32
1 David A. Schragger

New projects 11 14

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: New projects 11 14

1

David A. Schragger

Page 2: New projects 11 14

2

BOX _ SUMMER 2014

D&D: David A. Schragger, Doron Serban

Solidified Kinetic Structures

Catia, Grasshopper, Rhino

WORLD TAKES

Page 3: New projects 11 14

3

Page 4: New projects 11 14

4

Page 5: New projects 11 14

5

Page 6: New projects 11 14

6

Page 7: New projects 11 14

7

Page 8: New projects 11 14

8

Page 9: New projects 11 14

9

Page 10: New projects 11 14

10

Page 11: New projects 11 14

11

Page 12: New projects 11 14

12

Page 13: New projects 11 14

13

Page 14: New projects 11 14

14

The Peddie School Residence Halls, Hightstown, NJ

Studio Hillier: DesignerPrincipal: Bob Hillier

Schematic Design, Design Development

Page 15: New projects 11 14

15

Page 16: New projects 11 14

16

Page 17: New projects 11 14

17

Page 18: New projects 11 14

18

Page 19: New projects 11 14

19

Page 20: New projects 11 14

20

Page 21: New projects 11 14

21

Page 22: New projects 11 14

22

Page 23: New projects 11 14

23

Page 24: New projects 11 14

24

The Kirby Math Building, Lawrenceville, NJ

Studio Hillier: DesignerPrincipal: Bob Hillier

Design Development, Construction Documents

Page 25: New projects 11 14

25

Page 26: New projects 11 14

26

Page 27: New projects 11 14

27

UP

DN

DN

UP 121110987654321

24 23 22 21 20 19 18 17 16 15 14 13

UP

UP

121110987654321

23 22 21 20 19 18 17 16 15 14 13

1413121110987654321

21 20 19 18 17 16 15

A300 3

A1

A

B

C

D

E

AA

BB

CC

DD

EE

1 2 4

B1

1A310

A3001

A560

1

24

3

FFF

7

2B1B 3B

4A310

3A310

CLASSROOM_A101

CLASSROOM_B103

CLASSROOM_B110

CLASSROOM_B109

CLASSROOM_B108

CLASSROOM_B107

GIRLSROOM

104

BOYSROOM

105

JC106

3 5 6

AAA

5.5A300

2

A560

7

8

5

6

23' -

2"

23' -

2"

22' -

3"

18' -

9"

8' -

10 1

/2"

VIF

5'

6' - 0" 19' - 8" 9' - 0" 7' - 6"

8.52°

FF'

12' - 39/16"

20' - 8"

20' - 8"

20' - 8"

20' - 8"

7' - 9"

6'20' - 9 1/16"

8.52°

8.52°

VIF

91' -

0"

86' - 4"

27' - 8"

CLASSROOM_A102

A3302

A400

6

A400

2

7

8

9

3

4

5

106 FG-5

A4001

A3501

A3503

5.6

A3504

A3505

106

100A100

G001

G001

G001

G003

G001

G001

G001

S002

G001

S001

G002

G002

G002

G003

G001

G003

G001G003

S002

S001

S001

S001

S002G002

M001

S001

M001

23' -

5 3

/4"

21' -

10"

20' - 111/4"

20' - 25/8"

20' - 25/8"

20' - 115/8"

26' - 10 3/4"

29' - 6 3/4"

ALIGN

25' - 9 3/4"

27' - 8"

8' - 8"

S002 S001 S001

S001

S001

S002

S001

A3506A3512

A3511

A3513

A3514

A3515

A3516

A3521

1A325

2A325

2A321

HALLWAY111

A3502

1' - 10"

1' - 10"

110

109

108

103

101

107

113

112

EXIS

TIN

G

EXISTING

EXPANSION JOINT

EXPANSION JOINT

8'CL

EAR

8.52°

8' - 8 7/8"

LINEOF CEILINGABOVE

MECHANICALSHAFT

3' - 7 1/8"

LINEOF BUILDINGABOVE

ENTRY STAIR100

5' - 8 3/8"

9' - 11 3/4"

8' - 11 7/8"

2A310

111

S001

S002

S001

S001

1A322

1A324

2A324

M003

M002

M001X

M001X

S001M

S001

S002

G101X

G101X

4' - 8"

15' - 0"

5' - 8"

15' - 0"

5' - 8"

15' - 0"

5' - 8"

15' - 0"

4' - 8"

2' -

8"6'

- 0"

4' -

0"6'

- 0"

3' -

8"6'

- 0"

4' -

0"6'

- 0"

2' -

8"

6' -

8"15

' - 0

"6'

- 8"

15' -

0"

6' -

8"

7' -

10"

6' - 0"

114

7A332

8A332

1A323

104

105

FE

FE

A3425

A3427

102

SAFTEYGATE

A1

A

B

C

D

E

AA

BB

CC

DD

EE

1 2 4

B1

1A310

FFF

7

2B1B 3B

4A310

3A310

3 5 6

AAA

5.55'

FF'6'

VIF

8' -

10 1

/2"

18' -

9"

22' -

3"

23' -

2"

23' -

2"

6' - 0" 19' - 8" 9' - 0" 7' - 6"

8.52°

VIF

20' - 8"

20' - 8"

