New X-band testing facility a.k.a. Xbox 2 N. Catalan. Lasheras for the X-band testing areas (XTA) activity group N. Catalan Lasheras

New X-band testing facility a.k.a. Xbox 2

Embed Size (px)

DESCRIPTION

New X-band testing facility a.k.a. Xbox 2. N. Catalan. Lasheras for the X-band testing areas (XTA) activity group. What is Xbox2?. A new test bench for testing RF structures at 12GHz above 100MV/m One structure/three months testing CPI VKX-8311A, 50MW klystron - PowerPoint PPT Presentation

Citation preview

Page 1: New X-band testing facility  a.k.a. Xbox 2

New X-band testing facility a.k.a. Xbox 2N. Catalan. Lasheras for the X-band testing areas (XTA) activity group

N. C

atal

an L

ashe

ras

Page 2: New X-band testing facility  a.k.a. Xbox 2

What is Xbox2?

• A new test bench for testing RF structures at 12GHz above 100MV/m– One structure/three months testing

• CPI VKX-8311A, 50MW klystron – First of this model under construction– Based in SLAC XL5 tube

• Scandinova 50Hz, 450kV modulator• Full time operation expected from next year.• Possible extension in 2014-15 (Xbox3) when

Linac4 klystrons/waveguides are installed

N. C

atal

an L

ashe

ras

Page 3: New X-band testing facility  a.k.a. Xbox 2

#2 50 MW klystron (XL-5, CPI) test stand will be able to deliver to the testing area up to 130 MW x 250 ns pulses at 50 Hz repetition rate. The overall power consumption is 43 kW.

From last collaboration meeting. (I. Syratchev)

Page 4: New X-band testing facility  a.k.a. Xbox 2

Xbox1 in building 2013N

. Cat

alan

Las

hera

s

CTF3 klystron gallery CTF2

Page 5: New X-band testing facility  a.k.a. Xbox 2

N. C

atal

an L

ashe

ras

Building 150. 352 MHz test stand

Page 6: New X-band testing facility  a.k.a. Xbox 2

Proposed layout for Xbox2 in buidling 150N

. Cat

alan

Las

hera

s

Dmitry Gudkov. RF-PM. See also EDMS 1238874

Page 7: New X-band testing facility  a.k.a. Xbox 2

Proposed layout for Xbox2 in buidling 150

Dmitry Gudkov. RF-PM

• Bunker to be reused as such with small modifications– Chicane modified to minimize

waveguide length– Radiation measurements done

in Xbox1 indicate shielding shall be reinforced on axis

• Modulator uses existing water/electricity distribution

• Top-left area used by the EBIS source tests at least until the end of 2013 (TBC)

N. C

atal

an L

ashe

ras

Test bunker

Modulator

Working area

LLRF

Vacuum/TWT

Page 8: New X-band testing facility  a.k.a. Xbox 2

N. C

atal

an L

ashe

ras

Modular design (from EDMS 1238874)

Page 9: New X-band testing facility  a.k.a. Xbox 2

N. C

atal

an L

ashe

ras

Modular design (from EDMS 1238874)

Page 10: New X-band testing facility  a.k.a. Xbox 2

Bunker areaN

. Cat

alan

Las

hera

s

• Vacuum sectors for fast turn around– Loads an waveguide

network baked-out– Bake-out of the DUT

after installation

• Adjustable length for DUT– Single and double

structures

• Additional capacity for extra diagnostics

Dmitry Gudkov. RF-PM

Page 11: New X-band testing facility  a.k.a. Xbox 2

• First piece of Xbox2!!• Compact SLED type pulse compressor.• RF measurements and final tuning next week!!• Four more units required

– Review of the concept, fabrication, mechanic support etc., by the end of February.

Pulse compressor

Page 12: New X-band testing facility  a.k.a. Xbox 2

‘’Simple” -60 dB directional coupler.

RF components procurement• Range of components

developed for X band• Design and prototyping ready

end 2012• First orders expected by the

end of May• New x-band flanges for Xbox3

Page 13: New X-band testing facility  a.k.a. Xbox 2

N. C

atal

an L

ashe

ras

LLRF• No beam. No synchronizing timing required.• Signal generation, diagnostics and control can be done within a NT PXI rack• Frequency multiplication and down conversion

– Successful tests in the lab• Temperature regulated rack (BI)

Page 14: New X-band testing facility  a.k.a. Xbox 2

N. C

atal

an L

ashe

ras

Status of the Xbox• Preparation of the site

– Final layout of the test stand. January 2013.– Cleaning-up the area.– Safety file preparation. RP shielding estimations done.– Shielding reinforcement .– Water system modification.– Electricity modification.– Cabling, Ethernet, compressed air.

• Installation– Modulator procurement. End of March 2013.– Klystron delivery. Delayed by 4 months!!– RF network and components. End of May 2013.– Vacuum network, pumps and valves. LLRF and controls.

• Commissioning– Modulator/klystron unit. – Conditioning of RF network surely 2014.

• Constrains– LS1 resources availability.– Water cut due to LS1 from mid-may until beginning 2014.

Page 15: New X-band testing facility  a.k.a. Xbox 2

PlanningN

. Cat

alan

Las

hera

s

Page 16: New X-band testing facility  a.k.a. Xbox 2

Schedule adjusted

• Yesterday

• Today

N. C

atal

an L

ashe

ras

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb MarKlystron procurement

RF components

System tests

No water

LS1

2012 2013 2014

Commissioning

Modulator procurement

Pulse compressor prototypeSite preparation

Network procurementNetwork installation

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

No water

LS1

Network installationCommissioning

Klystron procurementModulator procurement

RF componentsPulse compressor prototype

Site preparationNetwork procurement

2012 2013 2014

Page 17: New X-band testing facility  a.k.a. Xbox 2

Future:Xbox3. Cluster of small power units• Market survey for klystron-

modulator units out– Call for tender in the next weeks

• Components procurement under way – Waiting for new flanges

• Plan to start installation in2015

Xbox2

Xbox 3

Page 18: New X-band testing facility  a.k.a. Xbox 2

In summary

• New test facility preparation on-going– Site identified– Klystron and modulator under construction– RF components under procurement– Site preparation starting

• Still learning from Xbox1 and dog-leg experiences

• Preparing the way for Xbox3• X-band test capacity multiplied by 3!!