30
Neutrino Factory R&D in Europe Neutrino Factory R&D in Europe Rob Rob Edgecock Edgecock /RAL /RAL

Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

  • Upload
    dotram

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

Neutrino Factory R&D in EuropeNeutrino Factory R&D in Europe

Rob Rob EdgecockEdgecock/RAL/RAL

Page 2: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

OutlineOutline

• Introductioni.e. what has happened since last year

• European feasibility study

• Proton driversuperbeam developments

• Target

• Pion collection

• Muon front-end

• Muon acceleration

…………..with thanks to many people from ..with thanks to many people from whom Iwhom I’’ve stolen transparencies!ve stolen transparencies!

Page 3: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

IntroductionIntroduction

Last year: “…..or the art of [talking] for half an hourabout nothing!”

cut backs at CERN due to LHC

largely not replaced by other labs

general lack of funding

This year: some signs of improvement:

funding from EC FP6 + ISTC

uplift in (at least) one country

more positive noises from CERN management

future proposals to FP6/7

work still being done………..

Page 4: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

CARECARE

European Commission European Commission 66th th FFramework ramework PProgramme:rogramme:

• EC has defined various EC has defined various actionsactions to fundto fund

•• many only for specific many only for specific thematic prioritiesthematic priorities

•• made substantial funds available made substantial funds available –– 17.5B17.5B€€!!

•• some actions possible for PPsome actions possible for PP⇒⇒ ESGARDESGARD

•• Coordinated a proposal against Coordinated a proposal against IIntegrating ntegrating AActivitiesctivities⇒ Coordinated Accelerator Research in Europe

• Exploited two activities:- Networking Activities → BENE- Joint Research Activities → HIPPI

Page 5: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

Superconducting RF(SRF)

CARECARE

30%~.7M€

30%~0.3M€

30%~0.45M€

90%3.6M€

90%3.6M€

25%~1M€

65%~5M€

Page 6: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

Other Possible FP6 ActionsOther Possible FP6 Actions

DDesign esign SStudies:tudies:-- 11stst round (March 2004): round (March 2004): EUROTeVEUROTeV

EURISOLEURISOL-- 22ndnd round ( ):round ( ): NuFactDSNuFactDS

New New JRAJRAs s under CAREunder CARE

NNew and ew and EEmerging merging SScience and cience and TTechnologyechnology

→ both discussed later

Page 7: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

UK Funding UpliftUK Funding Uplift

From UK Gov, mainly due to initiative started by Ken PeachFrom UK Gov, mainly due to initiative started by Ken Peach

Good news: £21M from PPARC

Bad news:

LC beam delivery: £9M

Cockcroft Institute: £7M

Oxford/RH Centre: £2M

UKNF: £2M

MICE: £1M

PPARC

£7.5M

OST

£3-4M

CCLRC

Cockcroft Institute:

→ Discussed later & WG3

Page 8: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

European Feasibility StudyEuropean Feasibility Study

•• CERN CERN Yellow Report Yellow Report Published 2004:Published 2004:““ECFA/CERN Studies of a European Neutrino ECFA/CERN Studies of a European Neutrino

Factory ComplexFactory Complex””, CERN, CERN--20042004--002002

•• Chapter on the machine Chapter on the machine →→ European Feasibility StudyEuropean Feasibility Study

Page 9: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

European Feasibility StudyEuropean Feasibility Study

Page 10: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

Proton DriverProton Driver

CERN proton driver: CERN proton driver: SPLSPL

Number of changes: politicallytechnically

See Haseroth

WG3

Page 11: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

SPLSPL

CERN proton complexCERN proton complex

- increase in protons

- ultimate L for LHCLinac4

SPL

- LHC L upgrade

- SB to Frejus

- driver for EURISOL/BB

- driver for NF

Page 12: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

SPL R&DSPL R&D

Collaboration/funding:Collaboration/funding:

• HIPPI: CARE JRA - R&D of the technology for high intensity pulsed proton linear

accelerators up to an energy of 200 MeV- 9 labs- 11.1M€ + 3.6M€ (EC) for 5 years (2004-2008)