20' - 8"

20' - 8"

7' - 9"

VIF

8.52° VIF

BASEMENT001

MECHANICAL002

001 FG-6

002 FG-6

A3301

5.6

002

G001X

G001X

G001X

40' -

6 1

/4"

35' - 0 1/8"5' - 0"

9' -

2 1/

8"

16' -

9 5

/8"

2A321

41' -

0"

41' - 5 7/8"

1' - 10 1/8"

1' - 10"

1' - 10 1/8"

2' - 43/4"

1' -

10 1

/8"

1' - 10 1/8"

1' -

10 1

/8"

1' - 10 1/8"STAIR

EXIS

TIN

G

EXPANSION JOINT

EXPANSION JOINT

5' - 8 3/8"

9' - 11 3/4"

8' - 11 7/8"

COMP'D FILL

COMP'D FILL

2A310

STAIR000

001A

1A322

1A324 2

A324

ELECTRICALROOM

003

STEAMROOM

004

G001X

G001X G001X

003

004

4' - 8"

1' - 4"1' - 4"

19' -

8 7

/8"

1' -

4"

18' -

7 1

/8"

1' -

4"1'

- 4"

6' - 7"

1' - 4"

5' - 3"

1A323

25' - 5"

22' - 23/4"

47' -

4 3

/8"

6' - 4" 4' - 0"

SYMBOL LEGEND

NEW WALL

EXITING WALLS TO REMAIN

ProjectTrue NN

SCALE:

DRAWN BY:

REVIEWED BY:

PROJECT NO:

SHEET NO:

© studiohillier 2014. ALL RIGHTS RESERVED

B

A

C

D

E

F

G

H

J

K

12345678

Sheet Title

Project

J. Robert Hillier - Architect

Signature, Date and Seal

www.studiohillier.com

studiohillier190 Witherspoon StreetPrinceton, NJ 08542

T 609.688.9999F 609.688.9990

DOCUMENT HISTORY:

Lic. No. 4385

Key Plan

As indicated

7/30/2014 1:32:02 PM

KIRBY MATH &SCIENCE CENTERADDITION

THE LAWRENCEVILLESCHOOL,LAWRENCEVILLE, NJ

BASEMENT & FIRST LEVELFLOOR PLANS

DS

KC

0122

A200

PRO

GRE

SS S

ET-

CONS

TRUC

TIO

N DO

CUM

ENTS

50%

1/8" = 1'-0"1FIRST FLOOR PLAN

1/8" = 1'-0"2BASEMENT FLOOR PLAN

REV.# DATE PURPOSE1 04/17/14 DESIGN DEVELOPMENT2 07/28/14 CONSTRUCTION DOC 50%

Page 28: New projects 11 14

28

DN

UP

DN23 22 21 20 19 18 17 16 15 14 13

121110987654321

A300 3

A1

A

B

C

D

E

AA

BB

CC

DD

EE

1 2 4

B1

1A310

A3001

A560

11

12

9

10

FFF

7

2B1B 3B

4A310

3A310

CLASSROOM_A202

CLASSROOM_B203

GIRLSROOM

204

JC206

BOYSROOM

205

CLASSROOM_B207

CLASSROOM_B208

CLASSROOM_B209

CLASSROOM_B210

3 5 6

AAA

5.5A300

2

5'

FF'

6'

VIF

8' -

10 1

/2"

18' -

9"

22' -

3"

23' -

2"

23' -

2"

6' - 0" 19' - 8" 9' - 0" 7' - 6"

8.52°

12' - 39/16"

20' - 8"

20' - 8"

20' - 8"

20' - 8"

7' - 9"

20' - 9 1/16"

8.52°

8.52°

91' -

0"

86' - 4"

27' - 8"

206 FG-5

FACULTYLOUNGE

201

STAIR200

A3303

5.6

211

206

G001

G001

G001 G003

G001

G001

G001

S002

G001

S001

G002

G002

G002

G003

G001

G003

G001 G003

S002

S001

S001

S001

S001

S002

G002

M001

S001

S001

M001

23' -

5 1

/4"

21' -

10"

20' - 111/4"

20' - 25/8"

20' - 25/8"

20' - 115/8"

25' - 9 3/4"

29' - 6 3/4"

8' - 8"

S002 S001

S001

S002

S001

1A325

2A325

2A321

201

202

203

210

209

208

207

EXPANSION JOINT

EXPANSION JOINT

EXPANSION JOINT

EXPANSION JOINT

OPEN TO BELOW

OPEN TO BELOW

7' -

10"

HALLWAY211

MECHANICALSHAFT

GALLERY

HALLWAY

EXIS

TIN

G

EXISTING

8' - 11 7/8"9' - 11 3/4"

2A310

212

S001

S001

S001

S002

S002

1A322

1A324

2A324

M005

M001X

M001

M001

M001

M001

M001

7A332

8A332

1A323

204

205

FE

FE

7' - 2 3/4"A3432

A3517 A3518

A3519

A3431

A1

A

B

C

D

E

AA

BB

CC

DD

EE

1 2 4

B1

F

FF

7

2B1B 3B

3 5 6

AAA

5.55'

FF'

6'

23' -

2"

23' -

2"

22' -

3"

18' -

9"

VIF

VIF

6' - 0" 19' - 8" 9' - 0" 7' - 6"15' - 8 1/8"

8' - 11 7/8"

VIF

20' - 8"

20' - 8"

20' - 8"

20' - 8"

7' - 9"8.52°

8.52°

8.52°

VIF

5.6

EXISTINGSLOPE

EXISTINGSLOPE

EXISTINGSLOPE

L.P.H.P.

