KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3
ITEM NO : 20301
SUMMARY OF Roadway Excavation
SL NO LOCATION TOTAL QTY REMARKS
1 SUMMARY OF CUTTING -I RIGHT Side 544,946.82
2 SUMMARY OF CUTTING -I Left Side 422,663.99
3 Bridge 128+129.575 12,472.93
4 Bridge 172+600 16,750.00
5 Bridge 191+021 14,700.00
6 Additional Scope of Work for Section-1 17,725.91
DEDUCTION -2873
QUANTITY = 1,026,386.65 Cu.m
CONTRACTOR
PROJECT MANAGER
CONSULTANT
RESIDENT ENGINEER
QUANTITY SURVEYOR QUANTITY SURVEYOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3
ITEM NO : 20601
SUMMARY OF Embankment
SL NO LOCATION TOTAL QTY REMARKS
1 SUMMARY OF FILLING-I RIGHT Side 139,965.23
2 SUMMARY OF FILLING-I Left Side 76,111.34
3 Bridge 128+129.575 480,331.55
6 Bridge 141+000 700,000.00
4 Bridge 172+600 498,917.00
5 Bridge 191+021 266,082.65
7 Additional Scope of Work for Section-1 4,161.65
8 DEDUCTION (26,386.65)
9 DEDUCTION (13,847.00)
QUANTITY = 2,125,335.77 Cu.m
CONTRACTOR
PROJECT MANAGER
CONSULTANT
RESIDENT ENGINEER
QUANTITY SURVEYOR QUANTITY SURVEYOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3
ITEM NO : 20601
SUMMARY OF Sub Grade
SL NO LOCATION TOTAL QTY REMARKS
1 SUMMARY OF Sub Grade-I Right Side 124,887.07 ###
2 SUMMARY OF Sub Grade-II Right Side 114,134.72 ###
3 SUMMARY OF Sub Grade-I ( LEFT Side) 142,623.09 ###
4 SUMMARY OF Sub Grade-11 ( LEFT Side) 130,711.65 ###
5 SUMMARY OF Sub Grade-SIDE SLOPE ( LEFT Side) 89,723.70 ###
6 SUMMARY OF Sub Grade-SIDE SLOPE ( RIGHT Side) 74,490.71 ###
7 Bridge 128+129.575 22,655.02 ###
8 Bridge 172+600 - ###
9 Bridge 191+021 31,279.39 ###
10 Additional Scope of Work for Section-1 11,040.79 ###
11 Box Culverts Deduction (428.48)
Agg. Base Course
QUANTITY = 741,117.66 Cu.mB.B.CB.W.C
###
###
###B.W.C
CONTRACTOR
PROJECT MANAGER
CONSULTANT
RESIDENT ENGINEER
QUANTITY SURVEYOR QUANTITY SURVEYOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3
ITEM NO : 3030101
SUMMARY OF AGGREGATE BASE COURSE GRADING
SL NO LOCATION TOTAL QTY REMARKS
1 SUMMARY OF AGGREGATE BASE COURSE GRADING - I Right Side 80,239.57 ###
2 SUMMARY OF AGGREGATE BASE COURSE GRADING - II Right Side 68,945.80 ###
3 SUMMARY OF AGGREGATE BASE COURSE GRADING - I ( LEFT Side) 82,522.05 ###
4 SUMMARY OF AGGREGATE BASE COURSE GRADING - II ( LEFT Side) 80,557.67 ###
5 Bridge 128+129.575 21,027.35 ###
6 Bridge 172+600 39,829.15 ###
7 Bridge 191+021 46,715.79 ###
8 Additional Scope of Work for Section-1 7,646.14 ###
9 Box Culverts Deduction (334.08)
QUANTITY = 427,149.44 Cu.m
###
###
CONTRACTOR
PROJECT MANAGER
CONSULTANT
RESIDENT ENGINEER
QUANTITY SURVEYOR QUANTITY SURVEYOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
CONTRACTOR CONSULTANT
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3
ITEM NO : 4020102
SUMMARY OF Bituminous Prime Coat - Grade MC-I
SL NO LOCATION TOTAL QTY REMARKS
1 SUMMARY OF Bituminous Prime Coat - Grade MC-I Right Side 465,703.90 ###
2 SUMMARY OF MC - 01 ( LEFT Side) 551,300.43 ###
3 Bridge 128+129.575 71,777.96 ###
4 Bridge 172+600 119,105.66 ###
5 Bridge 191+021 147,367.49 ###
6 Additional Scope of Work for Section-1 25,079.90 ###
7 Box Culverts Deduction 1,210.87
QUANTITY = 1,381,546.21 Sq.m
###
###
CONTRACTOR
PROJECT MANAGER
CONSULTANT
RESIDENT ENGINEER
QUANTITY SURVEYOR QUANTITY SURVEYOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3
ITEM NO : 4050176
SUMMARY OF Bituminous Base Course ,Grade
