A Trusted FabricatorFor Malaysia Oil & Gas and Energy Industry
Shell & Tube Heat Exchanger
PETRONASPETRONAS Vendor
Thick Wall Pressure Vessel Class II & III
SLUG CATCHERClient : Petronas CarigaliDimension : 19,000mm TL x 5,300 ID x 148mm TWeight : 470 tonnesDelivery : 22 September 2010
ANOTHER NEW
WEIGHT RECORD
470 tonnes Old Weight Record 240 tonnes
RECYCLE GAS COMPRESSORKO DRUM (V-30233)Client : Malaysian Refining Company (MRC)Dimension : 2,500mm ID x 4,000 TL Weight : 90 tonnesDelivery : 8 June 2009
NEW RECORD
200 mm
Thick Wall Pressure Vessel
Strength
Company Profi le :
@ A p r i l 2 0 1 2
&Capabilities
Integrated Quality Systems
ISO 9001 : 2008ISO 14001 : 2004OHSAS 18001 : 2007, ASME ‘U’,’U2’,’S’,’R’ Stamps5S Japanese Management System
www.asturi.com.myMain Office :Lot 74-A, Jalan Gebeng 1/6,Gebeng Industrial Estate,26080 Kuantan, Pahang, MALAYSIATel : +(609) 5833 888Fax : +(609) 5833 999Email : [email protected]
KL Office :A1-2-1, Level 2, Block A1,Solaris Dutamas, Jalan Dutamas 1,50480 Kuala Lumpur, MALAYSIATel : +(603) 6207 9988Fax : +(603) 6207 9889Email : [email protected]
Awards & Recognitions
Winner of NPC Productivity 2005Winner of Human Resource Minister Award 2006Winner of Pahang Chief Minister Quality Award 2007Winner of National Quality Environment (5S) Award 2008The Best Vendor in Continuous Improvement 2008 by PetronasWinner of Industry Excellence Award 2008Winner of National Occupational Safety & Health (DOSH) Award 2009
Proven on Time Delivery Track Record“ ”“ Rated as the cleanest & most systematic fabrication yard by our clients ”
Rear View Inside Factory View
Front View
1
Table of Contents
Strength& Capabilities @ April 2012
Strength & Capabilities
2-3 1.Visit of VVIP
4-5 2.Financial Performance
6-11 3.Corporate Information
12-13 4.Safety & Health
19 7.Completed Products
22-23 9.Records & Special Achievements
24-29 10.Products : Pressure Vessels Heat Exchangers Process Skids Non Pressure Vessels
42-43 12.Manpower
44-47 13.Growth & Expansion
58-59 15.Defence : Tactical Bridging System
20-21 8.Manufacturing Experience
48-57 14.Civil : Project List Project Photos
6.Oil & Gas Division
Civil Division
Defence Division
18 30-41 11.Assets & Equipments
14-17 5.Organisation Structure
60-62 16.Well Services : Well Services
Well Services Division
2Strength & Capabilities
1. Visit ofVVIP
3
Visit of VVIP
Strength & Capabilities
Visit by Minister of Defence 2003, currently Prime Minister of Malaysia
Visit by Minister of International Trade & Industries 2008,currently Deputy Prime Minister of Malaysia
Visit by Pahang Chief Ministeraccompanied by VP Petronas1999
4Strength & Capabilities
2. FinancialPerformance
Financial Performance
5Strength & Capabilities
P a i d u p C a p i t a l M o v e m e n t
Paid Up RM 20M @ 6M USD Asset ValueRM 146M
Total Project FundingRM 219M
BankersRHB, Bank Islam, SME Bank, CIMB, Bank Rakyat, OCBC
Revenue (RM)2007 : 57M2008 : 150M2009 : 187M
2012 : 142M2010 : 159M2011 : 118M @ February 2012
2.8 2.8 2.8
8.8
20 20 20
0
5
10
15
20
2005 2006 2007 2008 2009 2010 2011
RM' M
illio
n
Year
6Strength & Capabilities
3. CorporateInformation
7
History of Asturi
Strength& Capabilities
December 1994AMB was incorporated
December 1995Office building and Block 1of the factory were completed
June 1996Commencement of Operation
December 1998Extension of Block 2 & 3factory buildings
August 1999Visit by The Right Honourable Dato’ Sri Adnan Yaakob,Chief Minister of Pahang
February 2000Authorization of ‘U’,’U2’,’S’,’R’ STAMPS from the American Society of Mechanicals Engineer (ASME)
September 2002Certified ISO 9001 : 2000 by BVQI
February 2003Visit by The Right HonourableDato’ Sri Mohd Najib Tun Razak, Minister of Defence, currentlyPrime Minister of Malaysia
October 2003Obtained Civil Class A License from the Malaysian Government (PKK)
June 2004Obtained Manufacturing Licenseof Special Equipment (Pressure Vessel) from People’s Republic of China
February 2005Awarded as Vendor to PETRONAS for Shell & Tube Heat Exchanger
April 2009Certified ISO 14001:2004, UKAS,DSM,OHSAS 18001:2007 by BVQI
September 2011Formation of first 2 subsidiaries- Asturi Truck & Crane Sdn.Bhd. (Rental Services for Heavy Truck & Crane)- Lapisan Warna Sdn.Bhd. (Specialised in Blasting & Painting Works)
December 2010Winner of NationalOccupational Safety & Health Malaysia (DOSH)
January 2011Extension of Block 9,10,11,12 & 13 factory building
January 2012Establishment ofWell Services Division
.
.
.
.
.
.
.
.
.
.