4" DIA RWC.

L.P.

H.P.L.P.

4" DIA RWC.

HIP RIDGE

HIP RID

GE

VALLEY

HIPRID

GE

HIP RIDGE

ALUMINUMFRAME SKYLIGHTSSYSTEM

4" DIA RWC.

RECESSEDCOPPER GUTTER

SLO

PE 2

" / 1

2"

L.P.

L.P.

1" / 48"

1" / 48"

8" GUTTER

SLO

PE 5

" / 1

2"

SLOPE 5" / 12"

SLOPE 5" / 12"

SLOPE

41/2" / 12"

SLOPE 4 1/2" / 12"

SLOPE

41/2" / 12"

2" / 12"

41/2" / 12"

SLOPE

2" / 12"

1' - 4"

8" GUTTER

8" GUTTER

8" GUTTER

41/2" / 12"

SCUPPER OPENINGTROUGH BLADE WALL

SYMBOL LEGEND

NEW WALL

EXITING WALLS TO REMAIN

ProjectTrue NN

SCALE:

DRAWN BY:

REVIEWED BY:

PROJECT NO:

SHEET NO:

© studiohillier 2014. ALL RIGHTS RESERVED

B

A

C

D

E

F

G

H

J

K

12345678

Sheet Title

Project

J. Robert Hillier - Architect

Signature, Date and Seal

www.studiohillier.com

studiohillier190 Witherspoon StreetPrinceton, NJ 08542

T 609.688.9999F 609.688.9990

DOCUMENT HISTORY:

Lic. No. 4385

Key Plan

As indicated

7/30/2014 1:32:09 PM

KIRBY MATH &SCIENCE CENTERADDITION

THE LAWRENCEVILLESCHOOL,LAWRENCEVILLE, NJ

SECOND LEVEL & ROOFPLAN

DS

KC

0122

A201

PRO

GRE

SS S

ET-

CONS

TRUC

TIO

N DO

CUM

ENTS

50%

1/8" = 1'-0"1SECOND FLOOR PLAN

1/8" = 1'-0"2ROOF PLAN

REV.# DATE PURPOSE1 04/17/14 DESIGN DEVELOPMENT2 07/28/14 CONSTRUCTION DOC 50%

Page 29: New projects 11 14

29

DN

UP

DN23 22 21 20 19 18 17 16 15 14 13

121110987654321

A300 3

A1

A

B

C

D

E

AA

BB

CC

DD

EE

1 2 4

B1

1A310

A3001

A560

11

12

9

10

FFF

7

2B1B 3B

4A310

3A310

CLASSROOM_A202

CLASSROOM_B203

GIRLSROOM

204

JC206

BOYSROOM

205

CLASSROOM_B207

CLASSROOM_B208

CLASSROOM_B209

CLASSROOM_B210

3 5 6

AAA

5.5A300

2

5'

FF'

6'

VIF

8' -

10 1

/2"

18' -

9"

22' -

3"

23' -

2"

23' -

2"

6' - 0" 19' - 8" 9' - 0" 7' - 6"

8.52°

12' - 39/16"

20' - 8"

20' - 8"

20' - 8"

20' - 8"

7' - 9"

20' - 9 1/16"

8.52°

8.52°

91' -

0"

86' - 4"

27' - 8"

206 FG-5

FACULTYLOUNGE

201

STAIR200

A3303

5.6

211

206

G001

G001

G001 G003

G001

G001

G001

S002

G001

S001

G002

G002

G002

G003

G001

G003

G001 G003

S002

S001

S001

S001

S001

S002

G002

M001

S001

S001

M001

23' -

5 1

/4"

21' -

10"

20' - 111/4"

20' - 25/8"

20' - 25/8"

20' - 115/8"

25' - 9 3/4"

29' - 6 3/4"

8' - 8"

S002 S001

S001

S002

S001

1A325

2A325

2A321

201

202

203

210

209

208

207

EXPANSION JOINT

EXPANSION JOINT

EXPANSION JOINT

EXPANSION JOINT

OPEN TO BELOW

OPEN TO BELOW

7' -

10"

HALLWAY211

MECHANICALSHAFT

GALLERY

HALLWAY

EXIS

TIN

G

EXISTING

8' - 11 7/8"9' - 11 3/4"

2A310

212

S001

S001

S001

S002

S002

1A322

1A324

2A324

M005

M001X

M001

M001

M001

M001

M001

7A332

8A332

1A323

204

205

FE

FE

7' - 2 3/4"A3432

A3517 A3518

A3519

A3431

A1

A

B

C

D

E

AA

BB

CC

DD

EE

1 2 4

B1

F

FF

7

2B1B 3B

3 5 6

AAA

5.55'

FF'

6'

23' -

2"

23' -

2"

22' -

3"

18' -

9"

VIF

VIF

6' - 0" 19' - 8" 9' - 0" 7' - 6"15' - 8 1/8"

8' - 11 7/8"

VIF

20' - 8"

20' - 8"

20' - 8"

20' - 8"

7' - 9"8.52°

8.52°

8.52°

VIF

5.6

EXISTINGSLOPE

EXISTINGSLOPE

EXISTINGSLOPE

L.P.H.P.

