BIN: Locality:QUEENS
No Flags have been issued during this inspection
Number of Spans:
Type of Inspection:
Eugene T. Grant
Date:
FOCH BLVD
Structure Information
Upendra Wagley, P.E. 069000-1
1055640
Inspection Date
City of NEW YORK
This Structure is not a Ramp
Report Reviewed by:
Postings (As of Inspection Date):
May 29, 2015
Approximate Year Built:
Reviewer Signature:
Upendra Wagley
11Feature Carried:
Typical or Main Span Type:
County:
2 - NORTHEAST
Region:
2Structure is wholly or partially owned or maintained by New York State Department of Transportation
Posted Vertical Clearance Under:
Eugene T. Grant, P.E. 073380-1
5.681Computed Condition Rating:
Action Items
There are no vulnerability reviews recommended
November 12, 2015
Not Posted
No Further Investigation Requested
General
Report Printed:
Not Posted
Not Posted
July 17, 2015
Posted Vertical Clearance On:
678I678IX5M11011
Signature Information
No Diving Inspection Requested
Inspection Signature:
General Recommendation:
Bridge Inspection Report
New York State
New York State Inspection Overview
Structure Inspected By:
Date:
02 - Stringer/Multi-Beam or Girder
Department of Transportation
Feature Crossed:1948
Inspector & Reviewer Information
6
Orientation:
Load Posting:
7/16/15 2:29 PM
Page 1 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
Structure RatingsAbutment Elements Begin Abutment End Abutment
4Joint with Deck 46Bearings, Bolts, Pads 64Seat and Pedestals 46Backwall 66Stem (Breastwall) 67Erosion or Scour 79Footings 98Piles 85Recommendation 5
Wingwall Elements Begin Abutment End Abutment7Walls 79Footings 97Erosion or Scour 78Piles 8
Channel ElementsStream Alignment 8Erosion and Scour 8Waterway Opening 8Bank Protection 8
Approach ElementsDrainage 7Embankment 8Settlement 7Erosion 8Pavement 6Guide Railing 8
Page 2 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
Span Ratings
Element Sub Element 1 2
Deck Elements Wearing Surface 6 6Curbs 6 6Sidewalks & Fascias 6 6Railings & Parapets 6 6Scuppers & Downspouts 8 8Gratings 8 8Median 8 8
Superstructure Deck Structural 5 5Primary Members 6 6Secondary Members 6 6Paint 5 5Joints 8 8Recommendation 6 6
Pier Bearings, Bolts, Pads 6 8Pedestals 7 8Top of Cap or Beam 7 8Stem Solid Pier 6 8Cap Beam 8 8Pier Columns 8 8Footings 9 8Erosion or Scour 7 8Piles 8 8Recommendation 6 8
Utilities Lighting 7 7Sign Structures 5 5Utilities & Supports 6 6
Page 3 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
NBI Deck Condition:
NBI Superstruct Condition:
NBI Substruct Condition:
NBI Channel Condition:
NBI Culvert Condition:
8
8
8
N
N
Federal NBI RatingsFederal Inspection Findings
Special Emphasis RequirementsSpecial Emphasis Inspection RequirementsNon-Redundant/Fracture Critical Members: No
Pin and Hangers: No
Fatigue-Prone Welds: No
Non-Categorized Fatigue-Prone Details: No
NoOther (Specified in Text):
Special Emphasis Detail NotesNone
Special Emphasis Certification:
Special Emphasis Certification
Hands-On Inspection Waived/Exception:
Note:
No
No
Page 4 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
Inspection Notes
1. BIN Plate is located at Begin Abutment and is in good condition.
2. Stone facing at both Abutment Stems, Wingwalls and Pier nose were inspected and found tobe in good condition.
3. Debris / Land Use form has been prepared and attached to this report.
4. The underside of the structural deck is covered with SIP forms in all Bays, except for Bay 6and is in satisfactory condition.The Underside of the fascias and concrete deck in Bay 6 werevisualy inspectected and approximately 20% was sounded. No loose concrete was found.
There are no photographs referenced for this commentGENERAL COMMENT
At the top of the deck, the Begin Abutment Joint sealer material over the Westbound lanes ispushed out across the length and shredded for 1.5' long over the right lane. On the Eastboundlanes, there is only minor debris accumulation.
Below the deck, there is sign of leakage on several Bays, as water and rust stains are presenton the Backwall.
Rating is downgraded to 4.
Referenced Photos: 1,2Abutment - Joint with Deck - Begin - Rated 4
At the top of the deck, the End Abutment Joint has minor debris accumulation across its length.The bridge side concrete header has minor edge spalls along the armor angle edge.
Below the deck, there is sign of leakage on several Bays, as water and rust stains are presenton the Backwall.
Rating is downgraded to 4.
Referenced Photos: 2,4Abutment - Joint with Deck - End - Rated 4
The top of the Bridge Seat has pigeon droppings up to 4" high at various locations. Thiscondition can trap moisture and cause deterioration of the Begin Abutment bridge elements.
Referenced Photos: 3Abutment - Seat and Pedestals - Begin - Rated 4
The top of the Bridge Seat has pigeon droppings up to 4" high at various locations. Thiscondition can trap moisture and cause deterioration of the End Abutment bridge elements.
Referenced Photos: 3Abutment - Seat and Pedestals - End - Rated 4
Page 5 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
The underside of the structural deck is covered with SIP forms in all Bays, except for Bay 6. TheSIP forms exhibit minor corrosion with leaching efflorescence at scattered locations, mainly inBays 3, 4, 5, 7, and 8.
The Underside of the fascias and concrete deck in Bay 6 were visualy inspectected andapproximately 20% was sounded. No loose concrete was found.
