BHEL 12 Haridwar to Mundra Port
3 CKL-2 GE 2 Kandla to Kurukshetra at Banas River
Cumulative length : 7500 Mtrs 6 bypasses were built during monsoon between Sirohi to Mundra just after Devastating flood
in Gujarat and Rajasthan in Aug, 2017
SHAKKAR RIVER - 1.0 KM. BYPASS CONSTRUCTED FOR BHEL-GADARWARA - 1
BYPASS CONSTRUCTED FOR BHEL-GADARWARA - 2
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 16
Project Division
ACCI
6. FEASIBILITY STUDY CROSSES 1,00,000 KMS –
BHARAT DARSHAN
In 30 months period ending 31st Dec, 2017, ACCI Technical Department has completed
1,03,337 kms. Feasibility study for various projects executed and also against the feasibility
study contract awarded for new projects by various MNCs, EPCs and Project owners as
detailed below for dimension of 93.10m x 8.12m x 8.92m & weight upto 1570 MT.
Project From To Max.
Weight
(MT)
Mode Total Kms.
IOCL-
Panipat,
Mathura
and
Vadodara
Godrej / Mujpur /
G.R.Engg.Jetty Tarapur /
ISGEC-Dahej
Panipat,
Mathura &
Vadodara
600 MT Multimodal 13637
Bathinda
Refinery
Kandla / Vijay Tank /
Mundra Port / Godrej
Vikhroli / Mumbai Port /
Phils Padgha / ISGEC-
Dahej / Phils Mangalore /
Pune / JNPT / G.R.Tarapur
/ L&T- Hazira
Bathinda
832 MT Multimodal 8614.7
Kms.
HURL
Gorakhpur
Kandla via-Bharatpur-Agra
/
Kandla via-Kota-Jhansi /
Allahabad Jhunsi Ghat
Gorakhpur 550 MT Multimodal 4847
Kms.
HURL-
Barauni
Haldia / Kandla / Hindustan
Fertilizer -
Barauni
550 MT Multimodal 3552
Kms.
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 17
Project Division
ACCI
Project From To Max.
Weight
(MT)
Mode Total Kms.
HURL -
Sindri
Kandla / Haldia / Zamania
/ Baktiyarpur
Hindustan
Fertilizer -
Sindri
550 MT Multimodal 3881
Kms.
HPCL-
Vizag
HSL / Lova Gardern Jetty /
Vishakhapattanam Port /
Gangavaram Port / BHEL-
HPV / Autonagar –
Fabrication Yard
HPCL-
Vizag
1500
MT
Road 59 Kms.
Export
Project
Dahej Mumbai
Port
1570
MT
Multimodal 23
Kms.
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 18
Project Division
ACCI
7. LICENCE, CERTIFICATION AND EHS
ACCI is an ISO, OHSAS Certified Company and after the annual audit, QS Quality Service certificate was
renewed upto 21.07.2018. Company is regularly conducting training programmes both by internal trainers
and external consultants.
Company has appointed full time Chief Safety Officer Mr. Dhiraj Waghmare who is available 24 X 7.
Company has trained many company officials as internal Auditor for OHSAS to ensure strict compliance of
EHS and Company has currently 8 internal Auditors. Company is also registered with National Safety
Council.
ACCI has obtained ship agency license from Mumbai port trust under registration no.A0651
Dhiraj Waghmare –
Chief Safety Officer
“SAFETY IS OUR
RESPONSIBILITY”