• IPHI collaboration:- 3 MeV RFQ

• ISTC:- DTL with magnetic focusing (3-40 MeV)- DTL with focusing by RF quadrupoles

(DTL-RFQ) (3-40 MeV)- Coupled Cavity DTL (40-100 MeV)- $1550 total- all prototypes delivered by summer 2006

Page 13: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

SPL R&DSPL R&D

3 MeV Test Stand to be installed in the PS South Hall (in place for linac 4)Purpose: test essential front-end issues (hardware & beam dynamics)Made of IPHI RFQ + CERN chopper line + IN2P3 diagnostics line + 2 LEP klystrons (1 for the RFQ + 1 for testing other RF structures).Initial use of a standard CERN proton source, to be replaced by an H- source. The elements will be placed in the exact position foreseen for Linac4.Operation with beam: 2007

3 MeV test stand

Chopper line (CERN)

IPHI RFQ(CEA/IN2P3)

Page 14: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

RAL Test StandRAL Test Stand

• “5MW” test stand also planned at RAL

• Builds on existing test stand for current ISIS upgrade

• Work done for the ESS

• Main aim is a further ISIS upgrade

• Directly relevant to Neutrino Factory

• Complementary to CERN:- different chopper, frequency, etc- more generic

• Also participating in HIPPI

• Close collaboration with CERN developing

• Beam >2007

RFQ

Bunch +

accel-erate

Chopper

Switch in 2 ns

for~0.1 ms

LEBT

Match ion

source to RFQ

Ion source

60 mA2 ms

Beam stop

Diagnostics

See Findlay WG3

Page 15: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

Target StudiesTarget Studies

Three programmes:Three programmes:

• Shock studies of solid targets

• TT2A experiment

• HARPSee

Fabich/CatanesiPlenary

Kirk/Bennett WG3

Page 16: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

Shock StudiesShock StudiesElectron beam tests:Electron beam tests:

• Electron beam welding machine

• Only realistic possibility for lifetime test

• Correct energy density

• Only surface effect

• First test done

Electron Gun

Aperture Plate Light pipe

Aperture plate

Optical Transport

Window and bellows

To Spectrometer

WaterCooled

BeamStop

Foil Electron Scanning:

Static Load

Upper clamp

Lower guide

50 HzRepetition(100 Hz skip across foils)

Beam Design

Path

Page 17: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

Shock StudiesShock Studies

• Second test under consideration

• Improved experimental setup & diagnostics

• Results also relevant to T2K e-beam

foils

Optical system

Spectrometer output

Simple numerical model

Page 18: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

Shock StudiesShock StudiesProton beam tests:Proton beam tests:

• Correct energy density available from PS & at ISOLDE

• Lifetime tests difficult

• PS will be used for mercury

• Solid target tests already done at ISOLDE

• Further tests planned, upgraded instrumentation

• Also relevant to T2K and CNGS

Page 19: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

HARPHARP

• Precise measurement of for hadrons

• Input for: - Neutrino Factory & superbeam- atmospheric neutrino flux- hadron production models- MiniBooNE, K2K, LSND experiments

ltdpdpd /2σ

• Data taking in 2001 and 2002

• 420M physics triggers, 1.5 to 15 GeV/c, many targets

• Since then: understanding detector

• First physics distributions: winter conferences 2004

• Latest results: this week………..

Page 20: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

Pion Pion Collection Collection -- HornsHorns

BEAM AXIS

1500

1000

Ø80

0

Ø20

00

Ø80

600 kA (outer horn)

300 kA (inner horn)

Not to scale

• Baseline collector in CERN layout: horn

• Standard for conventional neutrino beams

Two horns required to achieve

focussing needed for the Neutrino

Factory

See FabichWG3

Page 21: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

HornsHorns

• Three main issues being studied:- lifetime due to pulsing: 300/600kA at 50Hz

NEUTRINO FACTORY PROJECT - HORN PROTOTYPEGENERAL ASSEMBLY

S. Rangod 18/10/2001

Ø42

0

1030

Mag

netic

mea

sure

men

ts p

lane

- heating/lifetime due to beam

48.2 kW67kW

78.7kW

4MW, 2.2GeV proton beam+8kW from Joule effect

14.9kW

- optimisation of parameters for physics

Page 22: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

Muon Muon FrontFront--endend

• CERN “baseline”: all 88MHz linear channel

target a

nd horn

15 m deca

y channel

7.2 m phase

rotati

on

cooling (6

.4 m/ce

ll)