4" DIA RWC.

L.P.

H.P.L.P.

4" DIA RWC.

HIP RIDGE

HIP RID

GE

VALLEY

HIPRID

GE

HIP RIDGE

ALUMINUMFRAME SKYLIGHTSSYSTEM

4" DIA RWC.

RECESSEDCOPPER GUTTER

SLO

PE 2

" / 1

2"

L.P.

L.P.

1" / 48"

1" / 48"

8" GUTTER

SLO

PE 5

" / 1

2"

SLOPE 5" / 12"

SLOPE 5" / 12"

SLOPE

41/2" / 12"

SLOPE 4 1/2" / 12"

SLOPE

41/2" / 12"

2" / 12"

41/2" / 12"

SLOPE

2" / 12"

1' - 4"

8" GUTTER

8" GUTTER

8" GUTTER

41/2" / 12"

SCUPPER OPENINGTROUGH BLADE WALL

SYMBOL LEGEND

NEW WALL

EXITING WALLS TO REMAIN

ProjectTrue NN

SCALE:

DRAWN BY:

REVIEWED BY:

PROJECT NO:

SHEET NO:

© studiohillier 2014. ALL RIGHTS RESERVED

B

A

C

D

E

F

G

H

J

K

12345678

Sheet Title

Project

J. Robert Hillier - Architect

Signature, Date and Seal

www.studiohillier.com

studiohillier190 Witherspoon StreetPrinceton, NJ 08542

T 609.688.9999F 609.688.9990

DOCUMENT HISTORY:

Lic. No. 4385

Key Plan

As indicated

7/30/2014 1:32:09 PM

KIRBY MATH &SCIENCE CENTERADDITION

THE LAWRENCEVILLESCHOOL,LAWRENCEVILLE, NJ

SECOND LEVEL & ROOFPLAN

DS

KC

0122

A201

PRO

GRE

SS S

ET-

CONS

TRUC

TIO

N DO

CUM

ENTS

50%

1/8" = 1'-0"1SECOND FLOOR PLAN

1/8" = 1'-0"2ROOF PLAN

REV.# DATE PURPOSE1 04/17/14 DESIGN DEVELOPMENT2 07/28/14 CONSTRUCTION DOC 50%

Page 30: New projects 11 14

30

FIRST FL0' - 0"

SECOND FL14' - 0"

T.O. CAP28' - 6"

ROOF TOP43' - 8"

ROOF BOTTOM31' - 0"

AABBCCDDEE

VESTIBULE ROOF24' - 0"

3A310

AAAFF'

A3324 A3321

2A325

EXISTING

GL-3

GL-3

GL-6

GL-3

GL-3

GL-4

5

8

4

2

7

3

SPECIAL BRICK PATTERN

GL-5

GL-3

4

4

GL-3

GL-5

4

4

GL-5

GL-3

4

GL-5

GL-3

4

7A332

1A323

FIRST FL0' - 0"

SECOND FL14' - 0"

T.O. CAP28' - 6"

ROOF TOP43' - 8"

ROOF BOTTOM31' - 0"

1A310

VESTIBULE ROOF24' - 0"

56 5.55.6

A3322

S/S 8" HIGH SIGNAPPROX. GRADE

ALUM. FRAMESKYLIGHT SYSTEM

SPECIAL BRICK PATTERN7

2

3

8

5

6

4

4

GL-3

GL-3

GL-2

2A324

GL-6

FIRST FL0' - 0"

A1

SECOND FL14' - 0"

T.O. CAP28' - 6"

ROOF TOP43' - 8"

ROOF BOTTOM31' - 0"

A B C D E B1 3AFFF

VESTIBULE ROOF24' - 0"

4A310

A3326A3323 A3325

1A325

SPECIAL BRICK PATTERN

EXISTING

GL-3

GL-5

GL-3

GL-5

GL-3

GL-3

GL-3

GL-5

GL-5

5

4

4

5

7

3

2

4

4

4

4

4

4

4

4

GL-3

GL-3

GL-4

GL-2 4 4

4

GL-4

GL-6

8A332

EXPANSION JOINT

GL-1

GL-2 1/2"

GL-3 1"

GL-4

GL-5

GL-6

1"1"

6 m

m1

5/16

"

SCALE:

DRAWN BY:

REVIEWED BY:

PROJECT NO:

SHEET NO:

© studiohillier 2014. ALL RIGHTS RESERVED

B

A

C

D

E

F

G

H

J

K

12345678

Sheet Title

Project

J. Robert Hillier - Architect

Signature, Date and Seal

www.studiohillier.com

studiohillier190 Witherspoon StreetPrinceton, NJ 08542

T 609.688.9999F 609.688.9990

DOCUMENT HISTORY:

Lic. No. 4385

Key Plan

As indicated

7/30/2014 1:32:28 PM

KIRBY MATH &SCIENCE CENTERADDITION

THE LAWRENCEVILLESCHOOL,LAWRENCEVILLE, NJ

EXTERIOR ELEVATIONS

DS

KC

0122

A300

PRO

GRE

SS S

ET-

CONS

TRUC

TIO

N DO

CUM

ENTS

50%

1/8" = 1'-0"1EAST ELEVATION

1/8" = 1'-0"2NORTH ELEVATION

MATERIALS LEGEND

MATERIALKEY MATERIALS

2 STUCCO3 METAL ROOF4 GRANITE5 ALUMINUM FRAME

WINDOW SYSTEM6 ALUMINUM FRAME

SKYLIGHT7 GALVINIZED STEEL

BRACKETS8 ZINK RAIN LEADERSGL-1 SEE BELOWGL-2 SEE BELOWGL-3 SEE BELOWGL-4 SEE BELOWGL-5 SEE BELOWGL-6 SEE BELOW

1/8" = 1'-0"3WEST ELEVATION

3" = 1'-0"4A300 GLAZING TYPES

REV.# DATE PURPOSE1 04/17/14 DESIGN DEVELOPMENT2 07/28/14 CONSTRUCTION DOC 50%

FIRST FL0' - 0"

SECOND FL14' - 0"

T.O. CAP28' - 6"

PL_FLPL 00-13' - 0"

ROOF TOP43' - 8"

ROOF BOTTOM31' - 0"

STAIR200

A3222

_FL 1_C1_C48' - 3"

BASEMENT001

HALLWAY111

HALLWAY211

STAIR100

STAIR000

A5701

STUCCOSYSTEM

GWB

FIRST FL0' - 0"

SECOND FL14' - 0"

T.O. CAP28' - 6"

PL_FLPL 00-13' - 0"

ROOF TOP43' - 8"

ROOF BOTTOM31' - 0"

CLASSROOM_B208

CLASSROOM_B108

CLASSROOM_B203

CLASSROOM_B103

MECHANICAL002

203 FG-1

002 FG-6

103 FG-1

208 FG-1

108 FG-1

HALLWAY211

HALLWAY111

211 FG-2

111 FG-2

BASEMENT001

METAL PANELCEILING SYSTEM

METAL PANELCEILING SYSTEMMETAL PANEL

CEILING SYSTEMMETAL PANELCEILING SYSTEM

FIRST FL0' - 0"

SECOND FL14' - 0"

T.O. CAP28' - 6"

PL_FLPL 00-13' - 0"

ROOF TOP43' - 8"

ROOF BOTTOM31' - 0"

A3202

CLASSROOM_A202

CLASSROOM_B208

CLASSROOM_B108

CLASSROOM_A102

202 FG-1 208 FG-1

108 FG-1102 FG-1

FIRST FL0' - 0"

SECOND FL14' - 0"

T.O. CAP28' - 6"

PL_FLPL 00-13' - 0"

ROOF TOP43' - 8"

ROOF BOTTOM31' - 0"

VESTIBULE ROOF24' - 0"

HALLWAY111

MECHANICAL002

BASEMENT001

HALLWAY211

STAIR200

STAIR100

METAL PANELCEILING SYSTEM

STAIR000001 FG-6002 FG-6

111 FG-2

211 FG-2 200 FG-2

100 FG-2

000 FG-2

A5702

STUCCOSYSTEM

GWB

SCALE:

DRAWN BY:

REVIEWED BY:

PROJECT NO:

SHEET NO:

© studiohillier 2014. ALL RIGHTS RESERVED

B

A

C

D

E

F

G

H

J

K

12345678

Sheet Title

Project

J. Robert Hillier - Architect

Signature, Date and Seal

www.studiohillier.com

studiohillier190 Witherspoon StreetPrinceton, NJ 08542

T 609.688.9999F 609.688.9990

DOCUMENT HISTORY:

Lic. No. 4385

Key Plan

1/8" = 1'-0"

7/30/2014 1:32:45 PM

KIRBY MATH &SCIENCE CENTERADDITION

THE LAWRENCEVILLESCHOOL,LAWRENCEVILLE, NJ

BUILDING SECTIONS

DS

KC

0122

A310

PRO

GRE

SS S

ET-

CONS

TRUC

TIO

N DO

CUM

ENTS

50%

1/8" = 1'-0"1BUILDING SECTION NORTH-SOUTH 1

1/8" = 1'-0"3BUILDING SECTION EAST-WEST 1

1/8" = 1'-0"4BUILDING SECTION WEST-EAST 1

1/8" = 1'-0"2BUILDING SECTION SOUTH-NORTH 1

REV.# DATE PURPOSE1 04/17/14 DESIGN DEVELOPMENT2 07/28/14 CONSTRUCTION DOC 50%

Page 31: New projects 11 14

31

FIR

ST F

L0'

- 0"

SEC

ON

D F

L14

' - 0

"

T.O

. CAP

28' -

6"

PL_F

LPL

00-1

3' -

0"

RO

OF

BOTT

OM

31' -

0"

CON C

.FOU

NDAT

ION

WA L

LAND

FOO T

ING

-SE E

STRU

CTUR

ALDW

G S

PERI

M. IN

SULA

TION

-EX

TEND

DOW

N FA

CE U

PW

ALL M

IN. 4

8" V

ERTI

CALL

TY@

DOO

R OP

ENIN

GEX

TEND

2'-0

" PAS

T DO

OROP

ENIN

G

VAPO

R BA

RRIE

R

SLAB

ON

GRAD

ESE

E ST

RUCT

DW

GS

CLAS

SROO

M

102

CLAS

SROO

M

202 BA

SEME

NT

001

GRAN

ITE

SILL

GRAN

ITE

SPAN

DREL

PANE

L

1' -

10"

CON C

. SLA

B O N

MET

ALDE

CK -

SEE

STRU

CTDW

G S

STEE

L BEA

M-S

EE S

TRUC

TDW

G S

FIN.