SL NO LOCATION TOTAL QTY REMARKS
1 SUMMARY OF Bituminous Base Course ,Grade -l Right Side 46,133.39 ###
2 SUMMARY OF Bituminous Base Course ,Grade -ll Right Side 45,406.88 ###
3 SUMMARY OF BBC - 01 ( LEFT Side) 54,382.51 ###
4 SUMMARY OF BBC - 02 ( LEFT Side) 53,518.75 ###
5 Bridge 128+129.575 13,045.36 ###
6 Bridge 172+600 26,489.19 ###
7 Bridge 191+021 26,016.82 ###
8 Additional Scope of Work for Section-1 4,962.13 ###
9 Box Culverts Deduction 44.98
QUANTITY = 270,000.00 Cu.m
###
###
CONTRACTOR
CONTRACTOR
PROJECT MANAGER
CONSULTANT
RESIDENT ENGINEER
QUANTITY SURVEYOR QUANTITY SURVEYOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3
ITEM NO : 4050376
SUMMARY OF Bitumin Wearing Course, Grade
SL NO LOCATION TOTAL QTY REMARKS
1 SUMMARY OF Bitumin Wearing Course, Grade Right Side 22,526.10 ###
2 SUMMARY OF BWC ( LEFT Side) 26,522.57 ###
3 Bridge 128+129.575 2,638.09 ###
4 Bridge 172+600 7,820.22 ###
5 Bridge 191+021 6,237.09 ###
6 Additional Scope of Work for Section-1 1,255.93 ###
Quantities 67,000.00 Cu.m
######
CONTRACTOR
PROJECT MANAGER
CONSULTANT
RESIDENT ENGINEER
QUANTITY SURVEYOR QUANTITY SURVEYOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3
ITEM NO : 9030301
SUMMARY OF Retroreflectorized Thermoplastic White Traffic Lines
SL NO LOCATION TOTAL QTY REMARKS
1 SUMMARY OF Retroreflectorized Thermoplastic White Traffic Lines Right Side 3,645.00
2 SUMMARY OF White Line ( LEFT Side) 4,331.25
3 Bridge 128+129.575 12,884.25
4 Bridge 172+600 15,957.00
5 Bridge 191+021 20,263.00
Additional Scope of Work for Section-1 201.92
DONE QUANTITY OF White Line = 57,282.421 Sq.m
CONTRACTOR
PROJECT MANAGER
CONSULTANT
RESIDENT ENGINEER
QUANTITY SURVEYOR QUANTITY SURVEYOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3
ITEM NO : 9030302
SUMMARY OF Retroreflectorized Thermoplastic Yellow Traffic Lines
SL NO LOCATION TOTAL QTY REMARKS
1 SUMMARY OF Retroreflectorized Thermoplastic Yellow Traffic Lines Right side 14,580.00
2 SUMMARY OF Yellow Line ( LEFT Side) 17,325.00
3 Bridge 128+129.575 5,982.46
4 Bridge 172+600 16,999.00
5 Bridge 191+021 4,124.82
6 Additional Scope of Work for Section-1 2,357.17
DONE QUANTITY OF Yellow Line = 61,368.45 Sq.m
CONTRACTOR
PROJECT MANAGER
CONSULTANT
RESIDENT ENGINEER
QUANTITY SURVEYOR QUANTITY SURVEYOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
KINGDOM OF SAUDI ARABIA
Ministry of Transport
PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3
ITEM NO : 9030701
SUMMARY OF SUMMARY OF Cat Eyes
SL NO LOCATION TOTAL QTY REMARKS
1 SUMMARY OF Cat Eyes (Right Side) 8121
2 SUMMARY OF Cat Eyes ( LEFT Side) 9,646
3 Bridge 128+129.575 1,708
4 Bridge 172+600 2,916
5 Bridge 191+021 2,732
6 Additional Scope of Work for Section-1 377
DONE QUANTITY OF Cat Eyes = 25,500 No.
CONTRACTOR
PROJECT MANAGER
CONSULTANT
RESIDENT ENGINEER
QUANTITY SURVEYOR QUANTITY SURVEYOR
Contractor: Saudi Pan Kingdom (SAPAC)
Consultant: Ital Consult (SAB)
Summary of Section-1 Quantities
SL NO Description QTY Unit Ammount
1 Cutting 17,725.91 5.00 88,629.55
2 Embankment 4,161.65 7.00 29,131.55
3 SubGrade 11,040.79 12.00 132,489.48
4 A.B.C 7,646.14 43.00 328,784.02
5 Mc-1 25,079.90 1.00 25,079.90
6 B.B.C 4,962.13 214.00 1,061,895.82
7 B.W.C 1,255.93 429.00 538,793.97
8 White line 201.92 20.00 4,038.40
9 Yellow line 2,357.17 20.00 47,143.40
10 Cat Eyes 376.92 22.00 8,292.24
Total Ammount 2,264,278.33