.YB Dato’ Sri Mohd Najib Tun Razak Deputy Prime Minister and Minister of Defence Visit on Jan 03
YB Dato’ Sri Adnan Yaakob, Chief Minister of Pahang Visit on August 99
YB Tan Sri Muhyiddin Yassin, Minister of International Trade and Industry Visit on July 08
May 2006Winner of National Productivity Award 2005 (Ministry of International Trade & Industry)
September 2006Winner of Human Resource Minister Award 2006(Human Resource Development Council)
December 2006Certified 5S Japanese Management System by National Productivity Corporation
April 2007Awarded as Vendor to PETRONAS for Unfired Pressure Vessel Class II and III
November 2007Winner of Pahang Chief MinisterQuality Award 2007 by The StateGovernment of Pahang
July 2008Visit by Tan Sri Muhyiddin Yassin,Minister of International Trade and Industry, currently DeputyPrime Minister of Malaysia
September 2008Extension of Block 4,5,6,7 & 8factory buildings
October 2008Winner of National QualityEnvironment (5S) Award 2008by Malaysia Productivity Corporation
November 2008Winner The Best Vendor in Continuous Improvement by Petronas 2007-2008
March 2009Winner The Industry Excellence Award 2008 for category Quality Management Award (MPC)organised by MITI
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. Background
Roc No. :326994-MAuditors :Parkar Randall ThomasEstablished :13 December 1994Solicitors : Ibrahim Kamaruddin & AssociatesOperation :June 1996Company Secretary : Symphony Corporatehouse ServicesPaid Up Capital :RM20 Million @ USD 6MBankers :RHB Bank Bhd.SME Bank Bhd.Bank Islam (M) Bhd.CIMB Bank Bhd.
Contact
Main Office :
Lot 74-A, Jalan Gebeng 1/6,Gebeng Industrial Estate,26080 Kuantan, Pahang, MalaysiaTel : +(60) 9-5833 888Fax : +(60) 9-5833 999Email : [email protected]
KL Office :
A1-2-1, Level 2, Block A1,Solaris Dutamas, Jalan Dutamas 150480 Kuala Lumpur, MalaysiaTel : +(60) 3-6207 9988Fax : +(60) 3-6207 9889
www.asturi.com.my
Mission Statement
8Strength & Capabilities
ASTURI is a Mechanical & Civil Engineering based company. Our aim is to be one of the best company in the country by : Producing high quality products and services which meet International Standards. Meeting all regulatory requirements of our customers' needs. Our hope is to see the company grow and at the same timecontribute meaningfully to the country.
Principle Activities
2
4
6
8
10
12
1
3
5
7
9
11
13
BOD(Board Of Director)
Tender
Production
Purchasing
Health, Safety & Environment
Marketing
Design
QA/QC
Finance
Maintenance
Defence
Well Services
Civil Works
Admin & IT
50 Engineers108 Technicals & Office Staff
..As at April 2012
182 Workshop Staffs7 Civil Work Staffs
..
Organisation Structure
Staff Strength
1
Mechanical Engineering &Fabrication of process
equipments
A S T U R I
2 3
C i v i lWorks
M i l i t a r yEquipmentsOil & Gas
Petrochemical andEnergy
WellServicesDivison
ASME 'U', 'U2', 'S', 'R',’NB’ Stamps by ASME since 2000.
DOSH Malaysia since 2001.
ISO 9001 : 2008, by BVQI
ISO 14001 : 2004, UKAS,DSM (Environment)
OHSAS 18001 : 2007, by BVQI
ETQM (Electronic Total Quality Management) since 2001.
Japanese 5S Management System since 2006.
Products
Systems
ISO 9001:2008
ASME ‘U’, ‘U2,’S’,’R’,‘NB’ Stamps
ISO 14001:2004, UKAS,DSM
OHSAS 18001:2007
5S Management System
DOSH Malaysia
9
Quality Policy
Strength& Capabilities
Quality Certifications
To ensure all products are manufactured in compliance with International Standards.
To ensure our products are delivered on time.
To ensure all our customers are happy with our products & services.
To ensure all staff are efficient, effective and responsible in carrying out their duties.
To ensure that excellent working culture is practiced, in line with current changes.
To ensure all work carry out are in line with strict safety enviroment requirements.
Appointed Vendor &Design Capabilities
10Strength& Capabilities
Appointed Vendor to Petronasfor Heat Exchanger
Date Awarded 2 February 05
Reference 001-05-01-050
Scope of Work Fabrication, installation and Maintenance Shell and Tube Heat Exchanger inclusive of Retubing.
Petronas Vendor Shell & Tube Heat Exchanger
Appointed Vendor to Petronasfor Pressure VesselDate Awarded 29 March 07
Reference 001-07-01-072
Scope of Work Manufacture of Unfired Pressure Vessel Class II and Class III
Petronas VendorPressure Vessel Class II & III
Design Capabilities
PVEliteCodeware COMPRESS 2011Autodesk Inventor Professional 2011CADWorx Plant 2010Caesar II 5.3Tank 3.1 (API 650/653 )HTRI Suite 6.0 (Heat Transfer Research Institute) Nozzle Pro 8.0Staad Pro 8.0Autocad 2010Ansys 13.0
...........
Awards & Recognitions
11Strength & Capabilities
The Best Vendor inContinuous Improvement
2008 by Petronas
Winner of NPC Productivity
Award 2005
Winner of Human Resource
Minister Award 2006
Winner of Pahang Chief Minister
Quality Award 2007
Winner of National Quality
Environment (5S) Award 2008
Winner of Industry Excellence
Award 2008 National Occupational Safety & Health
(DOSH) Award 2009
MD receiving award from Deputy Prime Minister
MD receiving award from Prime Minister
MD receiving award from Director General of MPC
MD receiving award from Chief Minister of Pahang
MD receiving award from Secretary General Ministry of Human Resource
MD receiving award from Minister of International and Trade Industry
12Strength & Capabilities
4. Safety &Health
“SAFETY IS EVERYONE RESPONSIBILITY”
Safety & Health Policy
Prevention of Pollution and Injuries
Legal Compliance
Continual Improvement
Minimize the potential pollution to environment,injuries fromour activities,services and products.Maintained proactive system to report, record and take the appropriate action about the accident, incident and near-misses in order to prevent injuries and damage of our properties.