CEI

LING

SEE

RCP

4" B

RICK

VEN

EER

2" A

IR S

PACE

3" C

AVIT

Y IN

SULA

TION

CONT

AIR

& V

APOR

BAR

RIER

5/8" G

LASS

MAT

GYP

SUM

SHEA

THIN

G TY

PE X

6" C

FMF

@16

" O.C

.

5/8" M

OLD

RESI

STAN

T GW

B

CON C

. SLA

B O N

MET

ALDE

CK -

SEE

STRU

CTDW

G S

THER

MALL

Y BR

OKEN

STOR

EFRO

NT S

YSTE

MW

/ 1" I

NSUL

ATIN

G GL

ASS

THER

MALL

Y BR

OKEN

STOR

EFRO

NT S

YSTE

MW

/ 1" I

NSUL

ATIN

G GL

ASS

STEE

L BEA

M-S

EE S

TRUC

TDW

G S

FIN.

CEI

LING

SEE

RCP

11' - 0"

GRAN

ITE

SILL

13' - 0"14' - 6"2' - 6"

1" S

TUCC

O ON

MET

AL LA

TH O

N#1

5 BUI

LDIN

G PA

PER

ON 1/

2" C

EMEN

T BO

ARD

ONCO

LD F

ORM

META

L FRA

MING

@16

" O.C

.

6" C

OPPE

R GU

TTER

W/ G

UTTE

R GU

ARD

STEE

L SUP

PORT

BRAC

KET

PAIN

TED

14' - 0"

10' - 8"10' - 8"

11' - 0"

GRAN

ITE

BASE

A341

1

T.O

.S26

' - 8

"

STEE

L BEA

MSE

E ST

RUCT

. DRA

WIN

GS F

ORDE

TAILSCO

LD F

ORME

D ST

EEL R

OOF

TRUS

SES

SEE

STRU

CT.

DRAW

INGS

FOR

DET

AILS

CON T

. 6"X

6"CO

L. TO

COL

.SE

E ST

RUCT

. DRA

WIN

G S.

FIR

ST F

L0'

- 0"

SEC

ON

D F

L14

' - 0

"

T.O

. CAP

28' -

6"

PL_F

LPL

00-1

3' -

0"

RO

OF

BOTT

OM

31' -

0"

CON C

. SLA

B O N

MET

ALDE

CK -

SEE

STRU

CTDW

G S

STEE

L BEA

M-S

EE S

TRUC

TDW

G S

FIN.

CEI

LING

SEE

RCP

4" B

RICK

VEN

EER

2" A

IR S

PACE

3" C

AVIT

Y IN

SULA

TION

CONT

AIR

& V

APOR

BAR

RIER

5/8" G

LASS

MAT

GYP

SUM

SHEA

THIN

G TY

PE X

6" C

FMF

@16

" O.C

.

5/8" M

OLD

RESI

STAN

T GW

B

(SEE RCP)(SEE RCP)

CLAS

SROO

M

102

CLAS

SROO

M

202

BASE

MENT

001

CON C

. SLA

B O N

MET

ALDE

CK -

SEE

STRU

CTDW

G S

4" B

RICK

VEN

EER

2" A

IR S

PACE

3" C

AVIT

Y IN

SULA

TION

CONT

AIR

& V

APOR

BAR

RIER

5/8" G

LASS

MAT

GYP

SUM

SHEA

THIN

G TY

PE X

6" C

FMF

@16

" O.C

.

5/8" M

OLD

RESI

STAN

T GW

B

11' - 0" 11' - 0"

CON C

.FOU

NDAT

ION

WA L

L AND

FOO T

ING

- SE E

STR

UCT U

RAL

DWG S

PERI

M. IN

SULA

TION

-EX

TEND

DOW

N FA

CE U

PW

ALL M

IN. 4

8" V

ERTI

CALL

TY@

DOO

R OP

ENIN

GEX

TEND

2'-0

" PAS

T DO

OROP

ENIN

G

VAPO

R BA

RRIE

R

CAST

-IN-P

LACE

CON

CRET

ESL

AB-O

N-GR

ADE

SEE

STRU

CT D

WGS

F.O

. STU

D1'

- 0

3/4"

E.O

.S. &

1' -

10"

1" S

TUCC

O ON

MET

AL LA

TH O

N#1

5 BUI

LDIN

G PA

PER

ON 1/

2" C

EMEN

T BO

ARD

ONCO

LD F

ORM

META

L FRA

MING

@16

" O.C

.