Referenced Photos: 5Span 1-Superstructure - Deck Structural - Rated 5
The Sign Structure attached to Span 1, left fascia, exhibits paint peeling and rust with minorcorrosion on the supporting angles and plates.
Referenced Photos: 6Span 1-Utilities - Sign Structures - Rated 5
The underside of the structural deck is covered with SIP forms in all Bays, except for Bay 6. TheSIP forms exhibit minor corrosion with leching efflorescence at scattered locations, mainly inBays 3, 4, 5, 7, and 8.
The Underside of the fascias and concrete deck in Bay 6 were visualy inspectected andapproximately 20% was sounded. No loose concrete was found.
Referenced Photos: 5Span 2-Superstructure - Deck Structural - Rated 5
The Sign Structure attached to Span 2, right fascia, exhibits paint peeling and rust with minorcorrosion on the supporting angles and plates.
Referenced Photos: 6Span 2-Utilities - Sign Structures - Rated 5
Additional Inspection NotesDiving ReferenceThere was no dive referenced for this inspection.
Overloads ObservedNo overload vehicles were noted during this inspection.
Notes to Next Inspector
There were no notes to the next inspector recorded for this inspection.
No improvements were observed during this inspection.
Improvements Observed
Page 6 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
Staff Present During InspectionField Notes
BIN Plate and Fencing information
No Snow Fence.
A Pedestrian Fence is present.
The BIN Plate is in OK condition.
Team Leader: Upendra WagleyAssitant Team Leader: Paul Taveras
Inspection Time & Permit RequirementsTime Required to Inspect Bridge:
Lane Closure Usage:
No railroad flagging required
By Contractor for 9 Hours
11 Hours
Railroad Flagging Time:
Detailed Time & WeatherField Date Arrival Departure Temp (F) Weather Conditions
12:00 PM 04:00 PM 84 Partly Sunny05/27/201512:00 PM 04:00 PM 79 Sunny05/29/201512:00 PM 03:00 PM 82 Sunny05/26/2015
Page 7 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
Inspection PhotographsPhoto #1Top of the deck at begin
abutment, looking rightBegin Abutment Jointsealer material over theWestbound lanes is pushedout across the length andshredded for 1.5' long overthe right lane.
15_1055640_0003.jpgPhoto Number: 1 Photo Filename:
Photo #2End abutment, bays 4 and5, looking aheadSigns of leakage asevidenced by water andrust stains on the backwall.Begin abutment similar.
15_1055640_0011.JPGPhoto Number: 2 Photo Filename:
Page 8 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
Photo #3End abutment, bay 8,looking ahead and leftAccumulation of pigeondroppings on the bridgeseat. Begin abutment issimilar.
15_1055640_0012.JPGPhoto Number: 3 Photo Filename:
Photo #4Above the deck at endabutment, looking leftEnd Abutment Joint hasminor debris accumulationacross its length. Thebridge side concreteheader has minor edgespalls along the armorangle edge.
15_1055640_0001.JPGPhoto Number: 4 Photo Filename:
Page 9 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
Photo #5Span 1, bays 4 and 5,looking aheadSIP forms exhibit minorcorrosion with leachingefflorescence at scatteredlocations. Span 2 is similar.
15_1055640_0025.JPGPhoto Number: 5 Photo Filename:
Photo #6Span 2, right fascia, lookingback and leftThe Sign Structure exhibitspaint peeling and rust withminor corrosion on thesupporting angles andplates. Similar condition onleft fascia of span 1.
15_1055640_0014.JPGPhoto Number: 6 Photo Filename:
Page 10 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
Inspection SketchesSketch Filename: 15_BD240 (BIN 1055640).jpg
Sketch Filename: 15_BD240 (BIN 1055640).jpg
Page 11 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
Standard Photographs1055640_LOCATION_MAP.JPG
Page 12 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
1055640_QUAD_MAP.JPG
Page 13 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
AbutmentBegin.JPG
Page 14 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
AbutmentEnd.JPG
Page 15 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
ApproachBegin.JPG
Page 16 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
ApproachEnd.JPG
Page 17 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
ElevationLeft.JPG
Page 18 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
ElevationRight.JPG
Page 19 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
F2andF3CrossedLeft.JPG
Page 20 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
F2andF3CrossedRight.JPG
Page 21 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
FramingSpan1.JPG
Page 22 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
Pier1.JPG
Page 23 of 24
BIN: 1055640 Bridge Inspection ReportInspection Date: May 29, 2015
WingwallEndLeft.JPG
Page 24 of 24
Structure InformationStructure RatingsSpan RatingsFederal Inspection FindingsSpecial Emphasis RequirementsInspection NotesGENERAL COMMENTAbutment - Joint with Deck - BeginAbutment - Joint with Deck - EndAbutment - Seat and Pedestals - BeginAbutment - Seat and Pedestals - EndSpan 1-Superstructure - Deck StructuralSpan 1-Utilities - Sign StructuresSpan 2-Superstructure - Deck StructuralSpan 2-Utilities - Sign Structures
Additional Inspection NotesField NotesInspection PhotographsPhoto #1Photo #2Photo #3Photo #4Photo #5Photo #6
Inspection SketchesSketch Filename: 15_BD240 (BIN 1055640).jpg
Standard Photographs1055640_LOCATION_MAP.JPG1055640_QUAD_MAP.JPGAbutmentBegin.JPGAbutmentEnd.JPGApproachBegin.JPGApproachEnd.JPGElevationLeft.JPGElevationRight.JPGF2andF3CrossedLeft.JPGF2andF3CrossedRight.JPGFramingSpan1.JPGPier1.JPGWingwallEndLeft.JPG