New MTT - Approaches

19

Page 2: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

20

Marine – Raker Pile Installation

Page 3: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

New MTT - Approaches

21

Excavation of Approach following installation of SOE and concrete piles

Struts and Walers to brace excavation

Placement of Inverts, Walls, Roofs

Page 4: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

New MTT - Approaches

22

Excavation of Approach following installation of SOE and concrete piles

Struts and Walers to brace excavation

Placement of Inverts, Walls, Roofs

Page 5: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

Existing Tunnel Rehab and Upgrades

23

Three existing tubes

— Downtown Tunnel West Bound

— Downtown Tunnel East Bound

— Midtown Tunnel

Scope of repair similar

Page 6: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

Existing Tunnel Rehab and Upgrades

24

Scope

— Goal is to extend the useful life of existing assets

— Structural repairs

— Delaminated and spalled concrete

— Goal to meet NFPA 502

— (100 Megawatt fire)

— Ventilation upgrades

— ITS system

— Lighting Upgrades

Page 7: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

Schedule – Project Wide

25

Page 8: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

Project Manager – MLK Extension

Skanska USA Civil Southeast

—Past Projects

—Huguenot Bridge, Richmond, VA (Project Manager)

—Bridge of Lions, St. Augustine, FL (Project Manager)

—Route 5 Bridge over Chickahominy River, James City County, VA (Project Manager)

—APM Terminals Interchange, Portsmouth, VA (Project Engineer)

—Pinner’s Point Interchange, Portsmouth, VA (Assistant Project Manager)

26

SKW Constructors – Brent Hunt

Page 9: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

MLK Extension – Project Wide

27

Page 10: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

28

MLK Extension – Project Wide

Proposed MLKI-264

London Blvd.

Page 11: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

Technical Requirements – Final Design Criteria MLK Extension

—Designed to meet VDOT and AASHTO requirements

—Standard VDOT project with few exceptions

—Design-Build

—Design Exception required at London Blvd Ramp

—Proceed with existing ramp geometry (substandard)

—DB Scope includes ROW Acquisition

29

MLK Extension

Page 12: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

Construction through populated area

Railroad Coordination

—CSX

—NPBL

Historically significant sites

—Mount Calvary Cemetery Complex

—Potter’s Field site

—Unmarked graves

—Protect from construction equipment

30

MLK Extension – Design Considerations

Page 13: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

MLK Extension – Design Considerations

31

Calvary Baptist Church

— Preconstruction surveys

— Seismic Monitoring during construction

Page 14: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

Right of Way Acquisition

—Acquire property on behalf of the Commonwealth

—69 Parcels

—34 Structures to demolish

—Private Residential Homes

—Relocate residents

— Inspect homes, abate as necessary, then demolish

—Businesses

—Similar process to residential properties

—Additional work to coordinate movement of businesses

—Vulcan Materials

—Old Dominion Demolition

32

MLK Extension – Design Considerations

Page 15: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

General Information

—1 mile of controlled access freeway

—1.4 miles of elevate structure of varying width (1 to 3 lanes in each direction)

—Retaining Walls

—MSE Wall

—Geofoam

—Other

—SWM Ponds

—BMP Planting

33

MLK Extension – Mainline US-58

Page 16: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

General Information

—200 + Utility Relocations

—Water, Sewer, Cox, Dominion, Verizon, Virginia Natural Gas

—Modifications to existing 20” water line

—Primary water system feeder to downtown Portsmouth

—Ground Improvements

—Surcharges

—Pile Supported Embankments

34

MLK Extension – Mainline US-58

Page 17: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

I-264 Interchange

—New construction of 4 ramps between US-58 and I-264

—Roadway Widening of I-264 EB and WB

—Des Moines Avenue overpass

—Bridge over N&PBL

— ITS Relocation – overhead sign structure replacement

35

MLK Extension – Interchanges

Page 18: New MTT - Approaches - ghr.ashe.pro€¦ · New MTT - Approaches 21 Excavation of Approach following installation of SOE and concrete piles Struts and Walers to brace excavation Placement

I-264 Interchange

—Reconstruction of Frederick Blvd off ramp

—Permanent closure of Des Moines Exit and South Street on ramp

—Pedestrian Bridge Replacement

36

MLK Extension – Interchanges