14' - 0"14' - 6" 13' - 0"

6" C

OPPE

R GU

TTER

W/ G

UTTE

R GU

ARD

STEE

L SUP

PORT

BRAC

KET

PAIN

TED 4"

MET

AL R

.W.C

.

GRAN

ITE

BASE

6"1'

- 0"

FIR

ST F

LOO

R F

RAM

ING

AT

GR

OU

ND

LEV

EL. S

EE P

LAN

.

T.O

.S26

' - 8

"

STEE

L BEA

MSE

E ST

RUCT

. DRA

WIN

GS F

ORDE

TAILS

COLD

FOR

MED

STEE

L ROO

FTR

USSE

S SE

E ST

RUCT

.DR

AWIN

GS F

OR D

ETAI

LS

SCALE:

DRAWN BY:

REVIEWED BY:

PROJECT NO:

SHEET NO:

© studiohillier 2014. ALL RIGHTS RESERVED

B

A

C

D

E

F

G

H

J

K

12345678

Sheet Title

Project

J. Robert Hillier - Architect

Signature, Date and Seal

www.studiohillier.com

studiohillier190 Witherspoon StreetPrinceton, NJ 08542

T 609.688.9999F 609.688.9990

DOCUMENT HISTORY:

Lic. No. 4385

Key Plan

1/2" = 1'-0"

7/30/2014 1:32:51 PM

KIRBY MATH &SCIENCE CENTERADDITION

THE LAWRENCEVILLESCHOOL,LAWRENCEVILLE, NJ

WALL SECTIONS

JM

KC

0122

A320

PRO

GRE

SS S

ET-

CONS

TRUC

TIO

N DO

CUM

ENTS

50%

1/2

" = 1

'-0"

1W

ALL

SEC

TIO

N A

1/2

" = 1

'-0"

2W

ALL

SEC

TIO

N B

REV.# DATE PURPOSE1 04/17/14 DESIGN DEVELOPMENT2 07/28/14 CONSTRUCTION DOC 50%

DP

ELFL

1-1/4" NOM DIA STEEL PIPEHANDRAIL

TYPICAL CUSTOM WALL BRACKET-SIMILAR TO GUARDRAIL MOUNTEDBRACKET, EXCEPT FOR WALL PLATE

0' - 2

1/2" MC 12X10.6 STEEL CHANNEL

STRINGERS

STEEL BEAMDIM LINE OF STAIR NOSING

NOTE: WELD & GRIND SMOOTHEACH STAIR RAILINGCONNECTION &INTERSECTION

0' - 11"

2' - 1

0"

1' - 0"

PRE-CAST TERRAZZO TREADS

ELFL

EXTENDED PLATE TOCONTACT MAGNET

NO EXIT

2'-1

07/

8"

2 1/2" DIA STL POSTATTACHED TO SLAB WITH

ANCHOR BOLTS. WELD ENDCAP ON TOP OF POST

STEEL PLATE GATE WITHANGLE BORDER WITHPAINTED LETTERING

STEEL SPRING CLOSER

WALL MOUNTED MAGNETWIRED TO FIRE ALARM

SYSTEM. GATE TO CLOSEWHEN FIRE ALARM IS

ACTIVATED.

DP

FLEL

CONC FILL ON MET DECK

STEEL HANGER ROD AND STEELSUPPORT BRACKETSTEEL BEAM

FIRE RATED HEAD-OF-WALLDEFLECTION JOINT ASSEMBLY(WHI 495-1338/1334,OR EQ)STEEL HANGER ROD @ EACHCORNER OF INTERMEDIATELANDING

RATED PARTN TYPE ASSCHEDULEDSTEEL CLOSURE PLATE, FLUSHW/ FACE OF PARTNSTEEL

CHANNELINTERMEDIATELANDINGFRAMINGSEALANT

STAIR SHAFT

0' - 2

1/2"

0' - 1 1/2"0' - 0 1/4"

PRE-CASTTERRAZZOLANDING

DP

2'-1

0"

ELINT LAND

1-1/4" NOM DIA STEEL PIPEHANDRAIL

5/8" DIA STEEL BARSUPPORT BRACKET

21/

2"

LINE OF STAIR TREAD/RISER

STEEL C8 CHANNELDIM LINE OF STAIR NOSING

11" UON

6"

1' - 0"

PRE-CAST TERRAZZO TREADS

PRE-CAST TERRAZZO LANDING

31/

2"3

1/2"

DP

1-1/4" NOM DIA STEELPIPE HANDRAIL

STAIR WIDTH STAIR WIDTH

11"

TYP

STRINGER

1-1/4" NOM DIA STEELPIPE HANDRAIL

1-1/4" NOM DIA STEELPIPE GUARDRAIL

PARTIAL PLAN AT LANDING

DP

2'-1

0"

ELFL

1-1/4" NOM DIA STEEL PIPEHANDRAIL

STEEL MESH PANEL

MESH RAILING SYSTEM

STL PAN TREAD FILLED W/CONRETE

STEEL CHANNEL STRINGERSDIM LINE OF STAIR NOSING

10 5/8"

STL ANGLE CONNECTION

PLAN

SECTION

1-1/4" NOM DIA STEEL PIPEHANDRAIL

STAIR TREAD NOSING

MESH RAIL ASSEMBLY

3 1/2" TH. PRE-CAST TERRAZZOTREADS

DP

2'-1

0"

3'-6

"

ELINT LAND

1-1/4" NOM DIA STEEL PIPEHANDRAIL

5/8" DIA STEEL BARSUPPORT BRACKET AT EACHVERT POST

0' - 2 1/2"

21/

2"

12" X 1/2" STEEL PLATEBETWEEN STRINGERS

LINE OF STAIR TREAD

STEEL C8 CHANNEL3" PLATE WELDED TO STEELSTRINGERS.

