Mohamed Ibrahim Mohamed Abdel Hafez Elfayrouza Compound- Tower No. "6" - Smouha – Alexandria – Egypt Tel. : (002 03) 3926064 Mobile : (002) 01222295591 - (002) 0122 730 1240 E-mail : [email protected] Career Summary - Total 20 years of working experience in Execution, Planning, scheduling, project controls and Cost Control of the Oil &Gas, Refinery, petrochemical & Industrial projects in the field of construction & maintenance. Professional experience : Alexandria Petroleum Maintenance Co. (PETROMAINT) One of the Egyptian General Petroleum Ministry From 2000 till present. Job title: Planning & Cost Control Head Responsibilities: Provide planning, scheduling, project controls and cost control support required in the Page 1 Of 14

NEW CV.DOC

Embed Size (px)

Citation preview

Page 1: NEW CV.DOC

Mohamed Ibrahim Mohamed Abdel Hafez Elfayrouza Compound- Tower No. "6" - Smouha – Alexandria – EgyptTel. : (002 03) 3926064 Mobile : (002) 01222295591 - (002) 0122 730 1240E-mail : [email protected]

Career Summary- Total 20 years of working experience in Execution, Planning, scheduling, project controls and Cost Control of the Oil &Gas, Refinery,

petrochemical & Industrial projects in the field of construction &

maintenance.

Professional experience:

Alexandria Petroleum Maintenance Co. (PETROMAINT)

One of the Egyptian General Petroleum Ministry

From 2000 till present.

Job title: Planning & Cost Control Head

Responsibilities:

Provide planning, scheduling, project controls and cost control support required in the proposal, initiation & execution of all company's projects.

Discuss, coordinate and resolve long term and short term planning , scheduling, projects control and cost control problems with personnel throughout the company and with client and contractor organizations and prepare corrective actions.

Page 1 Of 12

Page 2: NEW CV.DOC

Manage all Projects WBS (work breakdown structure) using the latest project planning and scheduling tools Primavera and MS Project.

Manage all company projects progress reports, graphs and critical path analysis for the monthly and weekly progress reports to top management.

Analyze all company projects to plan the effective execution sequence based on current industry practices.

Supervising & tracking of all company projects expenditures and cost control activities.

Provide staffing guidance to Engineering and Construction supervisors in the areas of planning and scheduling by analyzing and evaluating all relevant and pertinent data.

Plan and provide work direction as required in the preparation of planning and scheduling control systems and practices to provide Engineering, Procurement and Construction supervisors the means to evaluate the progress and execution of assigned projects.

Prepare and follow up company sales, revenue plans & cost analysis.

Participating in preparing annual company business plan & planned operating and administration capital budget.

Page 2 Of 12

Page 3: NEW CV.DOC

Some of My Projects CV

PROJECT NAME Contr

act Value (LE)

START

DATE

FINISH

DATEClient Name

Maintenance and Operating offshore units in Sidi Kerir and Soukhna Sectors

186,903,000 Jan-12 Dec-

16 Sumed

Road Construction & Preparartion Of Land Rigs Drilling In Bed & Neag Location

90,000,000 Jul-09 May-

14 BAPETCO

Engineering , procurement, fabrication & installation of Elab Storage 4 Tanks Expansion New Projects

58,590,000

Nov-11 Jun-14

Egyption Lineat Alkail Bansine Company ( ELAB )

Road Construction & Preparation of Land Rig Drilling Locations

55,000,000 Jan-14 Dec-

15 BAPETCO

The Engineering, Procurement, Construction Supervision, Commissioning of 20MMSCF for El-Bassant two(2) Compression packages (2nd stage)

43,898,000

May-12

Nov-14

WASTANI PETROLEUM CO.( WASCO )

