14
New Shipbuilding Project management Marine Design & Constructions Pvt. Ltd. NAVGATHI

New Shipbuilding Project · PDF fileNew Shipbuilding Project management Marine Design & Constructions Pvt. Ltd. NAVGATHI

Embed Size (px)

Citation preview

New Shipbuilding Project management

Marine Design & Constructions Pvt. Ltd.NAVGATHI

ABOUT NAVGATHI

Three Years and growing fast

Client Interest is primary driving force

Have handled prestigious projects like

VLOO

Blend of youth and experience

Focus on developing innovative

solutions

ABOUT NAVGATHI

DESIGN

Basic Design

Production Design

Conversion Design

Other Design

CONSULTANCY

New Construction

Conversion & Repair

Pre-purchase & Delivery

Strategy Consulting

Shipbroking

CONSTRUCTION

Steel Vessels

Composite Vessels

Aluminum Vessels

PRODUCTS

Compact Dredgers

Weed Harvesters

Solar Boats

ELC Catalyst

Aluminum Propeller

Electric Outboards

Loading Computer

VMAP

Scilab

MarineWiki

TRAINING

FEA

Vibration

Hydraulics

Scilab

WHAT WE OFFER

Concept Design of Ships

Shipyard Assessment

Contract Specification Analysis

Plan Approval

Shipbuilding Supervision

New Construction

CONCEPT DESIGN OF SHIPS

Our Design team can conceptualize

clients’ ideas to a design for initial

discussions

New Construction

SHIPYARD ASSESSMENT

Shipyard Facilities

Quality Standards

Track Record

New Construction

Analysis of

CONTRACT SPECS ANALYSIS

Our Technical team with Shipbuilding

and Operations experience can provide

a detailed review of the Technical

Specification

New Construction

PLAN APPROVAL

Key stage in Shipbuilding where it is

possible to incorporate cl ient’s

o p e r a t i o n a l re q u i re m e n t s a n d

standards in to the design

Our Technical team cam execute this

process

New Construction

SHIPBUILDING SUPERVISION

A wide range of combinations of Site

Team

Cho ice based on expe r i ence ,

background, educational qualifications

and nationality

Customized site team according to

Client requirements

Client’s pre-approval of team members

New Construction

Nine (9) vessels at Hyundai Heavy Industries (2010-11)

Completed

319,000 DWT VLOO*

New Construction

*Very Large Ore Oil Carrier

Four (4) vessels at Hyundai Mipo Dockyard (2010-11)

Completed

37,000 DWT BULK CARRIERS

New Construction

Two (2) vessels at Hyundai Heavy Industries (2011-12)

263,000 DWT VLOC*

OngoingNew Construction

*Very Large Ore Carrier

Six (6) vessels at Hyundai Mipo Dockyard (2011-13)

37,000 DWT BULK CARRIERS

New ConstructionOngoing

CONTACT

INDIA (HEAD OFFICE)

III/131, KALAMASSERYKOCHI - 683104

T: +91-484-6492607F: +91-484-2543609E: [email protected]

Contact: Sandith Thandasherry (MD & CEO)M: +91-9895343637E: [email protected]

S.KOREA (SITE OFFICE)

TMT SITE OFFICE, HYUNDAI HEAVY INDUSTRIES, ULSAN - 682792

T: +82-52-202-6768/69F: +82-52-2333413E: [email protected]

Contact: Pramod Chambath (Site Manager)M: +82-1047310692E: [email protected]

Marine Design & Constructions Pvt. Ltd.NAVGATHI