17
Networking SIM Paul Dalli

Networking SIM Paul Dalli

  • Upload
    billie

  • View
    40

  • Download
    0

Embed Size (px)

DESCRIPTION

Networking SIM Paul Dalli. Official Work Order Network Engineering Team Background: - PowerPoint PPT Presentation

Citation preview

Page 1: Networking SIM Paul  Dalli

Networking SIMPaul Dalli

Page 2: Networking SIM Paul  Dalli

Official Work Order Network Engineering Team Background: The company has recently undergone an expansion program, which has resulted in the purchase of two remote sites

each located in Singapore and New Zealand respectively. This has necessitated the requirement to establish WAN connectivity between the sites. Although it has not yet been decided on what technology will be utilized for the WAN connectivity, an urgent requirement exists for the development of a prototype and business proposal to not only modernize the entire network infrastructure but to also select and configure an enhanced routing protocol that will support continued expansion and future modernization.

 Description of work to be performed Review the current network specification and recommend a routing process that will support the following:

Fast Convergence. VLSM. Authentication. Unequal cost load balancing. Cisco Discovery Protocol. Dot1q trunking.

Replace the current mixture of CISCO, NORTEL and JUNIPER routers with models that will support CDP and an advanced routing protocol for the business WAN.

Provide a subnetting scheme using the scheme at part 2. Provide a recommendation/justification for the upgrade of the current routers and equipment that will support the

business requirements. Provide all relevant documentation including:

Logical Topology diagram. Physical Topology diagram.

Test and troubleshoot the prototype, providing the results in a professional report. Provide a working prototype using relevant supporting prototyping software applications. Configure routers as DHCP servers to support the attached LANs. Provide a default route to the ISP router for all hosts to access the internet via the Headquarters router. ISP Router configuration Configure the ISP router with all basic configuration and security. Provide a Static route on the ISP router (summarizing all networks on the company Network) to direct all data back to

the company networks from the Web Server. The network address between the ISP and headquarters router is 189.54.69.265/30. The network between the ISP and Web server is 10.0.0.0/30.

Page 3: Networking SIM Paul  Dalli

Technical solution

Why?> Setting up new expansion for business

How is it a business solution?

Page 4: Networking SIM Paul  Dalli

Equipment requirements Headquaters site 1 X 1841 router with 4 serial and 2 fa. Interfaces 2 x Ethernet 2960 switches each connecting a Local area Network. Quantity of PCs representing the number of clients on each network segment. 1 X DNS Server to provide for Name resolution for the remote Web Server located at the ISP (

WWW.company.com). 1 X 19 inch rack for mounting all equipment. Power distribution for all equipment including backup power systems. Safety assessment sheet for the Telecommunications Room.

Remote Site 1 1 X 1841 router with four Serial and two FastEthernet interfaces. 2 x Ethernet 2960 switches each connecting a Local area Network. Quantity of PCs representing the number of clients on each network segment. 1 X 19 inch rack for mounting all equipment. Power distribution for all equipment including backup power systems. Safety assessment sheet for the Telecommunications Room.

Page 5: Networking SIM Paul  Dalli

Equipment requirements Remote Site 2 1 X 1841 router with four Serial and two FastEthernet interfaces. 2 x Ethernet 2960 switches each connecting a Local area Network. Quantity of PCs representing the number of clients on each network segment. 1 X 19 inch rack for mounting all equipment. Power distribution for all equipment including backup power systems. Safety assessment sheet for the Telecommunications Room.

ISP 1 x 1841 router (or other suitable router with two FastEthernet interfaces and at least one Serial interface to

connect to the ISP). 1 X remote Web server configured for HTTP: WWW.company.com. Cat 5 cabling as necessary. Serial cabling as necessary.

Page 6: Networking SIM Paul  Dalli

Subnet scheme Host Requirements:

Headquarters 90 hosts 60 hosts

Remote 1 60 hosts 30 hosts

Remote 2 128 hosts 60 hosts

Connections Between remote sites and Headquarters You will have to allow for the most efficient sub-networks to interconnect the sites as follows:

Both Remote1 and Remote2 will connect via WAN connection to Headquarters As a redundancy Remote1 will also connect to Remote 2 via a WAN connection

  The network address between the ISP and headquarters router is 189.54.69.264/30   The network between the ISP and Web server is 10.0.0.0/30