Commit to comply with all Environment & Occupational Safety and Health laws, regulation and other requirements.
Implement and periodically review our HSE Management System for continual improvement.
Communication
Awareness of Employees
Communicate our HSE policy and practices to all employees, contractors, suppliers and interested parties.
Instill HSE awareness among our employees about importance of managing their safety and health.
Provide training in the relevant environmental aspects & Occupational Safety and Health hazard in order to improve their awareness abut applicable impacts & risks from our activities, products and services.
To enable each employee performing their duties and responsibility accordingly.
Asturi is committed towards maintaining of Occupational Safety and Health Management System (OHSAS 18001). We are committed to : -
Use of Proper PPE Use of Tubular Scaffolding
Use of Body HardnessNatural Lighting for Conducive Working
Proper Arrangement of Plate for Safe Storage
Tube Caging for Safe Handling
Compulsory Training for Machine Operators
Safety & Health
13Strength & Capabilities
Working inConfine Space
Project Cummulative Safe Manhour5,150,922 until March 2012
Current Overall Cummulative Safe Manhour384,097 23 November 2011 - March 2012
Previous Overall Cummulative Safe Manhour4,766,615 February 2001 - November 2011
14Strength & Capabilities
5. OrganisationStructure
TenderManager : Mohd Kamal Nor B.Eng. (Hons) Chemical ProcessUniversiti Kebangsaan Malaysia (UKM)
Admin & ITExecutive Director : Fatiha SharifBSc. of Commerce (Marketing)Deakin University Australia
FinanceManager : Norasidi Abdul RaniB.A (Hons) Business Accounting, University Lincolnshire & Humberside, UK
QA/QCManager : Ezani MahazanBSc. (Hons) Mechanical EngineeringUniversiti Techonologi Malaysia (UTM)
ProductionManager : Sirajulhuda Mustapa Eng. (Hons) Chemical EngineeringUniversiti Sains Malaysia (USM)
HSEManager : Mohamad SallehDiploma Power Electrical UTMProfessional Cert. OHSAS , NIOSH
PurchasingManager : Zakarno Awang Chik STPM, Credit Management Skill, Recovery & Collection Management
DesignManager : Nik Mohd Ashraf B.Eng (Hons) Mechanical EngineeringUniversity Industry Selangor
MarketingExecutive Director : Fatiha SharifBSc. of Commerce (Marketing)Deakin University Australia
B o a r d O f D i r e c t o r s
1234
5678
910
Civil EngineeringManager : Ir.Razali BaharomBSc. Civil Engineering, Universityof Technology Melbourne, Australia
DefenceManager : Mejar SazaliDiploma Strategy Study,Armed Forces Staff College
1112
Well ServicesTechnical Director : Samsudin Mat16 years experience
Dato’ Md. Sharif ShamsuddinDate: Chairman
Dato’ Ramlan OthmanMaster of Public Administration University of Southern, California
Managing DirectorDato’ Md Sharif B.A (Hons) Anthropology & SociologyUniversity Malaya
Executive DirectorFatiha SharifBSc of Commerce (Marketing) Deakin University, Australia
Ir. Razali BaharomBSc Civil Engineering, University of Technology Melbourne, Australia
Technical DirectorKamal NorB.Eng.(Hons) Chemical Process ,University Kebangsaan Malaysia
Standing From Left :
Miss Fatiha Sharif (Executive Director), Dato’ Dr.Yahya Nordin (Director) ,Miss Teoh (Secretary), Mr.Ir.Razali Baharom (Executive Director)
Sitting From Left :
Dato’ Ramlan Othman (Chairman) , Dato’ Md. Sharif Shamsuddin (Managing Director)
BOARD OF DIRECTORS 2012
Dato’Sharifah FatimahShareholder
Kamal NorTechnical Director Tender Manager
Nik AshrafDesign Manager
SirajulhudaProduction Manager
EzaniQA/QC Manager
SallehHSE Manager
NorasidiFinance Manager
ZakarnoPurchasing Manager
SamsudinWell Services Manager
Mejar SazaliDefence Manager
DirectorDato’ Dr. Yahya NordinPHD (Local Govt.)University of Wales Ins. of Science & Technology
Functional Structure
15Strength & Capabilities
ST 01- 12 (R13)Effective Date : 22 March 2012
Approved by :
Dato’ SharifManaging Director
Business Development Structure
17Strength & Capabilities
Approved by :
Dato’ SharifManaging Director
ST 02 - 12 (R09)Effective Date : 22 March 2012
2. Subsidiaries 3. Incubators
Rental for Heavy Lift, Truck and Crane (51%)
Specialised in Blasting &Painting Works (70%)
Internal Process SeparationsManufacture
Design Engineering Services (70%)
891026 K
Roof Truss Manufacturing and Supply Services
Property & Development
HoldingDedari
Plant Maintenance Services
5. Principals
Boiler Designer
Flare Stack Manufacture
Tactical Bridging System195996-D
Property & Development
ONGSHA
1. Specialisation
SDN.BHD. 771613-X
Steel Structure Sdn.Bhd.
Design, installation of structure steel
Sdn.Bhd. 980969-D
Oil & Gas
Well Services
Civil Works
Technology by BV
Sdn.Bhd.
EDES TECHNOLOGYSdn.Bhd.
