A. White Plumbing Service Ltd Health and Safety Policy AWPS Ltd Sept 2015 A. White Plumbing Service Ltd Health & Safety Policy 1

New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

A. White

Plumbing Service

Ltd

Health & Safety Policy

1

Page 2: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

2.2.1 Managing Director

2.2.2 Estimators/Buyers

2.2.3 Senior Engineer

2.2.4 Operatives

2.2.5 Sub-Contractors

2.2.6 Safety Advisors (DIRECTOR)

SECTION 3

INDEX

SECTION 1 1.1 Health and Safety Welfare Policy Statement

SECTION 2

2.0 Company Organisation and Responsibilities 2.1 Health, Safety and Welfare Responsibilities

2.2 Company Management Structure

3.0 Arrangements 3.1 Accident Reporting & Investigation

3.2 First Aid and emergency procedures

3.3 CDM – Planning for Safety

3.4 Information, Training and Consultation

3.5 Welfare Provisions on site

3.6 Fire precautions

3.7 Fire /Emergency Procedures

3.8 HSE notifications & statutory signs

3.9 Competency check on subcontractors

3.10 Risk Assessments and Method Statements

3.11 Hazardous Substances (COSHH)

3.12 Manual Handling

3.13 Site Auditing / Inspections

3.14 General Site Rules

3.15 Personal Protective Equipment (COSHH)

3.16 Plant, Equipment and Transport

3.17 Electrical Equipment

3.18 Asbestos

3.19 Work at Height

3.20 Noise

3.21 Vibration

3.22 Health Surveillance

3.23 Office Safety

Appendix A Health & Safety Competency Assessment of Contractors

Appendix B Office Procedure

Appendix C Accident Reporting Flow Chart Procedures

Appendix D Exposure Points System & Ready-Reckoner

Appendix E Generic Risk Assessments

Appendix F COSHH Assessments

Appendix G Manual Handling Assessments

Page 3: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

SECTION 1

HEALTH, SAFETY AND WELFARE POLICY STATEMENT

Page 4: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

1.1 HEALTH, SAFETY AND WELFARE POLICY STATEMENT

The following policy is produced by A. White Plumbing Service Ltd Contractors , in order to

display our commitment to ensuring the integrity of all our employees’ health, safety and

welfare, along with anyone else affected by our undertakings. The policy will also display that

the Company is meeting our statutory duties as defined in Section 2(3) of The Health and Safety

at Work Act.

As Managing Director, I will personally take all reasonable and practicable steps to positively

control and ensure that our work practices and procedures are safe and without risk to either

health or safety. I will also ensure that for each project or task, a full account of all health,

safety and welfare implications, affecting our employees, the general public and, any other

persons are controlled and effective. To that end the Company will:

• Comply with all duties placed on us by any relevant legislation, codes of practice or

industry standards.

• Employ at all levels a competent and trained workforce through appropriate recruitment,

selection, performance assessment, training and, when necessary, re-training.

• Systematically identify hazards at the workplace and implement controls to minimise

the risk to employees and any others affected by us.

• Provide an effective system of communication throughout the Company to minimise the

risk to employees and encourage participation of high standards of health and safety

management.

• Maintain high standards, procedures and work instructions, which are sufficient to avoid

injury to employees and others. Provide properly engineered facilities, plant and

equipment and maintain them in a safe condition.

• Ensure through a systematic approach, the integrity of all projects from conception to

post commissioning.

• Only utilise operatives or sub contractors who demonstrate a level of commitment to

and comply with health, safety and welfare standards commensurate with the standards

maintained by the Company.

• Through investigation, follow up and analysis of incident reports, I will strive to

eliminate incidents with the potential to result in injury to employees and others, damage

to plant and equipment, and harm to the environment.

• Have in place audit and review systems to monitor the performance standards of the

Company health and safety management system and provide for on-going

improvements.

MANAGING DIRECTOR DATE

09/09/2015

Page 5: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

SECTION 2

COMPANY ORGANISATION AND RESPONSIBILITIES

Page 6: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

2.2.1 HEALTH, SAFETY AND WELFARE RESPONSIBILITIES

The Company firmly believes that a good record in health, safety and welfare protection is not

only an efficient management system but, also makes sound economic sense for our future well

being. In recognition of this, the following organisational responsibilities have been introduced

and delegated to ensure we attain and enjoy both high standards of health and safety

management and awareness.

2.2 COMPANY MANGEMENT STRUCTURE

MANAGING DIRECTOR

DIRECTOR (Health and Safety) Advisor

(Appointed under “The Management of

Health and Safety at Work Regulations”)

DIRECTORS

ESTIMATOR & BUYER

SENIOR ENGINEER OFFICE MANAGER

SITE OPERATIVES ADMINSTRATORS

Page 7: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

2.2.1 MANAGING DIRECTOR

Prepare and maintain an up to date Company Health and Safety Policy Statement, ensuring it is

brought to the notice of all employees.

Develop organisational procedures for the implementation of the policy, ensuring each person is

aware of his/her responsibilities and duties and, allocating the necessary resource to carry them

out.

Be aware of the statutory legislation affecting the Company’s operations and administer the

policy throughout the Company.

Comply with areas of the Construction Design, Management Regulations where necessary.

Ensure appropriate training is identified and delivered to staff.

Ensure company undertakings are correctly planned, hazards identified and controlled and

proper working practices are observed at all times, as required by current legislation or, any

Approved Code of Practice.

Ensure all health and safety factors are taken into account and considered i.e. safe-working

methods, equipment to avoid injury, property damage and wastage, adequate sanitary and

welfare facilities.

Ensure we maintain a close liaison with all sub contractors employed by us on all matters

relating to health and safety.

Ensure systems are in place for the reporting, investigation, costing of injury, damage and loss

and promoting proper analysis of such investigations to detect trends and to eliminate hazards.

Appropriately discipline any member of staff who fails to satisfactorily discharge their

responsibilities for health and safety.

Set a personal example through wearing appropriate personal protective equipment at all times

when visiting site.

Arrange regular meetings with the Safety Adviser to discuss company performance, accident

prevention, improvements and the general health, safety and welfare standards of the company.

Page 8: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

2.2.2 ESTIMATORS & BUYER

In the absence of the Managing Director, the Estimators / Buyers will deputise on his behalf on

all such occasions and, to this end, he will be aware of all Company Health and Safety practice

and procedures affecting our on site plumbing engineering operations. In addition he is

required to:

• Understand the Company Health and Safety Policy and ensure it is readily available on

each site and bring to the attention of the Managing Director any amendment or new

working procedure relevant to our business undertaking.

• Plan work in accordance with legislative requirements ensuring it is regularly reviewed

to establish if appropriate improvements or additions should be made.

• Assess the risks associated with any unusual situation; outline the potential hazards at

each stage, indicate the necessary control procedures to be adopted and, provide written

instructions. If appropriate, obtain from sub-contractors, details of risk assessments,

substances and work processes that are hazardous to health or safety or, ensure their

compliance with agreed company methods of work.

• At all times, ensure the protection of all operatives on the site, including any members

of the public and others who may have a right to be there.

• Informing sub-contractors, at the earliest possible time, of the appropriate Personal

Protective Equipment to be worn on site, at all times.

• Discipline anyone failing to discharge his or her individual health and safety

responsibilities satisfactorily.

• Review work procedures, methods and associated safety aspects with supervisors and, if

appropriate, the safety adviser before any unusual work activity is undertaken.

• Ensure appropriate corrective action is taken to rectify any hazardous site issues brought

to your attention by the safety adviser.

• Evaluate the competence level of sub-contracting companies who tender for work on

company projects and ensure there is a commitment on their part to implement and

maintain all aspects of their own and others health, safety and welfare.

Page 9: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

2.2.3 3 SENIOR ENGINEER

Understand the Company Health and Safety policy and ensure it is brought to the notice of all

employees, particularly new starters. Carry out work in accordance with the policy and, bring

to the notice of the managing Director, any necessary improvement(s).

Ensure all employees, sub-contract operatives and, in particular any apprentices or young

people, are given site induction training highlighting site hazards, emergency procedures, safe

methods of work and any other relevant safety precautions necessary. Records of all site

induction training are to be retained.

Ensure work activities are carried out to the required company standards, with the minimum of

risk to employees, other contractors, the public, equipment or materials.

Comply with areas of the Construction Design, Management Regulations where necessary.

As appropriate, issue written instructions detailing the method of work required and, ensure sub

contractors work in accordance with their agreed method statements and are available.

Ensure appropriate assessments have been carried out on any substances, processes or work

activity hazardous to health and safety, and that the appropriate control measures, training,

instruction, protective clothing etc. have been provided.

Ensure operatives under your control are aware of their responsibilities for safe working and are

fully aware they are not required or permitted to take unnecessary risks.

Arrange materials to be delivered and stacked in order to avoid double handling and ensure that

the off-loading of materials is carried out in a safe manner.

Plan and maintain a tidy site and, check all machinery, power and hand tools are maintained in

good condition.

Ensure adequate supplies of protective clothing and equipment are maintained on site and that

the protective equipment is suitable. Records are to be maintained of all issues of PPE.

Ensure emergency systems are in place, for alerting any of the emergency services. Provision

adequate first aid facilities and make site operatives aware of the location and the procedures

for receiving first aid treatment for injuries and the subsequent reporting of such injuries.

Co-operate with the Safety Adviser and seek his advice before commencing any new methods

of work or potentially hazardous operations.

Ensure adequate fire precautions are provisioned for the site office and welfare facilities and

also for the storage, dispensing and use of any flammable liquids or liquefied petroleum gases.

Page 10: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

2.2.4 OPERATIVES

Be familiar with the Company Health and Safety Policy and carry out your work in accordance

with its requirements.

Ensure the correct tools and equipment are used for the job and are maintained in a good

condition.

Always wear safety footwear and, as appropriate, any other Personal Protective Equipment

provided, e.g. goggles, respirators etc. as detailed in specific assessments for the task being

undertaken.

Report immediately any defects in machinery, tools or equipment.

Work in a safe manner at all times and do not take unnecessary risks likely to endanger yourself

or others.

Do not use machinery, tools or equipment for work for which it they are neither intended for or,

you have not been specifically trained to operate.

Remain vigilant to other hazards developing during your work and, as appropriate, warn other

employees, particularly new employees and young people, of them.

Do not play practical jokes or engage in “horseplay” on site.

Ensure that all provisioned welfare and sanitary facilities are maintained to a high standard and

report any person found abusing them.

Report immediately to your supervisor any injury sustained from an accident at work, even if

the injury d not stop you from working.

If appropriate, suggest safer methods or procedures of work.

Page 11: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

2.3.5 SUB-CONTRACTORS

Any employed sub-contractor will be expected to comply with our Company Policy for Health,

Safety and Welfare and must ensure their own Company Policy is available on site whilst work

is being carried out.

The Site Supervisor will ensure that all work is carried out in accordance with the relevant

statutory provisions, taking account of and considering the safety of others on the site and the

general public.

Sub-contractors must provide documented risk assessments and methods of work for all work

activity to be undertaken on site, which may be hazardous to either health or safety, before any

work is commenced. Any such assessments are to be conveyed to all sub-contract employees

on site and records maintained of this action. Any materials or substances brought to site which

have a health, fire or explosion risk are only to be used and stored in accordance with current

Regulation and practice and this information is to be available to both operatives and other who

may be affected by them.

Any item of machinery or equipment brought to site and used by sub-contractors’ must be safe,

free from defect and maintained in good working order. All appropriate guards and safety

devices are to be fitted and all necessary certificates and documentation must be available for

inspection. Information and assessment on the noise levels of the machinery or equipment are

to be carried out by the sub-contractor and this information provided to our Contracts Manager

before work commences.

Any injury sustained or damage caused by sub-contract employees must be reported

immediately to the Site Supervisor.

Sub-contract employees must comply with all safety instructions given by the Site Supervisor.

A. White Plumbing Service Ltd Contractors have appointed an independent safety adviser

who will, as appropriate, inspect our sites and report on all aspects of health, safety and welfare

matters and a written report will be produced for our site representative. Any sub-contractor

informed of a hazard or defect during these inspections is to rectify the matter immediately and

confirm the action taken to our Site Supervisor.

Sub-contractors will provision, for their employees, suitable fire and first aid emergency

procedures and any equipment required by the Regulations, unless a previous agreed

arrangement has been made for the use of alternative facilities.

Particular note is to be taken of the need to ensure that all workplaces are kept clean, tidy and

free from debris and waste materials and all work areas are continually cleared as work

progresses.

Page 12: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

2.2.6 SAFETY ADVISER (DIRECTOR)

As required by Regulation 7 of “The Management of Health and Safety at Work Regulations”,

DIRECTOR have been appointed to advise and assist all related health, safety and welfare

issues related specifically to our business undertakings. DIRECTOR will be responsible directly

to the Managing Director and will also maintain a close relationship with all other employees.

Specifically they will perform the following functions:

• Advise on the application and maintenance of our Company Health and Safety Policy

arrangements

• Maintain an up-to-date knowledge in matters of legislation and Regulations as they

apply and affect the company health and safety policy.

• Advise the Managing Director on any related safety matters.

• Advise employees at all levels, as appropriate, on matters directly affecting their health

and safety.

• Monitor the Company’s health and safety status by visits to site and ensuring our

compliance with current legislation and our company policy and standards.

• Investigate and report on any accident, dangerous occurrence or near miss and, as

appropriate, recommend any means of preventing a recurrence of the incident.

• Maintain a close liaison with the Health and Safety Executive Inspectors and other

appropriate organisations and departments relevant to our undertaking.

• Encourage a high profile health and safety campaign within all levels of the company

and review or recommend any health and safety contributions from company

employees.

• Advise company managers and Site Supervisors on training requirements for employees

ensuring they are competent to carry out detailed tasks within the parameters of current

safety legislation.

• Carry out regular site visits and advise management on the implementation

arrangements of the health and safety policy.

• Advise on the training requirements for employees, especially new starters, specifically

formal safety awareness training and site induction training.

Page 13: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

SECTION 3

GENERAL ARRANGEMENTS

Page 14: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.1 Accident reporting and investigation

3.1.1 All accidents should be classified as follows:-

• Minor accidents, resulting in absence from the workplace of less than 7 days including

weekends

• Reportable “Over 7 day” injuries that result in absence from work exceeding 7 days.

• Reportable “Major” injuries classified as:

- Any fracture, other that to fingers, thumbs or toes

- Any amputation

- Dislocation of the shoulder, hip, knee or spine

- Loss of sight (whether temporary or permanent)

- Chemical or hot metal burn to the eye or any penetrating injury to the eye.

- Any injury resulting from an electrical shock or electrical burn leading to

unconsciousness or requiring resuscitation or admittance to hospital for more than

24 hours.

- Any other injury :

- Leading to hypothermia, heat-induced illness or to unconsciousness

- Requiring resuscitation or

- Requiring admittance to hospital for more than 24 hours

- Loss of consciousness caused by asphyxia or by exposure to a harmful substance

by inhalation, ingestion or biological agent .

- Either of the following conditions which result from the absorption of any

substance by inhalation, ingestion or through the skin:

- Acute illness requiring medical treatment or

- Loss of consciousness

- Acute illness which requires medical treatment where there is reason to believe

that this resulted from exposure to a biological agent or infected material.

3.1.2 Furthermore, to comply with Reporting of Injuries, Diseases and Dangerous

Occurrences Regulations (RIDDOR) all accidents, no matter how small and apparently

inconsequential, must be recorded in the Accident Book.

3.1.3 RIDDOR require "responsible persons" to report certain injuries and dangerous

occurrences associated with work, to the appropriate enforcement authority (ie HSE).

3.1.4 In the event of a Major injury the Managing Director must, in the first instance, contact

the HSE by telephone directly.

3.1.5 Several of the reportable dangerous occurrences (listed in schedule 2 to RIDDOR) are

relevant to construction work. Where the accident is of a type that is required to be

reported, the initial report should be by the quickest means, ie telephone followed up by

a written report on the official form F2508 (F2508A for diseases) within 10 days.

Page 15: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.1 Accident reporting and investigation (cont)

3.1.6 In the cases of "more than three day" accidents or occupational diseases, then a written

report submitted within 10 days (on F2508 or F2508A) is sufficient, as soon as the

employer becomes aware of the situation.

