Munich Satellite Navigation Summit 2009 Munich Satellite Navigation Summit 2009 Galileo Galileo Development Status Development Status DR. MARTIN HOLLREISER DR. MARTIN HOLLREISER GALILEO PROJECT OFFICE GALILEO PROJECT OFFICE - - EUROPEAN SPACE AGENCY EUROPEAN SPACE AGENCY Navigare'09 Navigare'09 à à Neuchâtel Neuchâtel

Neuchatel - MH - 16Jun09 - ION-CH

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Neuchatel - MH - 16Jun09 - ION-CH

Munich Satellite Navigation Summit 2009Munich Satellite Navigation Summit 2009

Galileo Galileo Development StatusDevelopment StatusDR. MARTIN HOLLREISERDR. MARTIN HOLLREISERGALILEO PROJECT OFFICE GALILEO PROJECT OFFICE -- EUROPEAN SPACE AGENCYEUROPEAN SPACE AGENCY

Navigare'09 Navigare'09 àà NeuchâtelNeuchâtel

Page 2: Neuchatel - MH - 16Jun09 - ION-CH

GIOVE A/B

2011-2013

IOV PHASE FOC PHASE

2005 2008 2010 2005 2008 2010 20122012 -- 2014 2014 ……

44

Programme PhasesProgramme Phases

EXP PHASE

Page 3: Neuchatel - MH - 16Jun09 - ION-CH

GALILEO SYSTEM CONTEXT AND SERVICES

EXTERNAL ORGANISATIONS

GALILEO SATELLITE-ONLY SERVICES

(SIS BASED)

GALILEO USER SEGMENT

GALILEO GLOBAL COMPONENT

GALILEO CORE INFRASTRUCTURE

GALILEO SPACE

SEGMENT

GALILEO CONTROL SEGMENT GALILEO

MISSION SEGMENT

SoL Centre

CS Centre

RLSP

GSP

TSP

REGIONALGNSS

COMPONENTS

SAR BEACONS*

OS

SoL

CS

PRS

ERIS

SAR FL

SAR RL

GALILEONAVIGATIONRECEIVERS

*An embedded Galileo receiver in the beacon is required to get access to the SAR RL service

GSMC

MEOLUT

EXTERNAL SYSTEMS/ADDED VALUE SERVICE PROVIDERS

REGIONAL GNSS COMPONENTS

LOCAL GNSS COMPONENTS

COMMERCIAL SERVICE

PROVIDERS

Enhanced/Complementary Services

CIVIL AVIATION AIS/ATC

BIPM/UTC(K) IERS/ITRF

Galileo Mission Support*Timing (GST-UTC, GGTO,...)*Geodesy (GRF-ITRF)*Search and Rescue

Non SIS Galileo Data

Commercial Data

*Indirect ERIS*EGNOS CDDS

COSPAS SARSAT RCC OTHER GNSS

(GPS, GLONASS)

Page 4: Neuchatel - MH - 16Jun09 - ION-CH

SF

GACF

GSSULS

OSPFIPF

PTF

S-Band TC, TM

and Ranging L-Band Signal in SpaceC-BandMissionUp-Links

GroundControlSystem(GCS)

Galileo Space SegmentGSS - Galileo Sensor Station (nGRC, GRC)

PTF – Precise Time Facility

IPF – Integrity Processing Facility

OSPF – Orbitography and Synchronization Processing Facility

MGF – Message Generation Facility

ULS – Uplink Local Station

MUCF – MissionUplink and Control Facility

MSF – MissionSupport Facility

SPF – ServiceProduct Facility

M- and P-KMF – Mission and PRS Key Management Facility

GACF – Ground Assets Control Facility

MDDN – Mission Data Dissemination Network

MTPF – Maintenance andtraining platform Facility

SPF

x9 x40

M-KMF

MUCF

MSF

P-KMF …MGF

KeyMngmt

M&C data

Ground MissionSystem (GMS)

Integrity proc. Navigation proc.

Time ref.

Mission planning

Msg generation

Uplink scheduler

Mission support

M&C of Ground Assets

External products

GMS ArchitectureGMS Architecture

Page 5: Neuchatel - MH - 16Jun09 - ION-CH

Munich Satellite Navigation Summit 2009Munich Satellite Navigation Summit 2009

Galileo Frequency PlanGalileo Frequency Plan

Page 6: Neuchatel - MH - 16Jun09 - ION-CH

Galileo ServicesGalileo Services

Open Access

Commercial

Safety of Life

Search and Rescue

Free to air; Mass market; Simple positioning and timing

Encrypted; High accuracy; Guaranteed service

Open Service + Integrity and Authentication of signal

Encrypted; Integrity; Continuous availability

Near real-time; Precise; Return link feasible

Public Regulated

PVT

SAR

Page 7: Neuchatel - MH - 16Jun09 - ION-CH

GIOVE AGIOVE A

3 YEARS in orbit 3 YEARS in orbit Novel orbit, signals and clockNovel orbit, signals and clockGalileo FilingGalileo FilingMission extendedMission extended

Page 8: Neuchatel - MH - 16Jun09 - ION-CH

GIOVE BGIOVE B

Launched on 27 April 2008Launched on 27 April 2008Most stable clock in spaceMost stable clock in spaceMost advanced GNSS signalMost advanced GNSS signalPrecursor of IOVPrecursor of IOV

L1abc_CBOC{BOC(15,2.5)-c/BOC(1,1)-s/BOC(1,1)-s} Prime: Gain Step 7

-70.0

-60.0

-50.0

-40.0

-30.0

-20.0

-10.0

0.0

10.0

20.0

1530 1540 1550 1560 1570 1580 1590 1600 1610 1620

Frequency (MHz)