6. Agencies
Logistic
TOTAL LOGISTICSRESOURCES (KL) SDN.BHD. 713788-T
Logistic
510506-DSDN.BHD.
Trading Services
779447-MSDN.BHD.
4. Associates
Transport
Manpower Supply Services
Manpower Supply
Trading and Supply Services
PEACE UNITYEXTERNAL ENTERPRISE
779447-M
474269-M
SDN.BHD. ENGINEERING
S E T I A
Monitoring & Operation Structure
16Strength& Capabilities
ST 03 - 12 (R13)Effective Date : 22 March 2012
Approved by :
Dato’ SharifManaging Director
SHOP FLOORMEETING
CH : SirajulhudaSec : Adawiah
PROJECTTEAM MEETING
CH : Project LeaderSec : PN Engineer
PROJECTMEETING
CH : KamalSec : Adawiah
PT 1 : SirajulhudaPT 2 : EzaniPT 3 : KamalPT 8 Sirajulhuda
MARKETINGCOUNCIL
CH : Ms.FatihaSec : Kalvin
TECHNICAL DIRECTOR
MANAGING DIRECTOR
ISO 9001:2008COUNCIL
5 SCOUNCIL
QUALITY ASSURANCE
(QA)
MR : KamalSec : Mahamud
CN : SallehSec : Fauzieana
CH : Dato’ SharifSec. : Muaz
EXCOMEETING
MR :KamalSec : Muaz
HSE COUNCILISO
14001:2004OHSAS
I8001 : 2007
CH : SallehSec : Laila
DEPARTMENTMEETING
CH : HOD DeptSec : Ad Exec
PURCHASINGCOMMITTEE
CH : ZakarnoSec : Anis
Decision & Monitoring Level >>>
TECHNICAL ADVISOR
TRAININGDAY
CH : Dato’ SharifSec : Zatul
p e r i o d i c a l l y m o n t h l y
p e r i o d i c a l l y w e e k l y
p e r i o d i c a l l y w e e k l y
Wednesday Every 6 month Monthly Every 6 month
Thursday Friday Wednesday
Wednesday Every 6 month Monthly Every 6 month
1 MARKETING
M : Fatiha2 Ex
2 TENDER
M : 72 Ex
KamalEngineers
3 DESIGN
M : Nik Ashraf7 Engineers7 Draughtman2 Ex
4 PURCHASING
5 PRODUCTION
M : Zakarno2 Engineers
STORE4 Storekeepers3 Ex
MACHININGEx : Fadli7 machinists
MATERIAL INSPECTOR2 Material
Inspectors
M : Sirajulhuda9 Engineers2 Ex
6 QA/QC
7 HSE
M : Ezani9 Engineers
12 QC Inspectors3 Ex
M : Salleh4 Safety officer2 Ex8 Security Guards
6 Utility Workers
UTILITYEx : Rusdi
MAINTENANCEEx : Zulkiflee
Technicians
TRANSPORTATIONEx : Aziz11 Drivers-office15 Drivers - Cranes & Trucks
8 FINANCE
9 ADMIN
10 IT
M : Sidi82
ExFinance Officer
M : Fatiha4 Ex1 Utility Woker
M : Fatiha1 Ex
WELL SERVICES
CIVIL
DEFENCE
11
12
13
M: Samsuddin2 Engineers1 Ex
M: Ir Razali20 operation
staffs
M: Mejar SazaliMejar Tajuddin
Operation Level >>>
18Strength & Capabilities
OIL & GASD I V I S I O N
6. CompletedProducts
19Strength & Capabilities
Launcher &Receiver
71 units
Completed Products
Completed 1023 products
Shell & Tube Heat Exchangers
364 units
Process Skids
35 units
PressureVessels
497units
Tank & NonPressure Vessels
16 units
Others
40 units
20Strength & Capabilities
7. ManufacturingExperience
21Strength & Capabilities
Manufacturing Experience
PRODUCTS EXPERIENCECompleted 1023 products Shell and Tube Heat Exchangers - 364 units Pressure Vessels - 497 units Launcher & Receiver - 71 units Process Skids - 35 units Tank (Non PV) - 16 units Others - 40 units
Sizing ExperiencePressure Vessel 29+3 clad mm thick x 6,040 mm ID x 9,500 mm TL with 110 tonnesNon Pressure Vessel Site Built Tank size 15,000 mm ID Flare Stack to 65,400 mm L
Heaviest ExperiencePressure Vessel 148 mm thick x 5,300 mm ID x 19,000 mm TL with 470 tonnes Non Pressure Vessel (Flare Stack) 22 mm thick x 5,800 mm ID x 6,540 mm TL with 165 tonnes
Thickest ExperiencePressure Vessel 200 mm thick x 2,500 mm ID x 4,000 mm TL with 90 tonnes at 4,167 psi test pressure, ASME Section VIII, DIV.2Cladded Pressure Vessel 140 + 3 mm thick x 3,450 mm ID x 9,000 mm TL with 160 tonnes at 1,885 psi test pressure, ASME Section VIII, DIV.2
MANUFACTURINGEXPERIENCE
5000 numbers of tubes (10,000 nos of tubes holes),strength weld + light expansion
Largest Heat Exchanger Experience
Scope of Work Engineering Design (Process & Mechanical) Pressure Vessel Static Equipments (Vessel, Heat Exchanger, Filter,etc.) Piping and Structure Electrical and Instrumentation
Largest and Biggest Process Skid Experience
Record of delivery against contractual delivery from 20 weeks ARO to 13 weeks ARO(Amine Stripper for Ethylene Malaysia Sdn.Bhd.)