3.1.7 Any incident, accident or near miss shall be investigated, recording evidence via

photographs, written statements and interviews with those involved or injured and

witnesses. Any plant used shall be quarantined for inspection re damage or misuse of

equipment.

3.1.8 Where the outcome of the investigation can clearly identify a reason for the occurrence

and those people are identified as responsible then, if appropriate, the Managing

Director / Site Manager should instigate disciplinary procedures.

3.1.9 Accident reporting and investigation shall be undertaken by either the Site Supervisor

(non-reportable, minor incidents), or the Managing Director and / or Safety Adviser

(reportable, major injuries etc).

3.1.10 In all cases the appropriate remedial actions (to prevent a recurrence) will be instigated

by the Managing Director.

Summary

3.1.12 All accidents to be recorded in Accident Book

3.1.13 All accidents resulting absence exceeding 3 days must be reported to HSE

on F2508 form, DIRECTOR to be notified as soon as possible.

3.1.14 All “Major” accidents must be reported to HSE as soon as possible by telephone, again

DIRECTOR to be notified as soon as possible.

Options to report incident to HSE

Telephone The quickest and easiest way to do this is to call the Incident Contact

Centre with no need to fill in a report form. Just call 0845 300 99 23

(Monday to Friday 8:30am to 5:00pm) and speak to an ICC Operator

who will complete a report form over the phone. You will be sent a copy

for your records.

Online Complete the appropriate online report form above. The form

will then be submitted directly to the Incident Contact Centre. You will

be sent a copy for your records.

E-mail Download the appropriate form[10] and email it to [email protected].

Post Print out the appropriate form[11], complete it and post it to the Incident

Contact Centre, Caerphilly Business Park, Caerphilly,

CF83 3 GG.

Page 16: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.2 First aid and Emergency Procedures

3.2.1 Prior to the start of a project the Managing Director will formally appoint a First Aider

or an appointed person to be responsible to attend to an injured person.

3.2.2 Actions to be undertaken by the appointed person will include initial assessment of the

situation and to call emergency services, where appropriate. Only fully qualified First

Aiders will be permitted to provide first aid treatment.

3.2.3 The Appointed Person will be responsible for ensuring that the accident book is properly

filled out and that the Site Supervisor is advised of the injury where it may be

reportable.

3.2.4 The Appointed Person is also responsible for ensuring that the first aid box is fully

stocked at all times.

3.2.5 The name of the First Aider / Appointed Person shall be clearly displayed on the H & S

notice board and brought to the attention of all personnel at the induction process.

3.2.6 As A. White Plumbing Service Ltd only undertake work with Main Contractors we

shall expect the Main Contractor to ensure suitable provision for First Aid /

Emergencies and their details to be communicated at the main induction. Where

possible, A. White Plumbing Service Ltd shall supplement this with their own

Appointed Persons on sites.

3.2.7 All forms of ‘hot work’ are to have a suitable and appropriate “permit to work” and

effective monitoring of the hot work areas are to be carried out at cease work. Sub

contractors will include fire safety within their submitted risk assessments/method

statements, as appropriate.

3.3 The Construction (Design & Management) Regulations - Planning for Safety

3.3.1 The Construction (Design and Management) Regulations 2007 place duties on various

parties involved in the construction programme from Client to Contractors. The

Company shall fulfil the requirements of the Regulations related to its activities with

particular emphasis on co-ordination of work activities and good communication and

co-operation with our own staff and others on site.

3.3.2 A. White Plumbing Service Ltd shall plan, manage and monitor our own work to

ensure personnel and operations under our control are safe prior to works

commencing on site.

3.3.3 The Company shall carry out a survey of work tasks/workplace in relation to Health and

Safety and shall produce safe systems of work to minimise risks prior to works being

undertaken.

Page 17: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.2.1 We shall ensure any sub-contractors used are competent and request them to submit

their own proposals to overcome potential high-risk areas.

3.3.5 Monitoring of safety standards shall be via internal and external site inspections which

shall generate written reports. Any remedial action recommended shall be closed out as

soon as possible by the Site Supervisor or Managing Director.

3.3.6 During site inspections, meetings and briefings we shall consult all personnel regarding

matters pertaining to health and safety. Requests, queries or concerns shall be remedied

as soon as possible and passed to Head Office for discussion at the Monthly Contracts

Meeting.

3.3.7 Specialist advice shall be called on from our Safety Advisers as required to ensure

compliance with these Regulations.

3.4 Information, Training & Consultation

Safety and Health Information

3.2.1 Safety and health information shall be communicated to all relevant personnel including

those within the company and others who may be affected by the company’s operations.

3.4.2 Safety information may be in the form of this Policy, site-specific documentation,

posters, memos etc.

3.4.3 Site Supervisors hold copies of this Policy and site-specific documentation on site at all

times. Additional information on the whole range of construction operations is

contained in the construction manual GE706, a copy of which is held by the Site

Supervisor.

Training

3.4.4 The Managing Director will, as necessary, arrange suitable training to ensure that

employees at all levels are:-

(a) Aware of their safety and health responsibilities;

(b) Competent to carry out safely their duties as Managers, Supervisors or

Operatives;

(c) Competent to operate any specialist tools, plant or equipment.

Page 18: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.4.5 The Site Supervisor will supervise the training of new starters and apprentices and

arrange suitable induction training to ensure that they are familiar with the Policy and

with the hazards and precautions associated with their work.

3.4.6 Induction training shall be given to all operatives (both direct employees and

contractors) on all contracts prior to commencement of their work. All relevant

information pertaining to each contract shall be communicated at the induction along

with any residual risks and subsequent control measures as per our Risk / COSHH

Assessments.

3.4.7 All training (including induction training) shall be recorded with copies of attendance

sheets / certificates being held at Head Office and with the Principal Contractor on site.

Sub-contractor’s training records shall be requested prior to them commencing work on

site.

Consultation

3.4.8 Employees will be provided with copies of the General Policy Statement, details of their

individual responsibilities and other documents relevant to their work. The Policy will

be explained by appropriate staff and full discussion is encouraged.

3.4.9 Initiatives from employees on safety and health matters are encouraged and these should

be made through normal management channels. The Managing Director is readily

available, if necessary, for consultation on any safety or health matter.

Page 19: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

PROCEDURES FOR THE EMPLOYMENT OF NEW EMPLOYEES

3.4.10 This procedure is to be carried out by the Head Office when a new employee starts

work:

• Explain to the new employee his duties and to whom he is responsible

• Advise of the contents of the Company Safety Policy - ensuring the employee is

aware of his/her responsibilities

• Ascertain from the new employee if he suffers from any disability/illness, which

may prevent him/her carrying out certain work activities or if he requires additional

protective measures.

• Warn the new employee of any potentially dangerous areas, hazardous operation

and/or any prohibited actions on site e.g. entering specific areas without a safety

helmet, operating plant unless authorised etc.

• Arrange appropriate training or instruction to be given and inform head office

management, e.g. abrasive wheels etc

• Issue appropriate PPE e.g. safety helmet, goggles, ear defenders and obtain their

signature for the items issued.

3.4.11 Advise of the location of the first aid box and of the procedures to be taken in the event

of an accident, in particular, the necessity to record all accidents however trivial it may

appear at the time

Page 20: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.5 Welfare provisions on site

3.5.1 The Principal Contractor is responsible for providing adequate welfare facilities

however the Site Supervisor is responsible for ensuring that the facilities are adequate,

well maintained, serviced and clean at all times.

3.5.2 Welfare facilities will include but not be limited to

• Sanitary conveniences

• Washing facilities

• Drinking water

• Storing and changing clothes

• Rest facilities

3.5.3 These provisions must be in place prior to works commencing on site and be

situated reasonably near all places of work.

3.6 Fire / Emergency precautions – on site

3.6.1 The Site Supervisor shall ensure suitable and sufficient fire / emergency arrangements

are in place on all sites prior to A. White Plumbing Service Ltd commencing works.

Where equipment is provided by A. White Plumbing Service Ltd, the Site Supervisor

shall be responsible for routinely checking all fire equipment and recording the findings.

3.6.2 All operatives shall be given a site induction before entering the site, detailing the

emergency plans in the event of a fire / explosion or dangerous occurrence (i.e. scaffold

collapse).

3.6.3 The alarm shall be raised as per the Principal Contractors procedures but if one of our

employees is the first to notice an emergency situation they shall raise the alarm

verbally. All personnel shall assemble at the designated ‘muster point’.

3.6.4 A fire / emergency information poster shall be clearly displayed at various points with

relevant details of fire / emergency procedures.

3.6.5 A. White Plumbing Service Ltd employees shall make themselves known to the

appointed Fire Marshall during roll call and shall remain at the muster point until told

they can leave or re-enter the work area.

3.6.6 The Managing Director shall be informed as soon as is reasonably practicable or any

emergency situation which involves A. White Plumbing Service Ltd employees.

3.6.7 All appropriate precautions, such as the removal of flammable materials and not

smoking, must also be adhered to by A. White Plumbing Service Ltd employees.

Page 21: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.6.8 Personnel shall only attempt to fight fires when they have been trained to do so and feel

such an attempt is safe and within their capabilities.

3.6.9 Fire / emergency procedures shall be developed by the Principal Contractor for each site

as conditions and work practices vary from site to site.

3.7.0 Fire / Emergency procedures – Head Office

3.7.1 A fire risk assessment shall be undertaken for our main premises and any areas

identified as in need of remedial action shall be addressed as a priority.

3.7.2 Suitable and sufficient fire detection, warning and fire fighting equipment shall be

available on the premises should a fire break out.

3.7.3 An appointed person within the office shall be responsible for carrying out routine

checks on equipment and exits with records kept.

3.7.4 Refer to the Office Policy in Appendix B for further details.

3.8 HSE notification and statutory notices

3.8.1 Where required to be notified (in accordance with the Construction (Design and

Management) Regulations 2007), the HSE must be advised of the proposed start of a

project. This shall be undertaken by the Principal Contractor using the form F(10)

signed by the Client. A copy will be displayed on site and our Site Supervisor shall

check this is in place prior to works commencing.

3.8.2 A copy of the HSE law poster shall be available on all projects and at Head Office along

with copies of relevant Insurance details.

3.9 Competence checks on sub-contractors

3.9.1 Prior to appointment each contractor shall be assessed for competency for a given risk

category of work. This is undertaken by the Managing Director using the form in

Appendix A. It may be completed following a discussion with the contractor however

evidence shall also be requested.

3.9.2 Competence may also be assessed through previous knowledge of contractor’s work or

through recommendation but will not negate the need for relevant site specific

documentation to be provided.

Page 22: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.10 Risk Assessments and Method Statements

3.10.1 All projects and significant operations will be assessed for risks and method statements

prepared to ensure that all foreseeable risks are adequately identified and controlled with

details communicated to relevant personnel. Safe systems of work shall be

implemented, monitored and reviewed.

3.10.2 In accordance with the Work at Height Regulations, all work at any height is to be the

subject of Risk Assessment.

3.10.3 The Managing Director in liaison with DIRECTOR shall produce generic risk

assessments for work procedures.

3.10.4 The Managing Director and Site Supervisors shall be responsible for making all generic

risk assessments site specific. They shall also produce site specific Method Statements

for work processes as required.

3.10.5 All significant findings from the risk assessment process shall be brought to the

attention of the workforce. This shall be undertaken primarily at the induction stage but

shall be reinforced through regular Toolbox Talks, briefings and at meetings.

3.10.6 Risk assessments shall be undertaken for all tasks and shall include the identification of

risks posed to those not directly employed by A. White Plumbing Service Ltd(i.e.

members of the public, visitors, children etc), through their undertakings.

3.11 Hazardous Substances (COSHH)

3.11.1 Where it is necessary to use substances or processes, which could be hazardous to

health, the risks will be assessed and employees informed of

appropriate precautions, which must be taken prior to any substances being used.

3.11.2 Containers of hazardous substances should be marked with the appropriate danger

symbol and must not be used unless information on their safe use has been provided.

Page 23: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.11.3 The Company will use non-hazardous materials where possible, but the use of

hazardous chemicals etc. is necessary in many cases. The Control of Substances

Hazardous to Health Regulations require the following measures to protect people from

exposure to health risks from hazardous substances:-

• An assessment of the health risks created by work with hazardous

substances, and of necessary precautions to be taken.

• The control of exposure, where possible by means other than personal

protective equipment.

• Ensuring that control measures are used and maintained.

• The keeping of records and the giving of information, instruction and training to employees.

3.11.4 The Managing Director will ensure that information on the safe use of all materials

ordered by the Company is obtained from suppliers. The Site Supervisor will ensure

that similar information is provided where materials are supplied by subcontractors.

3.11.5 The Managing Director will ensure the preparation of an assessment of the health risks

involved in the use of any hazardous substance, ensure the provision of necessary

equipment and facilities, inform Supervisors of precautions which must be observed and

ensure that all necessary information, instruction and training is provided prior to any

substances being used.

3.11.6 The assessment of hazards from particular substances and processes may, where

necessary, be carried out by external consultants. Where the significance of exposure is

uncertain, it may be necessary to sample airborne contaminants; biological monitoring

may be necessary in the case of substances hazardous by ingestion or absorption through

the skin.

3.11.7 Many of the processes carried out by the Company are repetitive and assessments will

need to be carried out only once, unless circumstances of the work changes

significantly, e.g. when substances are used in confined spaces.

3.11.8 Assessments must be recorded in writing to show decisions and why and how they were

made. Records of assessments will be kept by the relevant parties.

3.11.9 Substances / process deemed hazardous to A. White Plumbing Service Ltd employees

and others who may be in the immediate vicinity include:

▪ Cutting processes or welding - Order to size to reduce need to cut;

- Ensure LEV or dust collection / suppression;

- Cut / weld in well ventilated area (outside);

- Wear appropriate RPE where above measures unpractical

COSHH Assessments shall be available in the site-pack.

Page 24: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.12 Manual Handling

3.12.1 Wherever possible, use mechanical means to lift and transport items. Where use of

mechanical means is impracticable, a risk assessment must be made and sufficient

persons must be available to lift the relevant load taking into account the physical

capability of the individual, size, shape and weight of the load.

3.12.2 It remains the responsibility of the employee to ensure the load is within his / her

capacity; and that assistance is sought if the load is unmanageable.

3.12.3 Ensure that the items are lifted correctly with the back straight and using the legs to raise

yourself if the load is low. Use a good grip with the feet apart to hip width and one foot

slightly in front of the other.

3.12.4 Avoid twisting, stooping or reaching to lift or deposit the load. Ensure that access areas

are clean and clear and that the lighting is adequate. Wear gloves and safety footwear.

3.12.5 Protect sharp edges. Avoid long lifts and if necessary change grip when the load is at

waist height. Keep the load close to your body. During repetitive work allow sufficient

time for resting.

3.12.6 If more than one person is involved then a suitable person must be nominated to control

the job. If possible, break the load down into smaller items and secure items, which are

loose to prevent the load shifting when being carried.

3.12.7 The Managing Director / Site Supervisor shall be responsible for ensuring manual

handling assessments are undertaken – this may be through delegation to other

competent personnel.

3.12.8 Areas identified which require assessment for manual handling include:

▪ Lifting and carrying large, unwieldy items (boilers / piping):

- Order manageable sized items;

- Engage the use of mechanical devices to lift, carry and position;

- Reduce the time required to manually handle items;

- Use two-man lifts wherever possible;

- Ensure safe handling techniques are used.

▪ Lifting and carrying general construction tools / items:

- Engage the use of mechanical devices to lift, carry and position;

- Reduce the time required to manually handle items;

- Carry only small amounts within your capability;

- Ensure safe handling techniques are used.

Page 25: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.13 Site Auditing / Inspections

3.13.1 The Director responsible for Health and Safety shall arrange for regular audits

of work activities to ensure compliance with relevant statutory provisions and

the Company Health and Safety Policy.

3.13.2 Such audits shall include external Advisers auditing our safety management systems /

premises and also visiting sites and reporting on safety standards.

3.13.3 In addition to auditing, regular walk-through inspections shall be undertaken by Site

Supervisors with findings recorded and addressed as required.