Repair & rehabiliation of sumed pipe line

36,496,000

Sep-02 Oct-05 Sumed

Page 3 Of 12

Page 4: NEW CV.DOC

Provision Of Road Construction & Preparartion Of Land Rigs & Drilling Location

30,000,000 Jul-04 Sep-

09 BAPETCO

Engineering , procurement, fabrication & installation of pipeline from kena storage tank to wady kena airport

28,950,000 Jun-02 Aug-

05 COOP

Engineering , procurement, fabrication & installation of New Generation Package at Raml Field

21,466,000 Jun-10 Oct-11 AGIBA

PROJECT NAME Contr

act Value (LE)

START

DATE

FINISH

DATEClient Name

Ashrafi Marine Structures Inspection & Maintenance

21,385,000 Dec-10 Dec-

13 AGIBA

Revamp And Rehablitation Of Sumed Pipe Lines - Second Stage

18,526,000

Aug-07

May-11 Sumed

The Engineering, Procurement, Construction Supervision, Commissioning and Start_Up of The Compression Package on Turn Key Basis

18,479,000

Sep-10

Mar-13

WASTANI PETROLEUM CO.( WASCO )

Repair of Obayied 13km wearing surface Layed

17,770,000

Nov-11

Mar-14 BAPETCO

Engineering , procurement, fabrication & installation of central W/S for mechanical &

16,676,000

Sep-08

Jul-12 PETROLEUM ARROWS CO.

Page 4 Of 12

Page 5: NEW CV.DOC

electrical car maintenanceEngineering , procurement, fabrication & installation of Jet Pipline From West Delta Storage Area To Burg Elarab

14,667,000 Jul-10 May-

14 COOP

Revamp of Elfayom Tanks and Erection of 2 Tanks 2000 m3 anf 1 Tanks 1000m3

14,404,000 Jan-08 Sep-

11 PETROJET

Engineering , procurement, fabrication & installation ofaircraft fueling station at hurgada airport

14,200,000 Jan-02 Apr-03

MISR PETROLEUM CO.

Engineering , procurement, fabrication & installation of 32" brackish water pipeline

13,213,000 Jul-01 Jul-05 EL NASR

PETROLEUM

Provision of maintenance of pipeline route at western desert

13,000,000 Jan-05 Jun-09 BAPETCO

PROJECT NAME Contr

act Value (LE)

START

DATE

FINISH

DATEClient Name

Engineering , procurement, fabrication & installation of Crystallizer plant and Tanks 2000m3-3000m3-4000m3

12,184,000 Jan-13 Jun-14

Arabian Company For Oil and Derivatives -Suez Egypt

Revamp And Rehablitation Of Sumed Pipe Lines - 3rd Stage

11,603,000 Jan-10 Dec-

11 Sumed

Engineering , procurement, fabrication &

10,200,000 Jun-07 Jun-10 AMOC

Page 5 Of 12

Page 6: NEW CV.DOC

installation ofTank VR Engineering , procurement, fabrication & installation ofFiltration System For The Existing Water Injection System (WIS)

10,150,000 Apr-13 Dec-

13

Esh El Mallaha Petroleum CO.

Site Preperation and Acess Roads

10,000,000

Nov-08

Nov-10

WASTANI PETROLEUM CO.( WASCO )

service agreement for valves maintenance

10,000,000 Apr-01 Apr-02 IVACO

Repair of tanks T-302 at Ras Shukier (Contract# GUP-EC-010-006)

9,586,000

Aug-11

Dec-13 GUPCO

Repair of tanks T-708 and T9801 at Ras Shukier

9,411,000 Oct-10 Jun-12 GUPCO

Electrical and Instrumentation Works For Khalda Compressors

9,275,000

Nov-08 Jun-10 PETROJET

Painting and Insulation activities for Port Said and Domietta Facilities2013

9,120,000 Dec-12 Jun-14

UNITED GAS DERIVATIVES CO. (UGDC)

Construction of SD7 Field Gas pipeline system

9,055,000

Mar-12 Jun-13 DAPETCO

intellegent pigging for pipe lines

9,000,000 Jul-01 Dec-

06PETROLEUM PIPELINES CO. "PPC"