Best Delivery Achievement
10.4m L x 7.6m W x 5.7m H (4 units) - 800 tonnes
Process Skid Experience Fuel Gas Skid Water Injection Skid Vacuum Pump Skid Glycol Re-Gen Skid Reboiler Skid Membrane Skid
Cladded MaterialsDuplex MaterialsChromo MaterialModified Austenistic MaterialsNon Ferrous MaterialsCuNiHastelloy B
Special Materials Experience
Longest ExperiencePressure Vessel (Splitting Column) 39 + 3 clad mm thick x 1,800 mm ID x 56,000 mm OL with 106 tonnes
Workshop Performance (Tonnage Range)
Workshop Performance (Material Thickness)
54% (32mm and below)
8% (75mm and above)
38% (32mm to 75mm)
Pressure Vessel48%Heat Exchangers
37%
Maintenance8%
Process Skids3% Structural
2%
Type of Products
Carbon Steel42%Stainless Steel
35%
Clad (CS + SS)15%
OthersAlloy 904L, Inconel 600,Incoloy 800/825, Alloy 2205 (Duplex)Alloy 2507 (Super Duplex),CrMo, CuNi(SB700), 8%
Type of Materials
22Strength & Capabilities
8. Records &Special
Achievements
23Strength & Capabilities
Records & Special Achievements
records & special achievements
Recycle Gas Compressor KO Drum
RECORD 2Thickest Record 200 mm
Dimension WeightDelivery
:::
200 mm Thick x 2,500 mm ID x 4,000 mm TL90 tonnesJune 2009
RECORD 1PV Heaviest Record 470 tonnes
Slug CatcherDimension WeightDelivery
:::
148 mm Thick x 5,300 mm ID x 19,000 mm TL470 tonnesSeptember 2010
Production Cooler
RECORD 4Largest Heat Exchanger Record 5000 tubes
Dimension WeightDelivery
1,700 mm ID x 14,159 mm OL88.5 tonnesAugust 2009
RECORD 3Largest & Biggest Process Skids 800 tonnes
Acid Gas Removal Skid (Membrane Skid) System Dimension Total WeightDelivery
:::
10.4 m L x 7.6 m W x 5.7 m (H)4 units 800 tonnesApril 2007
RECORD 6Longest Record 56,000 mm
RECORD 5Sizing 6,040 mm ID Record
Flash KO DrumDimension
WeightDelivery
:
::
29+3 clad mm Thick x 6,040 mm ID x 9,500 mm TL110 tonnes 2002
Splitting ColumnDimension
WeightDelivery
:
::
39+3 clad mm Thick x 1,800 mm ID x 56,000 mm OL106 tonnesApril 2007
24Strength & Capabilities
8. Products
25Strength& Capabilities
Pressure Vessels
Slug Receiver
V2060 Slug Catcher Sponge Oil Absorber Naphta Recovery Drum
Slug Catcher
Splitting Column
Recycle KO Drum
Inlet Separator Inlet Separator HP Gas Separator
Fractionation Column
Dearator Tower Dearator
Flash KO Drum
Flash KO Drum
Amine Stripper
Utility Storage Tank
Flash DrumDearator Tower
Stripper
Condensate Filter
Dearator ET-V-703
Reactor Vector
Volume Air Tank
Slug Separator & Test Separator
26
Pressure Vessels
Strength & Capabilities
Heat Exchangers
45 tonnes Bundle Puller
Production Cooler
Gas Cooler ReboilerDepropanizer & Deethanizer Stripper Boiler
EDC Quencher Cooler Tube Bundle HE MPA/Steam Exchanger Water Cooler Ref.Condenser
Multi Tube Exchanger Heat Exchangers ready for delivery
HCL Column ReboilerFeed/Steam/Viss Exchangers
Regen Gas Heater Tube BundleLP Production Cooler
HP Gas Cooler
Insertion of Tube Bundle
27Strength & Capabilities
Process Skids
Test Separator Seawater Injection Treatment Skid
Membrane Valve Skid
Reboiler Skid
Fuel Gas Skid Membrane Test Skid
Membrane Skids
Regeneration Skid
28
Process Skids
Strength & Capabilities
Non Pressure Vessels
HP / LP Flare Stack
Installation of Ladder & Platform -PDH Project
PDH Steel Structure Flare Stack System
Reheating Furnace Derrick Structure Flare Stack Stainless Steel Storage Tank
29Strength& Capabilities
Slug Catcher Heat Exchangers
Bundle Puller 45T
Membrane Valve Skid
RecycleKO Drum
Tube Bundle
30Strength & Capabilities
10. Assets & Equipments
Assets & Equipements 1/2
31Strenght & Capabilities
Assets & Equipements 2/2
32Strength & Capabilities
33
Assets & EquipmentsPictures 1/5
Strength & Capabilities
1.1 Plate Rolling Machine 85mm 1.2 Plate Rolling Machine 35mm 2.0 Rotator 5 -600 tonnes 3.0 Turntable 1 - 5 tonnes
4.0 Overhead Crane 5 -50 tonnes 5.1 SAW - auto Welding 5.2 FCAW Welding Machine 5.3 TIG Welding Machine
5.4 SMAW Welding Machine 5.5 Gouging Machine 5.6 Plasma Gouging Machine 5.7 Auto Mechinized Nozzle Welding
34
Assets & EquipmentsPictures 2/5
Strength& Capabilities
5.8 Column & Boom 4m x 4m 5.9 Welding Generator 5.10 Electrode Oven 6.1 CNC Profile Cutter Machine
6.2 Manual Plasma Machine 7.1 Jacking System 50 -150 tonnes 7.2 Hydraulic Jacking System 8.1 Manual Drilling Machine
8.2 CNC Drilling Machine 8.3 Vertical Lathe Machine 8.4 Horizontal Lathe Machine 8.5 Pipe Bevelling Machine
8.6.1 Flange Facing Machine 18”-74” 8.6.2 Flange Facing Machine 4”-22” 9.1 Press Machine 350tonnes 9.2 Tube Expander