3.14 General Site Rules

3.14.1 Safety Induction Training will be provided for all personnel on first arrival on site

(provided by the Principal Contractor and A. White Plumbing Service Ltd Site

Supervisor).

3.14.2 Noise - will be reduced wherever possible with cutting operations undertaken at

designated areas on site and limited. Radios on site are not allowed.

3.14.3 Wherever possible environmentally friendly products shall be used.

3.14.4 Site housekeeping – our work areas shall be maintained in a clean, tidy and safe

condition for the duration of the works.

3.14.5 Ensure that holes, excavations etc are securely protected / covered at all times and

particularly at the end of each day.

3.14.6 All waste materials including waste packaging, building materials, excavated materials

etc shall be collected and removed from site at regular intervals and prior to completion

of each contract. The Principal Contractors Site Waste Management Plan shall be

strictly adhered to with segregation and minimisation of waste a priority.

3.14.7 Traffic Management Systems and speed limits shall be strictly adhered to at all times.

3.14.8 Appropriate PPE shall be worn for relevant tasks by all personnel, including Hi-vis

clothing.

3.14.9 Any other rules which are dictated by the Principal Contractor, Client or work processes

etc. shall be adhered to by all A. White Plumbing Service Ltd personnel.

Page 26: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.15 Personal Protective Equipment (PPE)

3.15.1 After all other measures have been taken to minimise risk there will still remain

circumstances where protective equipment should be used.

3.15.2 In all cases the equipment should be suitable to the risks and conditions of use, of good

fit, compatible with other equipment and to C.E type approval standards.

3.15.3 It should be checked before issue and use, used only in accordance with the

manufacturer, stored carefully between use and disposed of safely when no longer

adequate.

3.15.4 The Company will seek to provide the equipment and suitable training and instruction to

its use. Employees must ensure that they are adequately protected, use what is provided

and treat it with due care, reporting any defect or loss and return to stores after use.

3.15.5 The Site Supervisor will ensure the provision of all necessary protective clothing and

equipment. Records will be kept of all PPE issued.

3.15.6 Subcontractors will normally be required to provide items of protective clothing and

equipment for their employees, unless alternative contract arrangements are made.

3.15.7 Employees and Subcontractors have a duty to use and to look after items of equipment,

which are provided for their protection. The misuse and wilful damage of any PPE may

result in disciplinary action being taken.

3.16 Plant, equipment and transport

3.16.1 All plant, equipment and transport is either company owned or hired from reputable hire

companies. All work equipment will be supplied with adequate safety instructions,

certification, thorough examinations certificates etc.

3.16.2 On arrival on site each piece of work equipment will be checked by the Site Supervisor

prior to being brought into use for the first time. A permit system is in place for high-

risk equipment such as screed pumps to ensure appropriate guarding etc is in place.

3.16.3 The Site Supervisor will also ensure that each piece of work equipment is regularly

checked for safety integrity, especially guards, braking devices, interlocks etc. Such

inspections shall be recorded on the appropriate form and kept on the site throughout the

life of the project with copies sent to H.O.

3.16.4 All equipment used on site must be in efficient working order and in a state of good

repair. It must also be suitable for the job which is being undertaken.

3.16.5 Maintenance of plant and equipment shall only undertaken by trained and

competent persons in line with manufacturers recommendations.

Page 27: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.16.6 Only those persons appointed and carrying a valid licence or certificate will be allowed

to use the certain plant and equipment (i.e. abrasive wheels).

3.16.7 Where new equipment is provided, the user will be given full instructions and training

(including manufacturers manual etc) on the safe and proper use of the equipment.

Records of such training shall be kept.

3.17 Electrical Equipment

3.17.1 A 110V temporary electrical supply will normally be provided on site and only 110V (or

less) tools and equipment shall be used where practicable.

3.17.2 All cables and connections must be checked by operatives prior to use to ensure they are

sound. Operatives should check for any external damage, including leads, plugs, guards

etc. Plugs must not however be taken apart.

3.17.3 All portable electrical equipment shall be tested by a competent PAT tester and shall

carry a label to indicate that the equipment is safe and does not pose a hazard. This is

undertaken internally at pre-determined intervals depending on the equipment and

records are kept.

3.17.4 The Managing Directors shall be responsible for ensuring all electrical equipment is

PAT tested with records kept.

3.17.5 Sub-contractors own equipment shall only be authorised on site when it complies with

the above.

3.17.6 Waterproof fittings must be used for any external work.

3.17.7 Leads must not be allowed to trail and cause a trip hazard.

3.17.8 Any repairs must be made by trained and authorised persons. Operatives must never

remove casings, leads, guards etc in order to carry out their own repairs.

3.17.9 Personnel shall be briefed on the dangers of faulty electrical equipment, pre-use checks

and fault reporting procedures at the induction stage and during Toolbox Talks /

inspections etc.

3.17.10Inspections shall be undertaken of portable electrical equipment on a weekly basis with

records kept of the findings. Any equipment deemed to be a risk shall be removed from

the work area and repairs undertaken.

Page 28: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.17.11 Permits to Work

All hot work activities are to be planned if they are to be executed safely and

successfully. Procedures will be required to control all hot work activity in hazardous

work areas, i.e. confined space, toxic environments etc. and should clearly show the

safety precautions that are required and should be properly supervised at all times. On

no account is anyone to carry out hot work on their own or without the proper safety

precautions and protective equipment present in any hazardous area.

3.18 Asbestos

3.18.1 The Company will not use asbestos products in its works. However, in refurbishment,

asbestos may be encountered in the form of asbestos cement sheets, asbestos lagging,

coatings or insulation board.

3.18.2 The Managing Director will ensure wherever it is applicable, an appropriate asbestos

survey has been undertaken or a copy of the premises Asbestos Register requested.

Details of which shall be included in the site pack and communicated to relevant

personnel prior to works commencing on site.

3.18.3 Personnel shall be trained and regularly briefed on how to identify possible asbestos

containing material – this shall include where it may be found and what it looks like.

Included in the briefing will be procedures to follow in the event of finding suspected

asbestos during construction works.

3.18.4 Where suspected asbestos is found, employees are required to stop work and segregate

the area to prevent possible further contamination,

CONTACT YOUR SUPERVISOR AND / OR MAIN CONTRACTO

IMMEDIATELY - DO NOT CONTINUE WORKING IN THAT AREA

3.18.5 An experienced, licensed specialist contractor will be employed to assesses and sample

the materials, if necessary the contractor will strip or carry out whatever work is

necessary to make the area safe.

Page 29: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.19.1 Work at Height

3.19.1 All work at height undertaken by A. White Plumbing Service Ltd will be carried out

within the scope of The Work at Height Regulations 2005. All work at height will be

subject to risk assessment being undertaken.

3.19.2 Where A. White Plumbing Service Ltd operate as a sub- contractor, but before any

work at height is undertaken on a Principal Contractors premises, our Site

Supervisor will communicate with the Principal Contractor and satisfy himself that

the work has been planned and suitable equipment has been selected in respect of

access, edge protection and fall protection.

3.19.3 Where A. White Plumbing Service Ltd are responsible for selecting, providing and

erecting access equipment for working at height we shall ensure that:

• Work at Height is avoided where possible, i.e. done at ground level and lifted

into place;

• If avoidance is not possible, equipment will be selected to prevent a possible fall,

this will be achieved by the use of scaffold, edge protection, birdcage scaffold,

powered access platforms and suitable access methods, i.e. Haki stair towers;

• Where it is not possible to prevent a fall, a method will be used to mitigate the

consequences of a fall i.e. fall nets, soft landing systems or personal suspension

equipment (harnesses).

3.19.4 In all cases A. White Plumbing Service Ltd will ensure:

• All work at height is planned and organised.

• Weather conditions are taken into account.

• The location of the work place is safe.

• All operatives undertaking the work at height are trained and competent.

• The equipment selected for work at height is appropriately inspected.

• The risk from fragile materials i.e. roof lights, is controlled.

• The risk from falling materials is controlled.

3.19.5 Other access and work platforms can be used, i.e. ladders and steps, but only after more

appropriate methods have been exhausted, and only for short duration, following a risk

assessment.

Page 30: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.20 Noise

3.20.1 Noise at work, if allowed to remain unchecked could lead to the reduction or even

the complete loss of hearing in employees' exposed to it. It is imperative that

measures are swiftly taken to reduce the excessive noise levels to a minimum and where

possible to the levels required by the Control of Noise at Work Regulations.

3.20.2 The Noise Regulations require specific action to be taken at certain values, these relate

to:

• The levels of exposure to noise averaged over a working day or week; and

• The maximum noise (peak sound pressure) to which employees are exposed in a

working day.

3.20.3 The Regulations have placed duties on employers at 3 defined action levels:

1st Action Level - daily or weekly exposure of 80 dB(A) or peak pressure of 135 dB

(A).

Employees to be informed of the potential damage to their hearing and, if requested by

them, provisioned with suitable hearing protection.

2nd Action Level – daily or weekly exposure of 85 dB(A) 85dB(A) or peak

pressure of 137 dB (A).

Where possible, the noise levels are to be reduced below the 85dB(A) threshold. If this

is not possible, the area is to defined as a noise hazard zone and suitable signs are to be

displayed; employees to be informed of the damage which will be caused to their

hearing and they are to be provisioned with suitable hearing protection which they

MUST wear.

Peak action level 87 dB(A) or peak pressure of 140dB(A) - these levels must not be

exceeded

Employees exposed to this level of noise, are to be removed from the workplace and not

exposed to further noise sources for that day.

3.20.4 These exposure limit values take account of any reduction in exposure provided by

hearing protection.

3.20.5 As required by the Regulations, whenever a potential noise hazard exists, arrangements

will be made to carry out suitable noise assessments and appropriate action will be

taken.

Page 31: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

In addition Supervisor are to ensure the following:

• Ensure any workplace instructions, regarding the wearing of hearing protection in

designated areas, are obeyed.

• Ensure machinery and equipment is selected and maintained to minimise noise

levels, and keep all engine covers etc. closed during use.

• Where possible, consider alternative methods of work to eliminate and reduce

possible noise levels.

• Where prolonged exposure is unavoidable, work should be planned to give

employees' adequate rest breaks away from the noisy environment.

• Ensure adequate means of communication in noisy environments, especially if there

are relevant alarm sounds, which may need to be heard, alternative signals may need

to be provided.

• When necessary, ensure that employees' have been instructed in the use of any

equipment provided for protection.

• The Safety Adviser, if requested will provide the following services, noise surveys,

noise assessments, noise control measures, individual noise monitoring, training and

instruction for employees'.

3.21 Vibration

3.21.1 The Company shall whenever possible use mechanically propelled equipment as

opposed to hand held. Where this is not possible low vibration equipment shall be

requested from suppliers (this also applies to contractors plant).

Personnel will be instructed in the regards of vibrating equipment and procedure to be

followed to reduce over exposure.

3.21.2 Vibration exposure from prolonged and regular work with powered hand-held tools,

equipment or processes can have adverse effects on the hands and arms of users.

Without effective controls, workers using such equipment may suffer various forms of

damage, collectively known as ‘hand-arm vibration syndrome’ (HAVS). This is a

painful condition and the effects can include impaired blood circulation, damage to the

nerves and muscles, and loss of ability to grip properly. The best-known form of

damage is vibration white finger’ (VWF), which is a prescribed industrial disease under

RIDDOR Regulations.

Page 32: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.21.3 Individual work processes and the tools being used should be observed. The

following points shall be considered to assist in identifying the problem.

• The number of employees using power hand-held tools and where they work.

• Is there a high turnover of people in any department using powered hand-held tools?

• Ask operators about vibration levels when the tool or machinery is in use. Do they

get numbness or tingling in their fingers? Have the operators complained about

recurring pain or throbbing in their hands, or difficulties with gripping objects, or

completing fiddly tasks such as fastening a button?

3.21.4 Looking at the task:

• Could the process be redesigned to avoid or reduce the use of powered hand-held

tools, e.g. by substitution or alternative mechanization?

• Are alternative lower vibration processes or methods available?

• Could remote or power-assisted controls be introduced?

3.21.5 Reducing Vibration Transmitted to the Hands

• Suitable and sufficient information, instruction and training shall be provided to all

operatives that use equipment that causes vibration to the hands. This should cover

working techniques to avoid excessive grip pressure and push and guiding forces.

The encouragement of workers to select the lightest tool capable of doing the work,

to rest the tool as much as possible on the material being worked, and hold it with a

light but safe grip.

• Job rotation and careful planning of the work can also keep the vibration exposure

down. Suitable levels of supervision of the activity will take place to make these

controls effective.

• It is very important to maintain blood circulation. This will be achieved by keeping the

hands and body warm to help maintain a good flow of blood to the fingers and reduce

the risk of injury.

• Gloves must be worn at all times when operating equipment that allows vibration to

reach the hands. This will assist in keeping the hands warm, so as to increase the blood

flow and reduce the vibration level to the hand.

• Special soft lining gloves are available. These gloves can reduce high-frequency

vibration but have little effect a mid or low frequencies, which are those most likely to

damage blood flow to the hands. The wearing of gloves also offer physical protection

to the hands.

• As in all cases involving personal protective equipment, it must only be used as the last

means of defence (i.e. when all other options of removing the hazard have been used).

Page 33: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

• Exhausts from pneumatic tools and equipment must not be allowed to discharge towards

the operator’s hands. A flexible hose to lead the exhaust away will also help with noise

control.

• Avoiding or cutting down smoking will help blood circulation, as will massage and

exercising of the fingers during work breaks.

• Assessments for all relevant tools / equipment shall be undertaken using manufacturers

guidance and the findings / controls communicated to relevant personnel.

3.22 Health Surveillance

3.22.1 The Managing Director shall ensure that prior to employment, personnel are asked as to

their general health in relation to work tasks required. A self-check questionnaire has

been introduced for completion by employees to help assess whether further specialist

screening or action is required by A. White Plumbing Service Ltd.

3.22.2 Should any person have a health problem which could affect their safety while at the

workplace, they shall inform their immediate supervisor.

3.22.3 Supervisors shall, where work activities could cause health problems, regularly check on

the welfare of personnel. Medical Practitioners (i.e. Occupational Health) shall be

approached whenever assessments / pre-contract information identifies possible health

risks.

3.23 Alcohol and Drug Abuse

3.23.1 Alcohol or drug abuse by employees and contractors (including supervisory and

management staff) can adversely affect the safety and health of not only themselves, but

the safety of all other operatives who work with them on site. It is, therefore, our

company policy that any person is known to be, or strongly suspected of being, affected

by alcohol or substance abuse, he/she is to be referred to the site agent who is to arrange

for the person to be removed from site.

3.23.2 Symptoms suggesting that a person is under the influence of drugs or alcohol may be

created by other conditions e.g. heat exhaustion, hypothermia, diabetes, etc, and the

person may be affected by legitimate medication prescribed by a doctor. These

conditions, while still requiring the person to be removed from their work for safety

reasons, will obviously affect any disciplinary action that may be considered. If there is

any doubt as to the person’s medical condition or to the cause of their condition, then,

medical advice should be sought immediately.

Page 34: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.24 Dermatitis

3.24.1 Occupational dermatitis is caused by the skin coming into contact with certain

substances at work i.e. cement, concrete, mortar and mineral oils. It is not

infectious, so it cannot be passed from one person to another.

3.24.2 Contact with these substances might immediately affect you or take weeks, even

months or years to cause occupational dermatitis. Irritant Contact Dermatitis

occurs soon after contact with the substance and the condition reverses after

contact ceases. However, prolonged and regular contact with sensitising agents

such as found in cement, turpentine and epoxy resins can lead to Allergic Contact

Dermatitis which is irreversible.

3.24.3 Signs can be redness, itching, scaling or blistering of the hand or forearms, the

places most likely to touch the substance. Certain type of dusts, liquids and

fumes can affect your face, neck or chest and can be very painful.

3.24.4 Dermatitis can be best controlled through good personal hygiene (regular hand

washing, avoiding contact with substances) and the use of personal protective

equipment e.g. overalls, wellington boots and use of barrier creams.

3.24.5 Reference must be made to the assessment made under the Control of Substances

Hazardous to Health Regulations to ensure a safe system of work is made

relevant to the level of risks.