EIR

P (d

BW

/ 10

kHz

RB

W)

AIT Ref TC24: 08 May 08 @ 07:30

L1abc_CBOC{BOC(15,2.5)-c/BOC(1,1)-s/BOC(1,1)-s} Prime: Gain Step 7

-70.0

-60.0

-50.0

-40.0

-30.0

-20.0

-10.0

0.0

10.0

20.0

1530 1540 1550 1560 1570 1580 1590 1600 1610 1620

Frequency (MHz)

EIR

P (d

BW

/ 10

kHz

RB

W)

AIT Ref TC24: 08 May 08 @ 07:30

Page 9: Neuchatel - MH - 16Jun09 - ION-CH

Munich Satellite Navigation Summit 2009Munich Satellite Navigation Summit 2009

IOVIOVININ--ORBIT VALIDATION PHASEORBIT VALIDATION PHASE

Page 10: Neuchatel - MH - 16Jun09 - ION-CH

IOV status and plansIOV status and plans

Ground Segment Ground Segment CDRsCDRs completedcompletedEM Payload and Satellite test completionEM Payload and Satellite test completionPFM Satellite integration completionPFM Satellite integration completionSatellite CDR Q3 2009Satellite CDR Q3 2009GMS and GCS commissioning at GCCGMS and GCS commissioning at GCC--I and GCCI and GCC--DDGSS, ULS and TTC deployment on remote sitesGSS, ULS and TTC deployment on remote sitesIOT station commissioningIOT station commissioningLEOP OCC procurementLEOP OCC procurementSystem CDR end 2009System CDR end 2009System Integration and Verification 2009System Integration and Verification 2009--20102010Launch in 2010Launch in 2010

Page 11: Neuchatel - MH - 16Jun09 - ION-CH

IOV Ground Segment IOV Ground Segment

Cordoba GSS

Troll GSS

Alaska GSS

Hawaii GSS

Papeete ULS/GSSEaster Island GSS

Washington GSS

Svalbard ULS/GSS

Kiruna TTC

Redu GSS

Fucino GSS

Riyadh GSS

Reunion ULS/GSS

South Africa GSS

Kourou TTC/ULS/GSS

Urumchi GSS

Perth GSS

New Caledonia ULS/GSS

S. Korea GSS

GSSULSTTC

Page 12: Neuchatel - MH - 16Jun09 - ION-CH

GCCGCC--D (D (OberpfaffenhofenOberpfaffenhofen))

Page 13: Neuchatel - MH - 16Jun09 - ION-CH

GCCGCC--I (I (FucinoFucino))

Page 14: Neuchatel - MH - 16Jun09 - ION-CH

SS--band TM&TC Stationband TM&TC Station

TTCF Kiruna Antenna TTCF Kiruna Antenna Installed on site (AugInstalled on site (Aug’’08)08)

TTCF Kourou Antenna at Factory TTCF Kourou Antenna at Factory Acceptance (JulAcceptance (Jul’’08)08)

Page 15: Neuchatel - MH - 16Jun09 - ION-CH

CC--band Upband Up--Link StationLink Station

Page 16: Neuchatel - MH - 16Jun09 - ION-CH

IOV EM satellite IOV EM satellite

Page 17: Neuchatel - MH - 16Jun09 - ION-CH

IOV STM SatelliteIOV STM Satellite

Page 18: Neuchatel - MH - 16Jun09 - ION-CH

Soyuz Launch Range Soyuz Launch Range at Europeat Europe’’s spaceport s spaceport ((KourouKourou))

Page 19: Neuchatel - MH - 16Jun09 - ION-CH

Munich Satellite Navigation Summit 2009Munich Satellite Navigation Summit 2009

FOCFOCFULL OPERATIONAL CAPABILITY PHASEFULL OPERATIONAL CAPABILITY PHASE

Page 20: Neuchatel - MH - 16Jun09 - ION-CH

From IOV to FOCFrom IOV to FOC

Page 21: Neuchatel - MH - 16Jun09 - ION-CH

FOC FOC ProcurementProcurement

EC EC ProgrammeProgramme ManagementManagementESA ESA ProcurementProcurement andand DesignDesign AgentAgent2009 2009 MilestonesMilestones

–– RefinedRefined ITTsITTs–– RefinedRefined ProposalsProposals–– Best Best andand Final Final OffersOffers (BAFO)(BAFO)–– FOC FOC ContractsContracts AwardAward

JanJan Feb Feb MarchMarch AprilApril May May JuneJune JulyJuly AugAug SeptSept Oct Nov Oct Nov DecDec

Page 22: Neuchatel - MH - 16Jun09 - ION-CH

GioveGiove A and A and GioveGiove B operationalB operationalIOV Phase onIOV Phase on--going: Launch in 2010going: Launch in 2010Full Deployment (FOC) Phase approvedFull Deployment (FOC) Phase approved–– 3.4 Billion Euro public funding3.4 Billion Euro public funding–– EC/ESA managementEC/ESA management

FOC procurement onFOC procurement on--going: contracts in 2009going: contracts in 2009Galileo services by 2013Galileo services by 2013

Galileo todayGalileo today

Page 23: Neuchatel - MH - 16Jun09 - ION-CH

Further information

http://www.europa.eu.int/dgs/energy_transport/galileohttp://www.esa.int/export/esaSA/navigation.htmlhttp://www.giove.esa.inthttp://www.gsa.europa.eu/go/galileo