9.3 Tube Facing Cutter 9.4 Tube Puller 9.5 Tube Bending Machine 9.6 Portable Magnetic Drill
9.7 Bundle Puller 10.1 Torque Wrench 10.2 Air Compressor 10.3 Hi Force Hydraulic Pump
Assets & EquipmentsPictures 3/5
35Strength & Capabilities
Assets & EquipmentsPictures 4/5
36Strength & Capabilities
10.4 Pallete Truck 11.1 Air Compressor (655CFM Hino) 11.2 Air Compressor (390CF Isuzu)
11.5 Blasting Pot - 300 LBS
11.7 Gauge & Hydrometer
11.3 Garnet Cleaner/Separator
11.4 Blasting Pot - 100 LBS
11.6 Blasting Pot - 600 LBS
12.1 UT Thickness Gauge 12.2 Digital Hostest 12-20mm
Assets & EquipmentsPictures 5/5
37Strength & Capabilities
13.1 Vernier Caliper 13.2 Digital Caliper 14.1 Clamp Meter
14.2 Densito Meter 15.1 Welding Gauge 16.1 Portable Digital Ultrasonic 17.1 Spectro Ar Spark Optical Emission
12.3 Manual Hostest 10-62mm 12.5 Temperature Infrared 12.6 Pressure Recorder 300-1000psi 12.7 Pressure Gauge 60-15000psi
38
Assets & Equipments
Strength & Capabilities
39
Assets & EquipmentsPictures -Heavy Vehicles (1/2)
Strenght & Capabilities
Mobile Crane TADANO 120TPH PMA 1766
Rough Terrain Crane KATO 45TPH PMA 1820
Mobile Crane TADANO 25T 1. PMA 277922. SL PMA 25211
Managed by :
40
Assets & EquipmentsPictures -Heavy Vehicles (2/2)
Strength & Capabilities
Skylift 18m PMA 10037
Skylift 25m PMA 22718 Low Loader 5 Axle (flat & lower deck)
Low Loader 3 Axle
Hydraulic multi axle trailer 192 wheeler
Forklift 5 tonnes Forklift 3 tonnes
Lorry 7 tonnes Lorry 3 tonnes
Managed by :
Assets & EquipmentsTransports
41Strenght & Capabilities
2008 2009 2010 2011
1 Transportation
1.1 Toyota Alphard 2 2
1.2 Toyota Innova 1 3 4
1.3 Toyota Hilux 1 2 3
1.4 Mercedes Benz Vito 119 1 1
1.5 Ford Ranger 1 1
1.6 Honda CRV E-RD1 1 1
1.7 Proton Waja 1 1 2
1.8 Nissan Vanette C22 1 1
Total 15
Asset : Accumulated List
NO ASSET NAMEPuchase Year Accumulated
Unit
42Strength & Capabilities
11. Manpower
Manpower
43Strength & Capabilities
List of Manpower (No.of Manpower)
DESIGNATION EXPERIENCE Under 5 years Over 5 years TOTAL
OFFICE
Top Management 0 5 5Management (Head of Department) 0 10 0HSE 9 7 16Supporting Staff 18 46 64
Engineer 25 24 53Design Engineer 11 8 19Production Engineer 6 5 11QC Engineer 5 5 10TQ Engineer 3 2 5 QC Inspector 4 4 8
Drafter 6 5 11Draftman 4 3 7Draftwoman 2 2 4Supervisor 0 3 3
TOTAL of Office Staff 162
WORKSHOP
Welders 31 19 50Foreman 0 5 5Helpers 20 43 63Fitters 22 15 37Machinist 9 2 11Semi Skill 1 5 6Scaffolders 2 2 4
TOTAL of Workshop Staff 176
TOTAL Staff (OFFICE + WORKSHOP) 338
Manpower as at April 2012
52% 48%
OfficeStaff
WorkshopStaff
44Strength & Capabilities
12. Growth &Expansion
Factory Layout
ST 18/1-08 (R4)Effective Date : 18 October 2011
45Strength & Capabilities
Factory Buildings (1/2)
46Strength & Capabilities
Block 1 : Storage/Receiving Material Area (1190m²)
Block 2 : Marking & Cutting Area, Store adn QC/PN/DN Office (1790m²)
Block 3 : Fabrication Workshop (3420m²)
Block 4 : Fabrication Workshop (3420m²)
Block 5 : Fabrication Workshop (3795m²)
Note : New Block 6,7,8 Factory Building completed @ September 2008
Block 6 :Tube Bending Area (720m²)
Block 7 :PWHT (720m²)
Block 8 :Blasting & Painting (720m²)
Factory Buildings (2/2)
47Strength & Capabilities
New ExtensionOffice 605 m Block 9,10,11,12,13 : Fabrication WorkshopFabrication for special materials exotic and non ferrous materialse.g : titanium, zirconium, alloys and etc
2
18Strength & Capabilities
CIVIL WORKSDIVISION
13. Civil Works
48Strength & Capabilities
Civil Works Project (1/2)
49Strength & Capabilities
AWARD DATE CONTRACTUAL ACTUAL
1 Pembinaan Bangunan Kilang Baja LKPP, Lepar, CompletedPekan, Pahang
2 Pembinaan Bangunan Kilang Kinsteel Bhd. CompletedKuantan, Pahang
4 Cadangan Membina Jalan Sambungan JKA-57/2005(T) 15/06/05 15/06/05 14/06/06 13,3 Completed
(Missing Link) Dari Jalan Awan Besar
Ke Lebuhraya Shah Alam, Kuala Lumpur
- Cadangan Membina "Ramp" Dari
Jalan 2/149, Bandar Baru Sri Petaling
Ke Lebuhraya Shah Alam Ke Arah Cheras
(Di Persimpangan Bertingkat Awan Kecil)
Kuala Lumpur Secara 'Design And Build'
(2004/A146)
5 Proposed Third Lane Widening Between PLUS/WU/UUD/0425/C2,C3/05-011 01/09/05 01/03/07 01/03/07 7,5 CompletedTanjung Malim and Slim River - Package 4
Sub-Contract for Drainage Works
J/PHG/LKPP/DK-03/2001
PHG/KKB/010-DK/2003
26/07/2001
14/01/2003
25/07/2002
15/09/2003 15/09/2003
25/07/2002
10,5
6,9
VALUEMillion RM STATUSDATENO PROJECT DESCRIPTION CONTRACT NO.