3.25 Respiratory Protection/Silica Dust

3.25.1 Silica dust is likely to be encountered in the cutting or blasting / cleaning of

sandstone, granite Or brick.

3.25.2 The Managing Director will identify material liable to give rise to this hazard and

the Contracts Manager will ensure that the risk is assessed and necessary control

measures specified.

3.25.3 Control measures may include the use of wet methods, exhaust ventilation, the

use of Respiratory protective equipment and the segregation of other workers.

Information regarding health risks associated with these operations i.e. silicosis

will be given to employees.

3.25.4 If identified as being necessary, employees may be requested to attend

occupational Health interviews.

Page 35: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

3.26 Lead

3.26.1 Where there is any possibility that persons may be exposed to lead, a suitable

assessment as required by the Control of Lead at Work Regulations must be carried out.

3.26.2 Exposure to lead will be determined by a competent person to determine if the exposure

to lead is significant.

3.26.3 Where exposure is significant, the company will provide adequate control measures, and

medical surveillance, to bring the exposure level down so far as is reasonably

practicable. A method statement will be developed for this work.

3.26.4 Employees will be given adequate information, instruction and training to understand

the associated risks and necessary precautions. Adequate welfare provisions, i.e.

washing, eating/drinking and changing facilities, and clothing accommodation, will be

made available.

3.23 Office Safety

3.23.1 All office staff have a duty to assist in reducing the risk of accidents and fire.

The following rules and precautions are to be observed:-

2.23.2 Keep desks tidy and ensure that waste paper is disposed of regularly.

3.23.3 Use a safe method of lifting any article and get assistance if necessary.

3.23.4 Never leave filing cabinet drawers open, or open more than one at a time.

3.23.5 Ensure that cables and connections on all electrical equipment are sound, that the

equipment is earthed and that a fuse of the correct rating is fitted in the plug.

3.23.6 Ensure that passageways, stairs and exits are kept clear of any obstruction.

3.23.7 All staff must be familiar with the fire emergency procedure and how to use fire

extinguishers, which are provided (water for wood or paper fires, dry powder or

CO2 for electrical fires).

3.23.8 Any DSE ‘Users’ must have a DSE Assessment for their workstation to ensure it

is ergonomically sound.

For further details see dedicated office safety policy in appendix

Page 36: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

APPENDIX A

Subcontractors H&S Competency Proforma

Page 37: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

VH H M L

HEALTH & SAFETY COMPETENCY ASSESSMENT OF CONTRACTORS

SITE LOCATION....................................OPERATION(S)..................................

RISK CATEGORY VH H M L

NAME & ADDRESS OF CONTRACTOR.............................................................

..................................................................................................................

HEALTH & SAFETY POLICY (Up to date/Signed by Senior Manager or Director Statement of commitment/lines of responsibilities)

SAFETY ADVICE/SURVEILLANCE (Independent company or internal advisor trained or experienced)

SAFETY TRAINING TO SUPERVISION & WORKERS (Series of suitable & sufficient courses to reach acceptable standard and/or experience)

PROCEDURES FOR COSHH/RIDDOR/NOISE (COSHH assessments, not just data, notification of accidents & records, noise assessments)

SAFETY GROUPS AND AWARDS (Federation or trade association, recognised Safety award)

PLANT, EQUIPMENT & VEHICLE INSPECTION (Inspection procedures if any, eg. Crane, hoist, etc as per F91 registers + others)

SAFE SYSTEMS OF WORK/METHOD STATEMENTS (Eg. Permit to work systems, detailed account of method, break down of elements)

ASSESSMENT OF THEIR SUBCONTRACTORS (Procedures to vet their subcontractors for safety)

RISK ASSESSMENTS (Procedures to identify risks and hazards, eg, H, M, L, and to address them - eliminate, substitute, control, reduce exposure, then PPE)

PASSING ON INFORMATION TO WORKERS (Induction sessions, tool-box talks, information packs, handbooks)

COMPETENCY OF DESIGNERS (Understanding of safety factors by their designers eg. practicality of erecting steel structures, edge protection, sequencing, anchor holes etc)

OVERALL ASSESSMENT

Comments:-

Signed Dated_

Page 38: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

AWPS Ltd

Sept 2015 Health and Safety Policy

APPENDIX B

Office Procedures

Page 39: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

CONTENT

Introduction...........................................................................................................

1. Company Policy....................................................................................................

2. The Law ................................................................................................................

3. Training.................................................................................................................

4. Dress .....................................................................................................................

5. Conduct .................................................................................................................

6. Office Equipment..................................................................................................

7. Small Office Items ................................................................................................

8. Lifting and Carrying .............................................................................................

9. Slips and Falls .......................................................................................................

10. Lighting.................................................................................................................

11. Visual Display Units .............................................................................................

12. Electrical Equipment.............................................................................................

13. Fire Precautions ....................................................................................................

14. Types of Extinguishers .........................................................................................

15. Health Hazards......................................................................................................

16. Protective Clothing ...............................................................................................

17. First Aid/Reporting Injuries..................................................................................

18. Toilet Facilities .....................................................................................................

19. Safety Committees ................................................................................................

20. Contractors and Visitors .......................................................................................

Page 40: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

INTRODUCTION

It is important to ensure that all employees are provided with a safe and healthy place in

which to work. This booklet is designed to help you understand the safety rules which you

must comply with whilst working in offices.

It is important to read, understand and implement the various requirements laid down in this

leaflet in order to prevent ill health and injury. A comprehensive Health and Safety Policy

has been published and is displayed on notice boards for your benefit. If you need further

advice on matters concerning health and safety please consult the policy or refer the problem

to your immediate superior so that it can be dealt with in the proper manner.

1. COMPANY POLICY

The Company Health and Safety Policy which is displayed on the notice board gives

details on the responsibilities assigned to key individuals within the organisation to

ensure that health and safety standards are implemented and properly maintained.

Comprehensive arrangements have also been included in order to explain company policy

on such matters as information and training, office inspections, reporting unsafe or

unhealthy conditions, safe systems of work, provision of safety equipment and devices,

fire prevention, etc.

2. THE LAW

The Health and Safety at Work etc. Act 1974 is the principle statute for ensuring that

appropriate health and safety standards exist within the U.K. This is supplemented by

more specific legal requirements contained in Regulations which relate to office

environment, such as The Management of Health and Safety at Work Regulations,

Workplace Regulations, Provision and Use of Work Equipment Regulations , Display

Equipment Regulations and others. The law says “you must take reasonable care of

the health and safety of yourself and of other persons who may be affected by your

acts or omissions at work”. It goes on to state that “you must not intentionally or

recklessly interfere with or misuse anything provided in the interest of health, safety

or welfare”. For example you are not allowed to misuse or interfere with fire equipment

which is there to help protect people if a fire breaks out. You will find a poster displayed

within the building entitled “Health and Safety Law” which summarises the main legal

aspects relating to health and safety. You should consult this poster for more detailed

information on the legal requirements relating to the office.

3. TRAINING

When you first join the Company you will receive appropriate instruction in order to

explain the various health and safety rules and procedures which apply within the office.

This type of instruction is designed to familiarise you with:

- Accident reporting procedures

- Local safety rules

- First aid arrangements

- How to report unsafe conditions

- Fire equipment

Page 41: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

- Evacuation procedures

- Protective clothing etc.

Listen carefully and remember to follow the advice given.

4. DRESS

Individuals have the freedom to choose what to wear but please remember to dress

sensibly when in the office.

- Avoid wearing high heels since they tend to catch on projections and can be

dangerous when descending stairs.

- If you need glasses wear them while in the office particularly when working at

Visual Display Units (V.D.U.s) in order to avoid eye-strain.

- Don’t wear loose clothing such as scarves, ties etc. when working on or near moving

machinery.

5. CONDUCT

Irresponsible behaviour can lead to serious accidents.

- Walk - don’t run. Always look where you are going, particularly at blind spots such

as doorways, openings and partitioning.

- It is dangerous to read documents whilst walking through the office.

- Don’t interfere with electrical equipment. Arrange for an electrician or some other

qualified and authorised person to undertake repairs.

- Smoke in authorised places only and make sure you properly extinguish matches,

cigarettes, cigars or pipes in the ashtrays provided.

- Don’t leave material or equipment in passageways where people can trip over.

- Leave fire equipment in its designated location unless you need it to extinguish a fire.

- Never wedge open fire doors. They are designed to stop smoke and fire spreading to

other parts of the building - so always keep them closed.

- Don’t indulge in horseplay or practical jokes.

6. OFFICE EQUIPMENT

Office equipment should be maintained in good condition and positioned to allow

adequate clearance for staff.

- Report defects such as sharp corners, broken chairs, sticky drawers, trailing cables,

damaged flooring etc.

- Do not leave desk drawers open or swing back on chairs.

- Always fill the bottom drawers of filing cabinets first and only open one drawer at a

time to prevent the cabinet toppling.

- Never open a drawer when someone is working below.

- Before attempting to lift or move desks and cabinets always ask for help and remove

or empty drawers.

- Don’t put sharp objects in waste bins such as broken glass, sharp blades etc.-

remember someone has to empty these containers. Paper should always be placed in

the bin not thrown at it.

Page 42: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

- Always follow the instructions which accompany printing and photocopying

machines particularly the requirement to switch off the machine before clearing

paper paths, cleaning parts or making adjustments.

- Never attempt to repair machines unless trained and authorised to do so.

- Don’t stand on chairs to reach high objects - use a stepping stool or step ladder.

7. SMALL OFFICE ITEMS

Everyday office items which you handle such as scissors, pins or staples can inflict

serious injuries if they are not used properly.

- Don’t use razor blades. If you have to cut material, use scissors or if necessary a

retractable Stanley knife but remember to keep your hands well away from the blade.

- Avoid using knives to sharpen pencils. Pencil sharpeners should be used for this

purpose.

- It is better to use clips or staples rather than pins to hold paper together. Always use

a hand operated staple extractor to remove staples. Never use your fingers.

- Scissors are meant to cut - not to open envelopes, prise open can lids or remove

screws etc.

- Always pick up drawing pins which fall on the floor in case someone treads on them.

8. LIFTING AND CARRYING

Bad lifting technique can lead to serious back strain or other injuries. If you have to lift

or carry something heavy, follow these simple rules:

- Use a trolley or some other mechanised system whenever possible.

- Ask for assistance to make the task of lifting easier.

- If you feel the load is within your capability, keep your back straight and bend your

knees, get a firm grip, hold the item close to your body and use your legs not your

back to straighten up.

- Make sure you can see where you are going and ask someone to open doors, where

necessary, to provide you with clear access.

9. SLIPS AND FALLS

Slips and falls are one of the major causes of accidents within the office.

- Stairways are particularly dangerous. Take great care when using them and keep a

firm hold of the handrail especially if you are descending stairs.

- Always keep your office tidy and don’t leave things lying on the floor.

- Waste bins should be kept in a safe place and boxes, containers or office equipment

should not be left in passageways where personnel can fall and hurt themselves.

- If you spill coffee, tea or other liquids always mop it up. This is particularly

important on stairs where a fall may result in very serious injuries.

- Make sure there are no trailing cables, damaged carpet or flooring, which could trip

you up.

Page 43: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

10. LIGHTING

The standard of lighting in the office must be adequate to provide a safe working

environment.

- Check that your working area and adjacent corridors or passageways are well lit.

- Report any defective lighting or dark areas so that the matter can be rectified.

11. VISUAL DISPLAY UNITS (V.D.U.s)

Using V.D.U.s for long periods of time may result in headaches, eye strain and back

problems.

- Make sure that your chair is at the correct height and supports your back properly.

- Don’t remain too long in one position - frequently change your position to avoid

unnecessary strain.

- Avoid repeated stretching movements.

- Make sure your screen image is sharp and individual characters can be read easily.

- If you normally wear glasses put them on.

- Adjust the brightness to suit lighting conditions and position the screen to avoid

reflections.

- Clean the screen regularly to remove dirt and grime.

12. ELECTRICAL EQUIPMENT

Electric shock can result in death and therefore electrical equipment should be treated

with respect.

- Electric shock placards will be posted in appropriate areas. Read them and get to

know how to deal with electric shock and carry out artificial respiration.

- Never tamper with electrical equipment or attempt to make repairs. Remember - even

low voltage equipment can be dangerous.

- Check cables and equipment for damage, loose connections, exposed wiring etc. If

you discover a fault - switch off the appliance and report the matter immediately.

- Always keep electrical cupboard doors and panels closed and make sure covers

protecting electrical apparatus remain securely in place.

- Make sure trailing cables particularly behind computer and word processing

equipment has been neatly installed. All trailing cables should be kept to a minimum

and positioned to prevent people tripping over them.

- Never overload the circuit by attaching too many appliances. Remember standard

socket outlets are capable of taking a maximum of 13 amps - so check the rating of

the equipment before adding it to the system.

- Switch off and disconnect any equipment which is overheating - and report it

immediately.

- Always unplug, or if this is not possible switch off, all non essential electrical

equipment before leaving the office.

Page 44: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

13. FIRE PRECAUTIONS

Every year many people are killed in fire - not by flame but from thick toxic smoke

given off during combustion which spreads rapidly through the building. You must

adhere to the following simple fire precautions in order to minimise the risk.

- Listen carefully to appropriate instruction and training on the correct use of fighting

equipment and evacuation procedures.

- Get to know the location and types of extinguishers in your immediate area and make

sure that they are kept clear of obstructions.

- Never wedge open fire doors - even in hot weather, and always check that your fire

escape route is not blocked or impeded.

- Find out where the nearest escape routes are so that you know which route to follow

in an emergency.

- Always extinguish sources of ignition properly - such as cigarettes, matches etc.

- Unplug or switch off all non essential electrical appliances and close doors when you

leave at night.

- Read the fire instructions displayed in the office and get to know the fire warning

signal.

- Fighting fires can be dangerous - only tackle small fires which can be extinguished

easily after you have activated the fire alarm.

- If you hear the alarm, immediately evacuate the office and make other personnel in

the building aware. Remember stay calm and walk - don’t run.

- Don’t spend time clearing desks or collecting personal belongings. Leave by the

quickest or safest exit and close doors behind you in order to restrict the spread of

fire and smoke.

- All personnel must make their way to the designated Assembly Point at the far end of

the car park and make themselves known to the senior person who will check all

personnel are accounted for.

Page 45: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

14. TYPES OF FIRE EXTINGUISHERS

Fire extinguishers are usually colour coded to clearly show the type of fire they are

capable of extinguishing (new extinguishers will be painted red, a label on the side will

be in colour).

Extinguisher Colour Use on

Water Red Combustibles e.g. wood, paper, cardboard,

fabrics etc.

Dry Powder Blue Flammable liquids, gases and electrical

equipment.

Carbon Dioxide (CO2) Black Electrical and Flammable liquid fires.

Foam Buff Flammable liquids, oil, fats and spirits

15. HEALTH HAZARDS

There are a number of substances used around the office including cleaning liquids which

may be harmful to health if used improperly.

- Always read the instructions on the container or data sheet and follow the advice

given. - Never sniff containers to find out what is in them.

- Ensure there is adequate ventilation or wear suitable respiratory protective equipment

when using substances which give off harmful vapour.

- When harmful liquids spill the evaporating surface increases allowing greater

amounts of vapour to escape. Wear suitable protective clothing when mopping up

spills and keep other personnel clear until the liquid has been removed and the area

ventilated.

- Never put harmful substances in unmarked containers in case it is mistaken for

something else.

- Always make sure that lids and caps are replaced immediately after use and store the

container in a safe place.

16. PROTECTIVE CLOTHING

Suitable protective clothing will be provided if a particular task requires it - consult

your supervisor if in doubt.

- Check the general condition of any protective clothing before wearing it and report

any defects.

- Make sure things like eye protection, respirators, ear defenders etc.

fit properly and keep them on whilst exposed to risk.

- Clean and disinfect equipment, where necessary, and return it to its proper storage

place when not in use.

Page 46: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

17. FIRST AID/REPORTING INJURIES

Proper provision has been made for treating injuries sustained in the office. Consult

the notice displayed in various parts of the building which gives details of first aid

arrangements.