80 MHzDecay Rotation Cooling I Acceleration

IAcceleration

IILength [m] 15 8 90 ≈ 10 ≈ 450

Diameter [cm] 40 40 40 30 20

B-field [T] 4 4 4 4 quads

Frequency [MHz] 80 80 80 80-200

Gradient [MV/m] 4 4 4 4-10

Kin Energy [MeV] 200 200 300 2000

Basically unchanged for

2 years

Page 23: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

RAL FrontRAL Front--end Studiesend Studies

• Two front-ends being studied at RAL:- inverse phase rotation chicane- cooling ring

S = solenoid, A = absorber, 36 cavities in blocks of 3• Both currently being optimised (pre-GRID!)

Page 24: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

FunnellingFunnelling

•• Split proton beam on to Split proton beam on to ““44”” targets + hornstargets + horns

•• ““FunnelFunnel”” pions pions into same decay channelinto same decay channel

•• FODO focussing using quads, rather solenoid focussingFODO focussing using quads, rather solenoid focussing

Pions

Muons

Page 25: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

FrontFront--end R&Dend R&D

•• Contributions to three projects:Contributions to three projects:-- MuScatMuScat-- MuCoolMuCool-- MICEMICE

•• Two others in Europe:Two others in Europe:-- Frictional cooling Frictional cooling -- Laser ionisation of Laser ionisation of muoniummuonium

Page 26: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

MuScatMuScat

•• Measurement of Measurement of muon muon MCS as input toMCS as input to-- cooling simulationscooling simulations-- MICEMICE-- GeantGeant

•• Two dataTwo data--taking runs at TRIUMF taking runs at TRIUMF –– 2000 & 20032000 & 2003

• Data analysis taken longer than expected(!):- high precision experiment- small fractions of a few people

• First results this week

See Murray Plenary

Page 27: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

MICEMICE

European contributionsEuropean contributions

• Beamline and infrastructure: UK, Switzerland

• Tracking detectors: Italy, Switzerland, UK

• Particle-id detectors: Belgium, Italy

• Coils: Italy, UK

• RF-power: Switzerland, UK

• Magnetic field measurements: Netherlands

• Software: Italy, Switzerland, UK

Page 28: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

Muon Muon AccelerationAcceleration

Some activity on Some activity on RLAsRLAs::- at CERN some time ago- Saclay more recently

More recently, much activity on More recently, much activity on FFAGsFFAGs::- Saclay: beam dynamics studies

150 MeV proton FFAG: horizontal & vertical beam envelopes

- CERN: development of FFAG simulationsbeam dynamics and lattices studies

- RAL: studies towards an isochronous, 16turn, 8-20 GeV FFAG

See MeotWG3

Page 29: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

Electron Model FFAGElectron Model FFAG

• Electron model of a non-scaling FFAG

• Much work done (by one person!)→ parameters for 10-20 MeV machine

15m in circumference

• Increasing EU participation:- high current p-driver- medical applications- ADS- ion acceleration- industry

• Have a candidate host lab: Daresbury- two possible injectors- some associated infrastructure

• Investigating funding, e.g. FP6

Page 30: Neutrino Factory R&D in Europe133.1.141.121/~nufact04_talks/talks/26_ple_edgecock.pdf · Introduction Last year: “…..or the art of [talking] for half an hour about nothing!”

ConclusionsConclusions• Financial situation has improved

• Hopefully, this will continue!

• Focus on a number of projects to attract more people

• Proton driver:- very healthy- two test stands under development

• Target and collection:- TT2A- solid target shock studies- tests/simulations of horns- First HARP results soon

• Front-end:- First MuScat results- MICE progressing well

• Acceleration:- Focus on e-model FFAG