6 Proposed Third Lane Widening BetweenPLUS/WU/UUD/0425/C2,C3/05-011 01/09/05 01/06/07 01/03/07 12,1 CompletedTanjung Malim and Slim River - Package 4
Sub-Contract for Clearance and Earthworks
7
- 01/05/07 01/05/07 01/09/08 5,6 Completed
Extension Factory Phase 3 - Block E, F, G, & H at Lot 74-A, Gebeng Industrial Estate, Kuantan, Pahang Darul Makmur
Merekabentuk, Membina dan Menyiapkan Projek Lebuhraya Pantai Timur Fasa 1 DariKarak-Kuantan dan Ke Sempadan Pahang/Terengganu.Subcontract For Earthworks and DrainageWorks For Package 1F1 (Ch 148+885 to152+600)
MTD/ECE/SC/RW-1F1/01.001 01/06/03 03/04/04 31/03/04 22,7 Completed3
Civil Works Project (2/2)
50Strength & Capabilities
AWARD DATE CONTRACTUAL ACTUAL
VALUEMillion RM STATUSNO PROJECT DESCRIPTION CONTRACT NO.
8 Rancangan Bekalan Air Jerantut:- S/PHG/JBA/IP/DK/011/2007 08/05/07 28/07/08 31/07/10 29,2
CompletedPakej A(i): Cadangan Membina dan Menyiapkan Loji Batu Embun Daerah Jerantut, Pahang Darul Makmur
9 Menyiapkan Kerja-Kerja Terbengkalai Projek F/PHG/DK/1107/2009 02/04/09 26/05/10 30/04/10 15,8
CompletedNaik Taraf Jalan Kg. Tg. Lumpur Laluan 3 (C13),Kuantan, Pahang Darul Makmur
10 Extension Factory Phase 4 - Block K, L, M & N at Lot 74 - A, Gebeng Industrial Estate, Kuantan, Pahang Darul Makmur
- 15/06/09 01/09/10 - 10,5 80% progress
11 Pembinaan Bangunan IM Kilang Lot 49545 - Siklon Separator
12
13 Proposed Infrastructure Development for Phase 3 of
Malaysia International Aerospace Centre (MIAC) atSultan Abdul Aziz Shah Airport, Subang, Selangor
MIAC/PCD/C/03/2011
- 15/06/09 01/09/10 3,2 80% progress
Pembinaan Unit Kediaman Kos Sederhana Rendah Di Wakaf Sg. Nibong, Pulau Pinang.
JKR/IP/CKUB/72/2010 01/06/10 28/11/11 - 14 New
06/06/11 20/6/11 19/2/12 13,9 New
14 The Proposed Construction And Completion of Package 1 of The Marine Fish Hatchery And Fish Seed Marketing Centre At Merchong, Pekan, Pahang For The East Coast Economic Region Development Council (ECERDC)
4600000212 17/11/11 15/12/11 14/12/13 31,4 New
15 Kerja-kerja Membekal, menghantar danmemasang papan sesekat untuk tangki Pengentalan Serta Kerja-Kerja BerkaitanDi Loji-Loji Jabatan Bekalan Air Pahang
S/PHG/JBA/IP/DK/008/2011 18/11/11 02/5/12 - 1,884,35 New
Civil Works Pictures (1/7)
51Strength & Capabilities
LEBUHRAYA PANTAI TIMUR FASA 1 Pakej 1F-1 (Ch 148+885 ke Ch 152+600)
Kerja Tanah Kerja Tanah
Kerja Tanah
Memasang Konkrit Culvert Memasang Konkrit Culvert
Menurap 75mm ACBC
LandscapeJambatan
JALAN AWAN BESAR KE LEBUHRAYA SHAH ALAM, KUALA LUMPUR Design and Build’ (2004/A146)
Siap dibina Siap dibina
Siap dibinaPavement
Civil Works Pictures (2/7)
52Strength & Capabilities
Memasang Konkrit Culvert
Menurap Crush Run
Kerja Tanah
NORTH-SOUTH EXPRESSWAY TANJUNG MALIM AND SLIM RIVERPakej 4 PLUS/WU/UUD/0425/C2,C3/05-011
Siap dibina
Kerja Slop
Memasang Box Culvert
RANCANGAN BEKALAN AIR JERANTUT PAHANGPakej A (i) S/PHG/JBA/IP/DK/011/2007
Chlorine Contact Tank Water Intake
Bangunan Pentadbiran Tangki Air
Filter Gallery
Civil Works Pictures (3/7)
53Strength & Capabilities
PEMBINAAN BANGUNAN KILANG KINSTEEL BHD. KUANTAN, PAHANG
PEMBINAAN BANGUNAN KILANG BAJA LKPP,LEPAR, PEKAN, PAHANG
Pembinaan sedang dijalankan
Memasang dapur Memasang peralatan
Kerja Piling Kerja Foundation
Pembinaan sedang dijalankan Siap dibina
Civil Works Pictures (4/7)
54Strength & Capabilities
Kerja sedang dijalankan Kerja pembinaan hampir siap
Siap dibina
JALAN TANJUNG LUMPUR C13, KUANTAN, PAHANGF/PHG/K/DK/1107/2009
Kerja Tanah
Siap dibina
Kerja sedang dijalankan
Footing
EXTENSION FACTORY PHASE 4BLOCK K,L,M & N at Lot 74-A, Gebeng Industrial Estate, Kuantan
Proses Piling
Pembinaan Structure
Footing
Footing
Pembinaan Structure
Civil Works Pictures (5/7)
55Strength & Capabilities
PEMBINAAN BANGUNAN INDERA MAHKOTA, KUANTANSIKLON SEPARATORS SDN BHD
Pembinaan Pejabat
Tapak Pembinaan
Pembinaan Pejabat
Pembinaan Structure
Pembinaan Structure
Proses Pembinaan
Kilang Siklon