PROJECT NAME Contr

act Value (LE)

START

DATE

FINISH

DATEClient Name

Cutting, removing & development of tank 10000 ton at Abo El-Reesh-Aswan and

8,780,000

Dec-09 Mar-12

COOP

Page 6 Of 12

Page 7: NEW CV.DOC

construct for No. of (2) tanks 2500 ton

crude oil fired heater

8,612,000 Jan-00 Dec-

00 ASSIUT

Revamp of Shipping pipe line 6" with lentgh 12 km at abu snan Fields

8,540,000 Dec-12 May-

14GENERAL PETROLEUM CO.

Engineering , procurement, fabrication & installation of 3 pipelines at matrouh

8,235,000

Mar-99

Nov-01 COOP

meadia onshore fire fighting

8,205,000 Jan-00 Jan-01 WEPCO

Execution of Pipes for Removal of Gas Throat

8,180,000 Dec-08 Nov-

10SUEZ OIL PROCESSING CO.

Steel Structure and Tanks Repair

8,076,000 Oct-11 Jun-14

Arabian Company For Oil and Derivatives -Suez Egypt

Painting and Insulation activities for Port Said and Domietta Facilities

8,054,000 Jun-12 Mar-

13UNITED GAS DERIVATIVES CO. (UGDC)

Maintenance and Operations of Solar , Ajax and substations

8,002,000 Jan-08 Mar-

12 DAPETCO

Revamp of Pipelines Network For El-Baalwa Storage Area

7,919,000

Mar-09

Feb-12 COOP

R/S Oil storage tank #311

7,770,000 Oct-06 Jun-09 GUPCO

Maintenace works for TK# 4 at Port Said

7,634,000 Jul-09 Nov-

11MISR PETROLEUM CO.

PROJECT NAME Contr STAR FINIS Client

Page 7 Of 12

Page 8: NEW CV.DOC

act Value (LE)

T DATE

H DATE Name

Engineering , procurement, fabrication & installation of VIP Building & Conferenve Hall at El-Hamra Terminal ( Contract OPR #61/2012)

7,607,000 Jan-13 Mar-

15 WEPCO

Hot insulation works for project C2C3 at LPG site

7,150,000

Mar-10 Jun-11 PETROJET

Major inspection overhaul works for sulzer turbine GT-01 at Belayim

7,057,000 Apr-10 Dec-

11 PETROBEL

Obayied new labor mess hall

6,952,000

Mar-11

Mar-13 BAPETCO

Painting and Insulation activities for Port Said and Domietta Facilities

6,950,000 Jun-10 Apr-12

UNITED GAS DERIVATIVES CO. (UGDC)

Intellegent Pigging for lines with total length 717 km

6,641,000 Feb-11 Jun-13

PETROLEUM PIPELINES CO. "PPC"

Engineering , procurement, fabrication & installation of Medical affairs building works

6,562,000

Sep-09

Aug-12

PETROLEUM PIPELINES CO. "PPC"

Desludging For Tow Oil Tanks Storage At Dahshour Terminal

6,555,000 Jun-06 Dec-

09QARON PETROLEUM CO.

Engineering , procurement, fabrication & installation ofYumna early production facilities

6,521,000 Jan-08 Mar-

09 BAPETCO

Page 8 Of 12

Page 9: NEW CV.DOC

R/B,Z/B & R/F ON/Offshore Intelligent Pigging

6,507,000 Feb-14 Feb-

15 SUCO

Renovation of administration building, stores & car shed and fences

6,494,000 Jun-10 Jun-13

MISR PETROLEUM CO.

PROJECT NAME Contr

act Value (LE)

START

DATE

FINISH

DATEClient Name

Construction of Hydrant P/L at Burg El-arab Airport

6,351,000 Dec-07 Feb-

10MISR PETROLEUM CO.