- Get to know where the first aid equipment is kept and who to contact if someone is

injured.

- Don’t interfere with or misuse first aid equipment.

- Always report injuries to your immediate supervisor - no matter how slight. If you

receive treatment, make sure it is recorded in the Accident Book (AWAB).

- Co-operate with any subsequent accident investigation so that the cause can be

established and appropriate remedial action taken to prevent a recurrence.

18. TOILET FACILITIES

These are provided in accordance with the standards detailed under the Workplace

Health, Safety and Welfare Regulations.

- Keep them clean and report any defects or missing items such as soap, towels, paper

etc.

- Paper used for drying hands must be disposed of in the receptacles provided.

- Maintain good personal hygiene by washing your hands after using toilet facilities.

- Do not drink tap water unless it is specifically marked “Drinking Water”.

19. SAFETY COMMITTEES

Because A. White Plumbing Service Ltd is a small firm with fewer that 10 persons

ever using the office at any one time all health & safety matters should immediately

be brought to the attention of Andrew White.

If there is still any doubt or further queries contact DIRECTOR Health & Safety Advisor,

Andrew White.

20. CONTRACTORS AND VISITORS

The company has certain legal obligations for the health and safety of contractors and

visitors in the office.

- Always meet visitors at reception and escort them to their destination.

- Make them aware of any local safety procedures and take them with you in the event

of fire evacuation.

- If you see any contractors, cleaners, service personnel etc. acting unsafely report the

matter to your superior so that it can be raised with the company concerned.

REMEMBER - If you do not understand the health, safety or fire precautions associated

with your workplace, consult your immediate superior.

Page 47: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

APPENDIX C

Accident Reporting Flowchart Procedures

Page 48: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

ACCIDENT REPORTING & INVESTIGATION FLOWCHART

Injury Accident

First Aid Treatment/ Assessment

1st Aider or Injured Person (IP) completes Accident Book AWAB

IP returns to work with no lost time

• Take photos

• Identify witnesses

• Identify trends

• Record contact details

“OVER 3-DAY ACCIDENT” (If in doubt – call DIRECTOR)

MAJOR INJURY

IP leaves site – check with employer when he returns to work. Take photos of place of accident

IP is admitted into hospital for more than 24 hours – classed as “Major Injury”

IP absence 7 days or less

IP does not return to work

IP diagnosed

with Major Injury. For

• Notify DIRECTOR immediately

• Isolate scene

• Take photos

• Identify witnesses

• Identify trends

• Isolate the scene

• Notify DIRECTOR immediately

• Advise Line Manager

• Ensure IP’s employer is advised and that he contacts next of kin

• Identify witness

• Ensure F2508 completed by employer within 10 days & sent to HSE

• Isolate the scene

• Notify DIRECTOR immediately

• Advise Line Manager & Technical Services Dept

• Ensure IP’s employer & next of kin advised

• identify witness

• Ensure HSE notified

immediately

Page 49: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

DIRECTOR to undertake accident investigation

DIRECTOR to undertake accident investigation

Page 50: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

DANGEROUS OCCURENCE REPORTING & INVESTIGATION FLOWCHART In the event of

Significant injury, refer to 2 Minor incident • Take photos 3

• Identify witnesses 4

Incident 1 Accident Reporting Flowchart

No significant damage No possibility of serious/major injury

6

• Establish prevention measures to prevent recurrence • Record incident in diary

Option for 5

List of Reportable Dangerous Occurrences

• Collapse, overturning or failure of any load-bearing part of any piece of lifting equipment

• Collapse or partial collapse of any scaffold over 5 metres in height or fall of any cradle, etc.

• Collapse of 5 tonnes or more of any building or structure, or any false work, or any wall or floor in any workplace.

• Explosion, bursting or collapse of any closed vessel, boiler, etc.

• Notify DIRECTOR 7 immediately • Isolate area • Take photos

investigation by DIRECTOR

DIRECTOR to

8

REPORTABLE DANGEROUS OCCURRENCE

(If in doubt – call DIRECTOR)

• Contact with, or arcing from, any overhead electric cable caused by any plant or equipment.

• Electrical short-circuit with fire or explosion.

• Explosion or fire caused by any material resulting in stoppage of work or plant for more than 24 hrs.

• Uncontrolled release of 100 kg or more of a flammable liquid, 10 kg or more of a flammable liquid above its normal boiling point or 10g of a flammable gas, inside a building, and 500 kg or more of such substances outside a building.

• Uncontrolled release of any biological agents.

• Accidental ignition of any explosive.

• Failure of any load-bearing part of a freight container.

• Bursting, explosion or collapse, or fire involving a pipeline.

• Specific incidents involving road tankers.

• Specific incidents involving dangerous substances being conveyed by road.

• Escape of any substance in a quantity sufficient to cause death, injury or damage to health.

• Advise Line Manager

• Identify witnesses

• Ensure HSE notified immediately

undertake incident investigation

Page 51: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

NEAR MISS INCIDENT (If in doubt – call DIRECTOR)

Significant incident but outside of definition of reportable “Dangerous Occurrence” 9

• Notify DIRECTOR immediately

10

• Isolate area • Take photos

DIRECTOR to undertake

8

accident • Identify witnesses investigation

Page 52: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

51

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

With reference to the flow chart on the previous page, the following steps are explained:-

1. Significant Incident All significant incidents need to be assessed to establish whether it is reportable or of such

magnitude to justify a full investigation to establish root causes to prevent a recurrence.

2. In the event of injury, refer to Accident Reporting Flowchart before Some incidents are accompanied with injuries, in which 2 separate procedures may need to be

undertaken at the same time. In which case, refer to the Accident Reporting Procedure earlier

in this section.

3. Minor incident, no significant damage, no possibility of serious/major injury Some minor incidents occur of no major significance. Obviously, the site manager needs to

exercise a degree of common sense in this case, but where he feels he should record the

incident then the following procedure should be adopted.

4. Take photos, identify witnesses, establish prevention measures to prevent recurrence,

record incident in diary The purpose of this procedure is to record the event to show trends and during the collation of

information further details may arise which need further investigation. As a minimum, all data

should be recorded in the site diary.

5. Option for investigation by DIRECTOR Dependant on the significance of the incident, it may be appropriate to call DIRECTOR to

undertake an investigation, especially if a similar incident has occurred previously. This

decision may be taken by the Site/Project Manager in agreement with the

Contracts/Construction Manager.

6. List of Reportable Dangerous Occurrences Though apparently extensive, this list is only those which could take place on a construction

site. Under the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 1995

(RIDDOR), the various descriptions listed, taken from the regulations, are of such

significance that they are reportable immediately to HSE. In the event of any doubt or

confusion, DIRECTOR must be contacted for clarification.

7. Notify DIRECTOR immediately, isolate area, take photos, advise Line Manager,

identify witnesses, ensure HSE are notified immediately It is essential that the relevant persons are contacted immediately the incident has occurred.

Often, in an effort to minimise the significance of the incident, reporting is delayed.

However, this often has a negative effect, as news of the incident leaks out and, if reportable,

can result in enforcement action being taken by HSE.

The best policy is to report the incident immediately so that further adverse actions can be

minimised.

Page 53: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

52

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

8. DIRECTOR to undertake accident investigation All reportable dangerous occurrences must be investigated and it is essential that DIRECTOR

attend the site as soon as possible after the incident. To this end, early contact with

DIRECTOR should ensure that accurate information is collated to assist in the investigation.

All too often, crucial information is not available during the investigation process due to an

early oversight, or poor judgement of the situation.

9. Significant incident but outside of the definition of reportable “Dangerous

Occurrence” These incidents are often referred to as “Near-misses” and as such are often disregarded.

However, there will be valuable information to be retrieved as a result of such an event and

consequently, though not reportable, can serve as a valuable tool to understand the reason

behind the circumstance. Consequently, if treated as a “Dangerous Occurrence”, but not

reported to HSE, then important lessons may be learnt by the procedure.

10. Notify DIRECTOR, isolate area, take photos, identify witnesses To obtain as much information as possible, early action is required to contact DIRECTOR, to

isolate the area, take photos and identify witnesses. In this way, the appropriate actions and

reporting within A. White Plumbing Service Ltd can take place.

Page 54: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

53

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

APPENDIX D

Exposure Points System & Ready-

Reckoner

Page 55: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

54

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Exposure points system and ready-reckoner

The table below is a ‘ready-reckoner’ for calculating daily vibration exposures. All you need

is the vibration magnitude (level) and exposure time. The ready-reckoner covers a range of

vibration magnitudes up to 40 m/s2 and a range of exposure times up to 10 hours.

The exposures for different combinations of vibration magnitude and exposure time are given

in exposure points instead of values in m/s2 A(8). You may find the exposure points easier

to work with than the A(8) values:

• exposure points change simply with time: twice the exposure time, twice the

number of points;

• exposure points can be added together, for example where a worker is exposed

to two or more different sources of vibration in a day;

• the exposure action value (2.5 m/s2 A(8)) is equal to 100 points;

• the exposure limit value (5 m/s2 A(8)) is equal to 400 points;

Page 56: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

55

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Vibration

magnitude

m/s2

40 800 30 450 900

25 315 625 1250 20 200 400 800

19 180 360 720 1450

18 160 325 650 1300 17 145 290 580 1150

16 130 255 510 1000

15 115 225 450 900 1350 14 98 195 390 785 1200

13 85 170 340 675 1000 1350

12 72 145 290 575 865 1150 1450 11 61 120 240 485 725 970 1200 1450

10 50 100 200 400 600 800 1000 1200

9 41 81 160 325 485 650 810 970 1300 8 32 64 130 255 385 510 640 770 1000 1200

7 25 49 98 195 295 390 490 690 785 865

6 18 36 72 145 215 290 360 430 575 720 5.5 15 30 61 120 180 240 305 365 485 605

5 13 25 50 100 150 200 250 300 400 500

4.5 10 20 41 81 120 160 205 246 325 405 4 8 16 32 64 96 130 160 190 255 320

3.5 6 12 25 49 74 98 125 145 195 245

3 5 9 18 36 54 72 90 110 145 180 2.5 3 6 13 25 38 50 63 75 100 125

2 2 4 8 16 24 32 40 48 64 80

1.5 1 2 5 9 14 18 23 27 36 45 1 1 1 2 4 6 8 10 12 16 20

15m 30m 1h 2h 3h 4h 5h 6h 8h 20h

Duration (trigger time)

1. Find the vibration magnitude (level) for the tool or process (or the nearest

value) on the grey scale on the left of the table.

2. Find the exposure time (or the nearest value) on the grey scale across the

bottom of the table.

3. Find the value in the table that lines up with the magnitude and time. The

illustration shows how it works for a magnitude of 5 m/s2 and an

exposure time of 3 hours: in this case the exposure corresponds to 150

points.

4. Compare the point’s value with the exposure action and limit values (100

and 400 points respectively). In this example, the score of 150 points lies

above the exposure action value.

Page 57: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

56

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

The colour of the square containing the exposure point’s value tells you whether the exposure

exceeds, or is likely to exceed, the exposure action or limit value:

Above limit value

Likely to be above limit value

Above action value

Likely to be above action value

Below action value

5. If a worker is exposed to more than one tool or process during the day,

repeat steps 1 – 3 for each one, add the points, and compare the total

with the exposure action value (100) and the exposure limit value (400).

Page 58: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

57

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Appendix E

Generic Risk Assessments

1. First Fix Plumbing

2. Second Fix Plumbing 3. Hand-tools

4. Ladders

5. Steps 6. Abrasive Wheels

7. Portable Electrical Tools

8. Manual Handling (General)

Page 59: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

58

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

FIRST FIX PLUMBING

Risk Assessment No Assessor: Date:

Work Process

Installation of heating and water pipe work, associated controls and equipment into different

locations within new construction units

Risk Factor 1-4 (Low)

5-12 (Medium) obtained from risk matrix

15-25 (High)

Uncontrolled Risk Factor

L x S RF H/M/L

Hazards

Risk of fall from height

Falling materials, tools and equipment

Entanglement or contact with high-speed parts of

moving machinery, e.g. abrasive wheels, drills etc.

Damaged or worn hand tools

Poorly maintained power tools

Incorrect use of tools

Flying fragments of broken tools

Manual handling of materials

High noise levels

Fire from hot works (soldering or welding)

4

4

4

2

2

3

2

4

2

3

4

4

4

3

3

3

3

4

2

4

16

16

16

6

6

9

6

16

4

12

High

High

High

Medium

Medium

Medium

Medium

High

High

High

Site specific hazards (to be entered after site

assessment/task)

Page 60: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

59

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Harm Death or major injury to limbs

Risk of head injury

Death from strangulation, major injury to limbs or

severe skin burning and twisting

Skin lacerations or minor grazing

Death from electric shock or severe limb injury/s

Loss of sight in eye from ejecting metals

Torn muscles, ligaments and tendons

Noise induced hearing loss

Death or major injury to body from heat and flame

damage

People Affected

Operatives

All operatives, visitors/members of

the public

Operatives

Operatives

Operatives

Operatives

Operatives

Operatives/persons close by

All within the vicinity of the work

operations

Control Measures Guards fitted to power tools and free from defect

Tools and equipment checked, before use, to ensure they are in good condition,

properly maintained, in good working order and free from defect

Trained and competent operatives to use powered operated tools, inexperienced

operatives only for training purposes and with full supervision

Handling of heavy or bulky materials is to mechanised or assistance is to be

sought for the lifting operation

Appropriate PPE is to worn to minimise skin and eye contact with hazardous

substances - related COSHH assessment and control measures or respiratory

protection, as a last resort

Suitable hearing protection is to provisioned and worn. Operatives to be made

aware of the damage likely to be caused from excessive noise exposure

Residual

risk

Low

Low

Low

Low

Low

Low

Personal Protective Equipment Safety helmet

Hearing protectors

Safety goggles/glasses, as appropriate

Respiratory protection, as appropriate

Safety footwear

Additional Assessments COSHH

Hand tools

Manual handling assessment

Noise

Portable electrical equipment

Mobile Elevated Working Platforms

Tower platforms

Steps

Ladders

Page 61: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

60

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Information, instruction & training Site induction training and awareness of the risk assessment and method statement

appropriate to the task

Trained and competent operatives to carry out this type of plumbing task

Training in recognition and correct use fire appliances

Date of assessment Signature

Date for review Signature

Prepared By: :(Signature / Date) Authorized By: :(Signature / Date)

A. White

A. White

A comprehensive risk assessment will be carried out for every installation.

Refer to Risk Assessment.

Page 62: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

61

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

SECOND FIX PLUMBING

Risk Assessment No Assessor: Date:

Work Process Installation of fixtures and fittings into kitchen, bathroom, cylinder cupboards etc, and other

associated equipment into different locations within new construction units

Risk Factor 1-4 (Low)

5-13 (Medium) obtained from risk matrix

15-25 (High)

Uncontrolled Risk Factor

L x S RF H/M/L

Hazards Risk of fall from height

Falling materials, tools and equipment

Entanglement or contact with high-speed parts of

moving machinery, e.g. abrasive wheels, drills etc.