Pejabat Sikon Pandangan Dalam Kilang
Civil Works Pictures (6/7)
56Strength & Capabilities
PEMBINAAN UNIT KEDIAMAN KOS SEDERHANA RENDAHDI WAKAF SG. NIBONG, PULAU PINANG
naanibmeP sesorP
naanibmeP kapaT
naanibmeP sesorP
erutcurtS naanibmeP
gililP sesorP
naanibmeP sesorP
naanibmeP sesorP
naanibmeP sesorPPembinaan unit kediaman kos rendah di Wakaf Sg.Nibong
57Strength & Capabilities
Civil Works Pictures (7/7)
PEMBINAAN INFRASTRUKTUR FASA 3 MALAYSIA INTERNATIONAL AEROSPACE CENTRE (MIAC) -LAPANGAN TERBANG SULTAN HJ. ABDUL AZIZ SHAH, SUBANG, SELANGORMIAC/PCD/C/03/2011UNIT KEDIAMAN KOS SEDERHANA RENDAH
18Strength & Capabilities
DEFENCED I V I S I O N
14. TacticalBridgingSystem
56Strength & Capabilities
58Strength & Capabilities
Tactical Bridging System
59Strength & Capabilities
KEMENTERIAN PERTAHANAN MALAYSIA
TS BR 90 Tactical Bridging
Floating Double Span Bridge Bridge
Vickers Alvis Defence System, UK
ATLSB (Axially Extensioned Long Span Bridge) BR90
BAE SYSTEMSTactical Bridging System
Principles
Tactical Single Span Bridge
Bridging Vehicle
MINISTRY OF DEFENCE MALAYSIA
18Strength & Capabilities
WELLSERVICESD I V I S I O N
15. WellServices
56Strength & Capabilities
60Strength & Capabilities
Well Services
61Strength & Capabilities
Fishing
5/16” Braided Line Heavy Duty Fishing Services
0.140” Slickline Fishing Service
Slickline
0.108” Slickline Services
0.125” Slickline Services
Asturi Well Services Division Provides the Following Equipments :
5/16” Cabin Type Single Drum Unit
0.108” and 0.125” Double Drum Slickline Unit
0.140” Skid and Accessories
Welhead Control Panel to operate dual & triple BOP
15K High Pressure Test Pump
3.5” PCE 10K H2s Service
5.5” PCE 10K H2s Service
70ft High Reach Hydraulic Telescopic Wireline Mast
Grease Injection Skid
Grease Injection Flow Control Head 10k H2s Service
3.5" Dual and Tripple Ram Compact BOP 10k H2s Service
5.5" Dual and Tripple Ram Compact BOP 10k H2s Service
Turn Around Sheave 10k H2s Service
4 Cylinder and 6 cylinder Water cooled Perking engine zone 2 certification
Asturi Well Services Division Provides the Following Tools :
Basic Tools :
1.50”
1.75”
1.875”
Type of Tools
QLS and Treaded
Pulling Tools :
From 1.25” to 7.00”
Heavy duty pulling tools, Spring Jar, etc
1.50”
2.125”
2.50”
Our Heavy Duty Fishing and Slickline Services, make it straight forward for
Drilling, Production and Workover to meet our customer's needs, because our
highly experience peoples use reliable and fit for purpose equipment that can
service a routine operation of the most challenging pressure control situations.
With the full complement of fishing and slickline equipment +
wellsite experience people will help to reduce expenses for customers
because we can get the job done right this is our full commitment to customer
and to set us apart from our competitors
Well Logging & Well Log Analysis
Asturi Well Services Division Provides the Following Applications :
Tubing clearance
Running / pulling flow control devices
Opening and closing Sliding sleeves
Bottom hole Pressure surveys and Fluid Samples
Tagged fluid Levels
Setting / Pulling Tubing Plugs
Depth Determination
Broaching and Swedging
Sand Bailing
Braided Line and Slickline Fishing
Gas Lift Installation
Paraffin Removal
Asturi Well Services Division also provide Equipments and Tool Rentals
62Strength & Capabilities
Well Logging
Multifinger Calipers
Cased -hole Logging
Production Logging
Perforating
Pipe Recovery Operations
Well Log Analysis
Formation Evaluation
Full Wave Processing and Analysis
Old-Logs Translation and Interpretation
Multi-well Analysis
Well Log Processing and Analysis
Cased and Production Well Log Analysis
Downhole Pressure and Temperature Gauge
Pressure Build up Survey
Flowing Pressure Survey
Static/Flowing Gradient Survey
Modified Isochronal Test
Pressure Transient Analysis
“proven on tim
e delivery track record”
rated as the cleanest & most systematic fabrication yard by our clients