Page 7: Networking SIM Paul  Dalli

VLSM Addressing scheme

Page 8: Networking SIM Paul  Dalli

Existing model

Page 9: Networking SIM Paul  Dalli

Network Diagram

Page 10: Networking SIM Paul  Dalli

Physical Diagram

Page 11: Networking SIM Paul  Dalli

Router interface’s HQ router

Fast Ethernet 0/0 : 192.168.157.1/25 Fast Ethernet 0/1: 192.168.157.129/26

Serial0/0/0: 192.168.158.97/30 Serial0/0/1: 192.168.158. 101/30 Serial0/1/0: 189.54.69.65/30

  ISP router

Serial0/0/0: 189.54.69.66/30 Fast Ethernet0/0: 10.0.0.1/30

  Remote1 router

Fast Ethernet 0/0: 192.168.157.193/26 Fast Ethernet0/1: 192.168.158.65/27 Serial0/0/0: 192.168.158.98/30 Serial0/0/1: 192.168.158.105/30

  Remote2 router

Fast Ethernet 0/0: 192.168.156.1/24 Fast Ethernet 0/1: 192.168.158.1/26 Serial0/0/0: 192.168.158.106/30 Serial0/0/1: 192.168.158.102/30

Page 12: Networking SIM Paul  Dalli

Lan Switching and WirelessAim:• Configure Cisco 1841 router as r”outer on a stick”• Configure switch security and remote configuration via telnet• Configure all interfaces and trunk ports• Configure VTP servers and clients• Configure VLAN’s on switches• Configure RSTP• Configure inter-vlan routing

Page 13: Networking SIM Paul  Dalli

Official Work Order Network Engineering Team Background: The company has recently undergone an expansion program, which has resulted in the purchase of two remote sites each located in

Singapore and New Zealand respectively. This has necessitated the requirement to establish WAN connectivity between the sites. Although it has not yet been decided on what technology will be utilized for the WAN connectivity, an urgent requirement exists for the development of a prototype and business proposal to not only modernize the entire network infrastructure but to also select and configure an enhanced routing protocol that will support continued expansion and future modernization.

 Description of work to be performed Review the current network specification and recommend a routing process that will support the following:

Fast Convergence. VLSM. Authentication. Unequal cost load balancing. Cisco Discovery Protocol. Dot1q trunking.

Replace the current mixture of CISCO, NORTEL and JUNIPER routers with models that will support CDP and an advanced routing protocol for the business WAN.

Provide a subnetting scheme using the scheme at part 2. Provide a recommendation/justification for the upgrade of the current routers and equipment that will support the business

requirements. Provide all relevant documentation including:

Logical Topology diagram. Physical Topology diagram.

Test and troubleshoot the prototype, providing the results in a professional report. Provide a working prototype using relevant supporting prototyping software applications. Configure routers as DHCP servers to support the attached LANs. Provide a default route to the ISP router for all hosts to access the internet via the Headquarters router. ISP Router configuration Configure the ISP router with all basic configuration and security. Provide a Static route on the ISP router (summarizing all networks on the company Network) to direct all data back to the company

networks from the Web Server. The network address between the ISP and headquarters router is 189.54.69.265/30. The network between the ISP and Web server is 10.0.0.0/30.

Page 14: Networking SIM Paul  Dalli

Physical Topology

Page 15: Networking SIM Paul  Dalli

Remote2

S1 VTP server

Logical Topology

PC3

Page 16: Networking SIM Paul  Dalli

S2 VLAN Switch

ISP Router

S3 Backup Root-Bridge

Page 17: Networking SIM Paul  Dalli

Proposed Subnet SchemeDevice Interface IP Address Subnet Mask Default

GatewayFa0/1 - - -

Fa0/1.10 172.17.10.1 255.255.255.0 -

Remote2 Fa0/1.20 172.17.20.1 255.255.255.0 -

Fa0/1.30 172.17.30.1 255.255.255.0 -

Fa0/1.99 172.17.99.1 255.255.255.0 -

S1 VLAN99 172.17.99.11 255.255.255.0 172.17.99.1

S2 VLAN99 172.17.99.12 255.255.255.0 172.17.99.1

S3 VLAN99 172.17.99.13 255.255.255.0 172.17.99.1

PC1 NIC 172.17.10.21 255.255.255.0 172.17.10.1

PC2 NIC 172.17.20.22 255.255.255.0 172.17.20.1

PC3 NIC 172.17.30.23 255.255.255.0 172.17.30.1