Munich Satellite Navigation Summit 2009Munich Satellite Navigation Summit 2009
Galileo Galileo Development StatusDevelopment StatusDR. MARTIN HOLLREISERDR. MARTIN HOLLREISERGALILEO PROJECT OFFICE GALILEO PROJECT OFFICE -- EUROPEAN SPACE AGENCYEUROPEAN SPACE AGENCY
Navigare'09 Navigare'09 àà NeuchâtelNeuchâtel
GIOVE A/B
2011-2013
IOV PHASE FOC PHASE
2005 2008 2010 2005 2008 2010 20122012 -- 2014 2014 ……
44
Programme PhasesProgramme Phases
EXP PHASE
GALILEO SYSTEM CONTEXT AND SERVICES
EXTERNAL ORGANISATIONS
GALILEO SATELLITE-ONLY SERVICES
(SIS BASED)
GALILEO USER SEGMENT
GALILEO GLOBAL COMPONENT
GALILEO CORE INFRASTRUCTURE
GALILEO SPACE
SEGMENT
GALILEO CONTROL SEGMENT GALILEO
MISSION SEGMENT
SoL Centre
CS Centre
RLSP
GSP
TSP
REGIONALGNSS
COMPONENTS
SAR BEACONS*
OS
SoL
CS
PRS
ERIS
SAR FL
SAR RL
GALILEONAVIGATIONRECEIVERS
*An embedded Galileo receiver in the beacon is required to get access to the SAR RL service
GSMC
MEOLUT
EXTERNAL SYSTEMS/ADDED VALUE SERVICE PROVIDERS
REGIONAL GNSS COMPONENTS
LOCAL GNSS COMPONENTS
COMMERCIAL SERVICE
PROVIDERS
Enhanced/Complementary Services
CIVIL AVIATION AIS/ATC
BIPM/UTC(K) IERS/ITRF
Galileo Mission Support*Timing (GST-UTC, GGTO,...)*Geodesy (GRF-ITRF)*Search and Rescue
Non SIS Galileo Data
Commercial Data
*Indirect ERIS*EGNOS CDDS
COSPAS SARSAT RCC OTHER GNSS
(GPS, GLONASS)
SF
GACF
GSSULS
OSPFIPF
PTF
S-Band TC, TM
and Ranging L-Band Signal in SpaceC-BandMissionUp-Links
GroundControlSystem(GCS)
Galileo Space SegmentGSS - Galileo Sensor Station (nGRC, GRC)
PTF – Precise Time Facility
IPF – Integrity Processing Facility
OSPF – Orbitography and Synchronization Processing Facility
MGF – Message Generation Facility
ULS – Uplink Local Station
MUCF – MissionUplink and Control Facility
MSF – MissionSupport Facility
SPF – ServiceProduct Facility
M- and P-KMF – Mission and PRS Key Management Facility
GACF – Ground Assets Control Facility
MDDN – Mission Data Dissemination Network
MTPF – Maintenance andtraining platform Facility
SPF
x9 x40
M-KMF
MUCF
MSF
P-KMF …MGF
KeyMngmt
M&C data
Ground MissionSystem (GMS)
Integrity proc. Navigation proc.
Time ref.