Damaged or worn hand tools

Poorly maintained power tools

Incorrect use of tools

Flying fragments of broken tools

Manual handling of materials

High noise levels

Serious risk of fire from hot works (soldering or

welding) during second fix operations

4

4

4

2

2

3

2

4

2

3

4

4

4

3

3

3

3

4

2

5

16

16

16

6

6

9

6

16

4

15

High

High

High

Medium

Medium

Medium

Medium

High

High

High

Site specific hazards (to be entered after site

assessment/task)

Page 63: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

62

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Harm People Affected

Death or major injury to limbs

Risk of head injury

Death from strangulation, major injury to limbs or

severe skin burning and twisting

Skin lacerations or minor grazing

Death from electric shock or severe limb injury/s

Loss of sight in eye from ejecting metals

Torn muscles, ligaments and tendons

Noise induced hearing loss

Death or major injury from heat and flame damage

Operatives

All operatives, visitors/members of

the public

Operatives

Operatives

Operatives

Operatives

Operatives

Operatives/persons close by

All within the vicinity of the work operations

Page 64: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

63

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Control Measures Guards fitted to power tools and free from defect

Tools and equipment checked, before use, to ensure they are in good condition,

properly maintained, in good working order and free from defect

Trained and competent operatives to use powered operated tools, inexperienced

operatives only for training purposes and with full supervision

Handling of heavy or bulky materials is to mechanised or assistance is to be

sought for the lifting operation

Appropriate PPE is to worn to minimise skin and eye contact with hazardous

substances - related COSHH assessment and control measures or respiratory

protection, as a last resort

Suitable hearing protection is to provisioned and worn. Operatives to be made

aware of the damage likely to be caused from excessive noise exposure

Appropriate first aid fire appliance in place near to the project work area

Residual

risk

Low

Low

Low

Low

Low

Low

Low

Personal Protective Equipment Safety helmet

Hearing protectors

Safety goggles/glasses, as appropriate

Respiratory protection, as appropriate

Safety footwear

Additional Assessments COSHH

Hand tools

Manual handling assessment

Noise

Portable electrical equipment

Mobile Elevated Working Platforms

Tower platforms

Steps

Ladders

Information, instruction & training

Site induction training and awareness of the risk assessment and method statement

appropriate to the task

Trained and competent operatives to carry out this type of plumbing task

Training in the recognition and use of appropriate fire appliances

Date of assessment Signature

Date for review Signature

Prepared By: :(Signature / Date) Authorized By: :(Signature / Date)

A. White

A. White

A comprehensive risk assessment will be carried out for every installation.

Refer to Risk Assessment.

Page 65: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

64

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

HAND TOOLS

Risk Assessment No Assessor: Date:

Work Process

General hand tools used for general plumbing work for a variety of tasks including cold

chisels, screwdrivers, drills, spanners, files, spanners, wrenches etc.

Risk Factor 1-4 (Low)

5-14 (Medium) obtained from risk matrix

15-25 (High)

Uncontrolled Risk Factor

L x S RF H/M/L

Hazards

Loose hammer heads

Chisels with mushroom heads

Screwdrivers with split handles and/or damaged and

worn blades

Files with loose or missing handles exposing the tang

Blunt cutting tools

Sparks from tools

Tools used for the wrong purpose

3

3

4

4

4

4

4

4

4

3

3

4

4

4

12

12

12

16

16

16

16

Medium

Medium

High

High

High

High

High

Site Specific Hazards (to be added after site

assessment)

Page 66: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

65

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Harm Eye injury from ejected and flying airborne chips and

material debris

General cuts and bruises

Hand/Arm injuries from broken tools

Fire if flammable materials are present

Body (musculoskeletal) injuries from jarring caused by

the sudden failure of a tool

People Affected

Operators

Operators

Operators

Operators

Operators

Control measures The correct tools are to be used for the task in hand and maintained free from oil

and grease.

All tools are to be inspected prior to use, and damaged tools disposed or replaced

Hammer heads are to be checked for security and damage

Files are not to be used without the correct handle fitted over the tang

Sharp cutting edges of tools to be protected when stored or carried

Mushroom heads on chisels are to be removed by regular grinding

Screwdrivers and chisels are not to be used as pry bars

Insulated and non-conductive tools to be used when working on/near electrical

apparatus

Tools manufactured from non-ferrous metals are to be used to prevent fire and

explosion from any potential highly flammable material or explosive dust

Residual

risk

Low

Low

Low

Low

Low

Low

Low

Low

Low

Personal Protective Equipment

Eye goggles and gloves to be worn on all occasions when using metal or stone cutting chisels,

or hammers to drive hardened nails

Face masks to be worn when using grinding or cutting metal, stone or brickwork

Page 67: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

66

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Additional Assessments COSHH assessment for airborne dust contamination (cutting and grinding)

Personal Protective Equipment assessment

Information, instruction & training Operatives to be made aware of the hazards associated with the use of improper of hand tools

Operatives to be trained and competent in the storage, use, sharpening and general

maintenance of hand tools associated with their specific work activity

Date of assessment Signature

Date for review Signature

Prepared By: :(Signature / Date) Authorized By: :(Signature / Date)

A. White

A. White

A comprehensive risk assessment will be carried out for every installation.

Refer to Risk Assessment.

Page 68: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

67

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

LADDERS

Risk Assessment No Assessor: Date:

Work Process General work activity at height using ladders as primary means of access

Risk Factor 1-4 (Low)

5-15 (Medium) obtained from risk matrix

15-25 (High)

Uncontrolled Risk Factor

L x S RF H/M/L

Hazards Falls from height

Falling tools and materials

Associated overhead fixed electrical installation

Manual handling at height

3

4

2

4

3

3

4

4

9

12

8

16

Medium

Medium

Medium

High

Site Specific Hazards (to be added after site

assessment)

Harm Death

Broken limbs

Electrical shock and burns

Major or minor musculoskeletal injury/s

People Affected

Operative

Operative

Operative

Operative

Page 69: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

68

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Control measures

Ladders to be inspected before use. They are to be maintained, of sound materials,

free from any defect and in good condition. Any damaged ladder is to be removed

immediately from use

Ladders are to have a firm even base, and not have any makeshift packing

materials, either to gain height or level, they are to be tied off or footed on all

occasions

They are to be set at a ratio of 1 metre out to every 4 metres up

Ladders are to be clear of any excavation and sited such as not to cause a hazard to

others

Ladders are not to be placed on fragile surfaces or fittings

Only 1 operative is to on the ladder at a time, and it is never to be climbed to the

top rung of the ladder and operatives are not to over-reach when carrying out the

task

Operatives are to aware of the potential hazards from any overhead electrical line

in the vicinity of their work

Ladders are only to be used as a working place for light work activity e.g.

maintenance or painting for short periods up to a maximum of 30 minutes. Where

longer periods of work are anticipated other suitable access equipment, such as

trestles or scaffolds should be used

Residual

risk

Low

Low

Low

Low

Low

Low

Low

Low

Personal Protective Equipment Safety helmets

Boots

Gloves

Additional Assessments

Manual handling assessment

Hand tools

Electrical power tools

Information, instruction & training Site induction training and operatives to be made aware of the risk assessment and method of

work for the task

Manual handling instruction on the lifting carrying, positioning and lowering of ladders

Date of assessment Signature

Date for review Signature

Prepared By: :(Signature / Date) Authorized By: :(Signature / Date)

A. White

A. White

A comprehensive risk assessment will be carried out for every installation. Refer to Risk Assessment.

Page 70: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

69

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

STEP LADDERS

Risk Assessment No Assessor: Date:

Work Process

General work activity at height using step ladders as primary means of access

Risk Factor 1-4 (Low)

5-16 (Medium) obtained from risk matrix

15-25 (High)

Uncontrolled Risk Factor

L x S RF H/M/L

Hazards Falls from height

Falling tools and materials

Associated overhead fixed electrical installation

Manual handling at height

3

4

2

4

4

3

4

4

12

12

8

16

High

High

Low

High

Harm Death

Broken limbs

Electrical shock and burns

Major or minor musculoskeletal injury

People Affected

Operative

Operative

Operative

Operative

Page 71: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

70

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Control measures

The steps are to be of sound material, properly maintained, free from any defect

and in good condition. They are to be inspected before use and if defective

removed from use immediately

The treads, hinges, bolts, screws and fixings must all sound and secure

Retaining cords or hinges are to of equal length and in good condition. The legs

of the steps are to be positioned as far apart as the retaining cord or hinges allow,

and all 4 legs are to be stood on a firm, stable surface

Steps are to at right angels to the task, whenever possible

When climbing a step ladder, the operative’s knees are to be kept below the top of

the steps

On no account is the top tread of the step ladder to be used as a working platform,

unless it has been constructed with a platform and a secure handhold

Residual

risk

Low

Low

Low

Low

Low

Low

Personal Protective Equipment

Safety helmets

Boots

Gloves

Additional Assessments Manual handling assessment

Use of electrical power tools

Use of hand tools

Information, instruction & training

Site induction training and operatives to be made aware of the risk assessment and method of

work for the task

Manual handling instruction on the lifting carrying, positioning and lowering of ladders

Date of assessment Signature

Date for review Signature

Date for review Signature

Prepared By: :(Signature / Date) Authorized By: :(Signature / Date)

A. White

A. White

A comprehensive risk assessment will be carried out for every installation.

Refer to Risk Assessment.

Page 72: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

71

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

ABRASIVE WHEEL

Risk Assessment No Assessor: Date:

Work Process

General use of abrasive grinding and cutting discs in hand held grinding machines, or angle

grinders, used for the abrasive cutting or grinding of various materials

Risk Factor 1-4 (Low)

5-17 (Medium) obtained from risk matrix

15-25 (High)

Uncontrolled Risk Factor

L x S RF H/M/L

Hazards

Bursting wheel or disc

Contact with wheel or disc

Entanglement with moving parts

Flying debris particles from bursting disc

Flying debris particles from cutting and grinding

Airborne dust

Noise

3

3

2

3

3

4

4

4

3

4

4

4

3

4

12

9

8

12

12

12

16

Medium

Medium

Medium

Medium

Medium

Medium

High

Site specific hazards (to be entered after site

assessment/task)

Page 73: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

72

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Harm Fatality

Severe cutting and laceration

Respiratory induced problems

Eye injury

Noise induced hearing loss

People Affected

Operators

Operators

Operators

Operators

Operators

Control measures Grinders fitted with fully functional guards to contain the debris from a bursting

wheel/disc, and cutters and grinders regularly maintained

Correct type of wheels/discs to suit the spindle speed and the task, and new discs

inspected for damage before fitting and adequate and suitable storage for abrasive

wheels

Dust extraction system or good ventilation in the event of a potential dust hazard

No loose clothing, and work area to be kept clear

A permit-to-work system when used in potentially hazardous or flammable areas

Adequate operatives trained and appointed to change the abrasive wheel discs

PPE be at worn at all times

Residual

risk

Low

Low

Low

Low

Low

Low

Low

Personal Protective Equipment Full eye goggle protection and hearing protection to be worn

Mask or respirator to be used in the event of inadequate dust control

Additional Assessments

COSHH assessment on airborne dust contamination

Noise assessment

Personal Protective Equipment

Page 74: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

73

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Information, instruction & training All persons in the immediate area likely to be affected by any airborne dust contamination or

flying debris particles or noise are to be informed or cleared from the area

Operatives are to be trained in the correct storage, handling, testing, adjustment and working

operation of the abrasive wheel and in the recognition of the different hazards, and trained in

the correct use of the Personal Protective Equipment

Operatives to be trained and appointed for the changing of abrasive wheels/disc

Date of assessment Signature

Date for review Signature

Date for review Signature

Prepared By: :(Signature / Date) Authorized By: :(Signature / Date)

A. White

A. White

A comprehensive risk assessment will be carried out for every installation.

Refer to Risk Assessment.

Page 75: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

74

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

PORTABLE ELECTRICAL

EQUIPMENT

Risk Assessment No Assessor: Date:

Work Process General work activities associated with the normal use of portable electrical equipment

including all tools, test equipment or appliances used for designated tasks

Risk Factor 1-4 (Low)

5-18 (Medium) obtained from risk matrix

15-25 (High)

Uncontrolled Risk Factor

L x S RF H/M/L

Hazards Electrical shock or short to earth from the following:

• Electric powered tool operation

• Portable electrical appliances

• Leads, connector and other associated

components of electrical tools and appliances

• Fire

4

4

4

4

4

4

4

5

16

16

16

20

High

High

High

High

Site specific hazards (to be entered after site specific

assessment)

Page 76: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

75

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Harm People Affected

Death

Major or minor injury from electric shock

Major or minor injury from a fall from height

Burns associated with electric shock or fire

Operatives

Operatives

Operatives

Operatives

Control measures Portable appliance tools, whenever possible, are to be 110 volt rated and operated

in conjunction with a step down centre tapped earthed transformer

Portable appliance tools, equipment and leads etc. are to be suitable for the

purpose for which they are to be used, have been subjected to a routine test carried

out by a competent person and at the intervals recommended in current HSE

guidance and the Company policy

Records of portable appliance maintenance intervals and defects are to be recorded

and available for inspection

External contractors will comply with the 110 volt power supply restriction and

testing requirement when employed on work activities within the Group

Any defective equipment is to removed from use, have a defective label fitted and

is not to be returned to service until it has been certified as fit for use by a

qualified electrician

Records of all portable electrical appliance testing is to be maintained

Residual

risk

Low

Low

Low

Low

Low

Low

Personal Protective Equipment Personal Protective Equipment may be required for specific work task and activities using

portable appliance tools and equipment as detailed in appropriate method statements

Additional Assessments Specific electrical risk assessment will be required for all work activity, especially any

hazardous activity i.e. working in a flammable atmosphere

Page 77: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

76

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Information, instruction & training Operatives using portable appliance tooling and associated equipment must have received site

specific induction training

Any routine testing or maintenance activities a re to be carried out by operatives trained and

competent to recognise a defect and to remove the tool or equipment from use

Any repair/s to electrical equipment is to be carried out by an qualified electrician

Date of assessment Signature

Date for review Signature

Prepared By: :(Signature / Date) Authorized By: :(Signature / Date)

A. White

A. White

A comprehensive risk assessment will be carried out for every installation.

Refer to Risk Assessment.

Page 78: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

77

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

MANUAL HANDLING (General)

Risk Assessment No Assessor: Date:

Work Process

The lifting, carrying, transporting and fixing of radiators, pipes, boilers and associated

equipment both at ground floor level and at height

Risk Factor 1-4 (Low)

5-19 (Medium) obtained from risk matrix

15-25 (High)

Uncontrolled Risk Factor

L x S RF H/M/L

Hazards

Incorrect posture when lifting, carrying and transporting

materials and equipment

Dropping materials and equipment

Sharp edges and protruding surfaces

4

3

3

4

4

3

16

12

9

High

Medium

Medium

Site specific hazards (to be entered after site specific

assessment)

Harm Permanent acute and/or chronic pain from the

dislocation of a disc in the back

Hernia from lifting loads in excess of capability

Acute pain from sprains and strains to torn muscles,

ligaments and tendons

Damaged limbs from dropping loads

Cut and abrasions from sharp, rough or splintered edges

People Affected

Operatives

Operatives

Operatives

Operatives

Operatives

Control measures Residual risk

Page 79: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

78

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Mechanise lift and movement of materials and equipment

2 man lift of heavy materials and equipment

Correct physical posture for lifting:

• Correct position of feet

• Flexible knees

• Straight back

• Arms close to the body for lifting and carrying

• Correct grip or hold

• Chin up, head up

• Use of body weight

Low

Low

Low

Personal Protective Equipment Protective footwear

Gloves

Additional Assessments

Specific manual handling assessments to be carried out for specific materials and equipment

Information, instruction & training Manual handling awareness training and briefing prior to the movement of materials and

equipment

Date of assessment Signature

Date for review Signature

Date for review Signature

Prepared By: :(Signature / Date) Authorized By: :(Signature / Date)

A. White

A. White

A comprehensive risk assessment will be carried out for every installation.

Refer to Risk Assessment.

Page 80: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

79

Hazard Data

Sheet No

Substance/material Page

1. Butane – Propane mix gas cartridge

2.

Fluxite Paste

3.

Power Flow Paste Flux

4.

Solder Wire (containing tin and copper)

5.

Solder Wire (containing tin/lead/antimony/bismuth

6.

Fernox Super Concentrate Central Heating Protector

7.

Fernox Supercon Central Boiler Noise silencer

8.

Superfloc

9.

Fernox Supercon Central Heating Cleanser

10.

Fernox Lime Scale Remover

11.

Metallic Lead

12.

Jet Blue Thread Sealant

13.

Jet White

14.

Indasol Solvent Weld (Non pressure)

15.

Indasol CT 36 Cleaner

16.

Silicone Sealant

17.

Regular Flux Paste

18.