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 19
Project Division
ACCI
8. GALLERY
Receiving of Carbomate Condenser 25.659m x 4.6m x
4.974m – 274 MT at Mundra port for CFCL Gadepan
Carbomate Condenser 25.659m x 4.6m x 4.974m –
274 MT from Mundra to port to CFCL Gadepan
CO2 Absorber Section 1 - 19.1m x 5.30m x 5.59m – 128
MT from Godrej Dahej to CFCL Gadepan
Ammonia Unitized Chiller 28.5m x 4.77m x 5.33 –
310 MT from L & T Hazira to CFCL Gadepan
CO2 Stripper - 17.3m x 4.7m x 4.95m – 48 MT from
Godrej Dahej to CFCL Gadepan
Urea Reactor 23.75m x 4.5m x 4.65m – 192 MT
from ISGEC Dahej to CFCL Gadepan
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 20
Project Division
ACCI
T. G. Stator 10.225m x 5.104m x 4.841m – 466.26 MT
on 16+16 Girder bridge from Krishnapatnam port to
Kothagudam project iste
Cold Box 27.1m x 6.65m x 5.24 m – 155 MT from
Mundra port to CFCL Gadepan
Flag off ceremony of T. G. Stator 10.225m x 5.104m
x 4.841m – 466.26 MT at BHEL Haridwar
2 nos . T. G. Stator 10.225m x 5.104m x 4.841m –
466.26 MT outside BHEL Haridwar.
CO2 Absorber 14.63m x 6.77m x 6.40m – 213
MT from Godrej Dahej to CFCL Gadepan
Basket Container 37.83m x 3.83m x 3.83m –
210 MT from ISGEC Dahej to CFCL Gadepan
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 21
Project Division
ACCI
9. MEDIA REPORT
We are thankful to all those who have contributed to this edition of Newsletter. We appreciate
your comments. Please continue to send the same to
email id : [email protected] / [email protected]
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 22
Project Division
ACCI
10. OUR STRENGTH
Goldhofer hydraulic axles THP SL /45 series under 6 years old with high bending moment. Young fleet of average 7 years of age. Just 2 years old ballastable 15 T / Sq. Mtr deck strength barge fitted with 2 powered winches and
generator on board.
2 years old, load tested 2 nos of Girder of capacity up to 500t,
Brand new + less than 10 years old 19 pullers of 400 HP and above which includes 3 nos brand new. We are the only company which own 580 HP Scania puller (Imported).
Well maintained equipments with zero breakdowns with own workshop and warehouse facilities.
Highly experienced Professional project team comprising of Mech, civil engineers, master mariners, trained drivers, heavylift operators with vast experience in girder bridge movement.
Only company which has moved India’s heaviest T. G. Stator of 466 M. Tons for a distance of 10500 Kms for
which Girder bridge moved on 3269 Kms.
Over 500 Transformers weighing up to 325t and height up to 5.30 mtrs moved in the last 10 years for
cumulative distance of over 0.50 million kms across India from 9 locations.
Excellent track record of on time delivery and major focus on project
logistics. OHSAS and ISO certified With highest standard of safety with Zero accident.
Inhouse civil Engineering team and successfully executed several multimodal transportation jobs
involving construction of jetty and bypasses.
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 23
Project Division
ACCI
11. FLEET STRENGTH
A] Road Transportation Equipments
Hydraulic Axles
1 Goldhofer hydraulic axles THP/SL 45 74 Nos.
2 Tratec heavy duty and axles 194 Nos.
3 Hydraulic axles Drop Deck 7 Nos.
4 Spacers 3 Nos.
Prime Movers
5 Volvo and scania pullers upto 580 HP 22 Nos.
6 Heavy Duty Girder Bridge upto 500t capacity 2 Nos.
7 Heavy Duty cranes 3 Nos.
8 Ro-Ro Ramp 6 Nos.
9 Stools 110 Nos.
10 Beams 34 Nos.
B] Marine Equipments
1 Deck Loader Barge - Sanskriti 1 No.
2 Ballast Pumps upto 300t capacity 7 Nos.
3 Hydraulic jacks – 200 t capacity each 4 Nos.
Newsletter
A g a r w a l ’ s C a r r i e r s C o r p o r a t i o n o f I n d i a
Page 24
Project Division
ACCI
AGARWAL’S CARRIERS CORPORATION OF INDIA ACCI GLOBAL CARRIERS PVT. LTD SACHIN LOGISTICS PVT LTD HARSHVARDAN REAL ESTATE LTD SHREE HEAVY LIFTERS
SPECIALISED SERVICES IN MULTIMODAL AND GIRDER BRIDGE TRANSPORTATION
Project Office B/412, ACME Plaza, Andheri Kurla Road, J. B. Nagar, Andheri (East), Mumbai – 4000 59.
Tel. : 022 – 40024366 / 40056768; Email : [email protected] / [email protected]
Head Office 401,Bharat Chambers,4th floor,Baroda Street,Carnac Bunder,Mumbai – 400 009.
Tel: 91-22-43664366; Email : [email protected]