Mission planning
Msg generation
Uplink scheduler
Mission support
M&C of Ground Assets
External products
…
GMS ArchitectureGMS Architecture
Munich Satellite Navigation Summit 2009Munich Satellite Navigation Summit 2009
Galileo Frequency PlanGalileo Frequency Plan
Galileo ServicesGalileo Services
Open Access
Commercial
Safety of Life
Search and Rescue
Free to air; Mass market; Simple positioning and timing
Encrypted; High accuracy; Guaranteed service
Open Service + Integrity and Authentication of signal
Encrypted; Integrity; Continuous availability
Near real-time; Precise; Return link feasible
Public Regulated
PVT
SAR
GIOVE AGIOVE A
3 YEARS in orbit 3 YEARS in orbit Novel orbit, signals and clockNovel orbit, signals and clockGalileo FilingGalileo FilingMission extendedMission extended
GIOVE BGIOVE B
Launched on 27 April 2008Launched on 27 April 2008Most stable clock in spaceMost stable clock in spaceMost advanced GNSS signalMost advanced GNSS signalPrecursor of IOVPrecursor of IOV
L1abc_CBOC{BOC(15,2.5)-c/BOC(1,1)-s/BOC(1,1)-s} Prime: Gain Step 7
-70.0
-60.0
-50.0
-40.0
-30.0
-20.0
-10.0
0.0
10.0
20.0
1530 1540 1550 1560 1570 1580 1590 1600 1610 1620
Frequency (MHz)
EIR
P (d
BW
/ 10
kHz
RB
W)
AIT Ref TC24: 08 May 08 @ 07:30
L1abc_CBOC{BOC(15,2.5)-c/BOC(1,1)-s/BOC(1,1)-s} Prime: Gain Step 7
-70.0
-60.0
-50.0
-40.0
-30.0
-20.0
-10.0
0.0
10.0
20.0
1530 1540 1550 1560 1570 1580 1590 1600 1610 1620
Frequency (MHz)
EIR
P (d
BW
/ 10
kHz
RB
W)
AIT Ref TC24: 08 May 08 @ 07:30
Munich Satellite Navigation Summit 2009Munich Satellite Navigation Summit 2009
IOVIOVININ--ORBIT VALIDATION PHASEORBIT VALIDATION PHASE
IOV status and plansIOV status and plans
Ground Segment Ground Segment CDRsCDRs completedcompletedEM Payload and Satellite test completionEM Payload and Satellite test completionPFM Satellite integration completionPFM Satellite integration completionSatellite CDR Q3 2009Satellite CDR Q3 2009GMS and GCS commissioning at GCCGMS and GCS commissioning at GCC--I and GCCI and GCC--DDGSS, ULS and TTC deployment on remote sitesGSS, ULS and TTC deployment on remote sitesIOT station commissioningIOT station commissioningLEOP OCC procurementLEOP OCC procurementSystem CDR end 2009System CDR end 2009System Integration and Verification 2009System Integration and Verification 2009--20102010Launch in 2010Launch in 2010
IOV Ground Segment IOV Ground Segment
Cordoba GSS
Troll GSS
Alaska GSS
Hawaii GSS
Papeete ULS/GSSEaster Island GSS
Washington GSS
Svalbard ULS/GSS
Kiruna TTC
Redu GSS
Fucino GSS
Riyadh GSS
Reunion ULS/GSS
South Africa GSS
Kourou TTC/ULS/GSS
Urumchi GSS
Perth GSS
New Caledonia ULS/GSS
S. Korea GSS
GSSULSTTC
GCCGCC--D (D (OberpfaffenhofenOberpfaffenhofen))
GCCGCC--I (I (FucinoFucino))
SS--band TM&TC Stationband TM&TC Station
TTCF Kiruna Antenna TTCF Kiruna Antenna Installed on site (AugInstalled on site (Aug’’08)08)
TTCF Kourou Antenna at Factory TTCF Kourou Antenna at Factory Acceptance (JulAcceptance (Jul’’08)08)
CC--band Upband Up--Link StationLink Station
IOV EM satellite IOV EM satellite
IOV STM SatelliteIOV STM Satellite
Soyuz Launch Range Soyuz Launch Range at Europeat Europe’’s spaceport s spaceport ((KourouKourou))
Munich Satellite Navigation Summit 2009Munich Satellite Navigation Summit 2009
FOCFOCFULL OPERATIONAL CAPABILITY PHASEFULL OPERATIONAL CAPABILITY PHASE
From IOV to FOCFrom IOV to FOC
FOC FOC ProcurementProcurement
EC EC ProgrammeProgramme ManagementManagementESA ESA ProcurementProcurement andand DesignDesign AgentAgent2009 2009 MilestonesMilestones
–– RefinedRefined ITTsITTs–– RefinedRefined ProposalsProposals–– Best Best andand Final Final OffersOffers (BAFO)(BAFO)–– FOC FOC ContractsContracts AwardAward
JanJan Feb Feb MarchMarch AprilApril May May JuneJune JulyJuly AugAug SeptSept Oct Nov Oct Nov DecDec
GioveGiove A and A and GioveGiove B operationalB operationalIOV Phase onIOV Phase on--going: Launch in 2010going: Launch in 2010Full Deployment (FOC) Phase approvedFull Deployment (FOC) Phase approved–– 3.4 Billion Euro public funding3.4 Billion Euro public funding–– EC/ESA managementEC/ESA management
FOC procurement onFOC procurement on--going: contracts in 2009going: contracts in 2009Galileo services by 2013Galileo services by 2013
Galileo todayGalileo today
Further information