Neat Cutting Oil

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

REGISTER OF

SUBSTANCES HAZARDOUS TO HEALTH

Appendix F

Page 81: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

80

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

001

Date: Rev 2011 Assessor: DIRECT

OR Material: Butane-Propane Mixture Process: Soldering

Trade name: Liquefied Petroleum Gas

Risks to Health: Extremely flammable. High concentrations can lead to nausea, headache, and dizziness. Cold Burns to the eyes and skin

Hazardous Contents: Butane and Propane with other high flammable petroleum products

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk:

High

Moderate

Low

WEL: 600 ppm 8 hour TWA value and 750 ppm in a 10 minute TWA value

Approved uses: Liquefied fuel supply source to generate high temperature flame for the

soldering and fusion of plumbing joints

Work Methods and Controls: Application of naked high temperature flame to melts solder

into a liquid in order to seal the joints of plumbing pipe work

Personal Protective Equipment Type to be worn

Gloves: Under normal soldering use no PPE is required to be worn

Goggles:

Coveralls:

Respirator/mask:

Training Required: Yes/No Plumbing trade basic soldering principles and skills

Health Surveillance: Yes/No No

Other control measures: Suitable fire appliance to be sited at all times

First Aid: If inhaled in quantity, remove to fresh air and if breathing stops administer

artificial respiration. Liquid contamination to either the skin or eyes will cause cold burns.

Ingestion is unlikely but should it occur treat as for inhalation.

Fire Precautions: Dry powder extinguisher

for liquid, water gas for other materials

Storage: Store gas cylinders upright on all

occasions

Spillage: Not expected Handling:

Waste: Metal cylinder only Transport: Prevent potential damage to

cylinders

Emergency action: None required

For further information: See attached hazard data sheet

Page 82: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

81

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

002

Date: Rev 2011 Assessor: DIRECTOR

Material: Soldering Paste Process: Soldering pipework

Trade name: Fluxite Paste

Risks to Health: The paste will cause burns severe irritation and corneal damage to the eyes

along with chemical burns to the exposed skin. If swallowed will cause corrosion of the

mouth, throat and digestive tract, abdominal pain and nausea. Inhalation of vapours or mists

will cause severe irritation to nose, throat and respiratory tract and possibly lung damage.

Hazardous Contents: Zinc Chloride

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk: High Moderate Low

WEL: Fume 1 mg per m3

per 8 hour TWA and 2mg per m3

per 15 min

Approved uses: Brush application to pipework and joints prior to soldering process work

Work Methods and Controls: Brush application of fluxite solder paste

Personal Protective Equipment Type to be worn

Gloves None required

Goggles Not required

Coveralls Heavy-duty cotton overalls to be worn

Respirator/mask Not required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: No

First Aid: Eyes- flush eyes immediately with plenty of water for at least 25 minutes. Skin –

wash immediately with soap and water and remove any contaminated clothing. Ingestion –

wash mouth with water and have the patient drink 1-3 glasses of water to dilute stomach

contents. Inhalation – remove from source of exposure and obtain medical assistance.

Fire Precautions: Any suitable fire appliance Storage: Under cover in cool, dry, ventilated

area

Spillage: No spillage expected Handling: Well ventilated area or LEV

Waste: Neutralise with plenty of water Transport:

Emergency action: Small quantities used and no procedures required For further information: See attached safety data sheet

Page 83: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

82

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

003

Date: Rev 2011 Assessor: DIRECTOR

Material: Soldering Paste Process: Soldering pipework

Trade name: Powerflow Paste Flux

Risks to Health: The paste will cause corneal irritation to the eyes along with irritation to

exposed skin surfaces. If swallowed will cause severe irritation to mouth, throat and digestive

tract. Inhalation of vapours or mists will cause severe irritation to nose, throat and respiratory

tract.

Hazardous Contents: Nonyl Phenol Ethoxylate and Hydrochloric acid

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk: High Moderate Low

WEL: Hydrochloric acid , 5ppm per 15 min

Approved uses: Brush application to pipework and joints prior to soldering process work

Work Methods and Controls: Brush application of fluxite solder paste

Personal Protective Equipment Type to be worn

Gloves None required

Goggles Not required

Coveralls Heavy-duty cotton overalls

Respirator/mask Not required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: No

First Aid: Eyes- flush eyes immediately with plenty of water for at least 25 minutes. Skin –

wash skin immediately with soap and water and remove any contaminated clothing. Ingestion

– wash out mouth with water and have the patient drink 1-3 glasses of water to dilute stomach

contents. Inhalation – remove from the source of exposure, keep warm and obtain immediate

medical assistance.

Fire Precautions: Any suitable fire appliance Storage: Under cover in cool, dry, ventilated

area

Spillage: No spillage expected Handling: Well ventilated area or LEV

Waste: Neutralise with plenty of water Transport:

Emergency action: Small quantities used and no procedures required

For further information: See attached safety data sheet

Page 84: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

83

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

004

Date: Rev 2011 Assessor: DIRECTOR

Material: Solder Process: Jointing pipework

Trade name: Solder wire, Ring, Ribbon and Foil containing tin/copper

Risks to Health: In its solid state the metal presents little hazard to plumbing operatives.

However in its molten state, the main hazard is from a thermal burn on direct contact with the

molten product. Eyes-molten metal may cause severe damage and result in loss of vision. Skin-

molten product may cause severe skin tissue damage. Ingestion unlikely, but will cause thermal

burns; inhalation of dust or fumes may cause gastrointestinal irritation and vomiting.

Hazardous Contents: Copper and tin

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk: High Moderate Low

WEL: Copper: 1mg/m

3 8 hour TWA and 2 mg/m

3 15 minutes

Tin: 2 mg/m3

8 hour TWA and 4mg/m3

15 minutes

Approved uses: Application to heated pipework and joints of plumbing work

Work Methods and Controls: Direct application to open flame heated metal pipework

Personal Protective Equipment Type to be worn

Gloves Leather, thick textile or thermal if handling hot materials

Goggles None required

Coveralls Heavy-duty cotton overalls Respirator/mask Only in confined spaces (separate assessment required)

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: No

First Aid: Eyes- flush eyes immediately with plenty of water for at least 25 minutes. Skin –

in case of contact with molten metal immediately flush the area with cold water and obtain

medical assistance. Ingestion – do not induce vomiting and keep warm. Inhalation – remove

from the source of exposure, keep warm and obtain immediate medical assistance.

Fire Precautions: Any suitable fire appliance Storage: Cool, dry, ventilated area

Spillage: No spillage expected Handling: Well ventilated area or LEV

Waste: Landfill Transport: No conditions

Emergency action: No procedures required

For further information: See attached safety data sheet

Page 85: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

84

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No 005

Date: Rev 2011 Assessor: DIRECTOR

Material: Solder Process: Jointing pipework

Trade name: Solder wire

Risks to Health: In its solid state the metal presents little hazard to plumbing operatives.

However in its molten state, the main hazard is from a thermal burn on direct contact with the

molten product. Eyes-molten metal may cause severe damage and result in loss of vision.

Skin-molten product may cause severe skin tissue damage. Ingestion unlikely, but will cause

thermal burns; inhalation of dust or fumes may cause irritation and ulceration.

Hazardous Contents: Antimony, Bismuth, Lead and Tin

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk: High Moderate Low

WEL: Antimony , 0.5mg/m3

8 hour TWA

Control of Lead at Work Regs; 0.15/m3 8 hour TWA

Tin: 2 mg/m3

8 hour TWA and 4mg/m3

15 minutes Approved uses: Application to heated pipework and joints of plumbing work

Work Methods and Controls: Direct application to open flame heated metal pipework

Personal Protective Equipment Type to be worn

Gloves Leather, thick textile or thermal if handling hot materials

Goggles None required

Coveralls Heavy-duty cotton overalls

Respirator/mask Only in confined spaces (separate assessment required)

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: No

First Aid: Eyes- flush eyes immediately with plenty of water for at least 25 minutes. Skin –

in case of contact with molten metal immediately flush the area with cold water and obtain

medical assistance. Ingestion – do not induce vomiting and keep warm. Inhalation – remove

from the source of exposure, keep warm and obtain immediate medical assistance.

Fire Precautions: Any suitable fire appliance Storage: Cover in cool, dry, ventilated area

Spillage: No spillage expected Handling: Well ventilated area or LEV

Waste: Recover when possible, landfill Transport: No conditions

Emergency action: No procedures required

For further information: See attached safety data sheet

Page 86: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

85

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

006

Date: Rev 2011 Assessor:

DIRECT

OR

Material: Central Heating Protector Process: Water Additive

Trade name: Fernox Super concentrate Central Heating Protector

Risks to Health: The liquid is classified as non-hazardous and if in contact with the eyes may

cause a slight transient irritation and the effects to the skin again will be a slight irritation

from prolonged and repeated use. Ingestion and inhalation may also produce slight irritation

to mouth, nose, throat, digestive and respiratory tract.

Hazardous Contents: This product is not classified as non-hazardous

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk: High Moderate Low

WEL: Propane vapour 150ppm 8 hour TWA

Approved uses: Mixing with central heating radiator water

Work Methods and Controls: Decanting into central heating radiator systems

Personal Protective Equipment Type to be worn

Gloves Not required

Goggles Not required

Coveralls Not required

Respirator/mask Not required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: No

First Aid: Eyes- flush eyes immediately with plenty of water for at least 15 minutes. Skin –

wash skin immediately with soap and water and remove any contaminated clothing. Ingestion

– wash out mouth with water and have the patient drink 1-3 glasses of water to dilute stomach

contents, do not induce vomiting. Inhalation – remove from the source of exposure, keep

warm and obtain immediate medical assistance.

Fire Precautions: None required Storage: Under cover in cool, dry, ventilated

area

Spillage: Flush with plenty of water Handling: No conditions

Waste: Neutralise with plenty of water Transport: No conditions

Emergency action: No procedures required

For further information: See attached safety data sheet

Page 87: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

86

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

007

Date: Rev 2011 Assessor: DIRECTOR

Material: Process: Water Additive

Trade name: Fernox Superconcentrate Boiler Noise Silencer

Risks to Health: The liquid is classified as non-hazardous and if in contact with the eyes may

cause a slight transient irritation and the effects to the skin again will be a slight irritation

from prolonged and repeated use. Ingestion and inhalation may also produce slight irritation

to mouth, nose, throat, digestive and respiratory tract.

Hazardous Contents: This product is classified as non-hazardous

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk: High Moderate Low

WEL: Propane vapour 150ppm 8 hour TWA

Approved uses: Mixing with central heating radiator water

Work Methods and Controls: Decanting into central heating radiator systems

Personal Protective Equipment Type to be worn

Gloves Not required

Goggles Not required

Coveralls Not required

Respirator/mask Not required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: No

First Aid: Eyes- flush eyes immediately with plenty of water for at least 15 minutes. Skin –

wash skin immediately with soap and water and remove any contaminated clothing. Ingestion

– wash out mouth with water and have the patient drink 1-3 glasses of water to dilute stomach

contents, do not induce vomiting. Inhalation – remove from the source of exposure, keep

warm and obtain immediate medical assistance.

Fire Precautions: None required Storage: Cool, dry, ventilated area

Spillage: Flush with plenty of water Handling: No conditions

Waste: Neutralise with plenty of water Transport: No conditions

Emergency action: No procedures required

For further information: See attached safety data sheet

Page 88: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

87

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

008

Date: Rev 2011 Assessor: DIRECTOR

Material: Process: Water Additive

Trade name: Fernox Superfloc

Risks to Health: The liquid is classified as non-hazardous and if in contact with the eyes may

cause a slight transient irritation and the effects to the skin again will be a slight irritation

from prolonged and repeated use. Ingestion and inhalation may also produce slight irritation

to mouth, nose, throat, digestive and respiratory tract.

Hazardous Contents: The product contains propane and sodium silicate and is classified as

non-hazardous.

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk: High Moderate Low

WEL: Propane vapour 150ppm 8 hour TWA

Approved uses: Mixing with central heating radiator water

Work Methods and Controls: Decanting into central heating radiator systems

Personal Protective Equipment Type to be worn

Gloves Not required

Goggles Not required

Coveralls Not required

Respirator/mask Not required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: No

First Aid: Eyes- flush eyes immediately with plenty of water for at least 15 minutes. Skin –

wash skin immediately with soap and water and remove any contaminated clothing. Ingestion

– wash out mouth with water and have the patient drink 1-3 glasses of water to dilute stomach

contents, do not induce vomiting. Inhalation – remove from the source of exposure, keep

warm and obtain immediate medical assistance.

Fire Precautions: None required Storage: Cool, dry, ventilated area

Spillage: Flush with plenty of water Handling: No conditions

Waste: No environmental conditions Transport: No conditions

Emergency action: No procedures required

For further information: See attached safety data sheet

Page 89: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

88

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

009

Date: Rev 2011 Assessor: DIRECTOR

Material: Central Heating Cleanser Process: Cleaning Heating Systems

Trade name: Fernox Superconcentrate

Risks to Health: The substance is classed as non-hazardous but may through prolonged or

frequent exposure cause slight transient irritation to the skin, eyes, respiratory system and

digestive system.

Hazardous Contents: Benzotriazole and propane

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk: High Moderate Low

WEL: Propane 150 ppm 8 hour TWA

Approved uses: Cleaning of central heating systems

Work Methods and Controls: Decanting into central heating systems to flush and clean.

Personal Protective Equipment Type to be worn

Gloves Not required

Goggles Not required

Coveralls Not required

Respirator/mask Not required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: No

First Aid: Immediately flood the eyes with plenty of water for at least 15 minutes. Skin-

wash with soap and water. Ingestion - wash out with water. Inhalation – remove from

exposure.

Fire Precautions: Not combustible. Storage: Under cover in cool, dry, ventilated

area

Spillage: Drench with water Handling: No precautions necessary

Waste: Landfill Transport: Transport containers upright

Emergency action: None required

For further information: See attached safety data sheet

Page 90: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

89

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

010

Date: Rev 2011 Assessor: DIRECTOR

Material: Water Lime Scale Remover Process: Cleaning Heating Systems

Trade name: Fernox Lime Scale Preventor

Risks to Health: The substance is classed as non-hazardous but may cause transient irritation

from abrasion to the skin, eyes, respiratory system and digestive system.

Hazardous Contents: No components are listed as hazardous

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk: High Moderate Low

WEL: None

Approved uses: Water additive to prevent lime scale

Work Methods and Controls: Decanting into central heating systems to inhibit lime scale

Personal Protective Equipment Type to be worn

Gloves Not required

Goggles Not required

Coveralls Not required

Respirator/mask Not required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: No

First Aid: Immediately flood the eyes with plenty of water for at least 15 minutes. Skin-

wash with soap and water. Ingestion - wash out with water. Inhalation – remove from

exposure.

Fire Precautions: Not combustible. Storage: Under cover in cool, dry, ventilated

area

Spillage: Drench with water Handling: No precautions necessary

Waste: Landfill Transport: Transport containers upright

Emergency action: None required

For further information: See attached safety data sheet

Page 91: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

90

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

011

Date: Rev 2011 Assessor: DIRECTOR

Material: Metallic lead Process: General Plumbing Work

Trade name: Plumbum or inorganic lead

Risks to Health: Prolonged exposure to lead dust or fume may affect the kidney, blood and

reproductive, digestive and nervous systems.

Hazardous Contents: Lead and other low concentrations of various impurities of other metals

may also be present. Extremely toxic fumes when heated above 350oC.

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk:

High

Moderate

Low

WEL: 0.15mg/m3

of air, 8 Hour TWA

Approved uses: Plumbing engineering work

Work Methods and Controls: Use of lead and lead mix constituents are required to have full

engineering control measures which include a ban on sanding abrading and other work

procedures likely to cause lead dust generation, which is extremely harmful to operatives.

Personal Protective Equipment Type to be worn

Gloves Suitable woven gloves

Goggles Appropriate safety goggles

Coveralls Heavy-duty overalls to be worn

Respirator/mask Required if dust or fume is to be generated

Safety Boots Normal safety protective footwear

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No If exposure to dust or fume is prolonged or cumulative

Other control measures: No eating smoking or drinking; wash thoroughly after

handling lead and shower after every heavy contamination.

First Aid: Flush the eyes with running water for 15 minutes. Skin contact – wash hands with

soap and water. Inhalation and ingestion – seek medical attention.

Fire Precautions: Dry Powder Storage: Cool, dry, ventilated area

Spillage: Hot lead should be allowed to cool

before handling

Handling: Gloves and coveralls

Waste: Return to manufacturer Transport: Transport containers upright

Emergency action: No normal arrangements necessary

For further information: See attached safety data sheet

Page 92: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

91

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

012

Date: Rev 2011 Assessor: DIRECTOR

Material: Jet-Blue Process: General Plumbing Sealing Work

Trade name: Fernox Jet-Blue Risks to Health: Prolonged exposure to substance may cause minor irritation to eyes, skin,

respiratory and digestive system.