11" UON

1"

45/

8"

PRE-CAST TERRAZZO TREADS

31/

2"

DP

DP

ELFL

1-1/4" NOM DIA STEEL PIPEHANDRAIL

0' - 2

1/2"

LINE OF STAIR TREAD/RISER

STEEL CHANNEL STRINGERS

NOTE: WELD & GRIND SMOOTHEACH STAIR RAILINGCONNECTION &INTERSECTION

2' - 1

0"

12" X 1/2" STEEL PLATE BETWEENSTRINGERS

PRE-CAST TERRAZZO LANDING

DP

PLAN

ELEVATION

8"51/

8"1"

0' - 2

1/2"

2' - 1

0"

3' - 6

"

FO WALL

1 1/4" NOM DIA STEEL PIPE

NOTE: WELD & GRINDSMOOTH EACH STAIR RAILINGCONNECTION & INTERSECTION

STRINGER CHANNEL BELOW

STAIR NOSING

5/8" DIA STEEL BARSUPPORT BRACKET

DP

3'-6

"

1 1/4" NOM DIA STEELPIPE HORIZ RAILINGS

1-1/4" NOM DIA STEEL PIPEHANDRAIL

5/8" DIA STEEL BARSUPPORT BRACKET AT EACHVERT POST

12"X1/2" STEEL PLATESTRINGERS

DIM LINE OF STAIR NOSING

LINE OF STAIR TREAD

3" PLATE WELDED TO STEELSTRINGERS. VERTICAL POSTSTO BE WELDED TO ANGLES

CLEAR SPACE BETWEEN EACHHORIZ RAIL ABOVE 34" SHALLBE LESS THAN 8"

PRE-CAST TERRAZZO TREADS

31/

2"3

1/2" 1' - 1"

STAIRDP

UON

1 1/4" NOM DIA STEEL PIPEHORIZ GUARD

1-1/4" NOM DIA STEEL PIPESTAIR HANDRAIL, WHEREOCCURS, RETURN TO FACE OFGUARDRAIL, PROVIDE STEELENDCAP

5/8" DIA STEEL BARSUPPORT BRACKET @ STAIRHANDRAIL

FLEL

1 1/4" NOM DIA STEEL PIPEVERT POST @ MAX 48" OC,UON

STEEL CHANNEL

CONC FILL ON METAL DECK

STEEL BEAM

3" x 2" x 3/8" x 8" L STEEL POSTBRACKET WELDED TOSTRINGER - TYPNOTE: WELD & GRIND SMOOTHEACH STAIR RAILINGCONNECTION & INTERSECTION

2' - 1

0"3' - 6

"

.

8"

DP

DP

2'-1

0"

3'-6

"

ELFL

1-1/4" NOM DIA STEEL PIPEHANDRAIL

21/

2"

LINE OF STAIR TREAD/RISER

STEEL CHANNEL STRINGERSDIM LINE OF STAIR NOSING

NOTE: WELD & GRIND SMOOTHEACH STAIR RAILINGCONNECTION &INTERSECTION

45/

8"

SCALE:

DRAWN BY:

REVIEWED BY:

PROJECT NO:

SHEET NO:

© studiohillier 2014. ALL RIGHTS RESERVED

B

A

C

D

E

F

G

H

J

K

12345678

Sheet Title

Project

J. Robert Hillier - Architect

Signature, Date and Seal

www.studiohillier.com

studiohillier190 Witherspoon StreetPrinceton, NJ 08542

T 609.688.9999F 609.688.9990

DOCUMENT HISTORY:

Lic. No. 4385

Key Plan

1" = 1'-0"

7/30/2014 1:34:06 PM

KIRBY MATH &SCIENCE CENTERADDITION

THE LAWRENCEVILLESCHOOL,LAWRENCEVILLE, NJ

STAIR DETAILS

Author

Checker

0122

A331

PRO

GRE

SS S

ET-

CONS

TRUC

TIO

N DO

CUM

ENTS

50%

1" = 1'-0"1A331 STAIR DET A

1" = 1'-0"2A331 STAIR DET B

1" = 1'-0"3A331 STAIR DET C

1" = 1'-0"4A331 STAIR DET D

1" = 1'-0"5A331 STAIR DET E

1" = 1'-0"6A331 STAIR DET F

1" = 1'-0"7A331 STAIR DET G

1" = 1'-0"8A331 STAIR DET H

1" = 1'-0"9A331 STAIR DET I

1" = 1'-0"10A331 STAIR DET J

1" = 1'-0"11A331 STAIR DET K

1" = 1'-0"12A331 STAIR DET L

REV.# DATE PURPOSE1 07/28/14 CONSTRUCTION DOC 50%

Page 32: New projects 11 14

32