Engineering , procurement, fabrication & installation of New Permanent Facility at East Abu Sanan Field

6,172,000 Jan-14 Sep-

14East Abu Snan Com.

Engineering , procurement, fabrication & installation of New Tank For HURGHADA Airport Refueling Station

6,008,000

Sep-08 Jul-10

MISR PETROLEUM CO.

Engineering , procurement, fabrication & installation ofNeag-1 E/I Base Scope construction Early production unit

6,000,000

May-14

May-15 BAPETCO

Deck Extension & Crane Installation

5,944,000 Dec-07 Mar-

09 SUCOEngineering , procurement, fabrication & installation of hydrant pipeline at sharm el-shekh airport plus extra works

5,932,000

Mar-00

Sep-00

MISR PETROLEUM CO.

Page 9 Of 12

Page 10: NEW CV.DOC

Construction of ulternative effluent water collection sump pit at Utility area

5,876,000 Apr-08 Jul-11 SIDPEC

Engineering , procurement, fabrication & installation of Fuel Storage Tanks

5,689,000 Dec-08 Oct-09 Pharaoh Gold

Mines

Engineering , procurement, fabrication & installation of Steel Storage Tanks

5,459,000 Apr-13 Jan-14 Petrosilah

Company

Engineering , procurement, fabrication & installation of pressure reduction station at Giza

5,441,000 Jan-11 Dec-

11OVERSEASGAS

Engineering , procurement, fabrication & installation of Nodal Compression Package Foundation and Civil Works

5,250,000 Apr-11 Aug-

12WASTANI PETROLEUM CO.( WASCO )

Samsung Engineering ( Korea )1999 Till 2000

Position Held: Civil Q.C Supervisor Engineer

Brief Description of Responsibilities: Q.C Supervisor Eng. Responsible for Following up (ITP) (Inspection and test Plan) and as a coordinator Eng. between Civil dep. and other departments of Poly Ethylene Plant Project at Sidi Kerir Petroleum Co. (SIDPEC)

Project Name : 300,000 Ton Poly Ethylene Plant

Location : El-Amerya - Alexandria

Client : Sidi Kerir Petroleum Co. (SIDPEC)

Main Contractor : Samsung Engineering (Korea)

Page 10 Of 12

Page 11: NEW CV.DOC

Sub Contractor : PETROJET

Contract Price : 240,000,000 $

Petroleum Projects & Technical Consultation Projects (( PETROJET ))

1996 Till 1998Position Held:

Senior Construction Eng.

Brief Description of Responsibilities: Responsible for all Building activities of Ammonia -Urea Plant at Abo Qir Fertilizer

Project Name : Ammonia -Urea Plant

Location : El-Tabya - Alexandria

Client : Abo Qir Fertilizer Co.

Main Contractor : Uhde GMPH (Germany)

Sub Contractor : PETROJET

Contract Price : 220,000,000 $

Education B.Sc. in Civil Engineering ( June- 1995 )

Alexandria University, Faculty of Engineering

Training Courses Project Management Professional- PMP New Horizon (Nov.2013). Project Cost Scheduling and Control Course Promastar (Feb.2009). Project Management –Project Budgeting Course Arab Academy for Science & Technology (Mar.2007). Scaffolding Design Course Arab Contractor Training Center (Nov.1996). Structure Analysis and Design (STAAD III) application Course

Page 11 Of 12

Page 12: NEW CV.DOC

Alexandria University, Faculty of Engineering (Aug.1995).

Computer skillsUsing the following software: Microsoft Office ( Excel- WinWord- PowerPoint ) Planning systems (Primavera , Microsoft Project) Other systems (STAAD III, Autocad,Maximo)

Language Skills Arabic : Mother Tongue. English : Excellent command written, Read, understood and

spoken.Personal Data

Date of birth: May 5th 1972. Place of birth : Alexandria, Egypt. Nationality : Egyptian. Marital Status : Married and I have two children.

References furnished upon request.