Hazardous Contents: The product is classed as non-hazardous.

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk:

High

Moderate

Low

WEL: Not listed

Approved uses: General plumbing cleaner

Work Methods and Controls: Sealing of threaded joints in plumbing systems

Personal Protective Equipment Type to be worn

Gloves None required

Goggles None required

Coveralls None required

Respirator/mask None required

Safety Boots None required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: None required

First Aid: Flush the eyes with running water if irritation persists seek medical attention. Skin

contact – wash hands with soap and water. Inhalation and ingestion – seek medical attention.

Fire Precautions: Dry Powder Storage: Under cover in cool, dry, ventilated

area

Spillage: Scrape up and landfill Handling: No conditions

Waste: Landfill Transport: No conditions

Emergency action: No conditions

For further information: See attached safety data sheet

Page 93: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

92

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No 013

Date: Rev 2011 Assessor: DIRECTOR

Material: Jet-Blue Process: General Plumbing Sealing Work

Trade name: Fernox Jet-White

Risks to Health: Prolonged exposure to substance may cause minor irritation to eyes, skin,

respiratory and digestive system.

Hazardous Contents: The product is classed as non-hazardous.

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk:

High

Moderate

Low

WEL: Not listed

Approved uses: General plumbing cleaner

Work Methods and Controls: Sealing of threaded joints in plumbing systems

Personal Protective Equipment Type to be worn

Gloves None required

Goggles None required

Coveralls None required

Respirator/mask None required

Safety Boots None required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: None required

First Aid: Flush the eyes with running water if irritation persists seek medical attention. Skin

contact – wash hands with soap and water. Inhalation and ingestion – seek medical attention.

Fire Precautions: Dry Powder Storage: Under cover in cool, dry, ventilated

area

Spillage: Scrape up and landfill Handling: No conditions

Waste: Landfill Transport: No conditions

Emergency action: No conditions

For further information: See attached safety data sheet

Page 94: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

93

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

014

Date: Rev 2011 Assessor: DIRECTOR

Material: Indasol MS 1475 Process: Non pressure weld cement

Trade name: Indasol

Risks to Health: Irritant to eyes and respiratory system. Prolonged skin contact may cause

irritation leading to dermatitis. Inhalation may lead to nausea, headaches, and dizziness.

Hazardous Contents: The product is classed as non-hazardous.

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk: High Moderate Low

WEL: Methyl Ethyl Ketone /LTEL 200 ppm

300 ppm

Cyclohexane /LTEL 25 pp 100 PPM Tetrohydrofuran /LTEL 200 ppm 250 ppm

Approved uses: General plumbing sealant work

Work Methods and Controls: Sealing of non-pressure joints in plumbing systems

Personal Protective Equipment Type to be worn

Gloves None required

Goggles None required

Coveralls None required

Respirator/mask None required

Safety Boots None required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: None required

First Aid: Flush the eyes with running water if irritation persists seek medical attention. Skin

contact – wash hands with soap and water. Inhalation and ingestion – seek medical attention.

Fire Precautions: Foam or Dry Powder Storage: Under cover in cool, dry, ventilated

area

Spillage: Scrape up and landfill Handling: No conditions

Waste: Landfill Transport: No conditions

Emergency action: No conditions

For further information: See attached safety data sheet

Page 95: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

94

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

015

Date: rev 2011 Assessor: DIRECTOR

Material: Cleaner Indasol CT 36 Process: Cleaning joints before applying cement

Trade name: Indasol

Risks to Health: Irritant to eyes and respiratory system. Prolonged skin contact may cause

irritation leading to dermatitis. Inhalation may lead to nausea, headaches, and dizziness.

Hazardous Contents: The product is classed as non-hazardous.

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk:

High

Moderate

Low

WEL: Methyl Ethyl Ketone /LTEL 200 ppm 300 ppm

Approved uses: General plumbing sealant work

Work Methods and Controls: Pre-application cleaner of joints

Personal Protective Equipment Type to be worn

Gloves None required

Goggles None required

Coveralls None required

Respirator/mask None required Safety Boots None required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: None required

First Aid: Flush the eyes with running water if irritation persists seek medical attention. Skin

contact – wash hands with soap and water. Inhalation and ingestion – seek medical attention.

Fire Precautions: Foam or Dry Powder Storage: Under cover in cool, dry, ventilated

area

Spillage: Scrape up and landfill Handling: No conditions

Waste: Landfill Transport: No conditions

Emergency action: No conditions

For further information: See attached safety data sheet

Page 96: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

95

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

016

Date: rev 2011 Assessor: DIRECTOR

Material: Silicone sealant Process: Sealing and jointing of baths and kitchens

Trade name: Dow Corning Hansil

Risks to Health: Irritant to eyes and prolonged contact may cause minor skin irritation

leading to dermatitis. Inhalation may lead to irritation of respiratory system.

Hazardous Contents: The product is classed as non-hazardous.

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk:

High

Moderate

Low

WEL: Acetoxysilane 10 ppm 8 hour TWA

Silica 6mg/m3

8 TWA (inhalable dust)

Approved uses: General plumbing sealant work

Work Methods and Controls: Sealing of baths and kitchens

Personal Protective Equipment Type to be worn

Gloves None required

Goggles None required

Coveralls None required

Respirator/mask An acid vapour mask should be used if used in large

quantities or confined spaces Safety Boots None required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: None required

First Aid: Flush the eyes with running water if irritation persists seek medical attention. Skin

contact – wash hands with soap and water. Inhalation and ingestion – seek medical attention.

Fire Precautions: Foam or Dry Powder Storage: Under cover in cool, dry, ventilated

area

Spillage: Scrape up and landfill Handling: No conditions

Waste: Landfill Transport: No conditions

Emergency action: No conditions

For further information: See attached safety data sheet

Page 97: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

96

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

017 Date: rev 2011 Assessor: DIRECTOR

Material: Regular Flux Paste Process: General soldering of joints

Trade name: Solder Flux

Risks to Health: There is generally no risks to health from the product until it is heated and

produces fumes when it may be slightly irritating to the eyes and the respiratory tract.

Hazardous Contents: This product is classified as non-hazardous

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk: High Moderate Low

WEL: Ammonium Chloride (for fume) 10 mg/m3

20 Mg/m3

Approved uses: Soldering of plumbing joints

Work Methods and Controls: Applied heat to metal joints

Personal Protective Equipment Type to be worn

Gloves Not required

Goggles Not required

Coveralls Not required

Respirator/mask Not required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: Yes/No No

Other control measures: No

First Aid: Eyes-flush with water; Skin-rinse with water; Inhalation-remove from exposure.

Fire Precautions: Non combustible Storage: Under cover in cool, dry, ventilated

area

Spillage: Scrape and landfill Handling: No conditions

Waste: Landfill Transport: No conditions

Emergency action: No conditions

For further information: See attached safety data sheet

Page 98: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

97

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

COSHH ASSESSMENT RECORD Ser No

018 Date: rev 2015 Assessor: DIRECTOR

Material: Neat Cutting Oil Process:

Trade name: Boss Non Soluble Cutting Oil

Risks to Health: Not classified as hazardous under CHIP Regulations

Hazardous Contents: This product is classified as non-hazardous

Route of exposure: Skin Cuts etc. Eyes Inhalation Ingestion

Degree of risk:

High

Moderate

Low

WEL: n/a

Approved uses: (as identified by Manufacturer / Supplier) Cutting Oil

Work Methods and Controls: Avoid contact with skin and eyes. Observe good standards of

hygiene

Personal Protective Equipment Type to be worn

Gloves Yes - Chemical, Impervious type – PVC or Rubber

Goggles Yes

Coveralls Not required

Respirator/mask Not required

Training Required: Yes/No Plumbing basic trade principles and skills

Health Surveillance: No

Other control measures: No

First Aid: Eyes-flush with water; Skin-rinse with water; Inhalation-remove from exposure.

Do not induce vomiting – drink water / milk. If systems persist – seek medical attention

Fire Precautions: Foam, Dry powder, Co2

Water Spray

Storage: Store in steel / stainless steel

containers. Protect from frost. Keep in

sealed containers.

Spillage: Protect drains and water courses.

Soak with absorbent material. Wash down

floor area as can become slippery

Handling: Avoid contact with skin and eyes.

Waste: In accordance with local regulations Transport: No conditions

Emergency action: Dial 999

For further information: See attached safety data sheet – contact BSS Group Plc –

0116262 3232

Page 99: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

98

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

Appendix G

List of

Manual Handling Assessments

Assessment No Lifting Operation Page

1

Vaillant Pro Central Heating Combination Boiler

2

Vaillant Plus Central Heating Combination

Boiler

3

Rettig 600H Central Heating Radiator (single)

4

Rettig 600H Central Heating Radiator (double)

Page 100: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

Compiled By: DIRECTOR

Date: 2015

99

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

MANUAL HANDLING RISK ASSESSMENT Ser No

001

Task: Moving and Installation of a Vaillant ecoTEC Plus Central Heating Combination

Boiler (Approximate weight: 43 Kg)

Significant injury: Yes. The lifting operation requires 2-men and no attempt is to be made

by anyone to move or lift the load without assistance or, if in poor physical health.

Detailed Assessment Yes No Remedial Actions

D the operations involve:

• Holding away from the trunk? Yes Additional man for lifting

• Twisting? Yes 2 man lift will limit body movement

to prevent twist

• Stooping? Yes Bend legs and keep straight back

• Reaching upwards? Yes Use of steps

• Carrying long distances? Yes Plan route and rest points

• Repetitive handling? No

• Strenuous pushing or pulling? Yes Loading/unloading from vehicle-plan

the lifting operation

Unpredictable movement of load? Yes Ensure 2 man lift at all times

including installation operation

Is the load:

• Heavy?

• Bulky?

• Difficult to grasp?

• Unstable?

• Harmful (sharp/hot etc.)?

Yes

Yes

Yes

No

No

Additional man for lifting

Additional man for lifting

Additional man for lifting

In the working environment

Yes

No

Additional man for lifting • Uneven floors?

• Poor floor surfaces? Yes Additional man for lifting

• Variations in level? Yes Additional man for lifting

• Poor lighting levels? Yes Fix temporary lighting, ensure travel

route of load is free of obstructions

• Extremes of temperature?

• Obstructions? No

Do the individuals performing the task:

• Require unusual capability?

• Have health problems?

• Require special information?

Yes

No

No

If in ill health “Do not Lift”

Issue manufacturers specification and

installation details

Assessment of Manual Handling Risk High

Page 101: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

Compiled By: DIRECTOR

Date: 2015

100

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

MANUAL HANDLING RISK ASSESSMENT Ser No

002

Task: Moving and Installation of a Vaillant ecoTEC Pro Central Heating Combination

Boiler (Approximate weight: 37 Kg)

Significant injury: Yes. The lifting operation requires 2-men and no attempt is to be made

by anyone to move or lift the load without assistance or, if in poor physical health.

Detailed Assessment Yes No Remedial Actions

D the operations involve:

• Holding away from the trunk? Yes Additional man for lifting

• Twisting? Yes 2 man lift will limit body movement

to prevent twist

• Stooping? Yes Bend legs and keep straight back

• Reaching upwards? Yes Use of steps

• Carrying long distances? Yes Plan route and rest points

• Repetitive handling? No

• Strenuous pushing or pulling? Yes Loading/unloading from vehicle-plan

the lifting operation

Unpredictable movement of load? Yes Ensure 2 man lift at all times

including installation operation

Is the load:

• Heavy?

• Bulky?

• Difficult to grasp?

• Unstable?

• Harmful (sharp/hot etc.)?

Yes

Yes

Yes

No

No

Additional man for lifting

Additional man for lifting

Additional man for lifting

In the working environment

Yes

No

Additional man for lifting • Uneven floors?

• Poor floor surfaces? Yes Additional man for lifting

• Variations in level? Yes Additional man for lifting

• Poor lighting levels? Yes Fix temporary lighting, ensure travel

route of load is free of obstructions

• Extremes of temperature?

• Obstructions? No

Do the individuals performing the task:

• Require unusual capability?

• Have health problems?

• Require special information?

Yes

No

No

If in ill health “Do not Lift”

Issue manufacturers specification and

installation details

Assessment of Manual Handling Risk High

Page 102: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

Compiled By: DIRECTOR

Date: 2015

101

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2012

MANUAL HANDLING RISK ASSESSMENT Ser No

003

Task: Moving and Installation of a single 600H Rettig radiator

(Approximate weight: 21 Kg)

Significant injury: Yes. The lifting operation requires 2-men and no attempt is to be made

by anyone to move or lift the load without assistance or, if in poor physical health.

Detailed Assessment Yes No Remedial Actions

D the operations involve:

• Holding away from the trunk? Yes Additional man for lifting

• Twisting? Yes 2 man lift will limit body movement

to prevent twist

• Stooping? Yes Bend legs and keep straight back

• Reaching upwards? No

• Carrying long distances? Yes Plan route and rest points

• Repetitive handling? No

• Strenuous pushing or pulling? Yes Loading/unloading from vehicle-plan

the lifting operation

Unpredictable movement of load? Yes Ensure 2 man lift at all times

including installation operation

Is the load:

• Heavy?

• Bulky?

• Difficult to grasp?

• Unstable?

• Harmful (sharp/hot etc.)?

Yes

Yes

No

No

No

Additional man for lifting

Additional man for lifting

In the working environment

Yes

No

Additional man for lifting • Uneven floors?

• Poor floor surfaces? Yes Additional man for lifting

• Variations in level? Yes Additional man for lifting

• Poor lighting levels? Yes Fix temporary lighting, ensure travel

route of load is free of obstructions

• Extremes of temperature?

• Obstructions? No

Do the individuals performing the task:

• Require unusual capability?

• Have health problems?

• Require special information?

Yes

No

No

Normal physical health

If in ill health “do not lift”

Issue manufacturers specification and

installation details

Assessment of Manual Handling Risk High

Page 103: New A. White Plumbing Service Ltd · 2019. 8. 10. · A. White Plumbing Service Ltd AWPS Ltd Health and Safety Policy Sept 2015 2.2.1 MANAGING DIRECTOR Prepare and maintain an up

102

A. White

Plumbing

Service

Ltd

Health and Safety Policy

AWPS Ltd

Sept 2015

MANUAL HANDLING RISK ASSESSMENT Ser No

004

Task: Moving and Installation of a Rettig double 600H radiator

(Approximate weight: 37 Kg)

Significant injury: Yes. The lifting operation requires 2-men and no attempt is to be made

by anyone to move or lift the load without assistance or, if in poor physical health.

Detailed Assessment Yes No Remedial Actions

D the operations involve:

• Holding away from the trunk?

• Twisting?

• Stooping?

• Reaching upwards?

• Carrying long distances?

• Repetitive handling?

• Strenuous pushing or pulling? Unpredictable movement of load?

Yes

Yes

Yes

Yes

Yes

Yes

No

No

Additional man for lifting

2 man lift will limit body movement

to prevent twist

Bend legs and keep straight back

Plan route and rest points

Loading/unloading from vehicle-plan

the lifting operation

Ensure 2 man lift at all times

including installation operation

Is the load:

• Heavy?

• Bulky?

• Difficult to grasp?

• Unstable?

• Harmful (sharp/hot etc.)?

Yes

Yes

Yes

No

No

Additional man for lifting

Additional man for lifting

Additional man for lifting

In the working environment

• Uneven floors?

• Poor floor surfaces?

• Variations in level?

• Poor lighting levels?

• Extremes of temperature?

• Obstructions?

Yes

Yes

Yes

Yes

No

No

Additional man for lifting

Additional man for lifting

Additional man for lifting

Fix temporary lighting, ensure travel

route of load is free of obstructions

Do the individuals performing the task:

• Require unusual capability?

• Have health problems?

• Require special information?

Yes

No

No

If in ill health “Do not Lift”

Manufacturers specification and

installation details

Assessment of Manual Handling Risk High

Compiled By: DIRECTOR Date: 2015